You are on page 1of 2

61037 (CTR PILLAR ASSY.

RH )
- Sample part prepared by OTC
- OTC part scan data, MSP part scan data, original CAD comparative submitted to TDEM
- Improvement areas suggested by TDEM are as under, (please see diagram below)

Hole location will be ensured by OTC


- 03 surface points improvment is
required.
Trim Line:
- This improvment will be done by Pre-MPT samples will be dispatch with current
tuning of welding jig or dies.
condition, however NG points will be improved
before MPT part making

The improvement over 03 surface points will be completed by OTC and 05 parts will be dispatched by Air on 17-Aug 2019
61038 (CTR PILLAR ASSY. LH )
- Sample part prepared by OTC
- OTC part scan data, MSP part scan data, original CAD comparative submitted to TDEM
- improvement areas suggested by TDEM are as under, (please see diagram below)

Hole location will be ensured by OTC


- 04 ~ 05 surface points
improvement is required
Trim Line:
- This modification will be done in Pre-MPT samples will be dispatch with current
dies of 61321-22 condition, however NG points will be improved
before MPT part making

- 04 ~ 05 surface points improvment is


required.

- This improvment will be done by


tuning of welding jig

- 01 hole (off-set) improvment is


required.

- This improvment will be done by


tuning of welding jig or piercing die

The improvement over 10 surface points and 01 hole off center will be complted by OTC and 05 parts will be dispatched
by Air on 17-Aug 2019