Technology Plan and Infrastruture Support System
Technology Plan and Infrastruture Support System
b. Trainee Requirements
Must have completed at least Junior High School/ High School or an
ALS Graduate with a Certificate of Achievement
Must be able to communicate both orally and in writing
Must be have an idea about at least computer literacy such as MS word
Must be able how to compute basic mathematical computation
c. Trainer Requirements
To qualify as Trainer for Electrical Installation and Maintenance NC II Level, a
person must:
Must have a Electrical Installation and Maintenance NCII or higher
level
Must have a 2 years’ experience in electrical industry or teaching
experience
Must be computer literate
Must have a Trainer’s Methodology level II certificate
Must have finish training in Online Blended Learning
Face to Face: Competent or Not yet Competent - Monitored thru Progress Chart,
Log Book, Attendance Sheet, Progress Sheet, Achievement Chart with Trainees
Record Book (TRB)
e. Institutional Assessment System
The following assessment methods shall be used for assessing the competency of
the participants and shall focus on the core units of competency. The basic and
common units shall be integrated or assessed concurrently with the core units.
Online:
Computer-based test - This is composed of multiple choice test given
online. The computer based test shall only be opened to a particular
participant scheduled for assessment during a designated time. If the
participant failed to take the test during the designated time, he should
notify the online mentor for another schedule of test. A trainee should
be able to get at least 80% of the correct answers to pass the test.
Face to Face:
Direct observation and questioning
Demonstration (able to impart knowledge and skills)
Project method
Practical Lab/Exercises
f. Training Plan/Schedule
The training shall run for two (2) weeks depending on the progress and paced of
the learner. A more detailed breakdown of schedules, which include learning
activities deadline of submission of outputs, and assessment, shall be indicated in
the study guide which will be uploaded to the LMS to serve as further guidance to
ensure completion of the program
A Unit of Competency 1 for Perform roughing-in, wiring and cabling works for
single-phase distribution, power, lighting and auxiliary systems in the Core
Competency is prepared, see attached. The e-learning material is a package
consisting of web scripts, videos, quizzes, interactive elements, task sheets with
performance criteria checklist. The institutional competency assessment is
composed of computer-based test on the LMS and Portfolio. While for the face-
to-face assessment were the direct observation and question, demonstration,
project method and practical laboratory exercises. These are all in the course area
for Electrical Installation and Maintenance NCII
III. Supplies, materials and equipment
Online:
PC/Laptop/Headset/Mobile Devices
LMS and User Credentials
Internet Connection
e. Enrolment System
The enrollment system shall be enrolled to Learning Management System
and shall be provided with their respectice credentials either:
Manually Enrolment
Self - Enrolment
Activity
Participation
Course Completion
h. Instructional Strategies
i. Online Activities: Trainer to Peer communication
1. Training Induction Program
2. Webinars
i. Learning Materials
The following learning materials shall be used in the training:
Interactive learning materials with self-check – the interactive
eLearning materials were developed by e TESDA Division. The
eLearning materials were bundled by learning outcome. The
eLearning materials have the following parts:
1. Learning Objectives - is to get idea what are you doing
the entire training.
2. Learning Contents - The participants determined the
lessons in the competency that they enroll.
3. Interactive Learning Activities - Participants can easily
understand by watching videos about the lesson
enroll with a interactive question inside the
video.
4. Self-checks with auto feedback - The participants can
get the result of the task that they finish.
5. Task Sheets with Performance Criteria Checklist -
Participants will evaluate about the task they
done
.
Task Sheets, Performance Criteria Checklists and output templates are
downloadable from the eLearning materials so that the task sheets maybe
done offline.
ii. Computer - Base Examinition - Simply refers to tests and assessments
conducted through the use of the organized systems on computers. This is
required per Learning Outcomes.
Task sheet - A checklist that you use to track important activities that you
must perform.
b. Technical Support Staff The following personnel shall serve as the trainers for
this training:
• Technical Support Staff (Development Site)
• Technical Support Staff
• Technical Support Staff
• Technical Support Staff