132kV Current Transformer (CT)
REQUEST FOR PROPOSAL
Tropical protection shall conform to BS: CP 1014 dated 15-06-1980, entitled “Protection
12.2
of Electrical Power Equipment against climatic condition.”
Page 2 of 3
132kV Current Transformer (CT)
REQUEST FOR PROPOSAL
Page 3 of 3
Doc No
Approved: CAT B
By OBS
Date :20/12/2023
NO. OF
REV. DATE PREPARED BY. CHECKED BY. APPROVED BY. REMARKS
SHEETS
50MVA, 33/132kV Substation, Document No: Rev No: 00
Rajasthan Project
Sangarh, Rajasthan , India IBVSI/RJ/SANGRAH/EE/TS/CT/01
Contents
1 Project Brief ...................................................................................................................................2
2 Items to be Procured ......................................................................................................................2
3 Delivery ..........................................................................................................................................3
4 Compliance ....................................................................................................................................3
5 Conflict ...........................................................................................................................................3
6 Scope of Work ...............................................................................................................................4
7 Inspection and Testing ...................................................................................................................5
8 Exceptions and Deviations .............................................................................................................5
9 Current Transformer ......................................................................................................................5
9.1 Quality certification..................................................................................................................5
9.1.1 Type and Duty .................................................................................................................7
9.1.2 Constructional Features ...................................................................................................7
9.1.3 Terminal...........................................................................................................................8
9.1.4 Grounding ........................................................................................................................8
9.1.5 General requirement ........................................................................................................8
9.2 Pre-dispatch Quality and Testing ............................................................................................8
9.3 Specific Erection Requirement ................................................................................................9
9.4 Onsite Testing.........................................................................................................................9
9.5 Packing and Dispatch ...........................................................................................................10
10 Submission ...............................................................................................................................10
11 List of Attachment .....................................................................................................................11
Rev. 0 Page 1
50MVA, 33/132kV Substation, Document No: Rev No: 00
Rajasthan Project
Sangarh, Rajasthan , India IBVSI/RJ/SANGRAH/EE/TS/CT/01
1 Project Brief
Project 50MVA, 33/132kV Switchyard
EPC -
2 Items to be Procured
Following Items (material and services), required for above mentioned Project in Clause 1 in line with
Procurement Specifications.
CT 250-500/1-1-1-1A
Core-4: PS Class
CT 250-500/1-1-1-1A
Core-4: PS Class
Rev. 0 Page 2
50MVA, 33/132kV Substation, Document No: Rev No: 00
Rajasthan Project
Sangarh, Rajasthan , India IBVSI/RJ/SANGRAH/EE/TS/CT/01
3 Delivery
Manufacturer is expected to deliver above specified item in clause 2 by Q1 of 202X. Manufacturing
time would be around six months from date of ordering.
4 Compliance
Manufacturer shall submit compliance statement, attached with this requisition, duly filled in along with
the offer as attached as Annexure-02 with this document.
5 Conflict
The technical specification shall be read in conjunction with all other Specifications and documents
attached. During resolving conflicts, the following order precedence:
1. Statutory Regulations:
− Applicable Act/Legal Requirement of Specific Country and Region.
− The Factory Act if applicable.
− Requirements of the statutory bodies.
2. Equipment Specifications.
3. Codes & Standards.
During order execution stage, in the event of conflict, actual or implied, amongst documents relating to
this requisition or enquiry or order, the more stringent requirement(s) shall apply. Manufacturer shall
identify and state such conflict(s) in the course of engineering / manufacturing to obtain Client’s
concurrence.
Rev. 0 Page 3
50MVA, 33/132kV Substation, Document No: Rev No: 00
Rajasthan Project
Sangarh, Rajasthan , India IBVSI/RJ/SANGRAH/EE/TS/CT/01
Similarly, if there is a conflict between the printed enclosures / catalogues / Specifications and other
statements of Manufacturer/Developer’s quotation, superior Specification advantageous to the
Purchaser/Developer shall prevail.
6 Scope of Work
Manufacturer’s Scope of Work / Supply has been broadly defined as under. Manufacturer to note that,
in no case shall their scope of supply / work is limited to content of this requisition only.
It is Manufacturer’s responsibility to verify the selection of type of item, material of construction of each
component as per the data mentioned in individual Specifications / data sheets / this Procurement
Specification. Manufacturer to suggest an alternative, in case not found suitable. They shall stand
guarantee for all items supplied by them, including their bought-out items. Manufacturer shall be
completely responsible to supply all required materials and services, including that of sub-
Manufacturer for satisfying the functional / operational requirements stated in this Specifications and
this Material Requisition.
Items not indicated clearly in Manufacturer’s offer, but required for technical requirements shall be
considered as included in Manufacturer’s scope of supply. Any deviation proposed by the sub-
Manufacturer for such items shall not be taken into account. Such items shall be considered to be
completed by Manufacturer on his full responsibility.
Rev. 0 Page 4
50MVA, 33/132kV Substation, Document No: Rev No: 00
Rajasthan Project
Sangarh, Rajasthan , India IBVSI/RJ/SANGRAH/EE/TS/CT/01
− Documentation (Hard copy and optical disk also for long storage).
− Factory Acceptance Testing (FAT) and Inspection of ex-factory items.
− Site Acceptance Testing (SAT).
− Statutory Approval.
− Training (Per day rate for Manufacturer’s shop as well as at Field).
− Special tools and tackles.
− Logistic support for supply of spares for next 5 years.
9 Current Transformer
This section herein describes the specific construction and erection requirement of Solar plant onsite
switchyard 132kV current transformer.
Rev. 0 Page 5
50MVA, 33/132kV Substation, Document No: Rev No: 00
Rajasthan Project
Sangarh, Rajasthan , India IBVSI/RJ/SANGRAH/EE/TS/CT/01
Standard Description
IEC 60060-1:1989/ High-voltage test techniques – Part 1: General definitions and test
IS 2071 requirements
Guide for the sampling of gases and of oil from oil-filled electrical equipment
IEC 60567:1992
and for the analysis of free and dissolved gases
IEC 60815:1986 Guide for the selection of insulators in respect of polluted conditions
General requirements and test methods for current transformers used for
IEC 60044-1
measurement and protection.
IEC 61869-2 Additional specifications for current transformers used for protection purposes
IEC 61869-3 Standard specifies the requirements for current transformers used for specific
applications, such as electronic voltage transformers, current transformers for
digital protection relays, and current transformers for transient performance
measurements.
Rev. 0 Page 6
50MVA, 33/132kV Substation, Document No: Rev No: 00
Rajasthan Project
Sangarh, Rajasthan , India IBVSI/RJ/SANGRAH/EE/TS/CT/01
Standard Description
IEEE C57.13 Guidelines for the design, testing, and application of current transformers used
in power systems.
IS 3618 Phosphate Treatment of Iron and Steel for Protection Against Corrosion
shall be maintained between 1% to 120% of rated current. CT burden shall not be less than
15VA to achieve required 0.2S accuracy class.
− The instrument security factor of metering core shall be low enough but not greater than 5.
9.1.3 Terminal
− Primary terminals shall be made of non-ferrous corrosion resistant material and provided with
bimetallic terminal connectors, and the terminal connectors required for connection of the
Instrument Transformer shall be an integral part of it. These terminal connectors shall be
suitable for connecting ACSR equivalent.
− Secondary terminals shall be brought out to a terminal box and suitable for connection to 2 x
2.5mm2 stranded copper conductors per way.
− All primary and secondary terminals shall be clearly and indelibly identified as per relevant
standard.
− The terminal box shall be of 3mm thick sheet steel, IP-55, weather proof and dust-tight,
complete with gasketted front access cover and removable gland plate at bottom for cable
entry.
9.1.4 Grounding
− Each current transformer shall be provided with two ground pads for connection to station
ground mat.
− The ground pad shall comprise buffed metal surface with two holes, M10 G.I. bolts and spring
washers to receive 75x12mm G.S flat.
− Always consider transformer as a part of the circuit to which it is connected and do not touch
the leads and terminals or other parts of the transformer unless they are known to be
grounded.
− Always ground the metallic bases of instrument transformer.
− Always ground one secondary terminal of the transformer, except if the windings are connected
to open delta. When the secondary of transformer is interconnected, there should be only one
grounded point to prevent accidental paralleling with system grounding wire. In case of
disconnection from the ground, the grounding screw has to be removed from the secondary
terminal.
− Always short-circuit the secondary of the current transformer, which is not currently in use to
prevent secondary voltages which may be hazardous to personnel or damaging to the
transformers secondary.
− In case of the current transformer with voltage indication (coupling electrode included) is
secondary terminal box equipped with PE terminal, which is connected with earthing screw to
the base plate, which must be generally earthed.
Rev. 0 Page 9
50MVA, 33/132kV Substation, Document No: Rev No: 00
Rajasthan Project
Sangarh, Rajasthan , India IBVSI/RJ/SANGRAH/EE/TS/CT/01
− Dissolved gas analysis to be carried out at the time of commissioning. CTs must have
adequate provision for taking oil samples from the bottom of the CT without exposure to
atmosphere.
10 Submission
Manufacturer shall submit following documents for current transformer. Manufacturer / supplier shall
submit valid type test certificates issued by a National or International Testing Authority.
Rev. 0 Page 10
50MVA, 33/132kV Substation, Document No: Rev No: 00
Rajasthan Project
Sangarh, Rajasthan , India IBVSI/RJ/SANGRAH/EE/TS/CT/01
11 List of Attachment
Rev. 0 Page 11
Doc No
50 MVA, 33/132 KV SUBSTATION AT, SANGARH, RAJASTHAN
IBVSI/RJ/SANGRAH/EE/CT
/GTP/01
Approved: CAT B
By OBS
Date : 20/12/2023
NO. OF
REV. DATE PREPARED BY. CHECKED BY. APPROVED BY. REMARKS
SHEETS
Document: GTP of 132kV Current Transformer
Document Number: IBVSI/RJ/SANGRAH/EE/CT/GTP/01
CT Ratio 250-500/1-1-1-1 A
Core-1 CL-0.2S, 15 VA
Core-2 CL-PS
Core-3 5P20, 30 VA
Core-4 CL-PS
CT Ratio 250-500/1-1-1-1 A
Core-1 CL-0.2S, 15 VA
Core-2 CL-PS
Core-3 5P20, 15 VA
Core-4 CL-PS
Page 1 Rev. 0
Vendor Data Vendor Data
Sr.No. Description Requirement
101-CT 102-CT
4 No. of Poles 1
6 Service Outdoor
Page 2 Rev. 0
Vendor Data Vendor Data
Sr.No. Description Requirement
101-CT 102-CT
25 Core Details:
Page 3 Rev. 0
Vendor Data Vendor Data
Sr.No. Description Requirement
101-CT 102-CT
28 Details of Windings:
a) Primary:
i) Material Copper
b) Secondary :
i) Material Copper
Page 4 Rev. 0
Vendor Data Vendor Data
Sr.No. Description Requirement
101-CT 102-CT
31 Permisible Limits :
b) Guranteed Phase Angle Error (Max.) Within permisible limits as per IS-2705
(Manufacturer to specify)
35 Insulators :
a) Type Porcelain
Page 5 Rev. 0
Vendor Data Vendor Data
Sr.No. Description Requirement
101-CT 102-CT
38 Insulating Oil:
Page 6 Rev. 0
Vendor Data Vendor Data
Sr.No. Description Requirement
101-CT 102-CT
42 Type of Treatment:
Page 7 Rev. 0
Vendor Data Vendor Data
Sr.No. Description Requirement
101-CT 102-CT
48 Bushing Porcelain
Page 8 Rev. 0