Project Name : INSTALLATION OF PRIMARY AND SECONDARY CHILLED PUMP

Client : URIC -SELECTA


Location : MANGGAHAN, PASIG
Date : JUNE 06, 2019

SECONDARY CHILLED PUMP


Volts 440 Accepted Rejected
Hz 60 Insulation and Cladding
kW 11 Noise level
A 19.2 Vibration level
pf 0.85 Rotation check
Connection Delta Equipment grounded

Ampere's Monitoring
TIME

Motor Ampere

Prepared by :

PETC

Approved by :

URIC
Project Name : INSTALLATION OF PRIMARY AND SECONDARY CHILLED PUMP
Client : URIC -SELECTA
Location : MANGGAHAN, PASIG
Date : JUNE 06, 2019

PRIMARY CHILLED PUMP


Volts Accepted Rejected
Hz Insulation and Cladding
kW Noise level
A Vibration level
pf Rotation check
Connection Equipment grounded

Ampere's Monitoring
TIME

Motor Ampere

Prepared by :

PETC

Approved by :

URIC