Legend:

Production - BY Billet Yard


Production - ML Mill Line
Production - F Furnace
Date: June 26, 2020 Daily Shutdown Activities Report
Department Item No. Area Activities
Production - BY 1 Vacant Lot Billet Cutting and laying
Production - BY 2 Rolling Mill - Stockyard Housekeeping & Billet Hustling
Production - F 3 Furnace Recuperator Maintenance of Recuperator (Inspection and Cleaning)
Production - F 4 Tank Side & Back Furnace Area Cleaning & Housekeeping
Production - F 5 Charging Area Mud & Dust Removal
Production -ML 6 Scale Pit Descaling
Production -ML 7 Rolling Mill - Roughing Operate dumptruck in disposal of mill scales to vacant lot
Production -ML 8 Rolling Mill - Roughing Descaling
Production -ML 9 Rolling Mill - Intermediate Descaling
Production -ML 10 Rolling Mill - Finishing Descaling
Production -ML 11 Cold Shear (200T) & Bundling Area Housekeeping
Machining of 12DB Roll (Notching & Engraving)(A1601-337U & A1602-199L)
Rolls & Tackle 12 Roll Shop
Machining of 12DB Roll (Grooving)(B1702-211U & B1702-031L)
Rolls & Tackle 13 Roll Shop Machining of Stand 3 Roll
Electrical Maintenance 14 Cooling Bed Removal of Aligning Roller Motor,subject for Reconditioning
Electrical Maintenance 15 Rolling Mill Tendering
Electrical Maintenance 16 Cooling Bed Removal of Aligning Roller Motor,subject for Reconditioning
Electrical Maintenance 17 Rolling Mill Tendering
Electrical Maintenance 18 Furnace Entry Pusher Tapping of Power Supply for Filtering Machine as per request by mechanical
Electrical Maintenance 19 E-shop Reconditioning of Aligning Roller Motor
Mechanical Maitenance (Crane) 20 Roughing Replaced long travel motor 1,2 and install inverter
Mechanical Maitenance 21 Cooling Bed Assemble spare Twin Channel one segment
Mechanical Maitenance 22 Furnace Oil filtering of Entry Pusher Hydraulic Unit
Mechanical Maitenance 23 Approach Table Removed links and adjusted chain tension of rollers
Mechanical Maintenance 24 Holding Table Removed links and adjusted chain tension of rollers
Report
Assigned Personnel Status / Percentage Completed
J Hallasgo, N Calolo Daily - Ongoing
C Villegas, N Calolo Ongoing
A Largo, I Maagad Ongoing - 80%
R Franada Completed burner quarls
R Atlao, J Cabrera, J Caubat Completed
BBacus, BSubingsubing, VEncabo, JYuana, RImboc,
Ongoing - 20%
RBrandares, BYu, Bbagundol
Falconete Ongoing
AGuinea Ongoing - 20%
JIhong, ETepait Ongoing - 20%
Wmasong Ongoing - 15%
BTorres Ongoing - 20%
337U Completed. 199L Ongoing - 30%
H. Lopez
211U Ongoing - 40%
A. Torres Ongoing - 90%
ASEdradan On-going
ASEdradan Completed
CCSatumbaga On-going
CCSatumbaga Completed
JCAman Jr. Completed
WLDerutas/JCAman Jr./DMSuscano On-going
MSoriano and Jbacarisas On-going - 95%
Bahade Ongoing - 90%
Burias, Lapetaje, Tacastacas Completed
Paghacian, Lapetaje, Tacastacas Completed
Oran, Burias, Tacastacas Completed
Date: June 29, 2020 Daily Shutdown Activities Report
Department Item No. Area Activities
Production - BY 1 Vacant Lot Billet Cutting
Production - F 2 Furnace Back Portion Recuperator Fabrication
Production - F 3 Furnace Uninstall Inspection Door Covers
Production - ML 4 Scale Pit Descaling
Production - ML 5 Rolling Mill - Roughing Descaling
Production - ML 6 Rolling Mill - Intermediate Descaling
Production - ML 7 Rolling Mill - Finishing Descaling
Production - ML 8 Bundling Area Segregation
Replacement of Cobble Ejector base plate for "A" and "B" Line and Recondition/Replacement
Rolls & Tackle 9 Assembly
of Arms and Pins.
Rolls & Tackle 10 Assembly Reconditioning of Finishing Mill Stand (F3, F5, F10, F8 , I1 and I2)
Rolls & Tackle 11 Assembly Replacement of Guide table side lock (F1, F11, F3, F5, F10, F8 , I1 and I2)
Machining of 12DB Roll (Notching & Engraving)(A1602-199L)
Rolls & Tackle 12 Roll Shop Machining of 12DB Roll (Grooving) (B1702-031L) Machining
of 8DB Roll Preparation (for Grooving 44 Passes) (B1612-467)
Rolls & Tackle 13 Roll Shop Machining of Stand 3 Roll (C1901-017U)
Rolls & Tackle 14 Roll Shop Machining of key bar for Mill Main Motor gear coupling
Electrical Maintenance 15 Cooling Bed Aligning Roller Motor,subject for Reconditioning
Electrical Maintenance 16 Rolling Mill Tendering
Electrical Maintenance 17 Cooling Bed Aligning Roller Motor,subject for Reconditioning
Electrical Maintenance 18 Rolling Mill Tendering
Electrical Maintenance 19 E-shop Fabrication of base for re-aligning of arm for heating zone acuator
Mechanical Maitenance (Crane) 20 Roughing Re-setting inverter and test run
Mechanical Maitenance (Crane) 21 Loading Area 2 (Logistics) Crane # 4 (7.5T)- Replaced brake Coil and Brake Rectifier
Mechanical Maitenance 22 Intermediate Mill Gearbox 4 - Open Flange, Inspection of Gears & Bearings
Mechanical Maitenance 23 Cooling Tower (Big) Clean Accumulated Scales and Fillers
ort
Assigned Personnel Status / Percentage Completed
Samonte, Lagumbay, Collantes, Cabello, Pumatong Daily - Ongoing
Aligada, Samonte, Gomez Ongoing - 65%
Nacua Completed
NKRaji, RHimalao, ABedro, APagon, AAmahoy, CAmora Jr.,
Ongoing - 21%
PBAcus, FLabail, NDaganato
JManto, ANabong, JLaborte, VElaco, RNedera Ongoing - 18%
MAPeñaflor, JSarigumba Ongoing - 16%
JGrana Ongoing - 13%
JBaguio, VJapson Jr., JABandiola Ongoing - 0.01%
MOlita & GPalmitos On-going - 50%
TCalonia On-going - 10%
TCalonia On-going - 25%
Ongoing - 30%
G. Rabago Completed
Ongoing - 0%
G. Leyses Ongoing - 90%
R. Malcampo Completed
ASEdradan Ongoing - 50%
ASEdradan Completed
CCSatumbaga Ongoing - 50%
CCSatumbaga Completed
WLDerutas/DGYlaya Ongoing - 85%
JBacarisas and JGomongkig Ongoing - 40%
JBacarisas and JGomongkig Completed
Elarcosa, Baco, Sasil On-going - 80%
Arellano, Redoblado, Frequencia On-going - 80%
Date: June 29, 2020
Department Item No. Area
Production - BY 1 Vacant Lot
Production - BY 2 Rolling Mill - Stockyard
Production - F 2 Furnace Back Portion
Production - F 3 Furnace
Production -ML 6 Scale Pit
Production -ML 7 Rolling Mill - Stand 1 to 7
Production -ML 8 Intermediate and Finishing
Mill - Stand 8 to 17
Production -ML 9 Bundling Area
Rolls & Tackle 10 Assembly

Rolls & Tackle 11 Assembly


Rolls & Tackle 12 Assembly
Rolls & Tackle 13 Assembly
Rolls & Tackle 14 Roll Shop
Rolls & Tackle 15 Roll Shop
Rolls & Tackle 16 Roll Shop
Electrical Maintenance 17 Cooling Bed
Electrical Maintenance 18 Rolling Mill
Electrical Maintenance 19 Cooling Bed
Electrical Maintenance 20 Rolling Mill
Mechanical Maitenance (Crane) 21 Roughing
Mechanical Maitenance (Crane) 22 Loading Area 1 (Logistics)
Mechanical Maitenance 23 Intermediate Mill
Mechanical Maitenance 24 Cooling Tower (Big)
Mechanical Maitenance 25 Cooling Tower (Big)
Daily Shutdown Activities Report
Activities
Billet Cutting
Housekeeping & Billet Laying
Recuperator Fabrication
Platform Fabrication
Descaling
Reconditioning of mill stands
Descaling
Segregation
Replacement of Cobble Ejector base plate for "A" and "B" Line and Recondition/Replacement
of Arms and Pins.
Reconditioning of Finishing Mill Stand (F1 and F11)
Reconditioning of Finishing and Intermediate Mill Stand (F3, F5, F10, F8 , I1 and I2, I3)
Replacement of Guide table side lock (F1, F11, F3, F5, F10, F8 , I1 and I2, I3)
Machining of 12DB Roll (Notching & Engraving)(A1602-199L)
Machining of 8DB Roll Preparation (for Grooving 44 Passes) (B1612-467)
Machining of Stand 3 Roll (C1901-017U)
Machining of key way for Bundling Table shafting.
Aligning Roller Motor,subject for Reconditioning
Tendering
Aligning Roller Motor,subject for Reconditioning
Tendering
Re-setting inverter and test run
Crane # 3 (7.5T)- Joy Stick Controller- Fabricate Base Frame
Gearbox 4 - Open Flange, Inspection of Gears & Bearings
Continue Cleaning Accumulated Scales and Fillers
Pump - Pull out Pipe and Repair Foot valve
tivities Report
Assigned Personnel Status / Percentage Completed
Bernades, Samonte, Lagumbay, Collantes, Cabello, Pumatong Daily - Ongoing
Bernades, Samonte, Lagumbay, Collantes, Cabello, Pumatong Daily - Ongoing
Gomez, Sabatin Ongoing - 67%
Samonte, Aligada, Nacua Ongoing - 10%
NKRaji, RHimalao, ABedro, APagon, AAmahoy, CAmora Jr., PBAcus,
Ongoing - 22%
FLabail, NDaganato
JManto, ANabong, JLaborte, VElaco, RNedera Ongoing - 0.14%
JSarigumba, JGrana Ongoing - 20%
JBaguio, JABandiola Ongoing - 0.02%
M. Olita & G. Palmitos 80%
T. Calonia & J. Villagracia 80%
T. Calonia & J. Villagracia 10%
T. Calonia & J. Villagracia 35%
Ongoing - 45% Ongoing
G. Rabago
- 40%
G. Leyses Ongoing - 95%
R. Malcampo Ongoing - 25%
ASEdradan On-going - 50%
ASEdradan Completed
CCSatumbaga On-going - 50%
CCSatumbaga Completed
WDerutas, JBacarisas and JGomongkig Pending - 40%
JBacarisas and JGomongkig Ongoing - 40%
Sasil, Elarcosa, Baco Completed
Arellano, Redoblado, Frequencia Completed
Arellano, Redoblado, Frequencia Completed