Karnataka Power Transmission Corporation Limited
Karnataka Power Transmission Corporation Limited
( Rupees two crore thirty four lakhs forty three thousand only)
233.50
0.93
234.43
st.Executive Engineer(E)
dal officer,110/11KV MUSS
Tiptur
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
Estimate No:- Date:-
Estimate for Replacement of 1x10MVA Power Transformer-2 by 1x20MVA Power
Transformer at 110/11KV Sub-station Mayasandra in Turuvekere Taluk, Tiptur nodal
center in K.B.Cross division,Tumakuru circle.
ABSTRACT-I
Estimate for Replacement of 1x10MVA Power Transformer-2 by 1x20MVA Power Transformer at 110/11KV Sub-station Mayasandra in
Turuvekere Taluk, Tiptur nodal center in K.B.Cross division,Tumakuru circle.
Wiring,Testing and
Supply of Material Erection charges
Sl No. Name of the Equipment/Materials Unit Qty Comissioning chareges
A1 POWER TRANSFORMER :
1 11 kv class 1*1000 sqmm UG cable XLPE Mtr 240 810.20 194448.00 54 12960
Heat srinkable type cable termination kits suitable for
2 1*1000sqmm XLPE CABLE (INDOOR TYPE) Nos 4 2910.00 11640.00
4 Copper flats for transformer secondary 100x10mm size Nos 4 41507.00 166028.00
2.5m length ( Market rate )
Bi metallic plates 150x150x2mm for LV terminals of
5 Nos 10 900.00 9000.00
transformer/NCT connections.(As per market rate)
6 11 kV Pin Insulator Shell with pin as per BESCOM SR Nos 6 105.00 630.00
A9 Grounding of equipment
Providing cast iron pipe of 100mm ID 13mm thickness
2.75m long with two part GI flat 50X6mm clamp
1 welded around the pipe etc.,including the cost Set 2 10988 21976
excavation(All materials supplied by the contractor.)
GST applicable
2915483.9112
Extra allowance over basic labour rates for station and
34742.01
line works to take care of contractors overheads at 15%
KPTCL,Mayasandra Tiptur
K.B Cross
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
Estimate No. :-
Estimate for Replacement of 1x10MVA Power Transformer-2 by 1x20MVA Power
Transformer at 110/11KV Sub-station Mayasandra in Turuvekere Taluk, Tiptur
nodal center in K.B.Cross division,Tumakuru circle.
Annexure-1 : Erection of Power Transformer
Moving transformer into the Plinth. For a distance of 20 MT /
1 52/ 23 48.00
meters as per site condition with wt 52 MT Mts
Total Rs
Total Rs
1x20MVA Power
e Taluk, Tiptur
e.
57,408.00
19,500.00
4840.96
73,522.08
11,026.00
166,297
former
Amount
28,876.80
7,800.00
1,436.40
8,269.50
46,382.70
tive Engineer(E)
USS Nodal Officer
iptur
Certificate :- Certified that I have personally visited the spot and prepared the estimate by using MWSR
2019 with GST for most economical and safe way of execution of work.
REPORT:- This estimate is prepared for an amount of Rs 2,34,43,000/-( Rupees two crore thirty
fourlakhs forty three thousand only) for augmentation of 110/11KV,10 MVA Power transformer-2 by 20
MVA at 110/11 KV Sub-station Mayasandra in Tiptur nodal center.
The Existing Power Transformers at 110/11KV Mayasandra sub station is over loaded.The supply
mainly feeding to Government hospital, villages , water supply, lightings & IP set installations. The load is
increasing day by day.
As the existing Transformer-2 is overloaded,it is proposed to increase the Transformer capacity
from 1 X 10 MVA by 20 MVA Power Transformer and also providing spare 1000 Sq.mm. U.G.Cable for
Transformer to avoid the power supply interruption at the time of pot head failure.The existing 11 KV NCT
ratio is 800-400/1A & this is not suitable for 20 MVA Transformer. In this estimate the existing NCT is
proposed to replace by 1200-800/1-1 A ratio. The capacity of existing Bank CT's are 800-400/1-1A and
they are to be replaced by 1200-800/1 A CT's.The provision for oil sump is made for CTR protection system.
The existing C & R panel of Transformer is suitable to 20 MVA Transformer. The released power
transformer,RTCC panel and 11KV NCT, CT, control cables and mounting structures are shown as credit.
This estimate is prepared as per the approved DPR vide No:B19/2387/95-96 Dated 02-05-2018.
The above augmentation work is approved in 72nd th TCCM meeting dated 17.02.2017.
Hence this estimate may be kindly sanctioned to take up the work at the earliest.
1 20
RTCC to C&R Panel ( Protection indication in TCS )
Total ( in metres )
2 4 core 6 Sqmm
Transformer MB to ACDB ( For Fan control ) 1 70
RTCC to DCDB for DC supply 1 30
OLTC drive MB to ACDB for 3 ph AC supply 1 60
CTR to ACDB 1 70
Total ( in metres )
3 2 core 6 Sqmm
Transformer MB to RTCC ( Load current ) 1 50
4 4 core 2.5 Sqmm
Transformer C&R panel to 11kV Bank ( LV breaker 2 80
status+inter trip)
5 2 core 2.5 Sqmm
DCDB to transformer MB 1 59
Transformer MB to RTCC (AC supply) 1 55
Transformer C&R panel to HV breaker ( breaker
1 60
status )
RTCC to DCDB for CDC supply 1 20
CTR to DCDB 1 65
Total ( in metres )
6 GI flat for earthing
Transformer body earthing/supporting structure earthing.
11KV Cable supporting structure
Total ( in meters )
7 CI Pipe earthing
Transformer body earthing
Total
208
102
20
330
70
30
60
70
230
50
160
59
55
60
20
65
259
40
20
60
ive Engineer(E)
r,110/11KV MUSS
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
Estimate for Replacement of 1x10MVA Power Transformer-2 by 1x20MVA Power Transformer at 110/11KV
Sub-station Mayasandra in Turuvekere Taluk, Tiptur nodal center in K.B.Cross division,Tumakuru circle.
Part-B:Dismantling Of Equipments
Sl no Particulars Unit Qty Rate
B1 POWER TRANSFORMER :
Amount
46,382.70
1,209.75
350.25
227.38
110.49
5,546.25
330.00
54,156.82
2,707.84
8,123.52
5011.82
70,000.00
ve Engineer [Ele]
S, Nodal Officer
iptur
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
Estimate No:- Date:-
Sub-Total 545268.53
ABSTRACT-II