PEGAGA LIFTING & SHIFTING SCHEDULE 2020 rev.

0
NO PROJCET ITEM LIFTING DATE SHIFTING DATE

61 PEGAGA CPP ERECTION OF LQ BASE FRAME 15 July, 2020 15 July, 2020

81 PEGAGA CPP LIFT & INTEGRATE LEVEL 1 MODULE ONTO BASE FRAME 24 July, 2020 24 July, 2020
(1/4 nos of LQ modules) (LQ1A)

82 PEGAGA CPP LIFT & INTEGRATE LEVEL 1 MODULE ONTO BASE FRAME 25 July, 2020 25 July, 2020
(2/4 nos of LQ modules) (LQ1B)

83 PEGAGA CPP LIFT & INTEGRATE LEVEL 1 MODULE ONTO BASE FRAME 26 July, 2020 26 July, 2020
(3/4 nos of LQ modules) (LQ1C)

63 PEGAGA CPP INSTALLATION OF GAS TURBINE GENERATOR PACKAGE (EX-8110A) 27 July, 2020 27 July, 2020

64 PEGAGA CPP INSTALLATION OF GAS TURBINE GENERATOR PACKAGE (EX-8110B) 7 August, 2020 7 August, 2020

65 PEGAGA CPP INSTALLATION OF GAS TURBINE GENERATOR PACKAGE (EX-8110C) 8 August, 2020 8 August, 2020

84 PEGAGA CPP LIFT & INTEGRATE LEVEL 1 MODULE ONTO BASE FRAME 27 July, 2020 27 July, 2020
(4/4 nos of LQ modules) (LQ1D)

67 PEGAGA CPP INSTALLATION OF SERVICE DECK 10 August, 2020 10 August, 2020

89 PEGAGA CPP LIFT & INTEGRATE LEVEL 2 MODULE ONTO LEVEL 1 LQ MODULE 31 July, 2020 31 July, 2020
(1/4nos of LQ modules)

118 PEGAGA CPP LIFT & INTEGRATE LEVEL 2 MODULE ONTO LEVEL 1 LQ MODULE 1//8/2020 1//8/2020
(2/4nos of LQ modules)

119 PEGAGA CPP LIFT & INTEGRATE LEVEL 2 MODULE ONTO LEVEL 1 LQ MODULE 2 August, 2020 2 August, 2020
(3/4nos of LQ modules)

120 PEGAGA CPP LIFT & INTEGRATE LEVEL 2 MODULE ONTO LEVEL 1 LQ MODULE 3 August, 2020 3 August, 2020
(4/4nos of LQ modules)

68 PEGAGA CPP INSTALLATION OF COOLER DECK 7 September, 2020 7 September, 2020

77 PEGAGA CPP LIFT & INTEGRATE LEVEL 3 MODULE ONTO LEVEL 2 LQ MODULE 7 August, 2020 7 August, 2020
(1/4nos of LQ modules)

78 PEGAGA CPP LIFT & INTEGRATE LEVEL 3 MODULE ONTO LEVEL 2 LQ MODULE 8 August, 2020 8 August, 2020
(2/4nos of LQ modules)

79 PEGAGA CPP LIFT & INTEGRATE LEVEL 3 MODULE ONTO LEVEL 2 LQ MODULE 9 August, 2020 9 August, 2020
(3/4nos of LQ modules)

80 PEGAGA CPP LIFT & INTEGRATE LEVEL 3 MODULE ONTO LEVEL 2 LQ MODULE 10 August, 2020 10 August, 2020
LIFTING & SHIFTING SCHEDULE 2020 rev.0

NO PROJCET ITEM LIFTING WEIGHT CRANE TRANSPORTER LIFTING DATE SHIFTING DATE REMARKS

61 PEGAGA CPP ERECTION OF LQ BASE FRAME 92.27 250T x 2, 280 x 1 nos 48 axles + 2 PPU 9-Jul-20 7/8/2020 400mt x 3 nos
Postpone

81 PEGAGA CPP LIFT & INTEGRATE LEVEL 1 MODULE ONTO BASE FRAME 69.1 Option 1: 400t x 2 18 axle + 1 PPU 7/24/2020 7/24/2020
(1/4 nos of LQ modules) Option 2: CC8800 single lift

LIFT & INTEGRATE LEVEL 1 MODULE ONTO BASE FRAME Option 1: 400t x 2
82 PEGAGA CPP (2/4 nos of LQ modules) 62.58 Option 2: CC8800 single lift 18 axle + 1 PPU 7/25/2020 7/25/2020

83 PEGAGA CPP LIFT & INTEGRATE LEVEL 1 MODULE ONTO BASE FRAME 56.91 Option 1: 400t x 2 18 axle + 1 PPU 7/26/2020 7/26/2020
(3/4 nos of LQ modules) Option 2: CC8800 single lift

INSTALLATION OF GAS TURBINE GENERATOR PACKAGE Maxer 400MT


63 PEGAGA CPP (EX-8110A) TBC by Engineering TRANSPORTER 7/27/2020 7/27/2020

64 PEGAGA CPP INSTALLATION OF GAS TURBINE GENERATOR PACKAGE Maxer 400MT TRANSPORTER 7-Aug-20 8/7/2020
(EX-8110B) TBC by Engineering

INSTALLATION OF GAS TURBINE GENERATOR PACKAGE Maxer 400MT


65 PEGAGA CPP (EX-8110C) TBC by Engineering TRANSPORTER 8-Aug-20 8/8/2020

84 PEGAGA CPP LIFT & INTEGRATE LEVEL 1 MODULE ONTO BASE FRAME 59.33 Option 1: 400t x 2 18 axle + 1 PPU 9-Aug-20 8/9/2020
(4/4 nos of LQ modules) Option 2: CC8800 single lift

Option 1: Maxer (400MT) x 2 nos.


67 PEGAGA CPP INSTALLATION OF SERVICE DECK Option 2: CC8800 & 7650 48 axles + 2 PPU 10-Aug-20 8/10/2020

LIFT & INTEGRATE LEVEL 2 MODULE ONTO LEVEL 1 LQ Option 1: 400t x 2


89 PEGAGA CPP MODULE 59.96 Option 2: CC8800 single lift 18 axle + 1 PPU 21-Aug-20 21-Aug-20
(1/4nos of LQ modules)

LIFT & INTEGRATE LEVEL 2 MODULE ONTO LEVEL 1 LQ Option 1: 400t x 2


118 PEGAGA CPP MODULE 72.45 Option 2: CC8800 single lift 18 axle + 1 PPU 22-Aug-20 22-Aug-20
(2/4nos of LQ modules)

LIFT & INTEGRATE LEVEL 2 MODULE ONTO LEVEL 1 LQ Option 1: 400t x 2


119 PEGAGA CPP MODULE 54.29 18 axle + 1 PPU 23-Aug-20 23-Aug-20
(3/4nos of LQ modules) Option 2: CC8800 single lift

LIFT & INTEGRATE LEVEL 2 MODULE ONTO LEVEL 1 LQ


120 PEGAGA CPP MODULE 54.18 Option 1: 400t x 2 18 axle + 1 PPU 24-Aug-20 24-Aug-20
(4/4nos of LQ modules) Option 2: CC8800 single lift

68 PEGAGA CPP INSTALLATION OF COOLER DECK Maxer (400MT) x 2 nos. 36 axles + 2 PPU 7-Sep-20 9/7/2020

LIFT & INTEGRATE LEVEL 3 MODULE ONTO LEVEL 2 LQ Option 1: 400t x 2


77 PEGAGA CPP MODULE 59.7 Option 2: CC8800 single lift 18 axle + 1 PPU 8-Sep-20 8-Sep-20
(1/4nos of LQ modules)
SPMT ONGC 98/2 PEGAGA TOTAL
12 axles + 1 PPU 0 1 1
12 axles + 2 PPU 2 0 2
18 axles + 1 PPU 0 16 16
24 axles + 2 PPU 13 1 14
36 axles + 2 PPU 0 1 1
48 axles + 2 PPU 9 2 11
TOTAL 24 20 44
12 axles + 2 PPU

PROJCET ITEM
PEGAGA CPP Diesel Storage Tank Row 6
ONGC 98/2
U PEGAGA
TOTAL

LIFTING WEIGHT TRANSPORTER


94MT 12 axle + 1 PPU
2
1
3

SHIFTING DATE REMARKS


19-Aug-20
12 axles + 2 PPU

PROJCET ITEM
ONGC 98/2 JACKET SKIRT PILE SLEEVES - ROW 1&2 (A&B)
ONGC 98/2 JACKET SKIRT PILE SLEEVES - ROW 6&7 (A&B)
ONGC 98/2
U PEGAGA
TOTAL

LIFTING WEIGHT TRANSPORTER


118.66MT 12 axles + 2 PPU
118.66MT 12 axles + 2 PPU
2
1
3

SHIFTING DATE REMARKS


JULY
JULY
18 axles + 1 PPU

PROJCET ITEM
LIFT & INTEGRATE LEVEL 1 MODULE ONTO
PEGAGA CPP BASE FRAME
(1/4 nos of LQ modules)
LIFT & INTEGRATE LEVEL 1 MODULE ONTO
PEGAGA CPP BASE FRAME
(2/4 nos of LQ modules)
LIFT & INTEGRATE LEVEL 1 MODULE ONTO
PEGAGA CPP BASE FRAME
(3/4 nos of LQ modules)
LIFT & INTEGRATE LEVEL 1 MODULE ONTO
PEGAGA CPP BASE FRAME
(4/4 nos of LQ modules)
LIFT & INTEGRATE LEVEL 2 MODULE ONTO
PEGAGA CPP LEVEL 1 LQ MODULE
(1/4nos of LQ modules)
LIFT & INTEGRATE LEVEL 2 MODULE ONTO
PEGAGA CPP LEVEL 1 LQ MODULE
(2/4nos of LQ modules)
LIFT & INTEGRATE LEVEL 2 MODULE ONTO
PEGAGA CPP LEVEL 1 LQ MODULE
(3/4nos of LQ modules)
LIFT & INTEGRATE LEVEL 2 MODULE ONTO
PEGAGA CPP LEVEL 1 LQ MODULE
(4/4nos of LQ modules)
LIFT & INTEGRATE LEVEL 3 MODULE ONTO
PEGAGA CPP LEVEL 2 LQ MODULE
(1/4nos of LQ modules)
LIFT & INTEGRATE LEVEL 3 MODULE ONTO
PEGAGA CPP LEVEL 2 LQ MODULE
(2/4nos of LQ modules)
LIFT & INTEGRATE LEVEL 3 MODULE ONTO
PEGAGA CPP LEVEL 2 LQ MODULE
(3/4nos of LQ modules)
LIFT & INTEGRATE LEVEL 3 MODULE ONTO
PEGAGA CPP LEVEL 2 LQ MODULE
(4/4nos of LQ modules)
LIFT & INTEGRATE LEVEL 4 MODULE ONTO
PEGAGA CPP LEVEL 3 LQ MODULE
(1/4nos of LQ modules)
LIFT & INTEGRATE LEVEL 4 MODULE ONTO
PEGAGA CPP LEVEL 3 LQ MODULE
(2/4nos of LQ modules)
LIFT & INTEGRATE LEVEL 4 MODULE ONTO
PEGAGA CPP LEVEL 3 LQ MODULE
(3/4nos of LQ modules)
LIFT & INTEGRATE LEVEL 4 MODULE ONTO
PEGAGA CPP LEVEL 3 LQ MODULE
(4/4nos of LQ modules)
ONGC 98/2
U PEGAGA
TOTAL

LIFTING WEIGHT TRANSPORTER

18 axle + 1 PPU

18 axle + 1 PPU

18 axle + 1 PPU

18 axle + 1 PPU

18 axle + 1 PPU

18 axle + 1 PPU

18 axle + 1 PPU

18 axle + 1 PPU

18 axle + 1 PPU

18 axle + 1 PPU

18 axle + 1 PPU

18 axle + 1 PPU

18 axle + 1 PPU

18 axle + 1 PPU
18 axle + 1 PPU

18 axle + 1 PPU
0
16
16

SHIFTING DATE REMARKS

24-Jul-20

25-Jul-20

26-Jul-20

27-Jul-20

31-Jul-20

1-Aug-20

2-Aug-20

3-Aug-20

7-Aug-20

8-Aug-20

9-Aug-20

10-Aug-20

14-Aug-20

15-Aug-20
16-Aug-20

17-Aug-20
24 axles + 2 PPU

PROJCET ITEM
ONGC 98/2 CPP SUB CELLAR ROW (PORTION 1)
ONGC 98/2 CPP SUB CELLAR ROW 6-7 (PORTION 2)
ONGC 98/2 JACKET TOWER A (LEG 1A & 2A)
ONGC 98/2 JACKET TOWER 1B
ONGC 98/2 LQ INSTALLATION OF LEVEL 4 FRAMING
ONGC 98/2 LQ INSTALLATION OF LEVEL 5 FRAMING
ONGC 98/2 JACKET BUOYANCY TANK ROW 1
ONGC 98/2 JACKET BUOYANCY TANK CENTER
ONGC 98/2 JACKET BUOYANCY TANK ROW 7
ONGC 98/2 JACKET X-PANEL ROW 1
ONGC 98/2 JACKET X-PANEL ROW 7
ONGC 98/2 JACKET X-PANEL ROW 2
ONGC 98/2 JACKET X-PANEL ROW 6
PEGAGA CPP UPENDING & ERECTION OF HELIDECK
FRAME C/W PANCAKE ONTO LQ
ONGC 98/2
U PEGAGA
TOTAL

LIFTING WEIGHT TRANSPORTER


253.27MT 24 axles + 2 PPU
180.46MT 24 axles + 2 PPU
321.69MT 24 axles + 2 PPU
321.69MT 24 axles + 2 PPU
265.50MT 24 axles + 2 PPU
211.47MT 24 axles + 2 PPU
216.02MT 24 axles + 2 PPU
198.5MT 24 axles + 2 PPU
216.02MT 24 axles + 2 PPU
106MT 24 axles + 2 PPU
106MT 24 axles + 2 PPU
88MT 24 axles + 2 PPU
88MT 24 axles + 2 PPU
24 axles + 2 PPU
13
1
14

SHIFTING DATE REMARKS


7/20/2020
7/25/2020
4/21/2020
6/3/2020
8/17/2020
8/27/2020
8/4/2020
6/30/2020
7/28/2020
JULY
JULY
JULY
JULY
early october Date TBC by Production
36 axles + 2 PPU

PROJCET ITEM
PEGAGA CPP INSTALLATION OF COOLER DECK
ONGC 98/2
U PEGAGA
TOTAL

LIFTING WEIGHT TRANSPORTER


36 axles + 2 PPU
0
1
1

SHIFTING DATE REMARKS


5-Aug-20
48 axles + 2 PPU

PROJCET ITEM
ONGC 98/2 CPP CELLAR DECK PORTION 1
ONGC 98/2 CPP CELLAR DECK PORTION 2
ONGC 98/2 CPP CELLAR DECK PORTION 3
ONGC 98/2 CPP MAIN DECK 3ND PORTION
ONGC 98/2 CPP MAIN DECK 1ND PORTION
ONGC 98/2 CPP MAIN DECK 2ND PORTION
ONGC 98/2 LQ INSTALLATION OF LEVEL 1 FRAMING
ONGC 98/2 LQ INSTALLATION OF LEVEL 2 FRAMING
ONGC 98/2 LQ INSTALLATION OF LEVEL 3 FRAMING
PEGAGA CPP ERECTION OF LQ BASE FRAME
PEGAGA CPP INSTALLATION OF SERVICE DECK
ONGC 98/2
U PEGAGA
TOTAL

LIFTING WEIGHT TRANSPORTER


553.14MT 48 axles + 2 PPU
673MT 48 axles + 2 PPU
573.31MT 48 axles + 2 PPU
TBA 48 axles + 2 PPU
565.67MT 48 axles + 2 PPU
465.85MT 48 axles + 2 PPU
345.83MT 48 axles + 2 PPU
346.75MT 48 axles + 2 PPU
242.6MT 48 axles + 2 PPU
48 axles + 2 PPU
48 axles + 2 PPU
9
2
11

SHIFTING DATE REMARKS


7/2/2020
7/16/2020
7/9/2020
7/30/2020
8/14/2020
8/24/2020
7/9/2020
7/22/2020
8/4/2020
15-Jul-20
22-Jul-20