61037 (CTR PILLAR ASSY.

RH )
- Sample part prepared by OTC
- OTC part scan data, MSP part scan data, original CAD comparative submitted to TDEM
- improvement areas suggested by TDEM are as under, (please see diagram below)

- 04 points surface points


improvement is required
100% accuracy over Hole location will be ensured
- This modification will be done in

- 01 hole (off-set) improvment is


required.

- This improvment will be done by


tuning of welding jig or piercing die

The level up improvement over 10 surface points and 01 hole off center will be complted by OTC and 05 parts will be disp
by Air on 17-Aug 2019
RH )

location will be ensured by OTC

- 06 points surface points improvment


is required.

- This improvment will be done by


tuning of welding jig

d by OTC and 05 parts will be dispatched


61038 (CTR PILLAR ASSY. LH )
- Sample part prepared by OTC
- OTC part scan data, MSP part scan data, original CAD comparative submitted to TDEM
- improvement areas suggested by TDEM are as under, (please see diagram below)

- 03 surface points improvment is


required.

- This improvment will be done by


tuning of welding jig or dies. 100% accuracy over Hole location will be ensured by OTC

The level up improvement over 10 surface points and 01 hole off center will be complted by OTC and 05 parts will be disp
by Air on 17-Aug 2019
H)

l be ensured by OTC

d by OTC and 05 parts will be dispatched