1) PCC 1:4:8 cement, fine sand & 40mm gauge stone ballast i/c s/o all m/l, t&p etc required for
proper completion of the work.
Material for 100 Cuft
Stone ballast 2.83 Cum @ 606.00 1714.98
fine sand 1.42 Cum @ 736.00 1045.12
Cement 9.8 bags @ 312.90 3066.42
(A) Total 5826.52
Labour
Mistri 1/8 Nos @ 225.00 28.13
Mason 1/3 Nos @ 225.00 75.00
Beldar 4 Nos @ 125.00 500.00
Coolie 6 Nos @ 125.00 750.00
Bhisti 1 Nos @ 125.00 125.00
Black smith 1/8 Nos @ 225.00 28.13
T&P sundrieL.S. 1x25.00 25.00
Total 1531.25
add 1/6 holiday 255.21
Total 1786.46
add 10% Height index 178.65
Total 1965.10
add 10% C.P. 196.51
(B) Total 2161.61
Total of A+B 7988.13
Hence Rate per Cum 7988.13x35.315/100 2821.01
Say 2821.00 Per Cum
Name of Work :- C/o R/wall on Nahri gad motor bridge approach road at x/s 0/6 to Circle - 6th Uttarkashi
0/7 under nabard XIV.
C.B. No - 15/EE dated - 28-09-2009
Division - Pron Div. P.W.D. Bhatwari
Name of Contractor - Sri Saudan Singh Bisht
Name of work :- C/o R/wall on Nahri gad motor bridge approach road of
Name at Contractor
x/s 0/4 to 0/5 under
:- Sri nabard
Saudan XIV.
Singh
Agency :- CB No 10/AE Dated 07.10.09 Bisht
Name of work :- C/o R/wall on Nahri gad motor bridge approach road at x/s 0/6 to 0/7 under nabard XIV.
Agency :- CB No 15/EE Dated 28.09.09 Name of Contractor :- Sri Saudan Singh Bosht
Name of Work :- C/o R/wall on Nahri gad motor bridge approach road at x/s 0/6 to 0/7 under nabard XIV. Date of Start :- 28.9.09
Name Of Contractor :- sri Saudan singh Bisht Date of Comnpletion :- 27.10.09
Contract Bond :- 15/EE dated 28.09.09 Date of Actual Compleuion :- 10.11.09
S.N Name of Work Unit As per Estimate As per Contract Bond As per Actual Variation % Contract Remarks
o. Qty Rate Amount Qty Rate Amount Qty Rate Amount As per Bond As per Estimate Bond
Saving Excess Saving Excess
1 2 3 4 5 6 7 8.0 9.0 10 11 12 13 14 15 16 17 18
1/1 Excavation in
foundation in all
type of soil i/c s/o all
m/l, t&p etc required
for proper
Cum 407.50 55.0 22412.5 199.50 55.0 10972.5 88.58 55.00 4871.90 6100.60 17540.60 55.60
completion of the
work.
ckx.ku esa
leLr ek=k,a
yh x;h Fkh]
2/2 RR stone masonary fdUrq dk;Z
laid dry i/c s/o all LFky dh
m/l, t&p etc required cko';drkcksa
for proper
completion of the Cum 83.00 642.0 53286.0 37.62 642.0 24152.0 0.00 642.00 0.00 24152.04 53286.00 100.00 dks ns[krs gq,
dk;Z dh ykxr
work. dks de djk
fn;k x;kA
vuqca/k dks
ns[krq gq,
3/3 HP stone filling as
fopyu cf/kd
per direction of EIC. Cum 295.00 143.0 42185.0 112.00 143.0 16016.0 148.11 143.00 21179.73 5163.73 21005.27 32.24 gS]fdUrq
ckx.ku dks
4/4 RR stone masonary na[krs gq,
laid 1:6 cement, fopyu cpr dks
sand mortar i/c s/o iznf'kZr djrk
all m/l, t&p etc gSA
required for proper
completion of the Cum 378.70 1328.0 502913.6 109.13 1328.0 144924.6 138.82 1328.00 184352.96 39428.32 318560.64 27.21
work.
Name of Work :- C/o R/wall on Nahri gad motor bridge approach road at x/s 0/4 to 0/5 under nabard Date of Start :- 7.10.09
XIV.
Name Of Contractor :- sri Saudan singh Bisht Date of Comnpletion :- 6.11.09
Contract Bond :- 10/AE-II dated 7.10.09 Date of Actual Compleuion :- 4.11.09
S.N Name of Work Unit As per Estimate As per Contract Bond As per Actual Variation % Contract Remarks
o. Qty Rate Amount Qty Rate Amount Qty Rate Amount As per Bond As per Estimate Bond
Saving Excess Saving Excess
1 2 3 4 5 6 7 8.0 9.0 10 11 12 13 14 15 16 17 18
1/3 HP stone filling as
per direction of
engineer in charge. Cum 160.00 143.0 22880.0 160.00 143.0 22880.0 136.27 143.00 19486.61 3393.39 3393.39 14.83
vkx.ku
vuqekfur
2/4 RR stone masonary ek=k ij cuk;k
laid 1:6 cement, x;k Fkk]
sand mortar i/c s/o fdUrq
all m/l, t&p etc okLrfod
required for proper ek=kvksa esa
completion of the fopyu vk;k gS
Cum 110.00 1328.0 146080.0 110.00 1328.0 146080.0 89.12 1328.00 118351.36 27728.64 27728.64 18.98 tks fd vuqca/k
work.
dh ek=kvksa
ls de gSaA
Name of Work :- C/o R/wall on Nahri gad motor bridge approach road at x/s 0/6 to 0/7 Circle - 6th Uttarkashi
under nabard XIV.
C.B. No - 15/EE dated - 28-09-2009
Division - Pron Div. P.W.D. Bhatwari
Name of Contractor - Sri Saudan Singh Bisht