Q.M.I.S.
QU,!\UTY MANAGEMENT INFORMATION SYSTEM
-Is an electronic tool that supports the quality system of the project
through:
l).R.F.1 Processes
2).Surve'illance Processes
· I .
....
, ,~ ql 0 ,0
.,.-......--.~ .. ~'=-~
- - - ._---
).Pro ctive otifiCat 0 P.I.D Inspector shall initiate Pro active notification
-
l·Gen lral Commen - P.I.D Inspector shall initiate General Comment Logbook
Entry tl:1his regular inspection or visit at the project.
--
JVgI a I
"I,: .
.......... Inspector
a.c.iv •• RFI
1 ;
--IR,--
. .0.- ............_
" . .. . . ...,.. ....,8Md
_Wi. S S N t , ICltM
_ "'N"'poIIoIlt
P C . TWOltRlflnlOIIe
. . I " . I I ........... CW
..
!
11.
i
I) b\Spaded &
Accepted Not
'".~1Dd
1.IIS.Cary . . . . . 1eCIOftd one +- h uh> WH I to _ _
1....... ...-.t 'gca , If U~ f. lu wd U...I"" 1" IlUl",
....................."""'.
1 'Id.
'100C2I. 1Il1o _
,...1IfI ........ ...
Rn 11 100 __
111 "",tiLOf'
. ..pI
ft. I~I tI U
O n-H old
On-"Olel
four ndrtUr IIndirtys. t tH.tut tI Id ~"'Jl~ t. LlflL... 'io..... Il,t t u kt: ",' U4. t:
Ih~ RH w,1I duy us N()pt!t," uncJ :rtouhJ Ltc e llc:lu ll Y': ' I "~ I I ullu'
Ie I ...."C 110 1'1 l u te ,. Rf l "un tit! e.tht,!'1 UH.up l u d It 1, ... 11111
!'Je,l oJ If
eel and cce ed - P.LO Inspector shall select this category if the R.F.I
was physically inspected and accepted the inspection point at this point the R.F.I
is clOSE'd.
•Vi ' - P.LO Inspector shall reject the issued R.F.I if the inspection resulted
in viola'tion to Saudi Aramco standards, Procedure and International Code and
R.F.I wi II be kept open and will be closed when the corrective action is completed
and ac(:epted .
•On-.lo - The P.LO Inspector may place the issued R.F.I "on hold" status if
there i~, deficiency minor and can be rectified within few hours.
II': iI
- I::ach checklist contain complete acceptance criteria for each and every
specific inspection activities check item per inspection work item,per discipline
eliminat ing the need to retrieve the applicable standard for inspection point in
questiol1.
1~1l1 1/ ,I
'" \
--. -~ --- -~ -
p - - - - - - ~ - - -
.PID Inspector - Responds and closes the R.F.I issued by Contractor and to
initiate md close surveillance/logbook entry.
).,Con actor Q . - Upload SATIP and SAIC applicable to the project,can view
R.F.I and surveillance/logbook entry.
4 Types of Inspection :
.:wJ,nn"illance - The PIO inspector visit to the project work site to observe and
inspect che construction or Equipment installation activities without prior
invitaticm by the contractor.
). itt ~ Point - Work activities can proceed after notifying the designated
organization or authority, Contractor QC has full responsibility to performing
inspection activities during the work activity .
• e "!W Poin - Work activity cannot proceed without first ensuring the review
and apl:roval of applicable documents or personnel qualification by a designated
organization or authority.
./
The Inspector working for contractor or manufacturer to
ensure that the work is performed in accordance with the
design and the applicable standards required by Saudi Aramco.
l).Perfo rmance of direct point inspection in the field of RFI and Surveillance
Based.
2).Revie lNing and validating the test result in related of inspection point.
·.
3).Revil::wing and approving pr.oject and Contractor quality documents and quality
personnel.
6).PID has responsible for quality monitoring of all stages construction and pre-
commissioning up to the final acceptance to ensure compliance with the
applicahle standard and project specification .
7).PID CJverage begin with the review the engineering drawing and project
propos;:11and details Design.
8).PID will assist the PMT to enforcing and interpreting the company standard and
specification.
l).The 5.audi Aramco quality inspector has the responsibility to assist the project
team during the design phase of the project life cycle, usually by reviewing the
partial Emgineering drawing and on occasion reviewing the project proposal
requirements.
· .
During Construction
2).Thesl~ is where most of the Saudi Aramco quality inspector activities lie, where
he runs Pro-active and RFI based inspection and review's as well as support the
project team in his technical discipline and expertise and contributes to the safety
of the project personnel and property.
11'11,11'
4).Provide Quality Assurance services that ensure the safe operation of all lifting
equipmmnt working on company facil ities.
• Checking RFI
• Reviews (Drawing and Submittals ...etc)
2).Mee1 ings
• 1)" Scope
• 2)" Normative References
• 3), Terms and Definitions
• 4)" Quality Management System
• 5)" Management Responsibility
• 6)" Resource Management
• 7), Project Execution (Product Realization)
• 8)" Measurement, Analysis and Improvement
0. 1"
This Scheo,ule describes COMPANY's minimum requirements for CONTRACTOR's Quality System
CONTRACI'OR shall implement for this Contract a Quality Management System in accordance
with the Iiltest version of ISO 9001 (Quality Management Systems· Requirements), which is
incorporal ed herein by reference and this Schedule "Q".
CONTRACI'OR shall plan, organize, control and execute all WORK in accordance with
CONTRACI'OR's Quality Plan(s), Inspection and Test Plans (iTPs) and documented procedures.
In accorda llce with ISO 9001, CONTRACTOR's top management shall review the project specific
Quality SY3tem every six months to ensure that the system is suitable, adequate and effective.
CONTRACI'OR shall provide resources to implement the Quality System as set forth in this
Contract.
I~ I I) .'
,' , "
CONTRACTOR shall include as part of his plan for measuring, monitoring, analysis and
improvem,::nt of his processes, how the plan·do·check·act cycle is driven wit hout end on this
project.
...--- - - - --------- - - -,
--"
..: _
-
J 11'':''
..... "
f
~Il l .. I'
Inspector Enter.'
Surveillance
QC Personnel
Receives
Nolifiealion
1
Aflersatlsfaclory reply fro the UC personnel
ondjorPM the iurvlllllancQ IIlIm II cllXee by the
inspector