SCHEDULE OF COLUMNS

"A" "y"
C-1
FTG. TO
ROOF DECK
BEAM 1@50; 6@100; REST @ 200
MM O.C. (2 SETS)

C-2
FTG. TO
ROOF DECK
BEAM 1@50; 6@100; REST @ 200
"x" MM O.C. (2 SETS)
"B"
C-1a
ROOF DECK
TO ROOF 2 1@50; 6@100; REST @ 200
BEAM MM O.C.

PC-1
NGL ROOF DECK
TO ROOF 2 1@50; 6@100; REST @ 200
TYPICAL FOOTING DETAIL BEAM MM O.C.

"t" SCHEDULE OF ISOLATED FOOTING


FTG. "A" "B" "t" REINFORCEMENT
MARK (m) (m) (m) "x" "y"
F-1 1.30 1.15 0.30

F-2 1.20 1.00 0.30

4 @ EVERY 3 LAYERS @ EVERY 3 LAYERS


L/ CHB CHB
t=
0.1

N.G.L. @ 600 MM O.C.

0.60 M (MIN.)
300 MM O.C. @ 600 MM O.C.
5

O.C. TOP BAR


0*L 0.10 M THK S.O.G.
0.6
0.20 M

0.10
0.10
BAR (TYPICAL)
BOTTOM BAR

300 MM O.C. 0.50 M 0.60 M


0.10 M THK S.O.G. CONT. BOTTOM BAR
0.10

WF - 1 WF - 2
0.20

0.20 0.60 0.20

DETAIL OF STAIR FOOTING


WALL FOOTING DETAILS