FIELD DEVELOPMENT (FDP) PLAN

It provides a basis for full resource life development design,


placing emphasis on identifying uncertainties and proposing
activities to resolve them

1
TO MAXIMIZE THE NPV BY
•Optimizing ULTIMATE RECOVERY
•Minimizing COST

TO MINIMIZE THE RISK


•Utilizing full life cycle approach

2
INTEGRATED APPROACH
•Get everyone on board early-on
•List and rank key uncertainties
•Schedule to reduce them
•Review milestones

3
THE CHALLENGE
Notional FDP to maximize the NPV

•HOW MUCH HC we have (STOOIP)


•HOW MUCH we can get (UR)
•HOW FAST we can get (kr)

•HOW we will get the HC

•Long term plans (Sor – MANAGERIAL)

•What are the risks and how big it is


•HSE issues
4