The document outlines a project to study and improve the reliability of a Terminal Automation System (TAS). It assigns a 6-week project to Mr. Karan Rana to study the TAS system, identify key areas for improvement, and ensure reliable operations. The project objectives include analyzing the system architecture of TAS, weigh bridges, and loading skids, as well as maintaining operations and addressing issues like SQL coding, backups, and calibration. Major milestones and their statuses are listed. The target achievement for all milestones is 100%.
The document outlines a project to study and improve the reliability of a Terminal Automation System (TAS). It assigns a 6-week project to Mr. Karan Rana to study the TAS system, identify key areas for improvement, and ensure reliable operations. The project objectives include analyzing the system architecture of TAS, weigh bridges, and loading skids, as well as maintaining operations and addressing issues like SQL coding, backups, and calibration. Major milestones and their statuses are listed. The target achievement for all milestones is 100%.
The document outlines a project to study and improve the reliability of a Terminal Automation System (TAS). It assigns a 6-week project to Mr. Karan Rana to study the TAS system, identify key areas for improvement, and ensure reliable operations. The project objectives include analyzing the system architecture of TAS, weigh bridges, and loading skids, as well as maintaining operations and addressing issues like SQL coding, backups, and calibration. Major milestones and their statuses are listed. The target achievement for all milestones is 100%.
Sr. No. Identify Area for Project Work Project Objective
Function
Terminal Automation System Instrumentation Study of Operation of
Project Functions Reliability Improvements TAS System & System 1 Improvements Project Project Assigned Project Name Duration Project Assigned By To (in weeks) Terminal Automation System 6 Mr. Karan Rana Mr. Jignesh Patel Functions
Terminal Automation System
Functions
Terminal Automation System
Functions
Maintenance & Operations
Maintenance & Operations
Maintenance & Operations
System Reliability Improvements
System Reliability Improvements
System Reliability Improvements
Key Learning Major milestones: Start Date End Date Status Outcome
System Architecture TAS System Architecture 5-Jan-20 21-Jan-20 Completed
System Architecture Weigh Bridge System 22-Jan-20 9-Feb-00 Completed
Architecture
System Architecture Loading Skid Architecture 10-Feb-00 21-Mar-20 Completed
Maintenance & Operation of TAS Server System 5-Jan-20 21-Jan-20 Completed
Operations Maintenance & Operation of Weigh Bridge 22-Jan-20 9-Feb-00 Completed Operations System
Maintenance & Operation of Loading Skid 15-Jun-20 30-Jul-20 Completed
Operations SQL Coding Issue solution, TAS Server Commissioning & 5-Jan-20 21-Jan-20 Completed Backup of Database, Redundancy Disk Cleaning for Server