You are on page 1of 4

BUILLDING WORK

CONCRETEE WALL
REKAPITULASI

No Breakdown Unit Node Amount (Sq.M)

1 FF1= CARPET TILES Sq. M FF1 498.60


2 FF2 = FACTORY FINISH Sq. M FF2 -
3 FF3=EPOXY ANTI-DUST & FF4= RAISED FLOORING Sq. M FF3 - FF4 249.00
4 FF4= RAISED FLOORING Sq. M FF4 -
5 FF5=FLOOR HARDENER Sq. M FF5 238.03
6 FF6= CERAMIC TILES Sq. M FF6 129.97
7 FF7=GRANITE Sq. M FF7 104.25
8 FF8= VINYL SHEET (NOT USED) Sq. M FF8 -
9 FF9= VINYL TILES Sq. M FF9 153.64
10 FF10 = VINYL TILES CR/AS Sq. M FF10 31.85
11 CONCRETE = WIREMESH Sq. M Concrete -
BUILLDING WORK
FLOOR
Dimension (m)
Number
Major Number No ROOM OF BUILLDING ADMIN CCR Breakdown Node Sketsa Amount Sq.m Note
(pcs)/side
Wide Long Thicknes

MANAGER
I 1 PURCHASING MANAGER FF1= CARPET TILES FF1 4.450 3.500 1.00 15.58
2 ENGINEER FF1= CARPET TILES FF1 4.500 3.500 1.00 15.75
3 MANAGER FF1= CARPET TILES FF1 5.200 3.500 1.00 18.20
4 WAITING AREA FF1= CARPET TILES FF1 6.000 6.000 1.00 36.00
5 FEMALE LOCKER & SHOWER ROOM FF7=GRANITE FF7 9.175 6.000 1.00 55.05
6 LOCKER ROOM FF6= CERAMIC TILES FF6 4.975 6.000 1.00 29.85
7 WAREHOUSE FF6= CERAMIC TILES FF6 8.550 3.850 1.00 32.92
8 HR SECRETARY/ CLERK ETC FF5=FLOOR HARDENER FF5 9.180 6.000 1.00 55.08
9 HR SECRETARY/ CLERK ETC FF1= CARPET TILES FF1 3.850 3.320 1.00 12.78
10 HR SECRETARY/ CLERK ETC FF1= CARPET TILES FF1 5.850 15.000 1.00 87.75
11 HR SECRETARY/ CLERK ETC FF1= CARPET TILES FF1 8.000 8.850 1.00 70.80
12 CONFERENCE ROOM FF1= CARPET TILES FF1 2.260 9.600 1.00 21.70
13 MEETING ROOM FF1= CARPET TILES FF1 6.000 6.480 1.00 38.88
14 IT OFFICER & SECRETARY FF1= CARPET TILES FF1 6.000 3.530 1.00 21.18
15 PLAT/ OPERATIONS MANAGER FF1= CARPET TILES FF1 6.000 7.900 1.00 47.40
16 QA ARCHIVE ROOM FF1= CARPET TILES FF1 6.000 6.000 1.00 36.00
17 (RAISED FLOOR) FF1= CARPET TILES FF1 6.000 3.300 1.00 19.80
18 LABORATORY FF3=EPOXY ANTI-DUST & FF4= RAISED FLOORING FF3 - FF4 6.000 6.500 1.00 39.00
19 LABORATORY FF10 = VINYL TILES CR/AS FF10 6.000 4.850 1.00 29.10
20 LAB GAS BOTTLE STORAGE FF10 = VINYL TILES CR/AS FF10 2.500 1.100 1.00 2.75
21 BIN CENTRE FF5=FLOOR HARDENER FF5 3.500 1.100 1.00 3.85
22 STORAGE-1 FF5=FLOOR HARDENER FF5 3.750 3.260 1.00 12.23
23 FF5=FLOOR HARDENER FF5 2.400 3.750 1.00 9.00
24 OPEN OFFICE AREA
RECEPTION FF1= CARPET TILES FF1 2.250 19.000 1.00 42.75
25 FF7=GRANITE FF7 6.000 4.250 1.00 25.50
26 INTERVIEW AREA/TRAINING ROOM FF7=GRANITE FF7 2.900 3.000 1.00 8.70
27 STORAGE-2 FF1= CARPET TILES FF1 3.300 4.250 1.00 14.03
28 CLEANERS FF5=FLOOR HARDENER FF5 2.100 2.900 1.00 6.09
29 HALLWAY-2 FF6= CERAMIC TILES FF6 2.500 2.900 1.00 7.25
30 FF9= VINYL TILES FF9 1.750 10.000 1.00 17.50
31 HALLWAY-2
HALLWAY-1 FF9= VINYL TILES FF9 14.000 2.300 1.00 32.20
32 HALLWAY-1 FF7=GRANITE FF7 6.000 2.500 1.00 15.00
33 FEMALE TOILET FF9= VINYL TILES FF9 2.260 12.000 1.00 27.12
34 TOILET FF6= CERAMIC TILES FF6 3.000 5.000 1.00 15.00
35 PRAYER ROOM (FEMALE) FF6= CERAMIC TILES FF6 3.400 5.000 1.00 17.00
36 PRAYER ROOM (MALE) FF6= CERAMIC TILES FF6 3.400 4.000 1.00 13.60
37 DOCUMENT CONTROL OFFICER FF6= CERAMIC TILES FF6 3.500 4.100 1.00 14.35
38 DRAFTSMAN FF9= VINYL TILES FF9 4.000 5.400 1.00 21.60
39 ENG & MAINTENANCE ENGINEER FF9= VINYL TILES FF9 1.925 5.400 1.00 10.40
40 ENG & MAINTENANCE MANAGER FF9= VINYL TILES FF9 3.100 7.200 1.00 22.32
41 DOCUMENT ARCHIVE ROOM FF9= VINYL TILES FF9 3.200 4.300 1.00 13.76
42 AIRLOCK FF9= VINYL TILES FF9 3.100 2.820 1.00 8.74
43 WH&LOGISTICS OFFICE/STORE KEEPER FF3=EPOXY ANTI-DUST FF3 2.800 3.400 1.00 9.52
44 ELECTRICAL ROOM FF5=FLOOR HARDENER FF5 2.830 2.830 1.00 8.01
45 TELECOM ROOM FF5=FLOOR HARDENER FF5 3.680 3.570 1.00 13.14
46 M&E BUILDING SUPPORT SERVICES & ACMV ROOM FF5=FLOOR HARDENER FF5 2.320 3.570 1.00 8.28
47 M&E BUILDING SUPPORT SERVICES & ACMV ROOM FF5=FLOOR HARDENER FF5 8.500 12.000 1.00 102.00
48 (RAISED FLOOR) FF5=FLOOR HARDENER FF5 5.700 3.570 1.00 20.35
49 (RAISED FLOOR) FF3=EPOXY ANTI-DUST & FF4= RAISED FLOORING FF3 - FF4 12.000 8.000 1.00 96.00
50 COVERED WALKWAY FF3=EPOXY ANTI-DUST & FF4= RAISED FLOORING FF3 - FF4 12.000 9.500 1.00 114.00
51 COVERED WALKWAY Concrete/Wiremesh 2.450 17.000 1.00 41.65
52 COVERED WALKWAY Concrete/Wiremesh 2.450 53.500 1.00 131.08
53 COVERED WALKWAY Concrete/Wiremesh 2.450 33.050 1.00 80.97
54 COVERED WALKWAY Concrete/Wiremesh 2.450 27.300 1.00 66.89
55 Concrete/Wiremesh 1.250 12.500 1.00 15.63

SUB JUMLAH

TOTAL JUMLAH
BUILLDING WORK
PLIN
REKAPITULASI

No Breakdown Unit Node Amount (M)

1 FF1= CARPET TILES M FF1 358.78


2 FF2 = FACTORY FINISH M FF2 -
3 FF3=EPOXY ANTI-DUST & FF4= RAISED FLOORING M FF3 - FF4 108.00
4 FF4= RAISED FLOORING M FF4 -
5 FF5=FLOOR HARDENER M FF5 173.02
6 FF6= CERAMIC TILES M FF6 120.35
7 FF7=GRANITE M FF7 79.65
8 FF8= VINYL SHEET (NOT USED) M FF8 -
9 FF9= VINYL TILES M FF9 165.51
10 FF10 = VINYL TILES CR/AS M FF10 28.90
11 CONCRETE = WIREMESH M Concrete/Wiremesh -
BUILLDING WORK
PLIN
Dimension (m)
Number
Major Number No ROOM OF BUILLDING ADMIN CCR Breakdown Node Sketsa Amount (M') Note
(pcs)/side
Wide Long Thicknes

MANAGER
I 1 PURCHASING MANAGER FF1= CARPET TILES FF1 4.450 3.500 1.00 15.90
2 ENGINEER FF1= CARPET TILES FF1 4.500 3.500 1.00 16.00
3 MANAGER FF1= CARPET TILES FF1 5.200 3.500 1.00 17.40
4 WAITING AREA FF1= CARPET TILES FF1 6.000 6.000 1.00 24.00
5 FEMALE LOCKER & SHOWER ROOM FF7=GRANITE FF7 9.175 6.000 1.00 30.35
6 LOCKER ROOM FF6= CERAMIC TILES FF6 4.975 6.000 1.00 21.95
7 WAREHOUSE FF6= CERAMIC TILES FF6 8.550 3.850 1.00 24.80
8 HR SECRETARY/ CLERK ETC FF5=FLOOR HARDENER FF5 9.180 6.000 1.00 30.36
9 HR SECRETARY/ CLERK ETC FF1= CARPET TILES FF1 3.850 3.320 1.00 14.34
10 HR SECRETARY/ CLERK ETC FF1= CARPET TILES FF1 5.850 15.000 1.00 41.70
11 HR SECRETARY/ CLERK ETC FF1= CARPET TILES FF1 8.000 8.850 1.00 33.70
12 CONFERENCE ROOM FF1= CARPET TILES FF1 2.260 9.600 1.00 23.72
13 MEETING ROOM FF1= CARPET TILES FF1 6.000 6.480 1.00 24.96
14 IT OFFICER & SECRETARY FF1= CARPET TILES FF1 6.000 3.530 1.00 19.06
15 PLAT/ OPERATIONS MANAGER FF1= CARPET TILES FF1 6.000 7.900 1.00 27.80
16 QA ARCHIVE ROOM FF1= CARPET TILES FF1 6.000 6.000 1.00 24.00
17 (RAISED FLOOR) FF1= CARPET TILES FF1 6.000 3.300 1.00 18.60
18 LABORATORY FF3=EPOXY ANTI-DUST & FF4= RAISED FLOORING FF3 - FF4 6.000 6.500 1.00 25.00
19 LABORATORY FF10 = VINYL TILES CR/AS FF10 6.000 4.850 1.00 21.70
20 LAB GAS BOTTLE STORAGE FF10 = VINYL TILES CR/AS FF10 2.500 1.100 1.00 7.20
21 BIN CENTRE FF5=FLOOR HARDENER FF5 3.500 1.100 1.00 9.20
22 STORAGE-1 FF5=FLOOR HARDENER FF5 3.750 3.260 1.00 14.02
23 FF5=FLOOR HARDENER FF5 2.400 3.750 1.00 12.30
24 OPEN OFFICE AREA
RECEPTION FF1= CARPET TILES FF1 2.250 19.000 1.00 42.50
25 FF7=GRANITE FF7 6.000 4.250 1.00 20.50
26 INTERVIEW AREA/TRAINING ROOM FF7=GRANITE FF7 2.900 3.000 1.00 11.80
27 STORAGE-2 FF1= CARPET TILES FF1 3.300 4.250 1.00 15.10
28 CLEANERS FF5=FLOOR HARDENER FF5 2.100 2.900 1.00 10.00
29 HALLWAY-2 FF6= CERAMIC TILES FF6 2.500 2.900 1.00 10.80
30 FF9= VINYL TILES FF9 1.750 10.000 1.00 23.50
31 HALLWAY-2
HALLWAY-1 FF9= VINYL TILES FF9 14.000 2.300 1.00 32.60
32 HALLWAY-1 FF7=GRANITE FF7 6.000 2.500 1.00 17.00
33 FEMALE TOILET FF9= VINYL TILES FF9 2.260 12.000 1.00 28.52
34 TOILET FF6= CERAMIC TILES FF6 3.000 5.000 1.00 16.00
35 PRAYER ROOM (FEMALE) FF6= CERAMIC TILES FF6 3.400 5.000 1.00 16.80
36 PRAYER ROOM (MALE) FF6= CERAMIC TILES FF6 3.400 4.000 1.00 14.80
37 DOCUMENT CONTROL OFFICER FF6= CERAMIC TILES FF6 3.500 4.100 1.00 15.20
38 DRAFTSMAN FF9= VINYL TILES FF9 4.000 5.400 1.00 18.80
39 ENG & MAINTENANCE ENGINEER FF9= VINYL TILES FF9 1.925 5.400 1.00 14.65
40 ENG & MAINTENANCE MANAGER FF9= VINYL TILES FF9 3.100 7.200 1.00 20.60
41 DOCUMENT ARCHIVE ROOM FF9= VINYL TILES FF9 3.200 4.300 1.00 15.00
42 AIRLOCK FF9= VINYL TILES FF9 3.100 2.820 1.00 11.84
43 WH&LOGISTICS OFFICE/STORE KEEPER FF3=EPOXY ANTI-DUST FF3 2.800 3.400 1.00 12.40
44 ELECTRICAL ROOM FF5=FLOOR HARDENER FF5 2.830 2.830 1.00 11.32
45 TELECOM ROOM FF5=FLOOR HARDENER FF5 3.680 3.570 1.00 14.50
46 M&E BUILDING SUPPORT SERVICES & ACMV ROOM FF5=FLOOR HARDENER FF5 2.320 3.570 1.00 11.78
47 M&E BUILDING SUPPORT SERVICES & ACMV ROOM FF5=FLOOR HARDENER FF5 8.500 12.000 1.00 41.00
48 (RAISED FLOOR) FF5=FLOOR HARDENER FF5 5.700 3.570 1.00 18.54
49 (RAISED FLOOR) FF3=EPOXY ANTI-DUST & FF4= RAISED FLOORING FF3 - FF4 12.000 8.000 1.00 40.00
50 COVERED WALKWAY FF3=EPOXY ANTI-DUST & FF4= RAISED FLOORING FF3 - FF4 12.000 9.500 1.00 43.00
51 COVERED WALKWAY PCC K400 PCC K400 2.450 17.000 1.00 38.90
52 COVERED WALKWAY PCC K400 PCC K400 2.450 53.500 1.00 111.90
53 COVERED WALKWAY PCC K400 PCC K400 2.450 33.050 1.00 71.00
54 COVERED WALKWAY PCC K400 PCC K400 2.450 27.300 1.00 59.50
55 PCC K400 PCC K400 1.250 12.500 1.00 27.50

SUB JUMLAH

TOTAL JUMLAH