NAME OF WORK: Construction of Helipad at Harshil under deposit work of civil Aviation Department.
Item : Cement/Steel/Lime
Source Rishikesh
Distance 255 Km. Pucca motor road
Cartage
Distance from the No. of Km. Total Approved Rates For Pucca Add extra Total (e+f)
approved Quarry Cartage of Cartage (Rs.) (bxd) (Rs.) for Kutcha
Distance Kms
(km.)
Distance from the No. of Km. Total Approved Rates For Pucca Add extra Total
approved Quarry Cartage of Cartage (Rs.) (bxd) (Rs.) for Kutcha (e+f)
Distance Kms
(km.)
Distance from the No. of Km. Total Approved Rates For Pucca Add extra Total
approved Quarry Cartage of Cartage (Rs.) (bxd) (Rs.) for Kutcha (e+f)
Distance Kms
(km.)
Distance from the No. of Km. Total Approved Rates For Pucca Add extra Total (e+f)
approved Quarry Cartage of Cartage (Rs.) (bxd) (Rs.) for Kutcha
Distance Kms
(km.)
Distance from the No. of Km. Total Approved Rates For Pucca Add extra Total (e+f)
approved Quarry Cartage of Cartage (Rs.) (bxd) (Rs.) for Kutcha
Distance Kms
(km.)
Distance from the No. of Km. Total Approved Rates For Pucca Add extra Total (e+f)
approved Quarry Cartage of Cartage (Rs.) (bxd) (Rs.) for Kutcha
Distance Kms
(km.)
Item : Maxphalt
Source Bhatwari store
Distance 47 Km. Pucca motor road.
Cartage
Distance from the No. of Km. Total Approved Rates For Pucca Add extra Total (e+f)
approved Quarry Cartage of Cartage (Rs.) (bxd) (Rs.) for Kutcha
Distance Kms
(km.)
NAME OF WORK: Construction of Helipad at Harshil under deposit work of civil Aviation Department.
SL. No. Description Unit Quantity Rate Cost
Page 7 of 54
Analysis of Rates
Say 18.80 Per mtr
Page 8 of 54
Analysis of Rates
Page 9 of 54
Analysis of Rates
Page 10 of 54
Analysis of Rates
19 P/F of Soil or Vent pipe 110 mm dia of
approved quality i/c s/o all complete.
As per TS estimate
detail of cost for 17.35 m
Material
A 110 mm pipe
5% allowance for wastage Nos 10 493.00 4930.00
Scaffolding 246.50
cartage of material L.S. 3 x 15 45.00
L.S. 5 x 10 75.00
Labour Total 5296.50
B Fitter
Badhani Per day No 0.42 278.00 116.76
Beldar Per day No 0.21 153.00 32.13
Per day No 0.83 153.00 126.99
Total of A + B Total 275.88
add 1% water allowance 5572.38
55.72
add 10% C.P. Total 5628.10
562.81
hence rate per mtr G.Total 6190.91
6190.91 / 17.35 356.83
Say 357.00 Per Rmt
20 same as above 50 mm
cartage L.S.
Market Rate
Add 10% C.P. 50.00
Cartage L.S. 5.00
4.00
Total 59.00 Per Rmt
21 P/F of Nahani trap 110 mm dia inlet
75 mm dia outlet i/c cost of cutting
hole & making good the wall i/c s/o all
m/l , t&p etc all complete.
As per TS estimate
Material
A Cost of Nahani trap 110 x 75 mm dia
Cement, Sand, grit No 138.00 1.00 138.00
Cartage of material L.S. 2.50 15.00 37.50
L.S. 0.50 5 2.50
Labour Total 178.00
B Mason
Beldar Per day No 0.50 278.00 139.00
Per day No 0.50 153.00 76.50
Total of A+B Total 215.50
Add 10% C.P. 393.50
39.35
G.Total 432.85 Per No
Say 433.00 Per No
22 P/f of 15 mm dia 'B' class (jindal STC
marked) GI pipe complete with GI
special such as bends, Tee, socket,
cross, clamps etc cutting & making
good the wall etc i/c s/o all m/l, t&p
etc required for proper completion of
the work.
Page 11 of 54
Analysis of Rates
23 Providing at placing on terrace at all
floor levels polythylene water tank.
As per TS estimate
Cost of Brass bib cock (400gm)
Add cartage of material No 1 760.00 760.00
Add labour & white lead L.S. 5.00
L.S. 0.70 15.00 10.50
Add 10% C.P. Total 775.50
77.55
G. Total 853.05
Say 853.00 Per No
25 Same as above but wall mixture of
Jaquar make.
as per TS estimate
Cost of Mixture
Add cartage of material No 1 2680.00 2680.00
Add labour & white lead L.S. 5.00
L.S. 1.00 50.00 50.00
Add 10% C.P. Total 2735.00
273.5
G. Total 3008.50
Say 3009.00 Per No
26 S/F of indian type W/C sheet of
parryware make with cystern.
Providing and fixing white vitreous as per SOR 24826 1014.70
china pedestal type (European
type/wash down type) water closet.
Extra for using coloured pedestal type as per SOR 24827 1113.90
W.C pan (European type) with low
level cistern of
Total 2128.60
G.Total 2128.60 Per No
27 S/F of Towel rod of Stainless steel with
Jaquar make.
As per TS estimate
Market Rate
Add Fitting charges No 1 1080.00 1080.00
Add cartage L.S. 1 20.00 20.00
L.S. 1 20.00 20.00
Add 10% C.P. Total 1120.00
112.00
G.Total 1232.00 Per No
28 S/F of C.P. Soap dish of Jaquar make.
as per TS estimate
Market Rate
Add Fitting charges No 1 808.00 808.00
Add cartage L.S. 1 20.00 20.00
L.S. 1 20.00 20.00
Add 10% C.P. Total 848.00
84.80
G.Total 932.80 Per No
Page 12 of 54
Analysis of Rates
29 S/F of C.P. angle cock of Jaquar make.
as per TS estimate
Market Rate
Add Fitting charges No 1 600.00 600.00
Add cartage L.S. 1 20.00 20.00
L.S. 1 20.00 20.00
Add 10% C.P. Total 640.00
64.00
G.Total 704.00 Per No
30 S/F of 24 BWG CGI sheet for roofing
i/c s/o all materials,labour,t&p etc all
complete.
Page 13 of 54
Analysis of Rates
Page 14 of 54
DETAIL OF MEASUREMENTS
NAME OF WORK: Construction of Helipad at Harshil under deposit work of civil Aviation Department.
S.No Particulars of Items Nos Nos Length Breadth Height Qty Unit
1 2 3 4 5 6 7 8 9
1 Class M-100 brick thick work in 1:6
cement sand mortar in super structure
i/c s/o all material, labour t&p etc
required for proper completion of the
work.
waiting room and varamanda long wall 1 3 3.00 0.23 0.52 1.07
Say 1613.17 kg
4 4.0 cm thick 1:2:4 cement concrete
floor with 7.5 cm thick 1:5:10 base
concrete with c/sand & 20 mm gauge
s/ballast i/c s/o all m/l , t&p etc
required for proper completion of the
work.
1 2 13.00 26.00
1 2 6.80 13.60
sunshed window 1 4 2.60 10.40
verandah 1 1 8.50 8.50
Total 58.50 Rmt
say 59.00 Rmt
S.No Particulars of Items Nos Nos Length Breadth Height Qty Unit
1 2 3 4 5 6 7 8 9
10 Finishing of walls with dulux multy
surface paint two or more shade in two
or nore coat.
in T1 & T2 2 1 2.00
Total 2.00 No
Say 2.00 No
T1 1 1 3.25 3.25
1 1 4.50 4.50
T2 1 1 3.25 3.25
1 1 4.50 4.50
for tank 1 1 10.80 10.80
Total 26.30 Rmt
Providing at placing on terrace at all
floor levels polythylene water tank.
23
1 1 250.00
Total 250.00 ltr
24 S/f of bib cock (1.27cm) 1/2"dia i/c s/o
all m/l, t&p etc required proper
completion of the work. Jaquar make.
8 1 8.00
Total 8.00 N0
1 2 3 4 5 6
1 #REF! #REF! Cum #REF! 47.00 #REF!
Total #REF!
Below 33.30% as per bond #REF!
Total A #REF!
Say #REF!
NAME OF WORK: Construction of Helipad at Harshil under deposit work of civil Aviation Department.
3 4.0 cm thick 1:2:4 cement concrete floor with 7.5 cm 295.00 Sqm 519.44 153234.06
thick 1:5:10 base concrete with c/sand & 20 mm gauge
s/ballast i/c s/o all m/l , t&p etc required for proper
completion of the work.
4 20 mm thick plaster with 1:2 cement & fine sand on dado or 22.00 Sqm 226.80 4989.60
skirting laid in panels finished with 3mm floating coat of
cement i/c s/o all material, labour, t&p etc required for proper
completion of the work.
5 12 mm thick plaster in 1:6 cement, sand mortar i/c s/o all m/l, 307.00 Sqm 107.40 32971.80
t&p etc required for proper completion of the work.
6 Same as above item but extra over rough face of brick 154.00 sqm 96.30 14830.20
wall (15mm and 12mm).
7 Add extra labour & material for making of drip course 59.00 Rmt 18.80 1109.20
(20x30mm) in projection of roof & sun shade. Completion as
per direction of EIC.
8 Rendering of roof slab with 1:3 cement & coarse sand mortar 6 86.00 Sqm 64.30 5529.80
mm thick just after RCC slab i/c all material, labour, t&p etc
required for proper completion of the work.
9 Finishing of walls with dulux multy surface paint two or more 115.00 Sqm 83.00 9545.00
shade in two or nore coat.
10 Painting on new iron works with two coats of approved paint 52.00 sqm 71.90 3738.80
including cost of supply of all materials, labour, T&P etc.
required for proper completion of the work as per direction of
Engineer-in-charge.
11 Supply & fixing of security grill over window as per 7.20 Sqm 779.00 5608.80
drawing or as per instruction of engineer in charge i/c
welding & supply of all materails, labours, t&p etc
required for proper completion of the work.
12 S/F of Galavanized mosquito proof wire mesh over 9.00 Sqm 180.00 1620.00
window with chir wood beading i/c s/o all m/l t&p etc
required for proper completion of the work.
13 Supply & fixing of heavy quality aprooved anodized 16.00 sqm 290.00 4640.00
aluminium fitting for door & window with necessary ms
hinges, steel screw, nut, bolts & other material as per
requirement.
14 M.S./Tor steel or iron work in plain work such as in 1613.17 Kg 61.40 99048.64
reinforcement cement concrete brought to required shape
as necessary including binding for proper shape including
cost of supply of all materials, labour, T&P etc. required
for proper completion of the work.
15 Providing and fixing panelled or panelled and glazed shutters 20.00 Sqm 1795.10 35902.00
for doors, windows Second class teak wood 35 mm thick
shutters.
16 Distempering with oil bound washable distemper of approved 255.00 Sqm 59.30 15121.50
brand and New work (two or more coats) over and including
priming coat with cement primer.
Total 522481.31
Say 522481.31
NAME OF WORK: Construction of Helipad at Harshil under deposit work of civil Aviation
Department.
18 P/f of white glazed viterious china wash basin R.S. or 2.00 No 1684.50 3369.00
C.I. basin painted white crome polish with stand of
parryware company, piller tab of Jaquar com. & union
complete.
19 P/F of Soil or Vent pipe 110 mm dia of approved 21.00 Rmt 357.00 7497.00
quality i/c s/o all complete.
20 same as above 50 mm 16.00 Rmt 59.00 944.00
21 P/F of Nahani trap 110 mm dia inlet 75 mm dia outlet 4.00 Nos 433.00 1732.00
i/c cost of cutting hole & making good the wall i/c s/o
all m/l , t&p etc all complete.
22 P/f of 15 mm dia 'B' class (jindal STC marked) GI pipe 26.30 Rmt 150.60 3960.78
complete with GI special such as bends, Tee, socket,
cross, clamps etc cutting & making good the wall etc
i/c s/o all m/l, t&p etc required for proper completion
of the work.
23 Providing at placing on terrace at all floor levels 250.00 Ltr 6.30 1575.00
polythylene water tank.
24 S/f of bib cock (1.27cm) 1/2"dia i/c s/o all m/l, 8.00 N0 853.00 6824.00
t&p etc required proper completion of the work.
Jaquar make.
25 Same as above but wall mixture of Jaquar make. 2.00 No 3009.00 6018.00
26 S/F of indian type W/C sheet of parryware make 2.00 Nos 2128.60 4257.20
with cystern.
27 S/F of Towel rod of Stainless steel with Jaquar 2.00 Nos 1232.00 2464.00
make.
28 S/F of C.P. Soap dish of Jaquar make. 2.00 Nos 932.80 1865.60
29 S/F of C.P. angle cock of Jaquar make. 6.00 Nos 704.00 4224.00
30 S/F of 4" dia C.I.waste pipe i/c s/o all m/l, t&p 14.50 Rmt 291.00 4219.50
etc required for proper completion of the work.
31 Providing & fixing of C.I. plain bends 5 to 10 cm dia i/c 5.00 Nos 128.00 640.00
s/o all m/l, t&p etc required for proper completion of
the work.
32 Centring and shuttering including strutting,ropping 80.00 Sqm 252.10 20168.00
etc. and removal of form for Suspended floors, roofs,
landings, balconies and access platform & all type of
structure.
Total 722875.64
Say 722875.00
NAME OF WORK: Construction of Helipad at Harshil under deposit work of civil Aviation
Department.
Total D #REF!
Total of A+B+C+D #REF!
Say #REF!
NAME OF WORK: Construction of Helipad at Harshil under deposit work of civil Aviation
Department.
32 Type I/14 GI roof & GI wall 1963 Painting, flooring, apron & change of GI sheet
33 Type I/15 GI roof & GI wall 1963 Painting, flooring, apron & change of GI sheet
34 Type I/16 GI roof & GI wall 1963 Painting, construction of drain, repairing of floor change of GI roof
35 Type I/17 GI roof & GI wall 1963 Painting, construction of drain, repairing of floor change of GI roof
36 Type I/18 GI roof & GI wall 1963 Painting, construction of drain, repairing of floor change of GI roof
37 Type I/19 GI roof & GI wall 1963 Painting, construction of drain, repairing of floor change of GI roof
38 Type I/20 GI roof & GI wall 1963 Painting, construction of drain, repairing of floor change of GI roof
39 Type I/21 GI roof & GI wall 1963 Painting & flooring
40 Type I/22 GI roof & GI wall 1963 Painting & flooring
41 Type I/23 GI roof & GI wall 1963 Painting & flooring
42 Type I/24 GI roof & GI wall 1963 Painting & flooring
43 Type I/25 GI roof & GI wall 1963 Painting & flooring
44 Type I/26 GI roof & GI wall 1963 Painting & flooring
45 Type I/27 GI roof & GI wall 1963 Painting & flooring
46 Type I/28 GI roof & GI wall 1963 Painting & flooring
47 Type I/29 GI roof & GI wall 1963 Painting & flooring
48 Type I/30 GI roof & GI wall 1963 Painting & flooring
49 Type I/31 GI roof & GI wall 1963 Painting & flooring
50 Type I/32 GI roof & GI wall 1963 Painting & flooring
51 Type I/33 GI roof & GI wall 1963 Painting & flooring
52 Type I/34 GI roof & GI wall 1963 Painting & flooring
53 Type I/35 GI roof & GI wall 1963 Painting & flooring
54 Type I/36 GI roof & GI wall 1963 Painting & flooring
55 Type I/37 GI roof & GI wall 1963 Painting & flooring
56 Type I/38 GI roof & GI wall 1963 Painting & flooring
57 Type I/39 GI roof & GI wall 1963 Painting & flooring
58 Type I/40 GI roof & GI wall 1963 Painting & flooring
59 Type I/41 GI roof & GI wall 1963 Painting & flooring
60 Type I/42 GI roof & GI wall 1963 Painting & flooring
61 Type I/43 GI roof & GI wall 1963 Painting & flooring
62 Type I/44 GI roof & GI wall 1963 Painting & flooring
Comparitive Statement
NAME OF WORK: Construction of Helipad at Harshil under deposit work of civil Aviation Department.
Sl Items Unit As per TS estimate As per Bond As per Actual work to be done
no
Qty Rate Amount Qty Rate Amount Qty Rate Amount Qty Rate Amount
1 #REF! Cum 730.00 47.60 34748.00 730.00 47.00 34310.00 554.00 47.00 26038.00 -176.00 47.00 -8272.00
2 #REF! Cum 8790.00 279.00 2452410.00 8790.00 275.00 2417250.00 11667.00 275.00 3208425.00 2877.00 275.00 791175.00
3 #REF! Cum 48.00 4364.00 209472.00 48.00 4200.00 201600.00 48.00 4200.00 201600.00 0.00 4200.00 0.00
4 #REF! Cum 683.00 1115.00 761545.00 683.00 1100.00 751300.00 494.00 1100.00 543400.00 -189.00 1100.00 -207900.00
5 #REF! Cum 190.00 533.00 101270.00 190.00 530.00 100700.00 167.00 530.00 88510.00 -23.00 530.00 -12190.00
6 #REF! Cum 230.00 2340.00 538200.00 230.00 2450.00 563500.00 374.70 2450.00 918015.00 144.70 2450.00 354515.00
7 #REF! Sqm 70.00 71.00 4970.00 70.00 65.00 4550.00 70.00 65.00 4550.00 0.00 65.00 0.00
8 #REF! Cum 0.00 86.00 59.00 5074.00 122.00 59.00 7198.00 36.00 59.00 2124.00
9 #REF! Cum 0.00 11.50 2150.00 24725.00 83.00 2150.00 178450.00 71.50 2150.00 153725.00
10 Class M-100 brick thick work in 1:6 Cum 0.00 32.50 3200.00 104000.00 36.10 3200.00 115520.00 3.60 3200.00 11520.00
cement sand mortar in super
structure i/c s/o all material, labour
t&p etc required for proper
completion of the work.
11 Same as above but brick masonary in Cum 0.00 35.00 3500.00 122500.00 0.00 3500.00 0.00 -35.00 3500.00 -122500.00
one wall brick in super structure etc
required for proper completion of the
work.
12 #REF! Cum 0.00 6.00 4800.00 28800.00 17.10 4800.00 82080.00 11.10 4800.00 53280.00
13 4.0 cm thick 1:2:4 cement concrete Sqm 0.00 50.00 275.00 13750.00 295.00 275.00 81125.00 245.00 275.00 67375.00
floor with 7.5 cm thick 1:5:10 base
concrete with c/sand & 20 mm gauge
s/ballast i/c s/o all m/l , t&p etc
required for proper completion of the
work.
14 Same as above but floor 4cm thick Sqm 0.00 7.50 150.00 1125.00 0.00 150.00 0.00 -7.50 150.00 -1125.00
without base concrete.
15 20 mm thick plaster with 1:2 cement Sqm 0.00 7.50 130.00 975.00 22.00 130.00 2860.00 14.50 130.00 1885.00
& fine sand on dado or skirting laid in
panels finished with 3mm floating
coat of cement i/c s/o all material,
labour, t&p etc required for proper
completion of the work.
16 #REF! Rmt 0.00 125.00 15.00 1875.00 63.00 15.00 945.00 -62.00 15.00 -930.00
17 12 mm thick plaster in 1:6 cement, Sqm 0.00 353.00 140.00 49420.00 307.00 140.00 42980.00 -46.00 140.00 -6440.00
sand mortar i/c s/o all m/l, t&p etc
required for proper completion of the
work.
18 Same as above item but extra over Sqm 0.00 176.50 7.00 1235.50 154.00 7.00 1078.00 -22.50 7.00 -157.50
rough face of brick wall (15mm and
12mm).
19 #REF! Rmt 0.00 101.00 9.00 909.00 101.00 9.00 909.00 0.00 9.00 0.00
20 Add extra labour & material for Rmt 0.00 58.00 18.00 1044.00 59.00 18.00 1062.00 1.00 18.00 18.00
making of drip course (20x30mm) in
projection of roof & sun shade.
Completion as per direction of EIC.
21 Finishing of walls with dulux multy Sqm 0.00 353.00 35.00 12355.00 115.00 35.00 4025.00 -238.00 35.00 -8330.00
surface paint two or more shade in
two or nore coat.
22 Painting on new iron works with two Sqm 0.00 54.00 60.00 3240.00 52.00 60.00 3120.00 -2.00 60.00 -120.00
coats of approved paint including cost
of supply of all materials, labour, T&P
etc. required for proper completion
of the work as per direction of
Engineer-in-charge.
23 Supply & fixing of security grill over Sqm 0.00 7.20 750.00 5400.00 7.20 750.00 5400.00 0.00 750.00 0.00
window as per drawing or as per
instruction of engineer in charge i/c
welding & supply of all materails,
labours, t&p etc required for proper
completion of the work.
24 S/F of Galavanized mosquito proof Sqm 0.00 9.00 180.00 1620.00 9.00 180.00 1620.00 0.00 180.00 0.00
wire mesh over window with chir
wood beading i/c s/o all m/l t&p etc
required for proper completion of the
work.
25 Supply & fixing of heavy quality Sqm 0.00 17.00 160.00 2720.00 16.00 160.00 2560.00 -1.00 160.00 -160.00
aprooved anodized aluminium fitting
for door & window with necessary ms
hinges, steel screw, nut, bolts & other
material as per requirement.
26 #REF! Sqm 0.00 96.00 120.00 11520.00 198.00 120.00 23760.00 102.00 120.00 12240.00
27 Reinforced cement concrete in Sqm 0.00 13.00 5000.00 65000.00 18.00 5000.00 90000.00 5.00 5000.00 25000.00
proportion of 1:1.5:3 (M-20) in
cement, coarse sand and 20mm
gauge stone grit as per specification
and drawing including cost of
material, labour, T&P etc. required
for proper completion of the work.
For roof slab & roof beams.
28 M.S./Tor steel or iron work in plain Qtl 0.00 21.00 4900.00 102900.00 22.00 4900.00 107800.00 1.00 4900.00 4900.00
work such as in reinforcement
cement concrete brought to required
shape as necessary including binding
for proper shape including cost of
supply of all materials, labour, T&P
etc. required for proper completion
of the work.
29 Cement concrete with cement, Cum 0.40 3500.00 1400.00 0.00 3500.00 0.00 -0.40 3500.00 -1400.00
c/sand & 20 mm gauge s/ballast in
proportion of 1:2:4 in hold fast i/c s/o
all m/l, t&p etc required for proper
completion of the work.
30 Providing and fixing panelled or Sqm 0.00 9.70 1200.00 11640.00 11.00 1200.00 13200.00 1.30 1200.00 1560.00
panelled and glazed shutters for
doors, windows Second class teak
wood 35 mm thick shutters.
31 Distempering with oil bound Sqm 0.00 7.20 1400.00 10080.00 9.00 1400.00 12600.00 1.80 1400.00 2520.00
washable distemper of approved
brand and New work (two or more
coats) over and including priming
coat with cement primer.
32 #REF! Cum 0.00 0.40 53000.00 21200.00 0.40 53000.00 21200.00 0.00 53000.00 0.00
4677717.50 5790030.00 1112312.50
deduct 33.30% as per bond -1557679.93 -1928079.99 -370400.06
Total 3120037.57 3861950.01 741912.44
33 #REF! Cum 0.00 0.00 54.00 1527.00 82458.00 54.00 1527.00 82458.00
34 Providing and laying vitrified floor Sqm 0.00 0.00 255.00 53.00 13515.00 255.00 53.00 13515.00
tiles in different sizes (thicknessto be
specified Size of Tile 60x60 cm.
35 #REF! Sqm 0.00 0.00 102.50 198.00 20295.00 102.50 198.00 20295.00
36 P/f of white glazed viterious china No 0.00 0.00 2.00 3349.00 6698.00 2.00 3349.00 6698.00
wash basin R.S. or C.I. basin painted
white crome polish with stand of
parryware company, piller tab of
Jaquar com. & union complete.
37 same as above 50 mm Rmt 0.00 0.00 21.00 357.00 7497.00 21.00 357.00 7497.00
38 #REF! Rmt 0.00 0.00 16.00 59.00 944.00 16.00 59.00 944.00
39 P/F of Nahani trap 110 mm dia inlet No 0.00 0.00 4.00 433.00 1732.00 4.00 433.00 1732.00
75 mm dia outlet i/c cost of cutting
hole & making good the wall i/c s/o
all m/l , t&p etc all complete.
42 S/f of bib cock (1.27cm) 1/2"dia i/c No 0.00 0.00 8.00 853.00 6824.00 8.00 853.00 6824.00
s/o all m/l, t&p etc required proper
completion of the work. Jaquar make.
43 Same as above but wall mixture of No 0.00 0.00 2.00 3009.00 6018.00 2.00 3009.00 6018.00
Jaquar make.
44 S/F of indian type W/C sheet of No 0.00 0.00 2.00 2662.00 5324.00 2.00 2662.00 5324.00
parryware make with cystern.
45 S/F of Towel rod of Stainless steel No 0.00 0.00 2.00 1232.00 2464.00 2.00 1232.00 2464.00
with Jaquar make.
46 S/F of C.P. Soap dish of Jaquar make. No 0.00 0.00 2.00 932.80 1865.60 2.00 932.80 1865.60
47 S/F of C.P. angle cock of Jaquar make. No 0.00 0.00 6.00 704.00 4224.00 6.00 704.00 4224.00
48 S/F of 4" dia C.I.waste pipe i/c s/o all Rmt 0.00 0.00 14.50 291.00 4219.50 14.50 291.00 4219.50
m/l, t&p etc required for proper
completion of the work.
49 Providing & fixing of C.I. plain bends 5 No 0.00 0.00 5.00 128.00 640.00 5.00 128.00 640.00
to 10 cm dia i/c s/o all m/l, t&p etc
required for proper completion of the
work.
50 #REF! Cum 0.00 0.00 257.00 739.00 189923.00 257.00 739.00 189923.00
51 #REF! Cum 0.00 0.00 257.00 689.00 177073.00 257.00 689.00 177073.00
52 #REF! Sqm 0.00 0.00 769.00 298.00 229162.00 769.00 298.00 229162.00
Grant Total 4102615.00 3120037.57 4630033.31 1509995.74
Contingency 164104.60 Contingency 185201.33
Total 4266719.60 Total 4815234.64
Say 42.67 lac Say 48.15 lac
SCHEDULE
Name Of Work:-Construction of Helipad at harshil-under
"B" deposit work of civil Aviation
Department .
Rate
Sl No Item Of Work Qty Unit Per
In Figure In Words
Class M-100 brick thick work in 1:6 9.00 Cum Cum 5419.00
cement sand mortar in super structure Rs. Five thousand
1 i/c s/o all material, labour t&p etc four hundred
required for proper completion of the Nineteen only
work.
2 Reinforced cement concrete in 13.70 Cum Cum 6264.30
proportion of 1:1.5:3 (M-20) in cement,
coarse sand and 20mm gauge stone grit
as per specification and drawing Rs. Six thousand two
hundred sixty four
including cost of material, labour, T&P
paise thirty only
etc. required for proper completion of
the work. Raft, column & lintel. in roof
and beams
3 4.0 cm thick 1:2:4 cement concrete floor 295.00 Sqm Sqm 519.44
with 7.5 cm thick 1:5:10 base concrete Rs.five hundred
with c/sand & 20 mm gauge s/ballast i/c nineteen paise fortyfour
s/o all m/l , t&p etc required for proper only
completion of the work.
4 20 mm thick plaster with 1:2 cement & 22.00 Sqm Sqm 226.80
fine sand on dado or skirting laid in Rs. Two hundred
panels finished with 3mm floating coat
twenty six paise
of cement i/c s/o all material, labour, t&p
etc required for proper completion of the eighty only
work.
5 12 mm thick plaster in 1:6 cement, sand 307.00 Sqm Sqm 107.40
mortar i/c s/o all m/l, t&p etc required for Rs. One hundred
proper completion of the work. seven paise forty only
6 Same as above item but extra over 154.00 Sqm Sqm 96.30 Rs. Ninety six paise
rough face of brick wall (15mm and thirty only
12mm).
7 Add extra labour & material for making 59.00 Sqm Sqm 18.80
of drip course (20x30mm) in projection Rs.Eighteen paise
of roof & sun shade. Completion as per eighty only
direction of EIC.
8 Rendering of roof slab with 1:3 cement & 86.00 Sqm Sqm 64.30
coarse sand mortar 6 mm thick just after Rs. Sixty four paise
RCC slab i/c all material, labour, t&p etc
required for proper completion of the thirty only
work.
9 Finishing of walls with dulux multy 115.00 Sqm Sqm 83.00
surface paint two or more shade in two Rs. Eighty three only
or nore coat.
10 Painting on new iron works with two 52.00 Sqm Sqm 71.90
coats of approved paint including cost
of supply of all materials, labour, T&P Rs. Seventy one paise
etc. required for proper completion of ninety only
the work as per direction of Engineer-in-
charge.
11 Supply & fixing of security grill over 7.20 Sqm Sqm 779.00
window as per drawing or as per
instruction of engineer in charge i/c Rs.Seven hundred
welding & supply of all materails, seventy nine only
labours, t&p etc required for proper
completion of the work.
12 S/F of Galavanized mosquito proof wire 9.00 Sqm Sqm 180.00
mesh over window with chir wood Rs. One hundred
beading i/c s/o all m/l t&p etc required
eighty only
for proper completion of the work.
15 Providing and fixing panelled or 20.00 Sqm Sqm 1795.10 Rs. One thousand
panelled and glazed shutters for doors, seven hundred ninety
windows Second class teak wood 35
mm thick shutters. five paise ten only
16 Distempering with oil bound washable 255.00 Sqm Sqm 59.30
distemper of approved brand and New Rs, fifty nine paise
work (two or more coats) over and
including priming coat with cement thirty only
primer.
17 Providing and laying vitrified floor tiles 102.50 Sqm Sqm 1274.50 Rs. One thousand two
in different sizes (thicknessto be hundred seventy four
specified Size of Tile 60x60 cm.
paise fifty only
18 P/f of white glazed viterious china wash 2.00 Nos Nos 1684.50
basin R.S. or C.I. basin painted white Rs. One thousand six
crome polish with stand of parryware hundred eighty four
company, piller tab of Jaquar com. & paise fifty only
union complete.
19 P/F of Soil or Vent pipe 110 mm dia of 21.00 Rmt Rmt 357.00 Rs. Three hundred
approved quality i/c s/o all complete. fifty seven only
20 same as above 50 mm 16.00 Rmt Rmt 59.00
Rs. Fifty nine only
21 P/F of Nahani trap 110 mm dia inlet 75 4.00 Nos Nos 433.00
mm dia outlet i/c cost of cutting hole & Rs, four hundred
making good the wall i/c s/o all m/l , t&p thirty three only
etc all complete.
22 P/f of 15 mm dia 'B' class (jindal STC 26.30 Rmt Rmt 150.60
marked) GI pipe complete with GI Rs, one hundred fifty
special such as bends, Tee, socket, paise sixty only
cross, clamps etc cutting & making
good the wall etc i/c s/o all m/l, t&p etc
23 required
Providingfor
at proper
placingcompletion
on terrace atof all
the 250.00 Rmt Rmt 322.10 Rs, three hundred
work.levels polythylene water tank.
floor twenty two paise ten
only
24 S/f of bib cock (1.27cm) 1/2"dia i/c s/o all 8.00 No Nos 853.00
m/l, t&p etc required proper completion Rs. Eight hundred
of the work. Jaquar make. fifty three only
30 S/F of 4" dia C.I.waste pipe i/c s/o all m/l, 14.50 Rmt Rmt 291.00
t&p etc required for proper completion Rs, two hundred
of the work. ninety one only
31 Providing & fixing of C.I. plain bends 5 5.00 Nos Nos 128.00
to 10 cm dia i/c s/o all m/l, t&p etc Rs, one hundred
required for proper completion of the twenty eight only
work.
32 Centring and shuttering including 80.00 Sqm Sqm 252.10
strutting,ropping etc. and removal of
form for Suspended floors, roofs, Rs. Two hundred fifty
landings, balconies and access platform two paise ten only
& all type of structure.
Contractor
6 Same as above but 75 mm dia Mtr 16.00 59.00 944.00 16.00 59.00 944.00 16.00 59.00 944.00 16.00 59.00 944.00 nil nil nil
7 P/F of Nahani trap 110 mm dia
inlet 75 mm dia outlet i/c cost of
cutting hole & making good the
wall i/c s/o all m/l , t&p etc all No 4.00 433.00 1732.00 4.00 433.00 1732.00 4.00 433.00 1732.00 4.00 433.00 1732.00 nil nil nil
complete.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
8 P/F of Manhole cover (45x45)cm
or (60x60) cm inside size double
seal frame of approved quality i/c
s/o all m/l, t&p etc required for
proper completion of the work. No 4.00 855.00 3420.00 4.00 855.00 3420.00 4.00 855.00 3420.00 4.00 855.00 3420.00 nil nil nil
14 S/F of Soap dish No 2.00 932.80 1865.60 2.00 932.80 1865.60 2.00 932.80 1865.60 2.00 932.80 1865.60 nil nil nil &rnSo&
15 S/F of angle cock. No 6.00 704.00 4224.00 6.00 704.00 4224.00 6.00 704.00 4224.00 6.00 704.00 4224.00 nil nil nil &rnSo&
167065.80 167065.80 167065.80 167065.80
2 Two Coat of oil bond Distemper surface i/c s/o 255.00 Sqm 53.00 Rs Fifty three only.
all material, labour, t&p etc required for proper
completion of the work.
3 Supply & fixing of tiles in flooring & dado in 1:3 102.50 Sqm 198.00 Rs One hundred
cement, c/sand mortar i/c s/o all m/l, t&p etc all ninty eight only.
complete.
4 P/f of white glazed viterious china wash basin 2.00 No 3349.00 Rs three thousand
R.S. or C.I. basin painted white crome polish with three hundred forty
stand of parryware company, piller tab of Jaquar nine only.
com. & union complete.
5 P/F of Soil or Vent pipe 110 mm dia of approved 21.00 Mtr 357.00 Rs Three hundred
quality i/c s/o all complete. fifty seven only.
6 Same as above but 75 mm dia 16.00 Mtr 59.00 Rs Fifty nine only.
7 P/F of Nahani trap 110 mm dia inlet 75 mm dia 4.00 No 433.00 Rs four hundred
outlet i/c cost of cutting hole & making good the thirty three only.
wall i/c s/o all m/l , t&p etc all complete.
9 P/f of 15 mm dia 'B' class (jindal STC marked) GI 26.30 Mtr 144.00 Rs One hundred
pipe complete with GI special such as bends, forty four only.
Tee, socket, cross, clamps etc cutting & making
good the wall etc i/c s/o all m/l, t&p etc required
for proper completion of the work.
10 S/f of bib cock (1.27cm) 1/2"dia i/c s/o all m/l, 8.00 No 853.00 Rs Eight hundred
t&p etc required proper completion of the work. fifty three only.
Jaquar make.
11 Same as above but wall mixture of Jaquar make. 2.00 No 3009.00 Rs Three thousand
nine only.
Page 47 of 54
12 S/F of indian type W/C sheet of parryware make 2.00 No 2662.00 Rs Two thousand six
with cystern. hundred sixty two
only.
13 S/F of Towel rod of Stainless steel with Jaquar 2.00 No 1232.00 Rs One thousand
make. two hundred thirty
two only.
1 I/we hereby agree to execute the above work..............……………….....................% above/below/at par the rates
filled as above.
2
I/We tender my/our rates as above after taking fully into consideration the specification, special condition of
the department for the above work and rate quoted above are inclusive of all leads, lifts, royalty, municipal
octroi and toll charges and other incident expenses.
3
I/we given below my/our permanent address. Any change in the address shall be intimated by me/us from time
to time in writing to the engineer in charge. We shall make necessary arrangements at all times to receive any
notes, orders and communication that will be issued and sent to me/us at this address. If any letter
communication is received back to sender undelivered, it will be deemed to have been delivered to me/us and
the department will be free to take action in view of the same without entitling me/us for any claim what so
ever on this account.
contractor
(Name and full address)
Page 48 of 54
1 2 3 4 5 6 7 8 9
1/1
Excavation in foundation in all type of soil i/c
0.00 516.17 516.17 s/o all m/l, t&p etc required for proper 47.00 24259.99 24259.99 0.00
completion of the work.
2/2
0.00 452.76 452.76 RR stone masonary laid in 1:6 cement, sand 1100.00 498036.00 498036.00 0.00
mortar i/c s/o all m/l, t&p etc required for
proper completion of the work.
4/4
RR stone masonary laid dry i/c s/o all m/l, t&p
0.00 151.30 151.30 etc required for proper completion of the 530.00 80189.00 80189.00 0.00
work.
5/5
0.00 11099.19 11099.19 Filling work by river bed materials i/c watering 275.00 3052277.25 3052277.25 0.00
dressing, ramming as per direction of EIC.
6/6 Concrete with 2cm gauge stone ballast, c/sand
& cement in proportion of 3:1.5:1 in
foundation i/c s/o all m/l, t&p etc required for
48.00 0.00 48.00 proper completion of the work. 4200.00 201600.00 0.00 201600.00
6/11 S/F of sal wood chaukhat & other framed i/c all
material labour, t&p etc required for proper
0.438 0.00 0.438 completion of the work. 53000.00 23214.00 0.00 23214.00
Name of Work :- Construction of Harshil helipad under deposit of Civil Aviation department.
Agency :- CB No 06/SE-6th dated 24-07-2008 Name of Contractor :- Sri Jagmohan Singh
Rawat.
Sl no Item of Work Now to Stone Sand Stone / Ballast
pay Qty Norms Qty Norms Qty Norms Qty
sanctioned Cost of work (Asper A.A./E.S.):- Rs. Lac Contract Bond :- 08/AE-III dated 01.10.10 C.B. Amount:-167064.20
Total upto Date Ex. Incurred on the Sanctioned work:-Rs. Lac Name Of Contractor :- Sri Jagmohan Singh Rawat
Total upto Date Ex. Against this work befor this variation:- Rs. Lac Total Ex. Against this C.B. after including this variation:- Rs. 78946.00
Sl.no Name of Item unit As per T.S. Estimate As per C.B. As per Actual Variation over C.B. Variation over T.S. Actual Remark
Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount Excess Saving % Excess Saving %
1 2 3 4 5 6 7 8 9 13 14 15 16 17 18 22 23 24 25
1/1 RR stone masonary Bsdsnkj }kjk
laid 1:6 cement, dk;Z u fd;s
f/sand material in tkus ds dkj.k
foundation of wall i/c vfUreh dj.k dj
s/o all m/l, t&p etc
required for proper Cum 54.00 1,527.00 82,458.00 54.00 1,527.00 82,458.00 51.70 1,527.00 78,945.90 - 3,512.10 4.27 - 3,512.10 4.27 fn;k x;k] ftl
completion of the dkj.k mDr en
work. es fopyu
vk;kA
sanctioned Cost of work (Asper A.A./E.S.):- Rs. Lac Contract Bond :- 08/AE-III dated 01.10.10 C.B. Amount:-167064.20
Total upto Date Ex. Incurred on the Sanctioned work:-Rs. Lac Name Of Contractor :- Sri Jagmohan Singh Rawat
Total upto Date Ex. Against this work befor this variation:- Rs. Lac Total Ex. Against this C.B. after including this variation:- Rs.
Sl.no Name of Item unit As per T.S. Estimate As per C.B. As per Actual Variation over C.B. Variation over T.S. Actual
Remark
Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount Excess Saving % Excess Saving %
1 2 3 4 5 6 7 8 9 13 14 15 16 17 18 22 23 24 25
1/2 Two Coat of oil bond Bsdsnkj }kjk
Distemper surface i/c s/o dk;Z u fd;s
all material, labour, t&p etc tkus ds dkj.k
required for proper vfUreh dj.k dj
completion of the work.
Sqm 255.00 53.00 13,515.00 255.00 53.00 13,515.00 - 53.00 - - 13,515.00 100.00 - 13,515.00 100 fn;k x;k] ftl
dkj.k mDr en
es fopyu
vk;kA
13/14 S/F of Soap dish No 2.00 932.00 1,864.00 2.00 932.00 1,864.00 - 932.00 - - 1,864.00 100.00 - 1,864.00 100 &rnSo&
14/15 S/F of angle cock. No 6.00 704.00 4,224.00 6.00 704.00 4,224.00 - 704.00 - - 4,224.00 100.00 - 4,224.00 100 &rnSo&