GENERAL INFORMATION ON DHAKA PBS-1

LOCATION : Palashbari,Savar,Dhaka
DATE OF REGISTRATION : 13-12-1978.
DATE OF ENERGIZATION : 02-06-1980.
AREA : 486 Sq. Km.
NO. OF UPAZILA : 02
NO. OF UNION : 15
NO. OF ZONAL OFFICE : 04
NO. OF COMPLAIN CENTRE : 12
NO. OF CONTROL ROOM : 01
NO. OF VILLAGE : 501
NO. OF VILLAGE ELECTRIFIED : 474
% OF VILLAGE ELECTRIFIED : 94.61%
TOTAL LINE CONSTRUCTED : 2400 Km
TOTAL CONSUMER CONNECTED : 2,60,555
CATEGORY WISE CONNECTION :
*DOMESTIC : 2,32,591
*COMMERCIAL : 21,013
*INDUSTRY : 4,136
*LP : 120
*IRRIGATION PUMP : 1,081
*OTHERS : 1,614
NO. OF CONSUMERS PER Km. : 112
REVENUE PER Km. (TK.) : 24.56 Lac.
NO. OF SUB-STATION (33/11 KV) : 27
NO. OF GRID SUB-STATION : 01
MAXIMUM DEMAND : 186 MW

4
ORGANIZATION CHART OF DHAKA PBS-1

5
SOME SPECIAL FEATURES OF DHAKA PBS-1

1. Installation of Solar Panel

Installation of Solar Panel for some percentage of total load is mandatory for

above 02 kw electric connection. It is shown below.

Serial No. Catagory of Percentage of solar panel (Applicable for above 02


connection kw connection)

1. Domestic 3% of total load.

2. Industrial & i) If the total load is up to 50 kw, than 07% of


Commercial light & fan load is mandatory.
ii) If the total load is more 50 kw, than 10%
of light & fan load is mandatory

TOTAL NUMBER OF SOLAR PANEL INSTALLED UNDER Dhaka PBS-1

Total number of consumer Total load (KW)


who installed solar panel
868 265.27

6
2. Customer care

One point service centre has been established here which acts in the following

way

Complain/Information

Member Service
Department

Accounts/ Revenue
Consumer Department

CO&M Department

Consumer
ENGR. Department

Consultant
Department
SOLUTION

Fig. Interaction between consumer and Dhaka PBS-1 through One Point Service
Centre

7
3. Quick response on new connection :

Recently Dhaka PBS-1 has introduced On-line application system of new connection to
give quicker response to its consumers.

LINE
ELECTRIC
FEASIBILITY CONSTRUCTION
APPLICATION DESIGN/ STAKING
STUDY DEPOSIT (If
(If necessary) necessary)
1 2 3 4

INTERNAL LINE
WIRING CONNECTION
ELECTRIC CONSTRUCTION
AGREEMENT
INSPECTION (If necessary)
WIRING

8 7 6 5

SECURITY ELECTRIC
CUSTOMER
DEPOSIT for CONNECTION
METER ORDER
CONNECTION

9 10 11

8
DETAILS OF THE GRID SUB-STATION VISITED AT DHAKA PBS-1

1. Power Source:

I. SUMMIT POWER PLANT


II. KABIRPUR POWER PLANT,SAVAR
III. KABIRPUR POWER PLANT, NAYARHAT

2. Main Line Voltage : 33 KV

3. High Tension Voltage : 11KV

4. Installed Capacity : 35 MVA

4. No. of units : 02

Unit #01 Unit#02


No.of transformers =06 No.of transformers =03
No.of feeders =04 (01ACR/feeder) No.of feeders =03( 01ACR/feeder)
Total Capacity=20MVA Total Capacity =15 MVA

CONCLUSION

9
Dhaka PBS-1 is going to modernize itself through digitization of billing, connection

application and meter reading system. Installation of Solar panel is still very much

limited as less than 1% of total consumers use it for domestic or commercial purpose. So

it is very much expected that solar power system will be provided to consumers in a more

convenient way. During this short time visit we got an overview of organizational and

operational structure as well as consumer dealing strategy of Dhaka PBS-1 which will

help us greatly in building our career.