You are on page 1of 7

ANZ Royal Bank (Cambodia) LTD.

Mao Tse Tung Blvd Branch


Construction New Building June 2008

SECTION 01010

SUMMARY OF WORK

PART 1 – GENERAL

1.1 SUMMARY

A. Furnish labor, materials, equipment, and services necessary for the proper execution
and
Completion of ANZ Royal Building work shown on the Drawings and specified
herein.

B. The Works defined by these documents includes, but is not limited to, the following:

1. Piling work, Cut pile, Pile caps.

2. Concrete structures.

3. Steel structures.

4. Building enclosure: steel, aluminum and glass facades.

5. Architectural work.

6. Elevators.

7. Mechanical equipment and distribution including cold water, potable water,


soil,
Waste and vent pipes, storm drainage, and automatic sprinkler system, air-
conditioning and ventilation.

8. Electrical equipment and distribution for except not the following


subsystems:

a. Electrical distribution and grounding


b. Electrical lighting and control
c. Emergency power (generators, UPS)
d. Fire alarm system.
e. Public address system.
f. Master clock system.
g. CCTV system.
h. Security system.
i. Telephone system.

C. Related requirements specified elsewhere:

1. Coordination requirements (Section 01040 COORDINATION).

2. Field engineering requirements (Section 01050 FIELD ENGINEERING).

File: ANZ-SP-MTB 2007


ANZ Royal Bank (Cambodia) LTD. Mao Tse Tung Blvd Branch
Construction New Building June 2008

3. Pre-construction and progress meetings (Section 01200 PROJECT


MEETING).

4. Submittal requirements (Section 01300 SUBMITTALS).

5. Testing and inspection requirements (Section 01400 QUALITY CONTROL).

6. Temporary utilities (Section 01500 CONSTRUCTION FACILITIES AND


TEMPORARY CONTROL).

7. Closeout requirements (Section 01700 CONTRACT CLOSEOUT).

D. Do not make scale measurements of the drawings, neither printed nor in electronic
format.

1.2 CONTRACTS

A. A single contract shall be awarded for each package.

B. The contract includes, but is not limited to the following specification sections:

DIVISION 1 – GENERAL REQUIREMENTS

01010 Summary of Work


01040 Co-ordination
01050 Field Engineering
01200 Project Meetings
01300 Submittals
01400 Quality Control
01500 Construction Facilities and Temporary Controls
01600 Material and Equipment
01700 Control Closeout

DIVISION 2 – SITEWORK

02220 Excavating, Filling and Backfilling for Building and Utilities


02351 Pile and Diaphragm Wall Foundations General
02367 Precast Prestressed Concrete Piles

DIVISION 3 – CONCRETE

03100 Concrete Formwork


03250 Concrete Reinforcement
03300 Cast-in-Place Concrete
03411 Structural Prestressed Precast Concrete
03455 Light Weight Concrete Panel
03542 Cement Underbed

DIVISION 4 – MASONRY

04220 Concrete Unit Masonry

File: ANZ-SP-MTB 2007


ANZ Royal Bank (Cambodia) LTD. Mao Tse Tung Blvd Branch
Construction New Building June 2008

DIVISION 5 – METALS

05120 Structural Steel - General


05150 Structural Steel Finishes
05300 Metal Deck
05500 Miscellaneous Metal
05510 Metal Stairs
05520 Handrails and Railings

DIVISION 6 – WOOD AND PLASTICS

NOT USED

DIVISION 7 – THERMAL AND MOISTURE PROTECTION

07180 Cement-Based Waterproof Coating


07421 Aluminum Composite Panel
07531 Elastomeric Sheet Roofing
07620 Sheet Metal Flashing and Trim
07724 Roof Scuttle
07840 Firestopping
07920 Sealants and Caulking

DIVISION 8 – DOORS AND WINDOWS

08112 Steel Doors and Frames


08520 Aluminum Windows
08720 Finish Hardware
08800 Grazing
08920 Glazed Aluminum Curtain Wall
08982 Facade/Curtain Wall Mockups

DIVISION 9 – FINISHES

09220 Portland Cement Plastic


09250 Gypsum Board
09310 Ceramic Tile
09390 Floor Hardener
09400 Terrazzo
09510 Acoustical Ceilings
09826 Aggregate Floor Surfacing
09900 Painting

DIVISION 10 – SPECIALTIES

10160 Toilet Compartments


10270 Access Flooring
10800 Toilet Accessories

DIVISION 11 – EQUIPMENT

11010 Facade Maintenance Systems

File: ANZ-SP-MTB 2007


ANZ Royal Bank (Cambodia) LTD. Mao Tse Tung Blvd Branch
Construction New Building June 2008

DIVISION 12 – FURNISHINGS

12490 Horizontal Blinds

DIVISION 13 – SPECIAL CONSTRUCTION

NOT USED

DIVISION 14 – CONVEYING SYSTEMS

14000 Conveying System Schedule


14210 Electric Traction elevators

DIVISION 15 – MECHANICAL

15010 General Mechanical Provisions


15015 Basic Plumbing Requirements
15055 Basic Plumbing Materials and Methods
15060 Piping
15075 Plumbing Identification
15100 Valves
15105 Plumbing Valves
15111 Balancing and Testing of Air and Water Systems
15121 Expansion and Flexible Pipe Connections
15130 Meter, Gauges and Thermometers
15140 Hangers Supports Anchors and Sleeves
15150 Access Doors in General Construction and Color Coded Identification
15153 Air-Cooled liquid Chillers
15170 Electric Motors
15171 Variable Frequency Drives
15190 Systems Identification
15240 Vibration Isolation
15241 Acoustics
15250 Insulation
15252 Air-cooled Condensing Units
15300 Central Station Air Conditioning Units
15315 Fire Suppression System
15320 Fire Pimps
15325 Sprinkler Systems
15375 Standpipe and Hose System
15392 Filters
15405 Domestic Water System
15406 Sanitary Waste and Vent System
15407 Storm Drainage System
15430 Plumbing Specialties
15440 Plumbing Fixtures
15450 Plumbing Equipment
15496 CO2 – Fire Suppression System
15508 FM200 – Fire Suppression System
15515 Hydronic Specialties

File: ANZ-SP-MTB 2007


ANZ Royal Bank (Cambodia) LTD. Mao Tse Tung Blvd Branch
Construction New Building June 2008

15726 Fan Coil Units


15740 Access Floor Air Terminal Units
15770 Base-Mounted Pumps
15800 Ductwork
15860 Fans
15890 Water Treatment
15900 Building Automation System (BAS)
15910 Dampers
15940 Air Outlets and Inlets

DIVISION 16 – ELECTRICAL

16010 Basic Electrical Requirements


16020 Equipment Connections and Coordination
16040 Fire/Smoke Stops
16100 Raceways and Fittings
16112 Bus Duct
16114 Cable Trays
16123 Building Wire and Cable (750 Volts and Below)
16130 Boxes
16131 Under floor Ducts and Raised Floor Trunking System
16141 Wiring Devices
16147 Lighting Control System
16195 Electrical Identification
16330 Capacitor Banks
16421 Electrical Duct Bank
16425 Switchboards
16440 Disconnect Switches (Isolator Switches)
16450 Grounding
16470 Panel boards
16476 Circuit Breakers
16480 Motor Controllers
16481 Motor Control Centers
16485 Low-Voltage Contactor
16500 Luminaries and Accessories
16535 Emergency Lighting Equipment
16601 Lightning Protection System
16610 Uninterruptible Power Supply (UPS)
16622 Emergency Generator Set
16625 Automatic Transfer Switches (ATS)
16672 Transient Voltage Surge Suppressor System
16720 Fire Alarm System
16740 Telephone / Data Common Cabling System
16743 Telephone System
16760 Closed Circuit Television and Control System
16768 Fiber Optic Cable
16770 Public Address Systems
16791 Self-Corrective System
16840 Security System
16960 Electrical Equipment Testing

File: ANZ-SP-MTB 2007


ANZ Royal Bank (Cambodia) LTD. Mao Tse Tung Blvd Branch
Construction New Building June 2008

E. The following related work will be awarded under separate contracts.

1. ANZ Royal Contract

1.3 SUBCONTRACTS

A. The facade work shall be awarded as a single subcontract. Separate subcontracts for
portions of the facade work will not be permitted.

1.4 USE OF PREMISE

A. Confine operations at the site to areas permitted by applicable ordinance, permits,


governing agencies, and the Contract Documents.

B. Access to Site shall be agreed with the Engineer prior to the Commencement Date.

C. Construction operations and site facilities shall be confined the Site Boundaries as
defined by Engineer.

D. The Contractor shall be responsible for safeguarding all works, utilities and facilities
and at their portion of the Site under his control.

F. The Contractor shall have possession of the Site at the location of the Works only.
The Contractor shall be responsible for arranging working space, storage facilities of
materials, sitting of temporary accommodations, etc. at locations to be agreed with
the Engineer. No claim whatsoever will be allowed for any reason regarding the
sitting or allocation of any such space regardless of the distance from the Works.

1.5 REGULATORY REQUIREMENTS

A. The Contractor shall comply with required Government regulations, codes,


standards, and the implementation procedure established by the Owner.

1.6 OCCUPANCY REQUIREMENTS

A. After preliminary acceptance of work in any space or spaces, the Owner shall have
the privilege of occupying and using such space or spaces in advance of final
inspection and acceptance of the entire work.
B. If the Owner desires to exercise such privilege, building services such as ventilating,
cooling, water, lighting, electrical power, and telephone shall be made available for
space or spaces to be occupied. If equipment required to furnish such services is not
entity completed at time the Owner desires to occupy the space or spaces, the work
shall be completed as soon as possible.

C. Prior to partial occupancy, the Owner shall:

1. Give the Contractor notice in writing of the Owner’s intent to occupy the
involved space or spaces.
2. Secure written consent of the Contractor unless, in opinion of the Owner, the
Contractor is chargeable with unwarranted delay in final cleanup of punch list
items or other Contract requirements.

File: ANZ-SP-MTB 2007


ANZ Royal Bank (Cambodia) LTD. Mao Tse Tung Blvd Branch
Construction New Building June 2008

3. Secure endorsement from the building authorities, insurance carrier, and


consent of surely, if any, permitting such occupancy during remaining period
of construction.

D. For period of partial occupancy, arrangements shall be made regarding operation and
cost of necessary ventilating, cooling, water, lighting, electrical power, and telephone
services. The Owner shall assume responsibility for operation of equipment of
equipment and utilities required to provide the above services, in part or in total, and
arrangements shall be made as to warranties affecting work associated with the space
or spaces so occupied.

E. The Owner’s occupancy or use of such space or spaces, however, shall not constitute
the Owner’s acceptance of work, materials, or equipment which are not in
accordance with requirements of Contract Documents, nor relieve the Contractor
from the Contractor’s obligations to complete the work, nor waive other unfulfilled
obligations or responsibilities under the Contract.

PART 2 – PRODUCTS

(Not applicable)

PART 3 – EXECUTION

(Not applicable)

END OF SECTION

File: ANZ-SP-MTB 2007