Building Work - Floor Admin CCR
Building Work - Floor Admin CCR
CONCRETEE WALL
REKAPITULASI
MANAGER
I 1 PURCHASING MANAGER FF1= CARPET TILES FF1 4.450 3.500 1.00 15.58
2 ENGINEER FF1= CARPET TILES FF1 4.500 3.500 1.00 15.75
3 MANAGER FF1= CARPET TILES FF1 5.200 3.500 1.00 18.20
4 WAITING AREA FF1= CARPET TILES FF1 6.000 6.000 1.00 36.00
5 FEMALE LOCKER & SHOWER ROOM FF7=GRANITE FF7 9.175 6.000 1.00 55.05
6 LOCKER ROOM FF6= CERAMIC TILES FF6 4.975 6.000 1.00 29.85
7 WAREHOUSE FF6= CERAMIC TILES FF6 8.550 3.850 1.00 32.92
8 HR SECRETARY/ CLERK ETC FF5=FLOOR HARDENER FF5 9.180 6.000 1.00 55.08
9 HR SECRETARY/ CLERK ETC FF1= CARPET TILES FF1 3.850 3.320 1.00 12.78
10 HR SECRETARY/ CLERK ETC FF1= CARPET TILES FF1 5.850 15.000 1.00 87.75
11 HR SECRETARY/ CLERK ETC FF1= CARPET TILES FF1 8.000 8.850 1.00 70.80
12 CONFERENCE ROOM FF1= CARPET TILES FF1 2.260 9.600 1.00 21.70
13 MEETING ROOM FF1= CARPET TILES FF1 6.000 6.480 1.00 38.88
14 IT OFFICER & SECRETARY FF1= CARPET TILES FF1 6.000 3.530 1.00 21.18
15 PLAT/ OPERATIONS MANAGER FF1= CARPET TILES FF1 6.000 7.900 1.00 47.40
16 QA ARCHIVE ROOM FF1= CARPET TILES FF1 6.000 6.000 1.00 36.00
17 (RAISED FLOOR) FF1= CARPET TILES FF1 6.000 3.300 1.00 19.80
18 LABORATORY FF3=EPOXY ANTI-DUST & FF4= RAISED FLOORING FF3 - FF4 6.000 6.500 1.00 39.00
19 LABORATORY FF10 = VINYL TILES CR/AS FF10 6.000 4.850 1.00 29.10
20 LAB GAS BOTTLE STORAGE FF10 = VINYL TILES CR/AS FF10 2.500 1.100 1.00 2.75
21 BIN CENTRE FF5=FLOOR HARDENER FF5 3.500 1.100 1.00 3.85
22 STORAGE-1 FF5=FLOOR HARDENER FF5 3.750 3.260 1.00 12.23
23 FF5=FLOOR HARDENER FF5 2.400 3.750 1.00 9.00
24 OPEN OFFICE AREA
RECEPTION FF1= CARPET TILES FF1 2.250 19.000 1.00 42.75
25 FF7=GRANITE FF7 6.000 4.250 1.00 25.50
26 INTERVIEW AREA/TRAINING ROOM FF7=GRANITE FF7 2.900 3.000 1.00 8.70
27 STORAGE-2 FF1= CARPET TILES FF1 3.300 4.250 1.00 14.03
28 CLEANERS FF5=FLOOR HARDENER FF5 2.100 2.900 1.00 6.09
29 HALLWAY-2 FF6= CERAMIC TILES FF6 2.500 2.900 1.00 7.25
30 FF9= VINYL TILES FF9 1.750 10.000 1.00 17.50
31 HALLWAY-2
HALLWAY-1 FF9= VINYL TILES FF9 14.000 2.300 1.00 32.20
32 HALLWAY-1 FF7=GRANITE FF7 6.000 2.500 1.00 15.00
33 FEMALE TOILET FF9= VINYL TILES FF9 2.260 12.000 1.00 27.12
34 TOILET FF6= CERAMIC TILES FF6 3.000 5.000 1.00 15.00
35 PRAYER ROOM (FEMALE) FF6= CERAMIC TILES FF6 3.400 5.000 1.00 17.00
36 PRAYER ROOM (MALE) FF6= CERAMIC TILES FF6 3.400 4.000 1.00 13.60
37 DOCUMENT CONTROL OFFICER FF6= CERAMIC TILES FF6 3.500 4.100 1.00 14.35
38 DRAFTSMAN FF9= VINYL TILES FF9 4.000 5.400 1.00 21.60
39 ENG & MAINTENANCE ENGINEER FF9= VINYL TILES FF9 1.925 5.400 1.00 10.40
40 ENG & MAINTENANCE MANAGER FF9= VINYL TILES FF9 3.100 7.200 1.00 22.32
41 DOCUMENT ARCHIVE ROOM FF9= VINYL TILES FF9 3.200 4.300 1.00 13.76
42 AIRLOCK FF9= VINYL TILES FF9 3.100 2.820 1.00 8.74
43 WH&LOGISTICS OFFICE/STORE KEEPER FF3=EPOXY ANTI-DUST FF3 2.800 3.400 1.00 9.52
44 ELECTRICAL ROOM FF5=FLOOR HARDENER FF5 2.830 2.830 1.00 8.01
45 TELECOM ROOM FF5=FLOOR HARDENER FF5 3.680 3.570 1.00 13.14
46 M&E BUILDING SUPPORT SERVICES & ACMV ROOM FF5=FLOOR HARDENER FF5 2.320 3.570 1.00 8.28
47 M&E BUILDING SUPPORT SERVICES & ACMV ROOM FF5=FLOOR HARDENER FF5 8.500 12.000 1.00 102.00
48 (RAISED FLOOR) FF5=FLOOR HARDENER FF5 5.700 3.570 1.00 20.35
49 (RAISED FLOOR) FF3=EPOXY ANTI-DUST & FF4= RAISED FLOORING FF3 - FF4 12.000 8.000 1.00 96.00
50 COVERED WALKWAY FF3=EPOXY ANTI-DUST & FF4= RAISED FLOORING FF3 - FF4 12.000 9.500 1.00 114.00
51 COVERED WALKWAY Concrete/Wiremesh 2.450 17.000 1.00 41.65
52 COVERED WALKWAY Concrete/Wiremesh 2.450 53.500 1.00 131.08
53 COVERED WALKWAY Concrete/Wiremesh 2.450 33.050 1.00 80.97
54 COVERED WALKWAY Concrete/Wiremesh 2.450 27.300 1.00 66.89
55 Concrete/Wiremesh 1.250 12.500 1.00 15.63
SUB JUMLAH
TOTAL JUMLAH
BUILLDING WORK
PLIN
REKAPITULASI
MANAGER
I 1 PURCHASING MANAGER FF1= CARPET TILES FF1 4.450 3.500 1.00 15.90
2 ENGINEER FF1= CARPET TILES FF1 4.500 3.500 1.00 16.00
3 MANAGER FF1= CARPET TILES FF1 5.200 3.500 1.00 17.40
4 WAITING AREA FF1= CARPET TILES FF1 6.000 6.000 1.00 24.00
5 FEMALE LOCKER & SHOWER ROOM FF7=GRANITE FF7 9.175 6.000 1.00 30.35
6 LOCKER ROOM FF6= CERAMIC TILES FF6 4.975 6.000 1.00 21.95
7 WAREHOUSE FF6= CERAMIC TILES FF6 8.550 3.850 1.00 24.80
8 HR SECRETARY/ CLERK ETC FF5=FLOOR HARDENER FF5 9.180 6.000 1.00 30.36
9 HR SECRETARY/ CLERK ETC FF1= CARPET TILES FF1 3.850 3.320 1.00 14.34
10 HR SECRETARY/ CLERK ETC FF1= CARPET TILES FF1 5.850 15.000 1.00 41.70
11 HR SECRETARY/ CLERK ETC FF1= CARPET TILES FF1 8.000 8.850 1.00 33.70
12 CONFERENCE ROOM FF1= CARPET TILES FF1 2.260 9.600 1.00 23.72
13 MEETING ROOM FF1= CARPET TILES FF1 6.000 6.480 1.00 24.96
14 IT OFFICER & SECRETARY FF1= CARPET TILES FF1 6.000 3.530 1.00 19.06
15 PLAT/ OPERATIONS MANAGER FF1= CARPET TILES FF1 6.000 7.900 1.00 27.80
16 QA ARCHIVE ROOM FF1= CARPET TILES FF1 6.000 6.000 1.00 24.00
17 (RAISED FLOOR) FF1= CARPET TILES FF1 6.000 3.300 1.00 18.60
18 LABORATORY FF3=EPOXY ANTI-DUST & FF4= RAISED FLOORING FF3 - FF4 6.000 6.500 1.00 25.00
19 LABORATORY FF10 = VINYL TILES CR/AS FF10 6.000 4.850 1.00 21.70
20 LAB GAS BOTTLE STORAGE FF10 = VINYL TILES CR/AS FF10 2.500 1.100 1.00 7.20
21 BIN CENTRE FF5=FLOOR HARDENER FF5 3.500 1.100 1.00 9.20
22 STORAGE-1 FF5=FLOOR HARDENER FF5 3.750 3.260 1.00 14.02
23 FF5=FLOOR HARDENER FF5 2.400 3.750 1.00 12.30
24 OPEN OFFICE AREA
RECEPTION FF1= CARPET TILES FF1 2.250 19.000 1.00 42.50
25 FF7=GRANITE FF7 6.000 4.250 1.00 20.50
26 INTERVIEW AREA/TRAINING ROOM FF7=GRANITE FF7 2.900 3.000 1.00 11.80
27 STORAGE-2 FF1= CARPET TILES FF1 3.300 4.250 1.00 15.10
28 CLEANERS FF5=FLOOR HARDENER FF5 2.100 2.900 1.00 10.00
29 HALLWAY-2 FF6= CERAMIC TILES FF6 2.500 2.900 1.00 10.80
30 FF9= VINYL TILES FF9 1.750 10.000 1.00 23.50
31 HALLWAY-2
HALLWAY-1 FF9= VINYL TILES FF9 14.000 2.300 1.00 32.60
32 HALLWAY-1 FF7=GRANITE FF7 6.000 2.500 1.00 17.00
33 FEMALE TOILET FF9= VINYL TILES FF9 2.260 12.000 1.00 28.52
34 TOILET FF6= CERAMIC TILES FF6 3.000 5.000 1.00 16.00
35 PRAYER ROOM (FEMALE) FF6= CERAMIC TILES FF6 3.400 5.000 1.00 16.80
36 PRAYER ROOM (MALE) FF6= CERAMIC TILES FF6 3.400 4.000 1.00 14.80
37 DOCUMENT CONTROL OFFICER FF6= CERAMIC TILES FF6 3.500 4.100 1.00 15.20
38 DRAFTSMAN FF9= VINYL TILES FF9 4.000 5.400 1.00 18.80
39 ENG & MAINTENANCE ENGINEER FF9= VINYL TILES FF9 1.925 5.400 1.00 14.65
40 ENG & MAINTENANCE MANAGER FF9= VINYL TILES FF9 3.100 7.200 1.00 20.60
41 DOCUMENT ARCHIVE ROOM FF9= VINYL TILES FF9 3.200 4.300 1.00 15.00
42 AIRLOCK FF9= VINYL TILES FF9 3.100 2.820 1.00 11.84
43 WH&LOGISTICS OFFICE/STORE KEEPER FF3=EPOXY ANTI-DUST FF3 2.800 3.400 1.00 12.40
44 ELECTRICAL ROOM FF5=FLOOR HARDENER FF5 2.830 2.830 1.00 11.32
45 TELECOM ROOM FF5=FLOOR HARDENER FF5 3.680 3.570 1.00 14.50
46 M&E BUILDING SUPPORT SERVICES & ACMV ROOM FF5=FLOOR HARDENER FF5 2.320 3.570 1.00 11.78
47 M&E BUILDING SUPPORT SERVICES & ACMV ROOM FF5=FLOOR HARDENER FF5 8.500 12.000 1.00 41.00
48 (RAISED FLOOR) FF5=FLOOR HARDENER FF5 5.700 3.570 1.00 18.54
49 (RAISED FLOOR) FF3=EPOXY ANTI-DUST & FF4= RAISED FLOORING FF3 - FF4 12.000 8.000 1.00 40.00
50 COVERED WALKWAY FF3=EPOXY ANTI-DUST & FF4= RAISED FLOORING FF3 - FF4 12.000 9.500 1.00 43.00
51 COVERED WALKWAY PCC K400 PCC K400 2.450 17.000 1.00 38.90
52 COVERED WALKWAY PCC K400 PCC K400 2.450 53.500 1.00 111.90
53 COVERED WALKWAY PCC K400 PCC K400 2.450 33.050 1.00 71.00
54 COVERED WALKWAY PCC K400 PCC K400 2.450 27.300 1.00 59.50
55 PCC K400 PCC K400 1.250 12.500 1.00 27.50
SUB JUMLAH
TOTAL JUMLAH