Project Number and Name: Ampol Lytton Refinery Future Fuels Project Bulk Stormwater Drainage
Inspection Title:
Earthworks
Sign-Off
Name: Signature: Date:
HEQ-TPE-00396
Rev. 6 (15/06/2018) Page 1 of 9
Inspection and Test Plan (ITP)
Inspection /
Hold Verification Sign
Test Method
Item Work Step Points/Witness Conformance Criteria Frequency Comments Date
Points BMD Kent
HEQ-TPE-00396
Rev. 6 (15/06/2018) Page 2 of 9
Inspection /
Hold Verification Sign
Test Method
Item Work Step Points/Witness Conformance Criteria Frequency Comments Date
Points BMD Kent
surface defects, as per Table 3.4
(refer to table below).
BCC S160 CL3.2.7 (NOV2018).
HEQ-TPE-00396
Rev. 6 (15/06/2018) Page 3 of 9
Inspection /
Hold Verification Sign
Test Method
Item Work Step Points/Witness Conformance Criteria Frequency Comments Date
Points BMD Kent
3. Roads: 750-mm
Refer to Table 5.1 below.
BCC S145 CL5.0 (May 2016).
BCC BSD-2042&2043.
- The backfill materials based on
location:
Backfill:
New Constructions (Roads &
Allotments): 1 sample for
every 1000m3
Select a backfill material (general or material.
select) to match the adjoining
subgrade material with 75-mm BCC S120
maximum stone size. CL2.2.
BCC S145 CL7.2,7.4 (May 2016).
BCC BSD-2042&2043. Geotechnical
2.7 Backfill Materials
Testing
Existing Roads: Unbound
A granular fill, stabilised sand or lean Pavement
mix concrete. Material:
Generally, granular fill: 1 material
1. Type 2.1 – CBR80 grading test for
2. Type 2.3 – CBR45 every 500m3.
3. Type 2.5 – CBR 15 BCC S120
BCC S145 CL7.2,7.4 (May 2016). CL6.1.
BCC BSD-2042&2043.
- Place and compact fill material Backfill:
uniformly in layers with loose layer
1 field density
thickness not exceeding 200 mm.
test per 2
- The minimum backfill compaction compacted
standards based on location: layers for every
1. Allotment fill: 40 linear
- 95% standard compaction. metres
2. Road formations (incl. footpaths): Unbound Geotechnical
2.8 Backfill Compaction Pavement:
> 0.3 m below subgrade: Testing
1 in situ density
- 95% standard compaction;
test per single
≤ 0.3 m below subgrade: compacted
- 100% standard compaction; layer of work
for every 40
BCC S145 CL7.5 (May 2016).
linear metres
BCC S145
CL2.3
HEQ-TPE-00396
Rev. 6 (15/06/2018) Page 4 of 9
Inspection /
Hold Verification Sign
Test Method
Item Work Step Points/Witness Conformance Criteria Frequency Comments Date
Points BMD Kent
Stormwater Drainage
Construct 450 RCP headwalls in Documentation FYFE - STORMWATER
3.1 Structures (Precast All Lines
accordance with BSD-2026 DRAINAGE PLAN
Components)
Engineering
Construct triple barrel 450 RCP lines Surveillance
in accordance with TMR SD 1035 &
1359
The Subcontractor (BMD) is to
provide suitable manhole / drainage Kent | Construction Scope Of
3.2 Vehicle Trafficable Covers All Structures Visual Inspection
structure covers provided for vehicle Work XY21024-18-Y30-5005
access areas,
4.0 Certification
- A CCTV survey/inspection to
demonstrate the assets have been
installed to the required standard.
4.1 CCTV Hold Point
- Issue CCTV survey to BCC
All Lines CCTV Pipe Survey
(hardcopy report and video display).
BCC S145 CL2.4 (May 2016).
An on-maintenacne inspection is to be
Upon
On-Maintenance conducted with the Principal
4.2 Hold Point
Contractor / Company and BCC, as
completion of Inspection
Inspection works
required.
HEQ-TPE-00396
Rev. 6 (15/06/2018) Page 5 of 9
HEQ-TPE-00396
Rev. 6 (15/06/2018) Page 6 of 9
HEQ-TPE-00396
Rev. 6 (15/06/2018) Page 7 of 9
HEQ-TPE-00396
Rev. 6 (15/06/2018) Page 8 of 9
HEQ-TPE-00396
Rev. 6 (15/06/2018) Page 9 of 9