TIE-IN PI PI TIE-IN NOTES
POINT POINT 1. ALL DIMENSIONS ARE IN MM OR LEVELS ARE IN M.
2. DRAWING ARE INDICATED & SUBJECT TO CHANGE DURING DETAIL ENGG.
DETAIL-A 3. LAYING OF PIPELINE AND STATION PIPING, VENDOR SHALL MAINTAIN SPECIFIED COVER OF
PIPELINE.
BYPASS LINE
N2 4. FOR VALVE PIT, REFER VALVE CHAMBER DRAWING.
PURGE
2"
This document is the property of TRACTEBEL ENGINEERING INDIA, any duplication or transmition to third parties is forbidden without its prior approval.
10" 4" REINFORCEMENT PAD
12" 4" REINFORCEMENT PAD
DETAIL-A 16" 6" REINFORCEMENT PAD
TIE-IN TIE-IN
POINT VENT LINE POINT
(DETAIL-B) X XX.06.19 ISSUED FOR APPROVAL. JV VA NC
(TYP.) VENT LINE 0 31.05.19 ISSUED FOR APPROVAL. JV VA NC
Rev. D M Y Modifications Drawn Checked Approved
2" CUSTOMER
INDIAN OIL CORPORATION LIMITED
PROJECT
N2 CITY GAS DISTRIBUTION PROJECT
PURGE 2"
RED. TEE SUBJECT
PIPING GENERAL ARRANGEMENT DRAWING
MAIN LINE 4"x2" FOR SV STATION WITH VENTING ARRANGEMENT
A3 NTS 1 of 2 X
VALVE PIT DETAIL-B Project No. Discipline Code System Code Serial No.
TRACTEBEL Engineering pvt. ltd. P.013554 D 20749 003