You are on page 1of 16

PERBANDINGAN LOAD COMBINATION FEED VS SNI 2019

BASED ON SNI 2012 BASED ON SNI 2019


Factored Load Combination Factored Load Combination
The following factored load combinations are used for reinforced concrete design by Ultimate The following factored load combinations are used for reinforced concrete design by Ultimate Stre
Strenght Design method (SNI 1726 2012). method (SNI 1726 2019).
Description Remarks No Description Remarks
1 1.4 D Permanent 1 1.4 D Permanent
2 1.2 D + 1.6 L + 0.5 (Lr or R) Permanent 2 1.2 D + 1.6 L + 0.5 (Lr or R) Permanent
3 1.2 D + 1.6 (Lr or R) + 1.0 (L or 0.5 W) Temporary 3 1.2 D + 1.6 (Lr or R) + 1.0 (L or 0.5 W) Temporary
4 1.2 D + 1.0 W + 1.0 L + 0.5 (Lr or R) Temporary 4 1.2 D + 1.0 W + 1.0 L + 0.5 (Lr or R) Temporary
5 1.2 D + 1.0 E + 1.0 L Temporary 5 1.2 D + 1.0 (Ev + Eh) + 1.0 L Temporary
6 0.9 D + 1.0 W Temporary 6 0.9 D + 1.0 W Temporary
7 0.9 D + 1.0 E Temporary 7 0.9 D - 1.0 Ev + 1.0 Eh Temporary

Unfactored Load Combination Unfactored Load Combination


The following unfactored loading combinations are used for foundation capacity review (Refer to
The following unfactored loading combinations are used for foundation capacity review (Refer to SNI 17
SNI 1726 2012).
Description Remarks No Description
1 1.0 D Permanent 1 1.0 D
2 1.0 D + 1.0 L Permanent 2 1.0 D + 1.0 L
3 1.0 D + 1.0 (Lr or R) Permanent 3 1.0 D + 1.0 (Lr or R)
4 1.0 D + 0.75 L + 0.75 (Lr or R) Permanent 4 1.0 D + 0.75 L + 0.75 (Lr or R)
5 1.0 D + (0.6 W or 0.7 E) Temporary 5 1.0 D + 0.6 W dari sni 2012 LC 5
6 1.0 D + 0.75 (0.6 W or 0.7 E) + 0.75 L + 0.75 (Lr or R) Temporary 6 1.0 D + 0.75 (0.6 W) + 0.75 L + 0.75 (Lr or R) dari sni 2012 LC 6
7 0.6 D + 0.6 W Temporary 7 0.6 D + 0.6 W
8 0.6 D + 0.7 E Temporary 8 1.0 D + 0.7 Ev + 0.7 Eh dari sni 2012 LC 5
9 1.0 D + 0.525 Ev + 0.525 Eh + 0.75 L dari sni 2012 LC 6
10 0.6 D - 0.7 Ev + 0.7 Eh

No. Symbol Description


The following load and force are considered in the design of General Civil & Structure :
1 DL Dead Load
2 E Equipment Load No. Name Symbol
3 E(E) Weight of machinery including appurtances and it is classified as empty load 1 Dead Load D
4 E(O) Operating Load 2 Live Load L
5 E(T) Testing Load 3 Live Load Roof Lr
6 W Wind Load 4 Equipment Empty Load E(E)
7 Ce Combined height, exposure and gust factor coefficient 5 Equipment Operatng Load E(O)
8 Cq Pressure coefficient 6 Equipment Test Load E(T)
9 qs Wind stagnation pressure 7 Wind Load in X-dir Wx
10 I Importance factor 8 Wind Load in Z-dir Wz
11 P Wind pressure 9 Seismic load in +X-dir. EQ(x+)
12 EQ Earthquake Load 10 Seismic load in -X-dir. EQ(x-)
13 V Base shear 11 Seismic load in +Z-dir. EQ(z+)
14 Ca Seismic coefficient 12 Seismic load in -Z-dir. EQ(z-)
15 Cv Seismic coefficient 13 Piping Empty P(E)
16 Wt Weight of equipment and / or structure 14 Piping Operating (Incl anchorage P(O)
17 R Reduction factor 15 Piping
Piping available)
Test Load (Incl anchorage P(T)
Piping available)
18 Bp Pedestal width 16 Water Ground Pressure WT
19 Lp Pedestal length 17 ~28 Impact Load (1 ~ 12) I
20 Bf Footing width 29 Thermal/ Friction force Th
21 Lf Footing length 30 Soil Pressure SP
22 hp Pedestal height 31 Pressure Coefficient C
23 hf Pedestal footing

24 Hcog Height of center gravity FACTORED COMBINATION


25 Af Projected area - Load Combination
26 SFH Sliding safety factor FACTORED For the design of concrete structure (Ultimate Strength Design Method)

Loading Condition Combination of Load


27 SFM Overturning safety factor
28 fc' Concrete compressive strength Empty 1.2[D+P(E)+E(E)]+1.6[SP+WT]
29 fy Reinforced yield strength 1.4[D+E(O)+P(O)]
30 σ Soil pressure 1.2[D+E(O)+P(O)]+1.6[L+Th+I]+1.6[SP+WT]+0.5Lr
31 qall Allowable soil bearing capacity 1.2[D+E(O)+P(O)]+1.6Lr+1.0[L+Th]+1.6[SP+WT]
32 y Unit Weight of Material 1.2[D+E(O)+P(O)]+1.6Lr+1.6[SP+WT]+0.5W
Normal Operation (1.2+0.2Sds)[D+E(O)+P(O)]+1.0[L+Th]+1.6[SP+WT]+1.0[EQx+ 0.3EQz]
(1.2+0.2Sds)[D+E(O)+P(O)]+1.0[L+Th]+1.6[SP+WT]+1.0[EQz+0.3EQx]
0.9[D+E(O)+P(O)]+1.6[Th+SP+WT]+1.0[W]
(0.9-0.2Sds)[D+E(O)+P(O)]+1.6[Th+SP+WT]+1.0[EQx+0.3EQz]
(0.9-0.2Sds)[D+E(O)+P(O)]+1.6[Th+SP+WT]+1.0[EQz+0.3EQx]
1.2[D+P(T)+E(T)]+1.6[SP+WT]+1.6L+0.5Lr
Test
1.2[D+P(T)+E(T)]+1.6[SP+WT]+1.0L+1.0W+0.5Lr
1.2[D+P(E)+E(E)]+1.6[SP+WT]+1.6(L+I)+0.5Lr
0.9[D+P(E)+E(E)]+1.6[SP+WT]+1.0[W]
Maintenance
(0.9-0.2Sds)[D+P(E)+E(E)]+1.6[SP+WT]+1.0[EQx+0.3EQz]
(0.9-0.2Sds)[D+P(E)+E(E)]+1.6[SP+WT]+1.0[EQz+0.3EQx]

UNFACTORED COMBINATION
For the design of steel structures/ soil bearing pressure (Working Stress Method)

Loading Condition Combination of Load

1.0[D+P(E)+E(E)]
1.0[D+P(E)+E(E)]+1.0[0.6SP+WT]
Empty 0.6[D+P(E)+E(E)]+1.0[0.6SP+WT]+0.6W
(0.6-0.14Sds)[D+P(E)+E(E)]+1.0[0.6SP+WT]+0.7(EQx+0.3EQz)
(0.6-0.14Sds)[D+P(E)+E(E)]+1.0[0.6SP+WT]+0.7(EQz+0.3EQx)
1.0[D+P(O)+E(O)]+0.6W
(1.0+0.14Sds)[D+P(O)+E(O)]+0.7(EQx+0.3EQz)
(1.0+0.14Sds)[D+P(O)+E(O)]+0.7(EQz+0.3EQx)
1.0[D+P(O)+E(O)]+1.0[L+C+I+Th]+Lr
Normal Operation 1.0[D+P(O)+E(O)]+0.75[L+Th]+0.75[0.6W]+0.75Lr
(1.0+0.10Sds)[D+P(O)+E(O)]+0.75[L+Th]+0.75[0.7[EQx+0.3EQz]]+0.75Lr
(1.0+0.10Sds)[D+P(O)+E(O)]+0.75[L+Th]+0.75[0.7[EQz+0.3EQx]]+0.75Lr
(1.0+0.10Sds)[D]+0.525[EQx+0.3EQz]+0.75 L
Normal Operation

(1.0+0.10Sds)[D]+0.525[0.3EQx+EQz]+0.75 L
1.0[D+P(T)+E(T)]+0.75L+0.75Lr
Test
1.0[D+P(T)+E(T)]+0.75[0.6W]
1.0[D+P(E)]+1.0[L+I]+1.0Lr
1.0[D+P(E)]+0.75[L+0.6W]+0.75Lr
(1.0+0.10Sds)[D+P(E)]+0.75[L+0.7[EQx+0.3EQz]]+0.75Lr
Maintenance
(1.0+0.10Sds)[D+P(E)]+0.75[L+0.7[EQz+0.3EQx]]+0.75Lr
(1.0+0.10Sds)[D]+0.525[EQx+0.3EQz]+0.75 L
(1.0+0.10Sds)[D]+0.525[0.3EQx+EQz]+0.75 L

Note : Nilai Sds di dapat dari PUSKIM Spekturm Respon Desain 2019 dengan Klasifikasi

Kelas T0 Ts Sds Sd1


SE 0,21 1,05 0,57 0,60
Bujur 104,235,905,146
Kota Prabumulih
Lintang -3,478,512,449
pga 0,2393
ss 0,5005
s1 0,3455
tl 20

STAAD INPUT SNI 2019


STAAD INPUT FEED LOAD COMBINATION
UNFACTORED LOAD COMBINATION
UNFACTORED LOAD COMBINATION
UNFactored Load Combination For the design of pile bearing capacity and displacement check
The following unfactored loading combination is used for steel deflection check and foundation (Working Stress Method, using Allowable Stress Design)
stability check. Unfactored load shall be used in checking member deflection and Foundation Stability.
LC DESCRIPTION REMARKS Empty * Empty Condition
101 D+L Permanent LOAD COMB 100 1.0(D+PE+EE)
102 D + L + 1.0 EQX + 0.3 EQZ Temporary 1 1.0 13 1.0 4 1.0
103 D + L + 1.0 EQX - 0.3 EQZ Temporary LOAD COMB 101 1.0(D+PE+EE) + 1.0(0.6SP+WT)
104 D + L - 1.0 EQX + 0.3 EQZ Temporary 1 1.0 13 1.0 4 1.0 30 0.6 16 1.0
105 D + L - 1.0 EQX - 0.3 EQZ Temporary LOAD COMB 102 0.6(D+PE+EE) + 1.0(0.6SP+WT)+0.6Wx
106 D + L + 1.0 EQX + 0.3 EQZ Temporary 1 0.6 13 0.6 4 0.6 30 0.6 16 1.0 7 0.6
107 D + L + 1.0 EQX - 0.3 EQZ Temporary LOAD COMB 103 0.6(D+PE+EE) + 1.0(0.6SP+WT)+0.6Wz
108 D + L - 1.0 EQX + 0.3 EQZ Temporary 1 0.6 13 0.6 4 0.6 30 0.6 16 1.0 8 0.6
109 D + L - 1.0 EQX - 0.3 EQZ Temporary LOAD COMB 104 0.5202(D+PE+EE) + 1.0(0.6SP+WT)+0.7(EQ(x+)+0.3E
110 D + L + WX Temporary 1 0.5202 13 0.5202 4 0.5202 30 0.6 16 1.0 9 0.7 11 0.21
111 D + L + WZ Temporary LOAD COMB 105 0.5202(D+PE+EE) + 1.0(0.6SP+WT)+0.7(EQ(x-)+0.3EQ
112 D + Cl 1 Permanent 1 0.5202 13 0.5202 4 0.5202 30 0.6 16 1.0 10 0.7 12 0.21
113 D + Cl 1 + 0.25 WX Temporary LOAD COMB 106 0.5202(D+PE+EE) + 1.0(0.6SP+WT)+0.7(EQ(z+)+0.3E
114 D + Cl 1 + 0.25 WZ Temporary 1 0.5202 13 0.5202 4 0.5202 30 0.6 16 1.0 11 0.7 9 0.21
115 D + Cl 2 Permanent LOAD COMB 107 0.5202(D+PE+EE) + 1.0(0.6SP+WT)+0.7(EQ(z-)+0.3EQ
116 D + Cl 2 + 0.25 WX Temporary 1 0.5202 13 0.5202 4 0.5202 30 0.6 16 1.0 12 0.7 10 0.21
117 D + Cl 2 + 0.25 WZ Temporary Operating * Operating Condition
118 D + Cl 3 Permanent LOAD COMB 108 1.0(D+PO+EO) + 0.6Wx
119 D + Cl 3 + 0.25 WX Temporary 1 1.0 14 1.0 5 1.0 7 0.6
120 D + Cl 3 + 0.25 WZ Temporary LOAD COMB 109 1.0(D+PO+EO) + 0.6Wz
121 D + Cl 4 Permanent 1 1.0 14 1.0 5 1.0 8 0.6
122 D + Cl 4 + 0.25 WX Temporary LOAD COMB 110 1.0798(D+PO+EO)+0.75(0.7(EQ(x+)+0.3EQ(z+)))
123 D + Cl 4 + 0.25 WZ Temporary 1 1.0798 14 1.0798 5 1.091 9 0.525 11 0.225
LOAD COMB 111 1.0798(D+PO+EO)+0.75(0.7(EQ(x-)+0.3EQ(z-)))
The following unfactored loading combination is used for steel design by Allowable Stress Design 1 1.0798 14 1.0798 5 1.0798 10 0.525 12 0.225

Increase in LOAD COMB 112 1.0798(D+PO+EO)+0.75(0.7(EQ(z+)+0.3EQ(x+)))


LC DESCRIPTION Remarks
Allowable Stress 1 1.091 14 1.091 5 1.091 11 0.525 9 0.225
201 D+L 0% Permanent LOAD COMB 113 1.0798(D+PO+EO)+0.75(0.7(EQ(z-)+0.3EQ(x-)))
202 1.05 [D + L + 1.0 EQX + 0.3 EQZ] 33% Temporary 1 1.0798 14 1.0798 5 1.0798 12 0.525 10 0.225
203 1.05 [D + L + 1.0 EQX - 0.3 EQZ] 33% Temporary LOAD COMB 114 1.0(D+PO+EO) + 1.0(L+C+I1+Th)+1.0Lr
204 1.05 [D + L - 1.0 EQX + 0.3 EQZ] 33% Temporary 1 1.0 14 1.0 5 1.0 2 1.0 31 1.0 17 1.0 29 1.0 3 1.0
205 1.05 [D + L - 1.0 EQX - 0.3 EQZ] 33% Temporary LOAD COMB 115 1.0(D+PO+EO) + 1.0(L+C+I2+Th)+1.0Lr
206 1.05 [D + L + 1.0 EQX + 0.3 EQZ] 33% Temporary 1 1.0 14 1.0 5 1.0 2 1.0 31 1.0 18 1.0 29 1.0 3 1.0
207 1.05 [D + L + 1.0 EQX - 0.3 EQZ] 33% Temporary LOAD COMB 116 1.0(D+PO+EO) + 1.0(L+C+I3+Th)+1.0Lr
208 1.05 [D + L - 1.0 EQX + 0.3 EQZ] 33% Temporary 1 1.0 14 1.0 5 1.0 2 1.0 31 1.0 19 1.0 29 1.0 3 1.0
209 1.05 [D + L - 1.0 EQX - 0.3 EQZ] 33% Temporary LOAD COMB 117 1.0(D+PO+EO) + 1.0(L+C+I4+Th)+1.0Lr
210 0.75 [D + L + WX] 33% Temporary 1 1.0 14 1.0 5 1.0 2 1.0 31 1.0 20 1.0 29 1.0 3 1.0
211 0.75 [D + L + WZ] 33% Temporary LOAD COMB 118 1.0(D+PO+EO) + 1.0(L+C+I5+Th)+1.0Lr
212 D + Cl 1 0% Permanent 1 1.0 14 1.0 5 1.0 2 1.0 31 1.0 21 1.0 29 1.0 3 1.0
213 0.75 [D + Cl 1 + 0.25 WX] 33% Temporary LOAD COMB 119 1.0(D+PO+EO) + 1.0(L+C+I6+Th)+1.0Lr
214 0.75 [D + Cl 1 + 0.25 WZ] 33% Temporary 1 1.0 14 1.0 5 1.0 2 1.0 31 1.0 22 1.0 29 1.0 3 1.0
215 D + Cl 2 0% Permanent LOAD COMB 120 1.0(D+PO+EO) + 1.0(L+C+I7+Th)+1.0Lr
216 0.75 [D + Cl 2 + 0.25 WX] 33% Temporary 1 1.0 14 1.0 5 1.0 2 1.0 31 1.0 23 1.0 29 1.0 3 1.0
217 0.75 [D + Cl 2 + 0.25 WZ] 33% Temporary LOAD COMB 121 1.0(D+PO+EO) + 1.0(L+C+I8+Th)+1.0Lr
218 D + Cl 3 0% Temporary 1 1.0 14 1.0 5 1.0 2 1.0 31 1.0 24 1.0 29 1.0 3 1.0
219 0.75 [D + Cl 3 + 0.25 WX] 33% Temporary LOAD COMB 122 1.0(D+PO+EO) + 1.0(L+C+I9+Th)+1.0Lr
220 0.75 [D + Cl 3 + 0.25 WZ] 33% Temporary 1 1.0 14 1.0 5 1.0 2 1.0 31 1.0 25 1.0 29 1.0 3 1.0
221 D + Cl 4 0% Permanent LOAD COMB 123 1.0(D+PO+EO) + 1.0(L+C+I10+Th)+1.0Lr
222 0.75 [D + Cl 4 + 0.25 WX] 33% Temporary 1 1.0 14 1.0 5 1.0 2 1.0 31 1.0 26 1.0 29 1.0 3 1.0
223 0.75 [D + Cl 4 + 0.25 WZ] 33% Temporary LOAD COMB 124 1.0(D+PO+EO) + 1.0(L+C+I11+Th)+1.0Lr
1 1.0 14 1.0 5 1.0 2 1.0 31 1.0 27 1.0 29 1.0 3 1.0
LOAD COMB 125 1.0(D+PO+EO) + 1.0(L+C+I12+Th)+1.0Lr
1 1.0 14 1.0 5 1.0 2 1.0 31 1.0 28 1.0 29 1.0 3 1.0
LOAD COMB 126 1.0(D+PO+EO) + 0.75(L+Th)+0.75(0.6Wx)+0.75Lr
1 1.0 14 1.0 5 1.0 2 0.75 29 0.75 7 0.45 3 0.75
LOAD COMB 127 1.0(D+PO+EO) + 0.75(L+Th)+0.75(0.6Wz)+0.75Lr
1 1.0 14 1.0 5 1.0 2 0.75 29 0.75 8 0.45 3 0.75
LOAD COMB 128 1.057(D+PO+EO) + 0.75(L+Th)+0.75(0.7(EQ(x+)+0.3EQ
1 1.057 14 1.057 5 1.057 2 0.75 29 0.75 9 0.525 11 0.225 3 0.75
LOAD COMB 129 1.057(D+PO+EO) + 0.75(L+Th)+0.75(0.7(EQ(x-)+0.3EQ
1 1.057 14 1.057 5 1.057 2 0.75 29 0.75 10 0.525 12 0.225 3 0.75
LOAD COMB 130 1.057(D+PO+EO) + 0.75(L+Th)+0.75(0.7(EQ(z+)+0.3EQ
1 1.057 14 1.057 5 1.057 2 0.75 29 0.75 11 0.525 9 0.225 3 0.75
LOAD COMB 131 1.057(D+PO+EO) + 0.75(L+Th)+0.75(0.7(EQ(z-)+0.3EQ
1 1.057 14 1.065 5 1.057 2 0.75 29 0.75 12 0.525 10 0.225 3 0.75
LOAD COMB 132 1.057(D)+0.525(EQ(x+)+0.3(EQz+))+0.75 L
1 1.057 9 0.525 11 0.3171 2 0.75
LOAD COMB 133 1.057(D)+0.525(EQ(x-)+0.3(Eqz-))+0.75 L
1 1.057 10 0.525 12 0.3171 2 0.75
LOAD COMB 133 1.057(D)+0.525(EQ(z+)+0.3(EQx+))+0.75 L
1 1.057 11 0.525 9 0.3171 2 0.75
LOAD COMB 134 1.057(D)+0.525(EQ(z-)+0.3(Eqx-))+0.75 L
1 1.057 12 0.525 10 0.3171 2 0.75
Test * Test Condition
LOAD COMB 135 1.0(D+PT+ET)+0.75L+0.75Lr
1 1.0 15 1.0 6 1.0 2 0.75 3 0.75
LOAD COMB 136 1.0(D+PT+ET)+0.75(0.6Wx)
1 1.0 15 1.0 6 1.0 7 0.45
LOAD COMB 137 1.0(D+PT+ET)+0.75(0.6Wz)
1 1.0 15 1.0 6 1.0 8 0.45
Maintenance * Maintenance Condition
LOAD COMB 138 1.0(D+PE)+1.0(L+I1)+1.0Lr
1 1.0 13 1.0 2 1.0 17 1.0 3 1.0
LOAD COMB 139 1.0(D+PE)+1.0(L+I2)+1.0Lr
1 1.0 13 1.0 2 1.0 18 1.0 3 1.0
LOAD COMB 140 1.0(D+PE)+1.0(L+I3)+1.0Lr
1 1.0 13 1.0 2 1.0 19 1.0 3 1.0
LOAD COMB 141 1.0(D+PE)+1.0(L+I4)+1.0Lr
1 1.0 13 1.0 2 1.0 20 1.0 3 1.0
LOAD COMB 142 1.0(D+PE)+1.0(L+I5)+1.0Lr
1 1.0 13 1.0 2 1.0 21 1.0 3 1.0
LOAD COMB 143 1.0(D+PE)+1.0(L+I6)+1.0Lr
1 1.0 13 1.0 2 1.0 22 1.0 3 1.0
LOAD COMB 144 1.0(D+PE)+1.0(L+I7)+1.0Lr
1 1.0 13 1.0 2 1.0 23 1.0 3 1.0
LOAD COMB 145 1.0(D+PE)+1.0(L+I8)+1.0Lr
1 1.0 13 1.0 2 1.0 24 1.0 3 1.0
LOAD COMB 146 1.0(D+PE)+1.0(L+I9)+1.0Lr
1 1.0 13 1.0 2 1.0 25 1.0 3 1.0
LOAD COMB 147 1.0(D+PE)+1.0(L+I10)+1.0Lr
1 1.0 13 1.0 2 1.0 26 1.0 3 1.0
LOAD COMB 148 1.0(D+PE)+1.0(L+I11)+1.0Lr
1 1.0 13 1.0 2 1.0 27 1.0 3 1.0
LOAD COMB 149 1.0(D+PE)+1.0(L+I12)+1.0Lr
1 1.0 13 1.0 2 1.0 28 1.0 3 1.0
LOAD COMB 150 1.0(D+PE)+0.75(L+0.6Wx)+0.75Lr
1 1.0 13 1.0 2 0.75 7 0.45 3 0.75
LOAD COMB 151 1.0(D+PE)+0.75(L+0.6Wz)+0.75Lr
1 1.0 13 1.0 2 0.75 8 0.45 3 0.75
LOAD COMB 152 1.057(D+PE) + 0.75(L+0.7(EQ(x+)+0.3EQ(z+))+0.75Lr
1 1.057 13 1.057 2 0.75 9 0.525 11 0.225 3 0.75
LOAD COMB 153 1.057(D+PE) + 0.75(L+0.7(EQ(x-)+0.3EQ(z-))+0.75Lr
1 1.057 13 1.057 2 0.75 10 0.525 12 0.225 3 0.75
LOAD COMB 154 1.057(D+PE) + 0.75(L+0.7(EQ(z+)+0.3EQ(x+))+0.75Lr
1 1.057 13 1.057 2 0.75 11 0.525 9 0.225 3 0.75
LOAD COMB 155 1.057(D+PE) + 0.75(L+0.7(EQ(z-)+0.3EQ(x-))+0.75Lr
1 1.057 13 1.057 2 0.75 12 0.525 10 0.225 3 0.75
LOAD COMB 156 1.057(D)+0.525(EQ(x+)+0.3(EQz+))+0.75 L
1 1.057 9 0.525 11 0.3171 2 0.75
LOAD COMB 157 1.057(D)+0.525(EQ(x-)+0.3(Eqz-))+0.75 L
1 1.057 10 0.525 12 0.3171 2 0.75
LOAD COMB 158 1.057(D)+0.525(EQ(z+)+0.3(EQx+))+0.75 L
1 1.057 11 0.525 9 0.3171 2 0.75
LOAD COMB 159 1.057(D)+0.525(EQ(z-)+0.3(Eqx-))+0.75 L
1 1.057 12 0.525 10 0.3171 2 0.75

FACTORED COMBINATION
FACTORED COMBINATION
For the design of concrete structure (Ultimate Strength Design Method)
Factored Load Combination Factored load and ultimate design shall be used in checking strength of material and reinforcement des
The following factored load combination is used for foundation dimension and reinforcement Empty * Empty Condition
design by Ultimate Strength Design method. LOAD COMB 200 1.2(D+PE+EE)+1.6(SP+WT)
LC DESCRIPTION REMARKS 1 1.2 13 1.2 4 1.2 30 1.6 16 1.6
301 1.4 D + 1.6 L Permanent Operating * Operating Condition
302 1.2 D + 1.0 L + 1.4 EQX + 0.42 EQZ Temporary LOAD COMB 201 1.4(D+EO+PO)
303 1.2 D + 1.0 L + 1.4 EQX - 0.42 EQZ Temporary 1 1.4 5 1.4 14 1.4
304 1.2 D + 1.0 L - 1.4 EQX + 0.42 EQZ Temporary LOAD COMB 202 1.2(D+EO+PO)+1.6(L+Th+I1)+1.6(SP+WT)+0.5Lr
305 1.2 D + 1.0 L - 1.4 EQX - 0.42 EQZ Temporary 1 1.2 5 1.2 14 1.2 2 1.6 29 1.6 17 1.6 30 1.6 16 1.6 3 0.5
306 1.2 D + 1.0 L + 0.42 EQX + 1.4 EQZ Temporary LOAD COMB 203 1.2(D+EO+PO)+1.6(L+Th+I2)+1.6(SP+WT)+0.5Lr
307 1.2 D + 1.0 L + 0.42 EQX - 1.4 EQZ Temporary 1 1.2 5 1.2 14 1.2 2 1.6 29 1.6 18 1.6 30 1.6 16 1.6 3 0.5
308 1.2 D + 1.0 L - 0.42 EQX + 1.4 EQZ Temporary LOAD COMB 204 1.2(D+EO+PO)+1.6(L+Th+I3)+1.6(SP+WT)+0.5Lr
309 1.2 D + 1.0 L - 0.42 EQX - 1.4 EQZ Temporary 1 1.2 5 1.2 14 1.2 2 1.6 29 1.6 19 1.6 30 1.6 16 1.6 3 0.5
310 1.2 D + 1.0 L + 1.6 WX Temporary LOAD COMB 205 1.2(D+EO+PO)+1.6(L+Th+I4)+1.6(SP+WT)+0.5Lr
311 1.2 D + 1.0 L + 1.6 WZ Temporary 1 1.2 5 1.2 14 1.2 2 1.6 29 1.6 20 1.6 30 1.6 16 1.6 3 0.5
312 1.2 D + 1.2 Cl 1 Permanent LOAD COMB 206 1.2(D+EO+PO)+1.6(L+Th+I5)+1.6(SP+WT)+0.5Lr
313 0.9 D + 0.9 Cl 1 + 1.6 WX Temporary 1 1.2 5 1.2 14 1.2 2 1.6 29 1.6 21 1.6 30 1.6 16 1.6 3 0.5
314 0.9 D + 0.9 Cl 1 + 1.6 WZ Temporary LOAD COMB 207 1.2(D+EO+PO)+1.6(L+Th+I6)+1.6(SP+WT)+0.5Lr
315 1.2 D + 1.2 Cl 2 Permanent 1 1.2 5 1.2 14 1.2 2 1.6 29 1.6 22 1.6 30 1.6 16 1.6 3 0.5
316 0.9 D + 0.9 Cl 2 + 1.6 WX Temporary LOAD COMB 208 1.2(D+EO+PO)+1.6(L+Th+I7)+1.6(SP+WT)+0.5Lr
317 0.9 D + 0.9 Cl 2 + 1.6 WX Temporary 1 1.2 5 1.2 14 1.2 2 1.6 29 1.6 23 1.6 30 1.6 16 1.6 3 0.5
318 1.2 D + 1.2 Cl 3 Permanent LOAD COMB 209 1.2(D+EO+PO)+1.6(L+Th+I8)+1.6(SP+WT)+0.5Lr
319 0.9 D + 0.9 Cl 3 + 1.6 WX Temporary 1 1.2 5 1.2 14 1.2 2 1.6 29 1.6 24 1.6 30 1.6 16 1.6 3 0.5
320 0.9 D + 0.9 Cl 3 + 1.6 WZ Temporary LOAD COMB 210 1.2(D+EO+PO)+1.6(L+Th+I9)+1.6(SP+WT)+0.5Lr
321 1.2 D + 1.2 Cl 4 Permanent 1 1.2 5 1.2 14 1.2 2 1.6 29 1.6 25 1.6 30 1.6 16 1.6 3 0.5
322 0.9 D + 0.9 Cl 4 + 1.6 WX Temporary LOAD COMB 211 1.2(D+EO+PO)+1.6(L+Th+I10)+1.6(SP+WT)+0.5Lr
323 0.9 D + 0.9 Cl 4 + 1.6 WZ Temporary 1 1.2 5 1.2 14 1.2 2 1.6 29 1.6 26 1.6 30 1.6 16 1.6 3 0.5
LOAD COMB 212 1.2(D+EO+PO)+1.6(L+Th+I11)+1.6(SP+WT)+0.5Lr
1 1.2 5 1.2 14 1.2 2 1.6 29 1.6 27 1.6 30 1.6 16 1.6 3 0.5
LOAD COMB 213 1.2(D+EO+PO)+1.6(L+Th+I12)+1.6(SP+WT)+0.5Lr
1 1.2 5 1.2 14 1.2 2 1.6 29 1.6 28 1.6 30 1.6 16 1.6 3 0.5
LOAD COMB 214 1.2(D+EO+PO)+1.6Lr+1.0(L+Th)+1.6(SP+WT)
1 1.2 5 1.2 14 1.2 3 1.6 2 1.0 29 1.0 30 1.6 16 1.6
LOAD COMB 215 1.2(D+EO+PO)+1.6Lr+1.6(SP+WT)+0.5Wx
1 1.2 5 1.2 14 1.2 3 1.6 30 1.6 16 1.6 7 0.5
LOAD COMB 216 1.2(D+EO+PO)+1.6Lr+1.6(SP+WT)+0.5Wz
1 1.2 5 1.2 14 1.2 3 1.6 30 1.6 16 1.6 8 0.5
LOAD COMB 217 1.314(D+EO+PO)+1.0(L+Th)+1.6(SP+WT)+1.0(EQ(x+)
1 1.314 5 1.314 14 1.314 2 1.0 29 1.0 30 1.6 16 1.6 9 1.0 11 0.3
LOAD COMB 218 1.314(D+EO+PO)+1.0(L+Th)+1.6(SP+WT)+1.0(EQ(x-)+
1 1.314 5 1.314 14 1.33 2 1.0 29 1.0 30 1.6 16 1.6 10 1.0 12 0.3
LOAD COMB 219 1.314(D+EO+PO)+1.0(L+Th)+1.6(SP+WT)+1.0(EQ(z+)
1 1.314 5 1.314 14 1.314 2 1.0 29 1.0 30 1.6 16 1.6 11 1.0 9 0.3
LOAD COMB 220 1.314(D+EO+PO)+1.0(L+Th)+1.6(SP+WT)+1.0(EQ(z-)+
1 1.314 5 1.314 14 1.314 2 1.0 29 1.0 30 1.6 16 1.6 12 1.0 10 0.3
LOAD COMB 221 0.9(D+EO+PO)+1.6(Th+SP+WT)+1.0Wx
1 0.9 5 0.9 14 0.9 29 1.6 30 1.6 16 1.6 7 1.0
LOAD COMB 222 0.9(D+EO+PO)+1.6(Th+SP+WT)+1.0Wz
1 0.9 5 0.9 14 0.9 29 1.6 30 1.6 16 1.6 8 1.0
LOAD COMB 223 0.786(D+EO+PO)+1.6(Th+SP+WT)+1.0(EQ(x+)+0.3EQ
1 0.786 5 0.786 14 0.786 29 1.6 30 1.6 16 1.6 9 1.0 11 0.3
LOAD COMB 224 0.786(D+EO+PO)+1.6(Th+SP+WT)+1.0(EQ(x-)+0.3EQ
1 0.786 5 0.786 14 0.786 29 1.6 30 1.6 16 1.6 10 1.0 12 0.3
LOAD COMB 225 0.786(D+EO+PO)+1.6(Th+SP+WT)+1.0(EQ(z+)+0.3EQ
1 0.786 5 0.786 14 0.786 29 1.6 30 1.6 16 1.6 11 1.0 9 0.3
LOAD COMB 226 0.786(D+EO+PO)+1.6(Th+SP+WT)+1.0(EQ(z-)+0.3EQ
1 0.786 5 0.786 14 0.786 29 1.6 30 1.6 16 1.6 12 1.0 10 0.3
Test * Test Condition
LOAD COMB 227 1.2(D+PT+ET)+1.6(SP+WT)+1.6L+0.5Lr
1 1.2 15 1.2 6 1.2 30 1.6 16 1.6 2 1.6 3 0.5
LOAD COMB 228 1.2(D+PT+ET)+1.6(SP+WT)+1.0L+1.0Wx+0.5Lr
1 1.2 15 1.2 6 1.2 30 1.6 16 1.6 2 1.0 7 1.0 3 0.5
LOAD COMB 229 1.2(D+PT+ET)+1.6(SP+WT)+1.0L+1.0Wz+0.5Lr
1 1.2 15 1.2 6 1.2 30 1.6 16 1.6 2 1.0 8 1.0 3 0.5
Maintenance * Maintenance Condition
LOAD COMB 230 1.2(D+PE+EE)+1.6(SP+WT)+1.6(L+I1)+0.5Lr
1 1.2 13 1.2 4 1.2 30 1.6 16 1.6 2 1.6 17 1.6 3 0.5
LOAD COMB 231 1.2(D+PE+EE)+1.6(SP+WT)+1.6(L+I2)+0.5Lr
1 1.2 13 1.2 4 1.2 30 1.6 16 1.6 2 1.6 18 1.6 3 0.5
LOAD COMB 232 1.2(D+PE+EE)+1.6(SP+WT)+1.6(L+I3)+0.5Lr
1 1.2 13 1.2 4 1.2 30 1.6 16 1.6 2 1.6 19 1.6 3 0.5
LOAD COMB 233 1.2(D+PE+EE)+1.6(SP+WT)+1.6(L+I4)+0.5Lr
1 1.2 13 1.2 4 1.2 30 1.6 16 1.6 2 1.6 20 1.6 3 0.5
LOAD COMB 234 1.2(D+PE+EE)+1.6(SP+WT)+1.6(L+I5)+0.5Lr
1 1.2 13 1.2 4 1.2 30 1.6 16 1.6 2 1.6 21 1.6 3 0.5
LOAD COMB 235 1.2(D+PE+EE)+1.6(SP+WT)+1.6(L+I6)+0.5Lr
1 1.2 13 1.2 4 1.2 30 1.6 16 1.6 2 1.6 22 1.6 3 0.5
LOAD COMB 236 1.2(D+PE+EE)+1.6(SP+WT)+1.6(L+I7)+0.5Lr
1 1.2 13 1.2 4 1.2 30 1.6 16 1.6 2 1.6 23 1.6 3 0.5
LOAD COMB 237 1.2(D+PE+EE)+1.6(SP+WT)+1.6(L+I8)+0.5Lr
1 1.2 13 1.2 4 1.2 30 1.6 16 1.6 2 1.6 24 1.6 3 0.5
LOAD COMB 238 1.2(D+PE+EE)+1.6(SP+WT)+1.6(L+I9)+0.5Lr
1 1.2 13 1.2 4 1.2 30 1.6 16 1.6 2 1.6 25 1.6 3 0.5
LOAD COMB 239 1.2(D+PE+EE)+1.6(SP+WT)+1.6(L+I10)+0.5Lr
1 1.2 13 1.2 4 1.2 30 1.6 16 1.6 2 1.6 26 1.6 3 0.5
LOAD COMB 240 1.2(D+PE+EE)+1.6(SP+WT)+1.6(L+I11)+0.5Lr
1 1.2 13 1.2 4 1.2 30 1.6 16 1.6 2 1.6 27 1.6 3 0.5
LOAD COMB 241 1.2(D+PE+EE)+1.6(SP+WT)+1.6(L+I12)+0.5Lr
1 1.2 13 1.2 4 1.2 30 1.6 16 1.6 2 1.6 28 1.6 3 0.5
LOAD COMB 242 0.9(D+PE+EE)+1.6(SP+WT)+1.0Wx
1 0.9 13 0.9 4 0.9 30 1.6 16 1.6 7 1.0
LOAD COMB 243 0.9(D+PE+EE)+1.6(SP+WT)+1.0Wz
1 0.9 13 0.9 4 0.9 30 1.6 16 1.6 8 1.0
LOAD COMB 244 0.786(D+PE+EE)+1.6(SP+WT)+1.0(EQ(x+)+0.3EQ(z+)
1 0.786 13 0.786 4 0.786 30 1.6 16 1.6 9 1.0 11 0.3
LOAD COMB 245 0.786(D+PE+EE)+1.6(SP+WT)+1.0(EQ(x-)+0.3EQ(z-))
1 0.786 13 0.786 4 0.786 30 1.6 16 1.6 10 1.0 12 0.3
LOAD COMB 246 0.786(D+PE+EE)+1.6(SP+WT)+1.0(EQ(z+)+0.3EQ(x+)
1 0.786 13 0.786 4 0.786 30 1.6 16 1.6 11 1.0 9 0.3
LOAD COMB 247 0.786(D+PE+EE)+1.6(SP+WT)+1.0(EQ(z-)+0.3EQ(x-))
1 0.786 13 0.786 4 0.786 30 1.6 16 1.6 12 1.0 10 0.3
27-Jun-20

design by Ultimate Strenght Design

Remarks
Permanent
Permanent
Temporary
Temporary
Temporary E di sni 2012, dipecah jadi E = Ev + Eh di sni 2019
Temporary
Temporary E di sni 2012, dipecah jadi E = Ev + Eh di sni 2019

y review (Refer to SNI 1726 2019).


Remarks
Permanent
Permanent
Permanent
Permanent
Temporary Kombinasi 5 di sni 2012, dipecah jadi kombinasi 5 dan 8 di sni 2019
Temporary Kombinasi 6 di sni 2012, dipecah jadi kombinasi 6 dan 9 di sni 2019
Temporary
Temporary
Temporary ADDITIONAL NEW LOAD COMB Jadi di sni 2019, tidak ada penambahan LC
E = Ev+Eh Hanya penjabaran dan pemecahan saja
E= 0.525 (EQx+0.3EQz)
Ev = 0.2 x Sds x D
gn Method)
LC SNI
d
2019
2
1
2
3
3
WT]+1.0[EQx+ 0.3EQz] 5
WT]+1.0[EQz+0.3EQx] 5
6
0[EQx+0.3EQz] 7
0[EQz+0.3EQx] 7
2
4
2
6
Qx+0.3EQz] 7
Qz+0.3EQx] 7

LC SNI
d
2019
1
1
7
7(EQx+0.3EQz) 10
7(EQz+0.3EQx) 10
5
8
8
2 or 3
6
0.7[EQx+0.3EQz]]+0.75Lr 9 0.525 = 0.75 x 0.7
0.7[EQz+0.3EQx]]+0.75Lr 9 0.525 = 0.75 x 0.7
9 ADDITIONAL NEW LOAD COMB
9 ADDITIONAL NEW LOAD COMB
4
6
2 or 3
6
8
8
9 ADDITIONAL NEW LOAD COMB
9 ADDITIONAL NEW LOAD COMB

19 dengan Klasifikasi Jenis Tanah SE (Tanah Lunak)

nd Foundation Stability.

(0.6SP+WT)+0.6Wx

(0.6SP+WT)+0.6Wz

1.0(0.6SP+WT)+0.7(EQ(x+)+0.3EQ(z+))
1.0 9 0.7 11 0.21
1.0(0.6SP+WT)+0.7(EQ(x-)+0.3EQ(z-))
1.0 10 0.7 12 0.21
1.0(0.6SP+WT)+0.7(EQ(z+)+0.3EQ(x+))
1.0 11 0.7 9 0.21
1.0(0.6SP+WT)+0.7(EQ(z-)+0.3EQ(x-))
1.0 12 0.7 10 0.21

0.75(0.7(EQ(x+)+0.3EQ(z+)))

0.75(0.7(EQ(x-)+0.3EQ(z-)))

0.75(0.7(EQ(z+)+0.3EQ(x+)))

0.75(0.7(EQ(z-)+0.3EQ(x-)))

(L+C+I1+Th)+1.0Lr

(L+C+I2+Th)+1.0Lr

(L+C+I3+Th)+1.0Lr

(L+C+I4+Th)+1.0Lr

(L+C+I5+Th)+1.0Lr

(L+C+I6+Th)+1.0Lr

(L+C+I7+Th)+1.0Lr

(L+C+I8+Th)+1.0Lr

(L+C+I9+Th)+1.0Lr

(L+C+I10+Th)+1.0Lr

(L+C+I11+Th)+1.0Lr

(L+C+I12+Th)+1.0Lr

5(L+Th)+0.75(0.6Wx)+0.75Lr

5(L+Th)+0.75(0.6Wz)+0.75Lr

0.75(L+Th)+0.75(0.7(EQ(x+)+0.3EQ(z+)))+0.75Lr
9 0.525 11 0.225 3 0.75
0.75(L+Th)+0.75(0.7(EQ(x-)+0.3EQ(z-)))+0.75Lr
10 0.525 12 0.225 3 0.75
0.75(L+Th)+0.75(0.7(EQ(z+)+0.3EQ(x+)))+0.75Lr
11 0.525 9 0.225 3 0.75
0.75(L+Th)+0.75(0.7(EQ(z-)+0.3EQ(x-)))+0.75Lr
12 0.525 10 0.225 3 0.75
x+)+0.3(EQz+))+0.75 L ADDITIONAL NEW LOAD COMB

x-)+0.3(Eqz-))+0.75 L ADDITIONAL NEW LOAD COMB

z+)+0.3(EQx+))+0.75 L ADDITIONAL NEW LOAD COMB

z-)+0.3(Eqx-))+0.75 L ADDITIONAL NEW LOAD COMB


L+0.7(EQ(x+)+0.3EQ(z+))+0.75Lr

L+0.7(EQ(x-)+0.3EQ(z-))+0.75Lr

L+0.7(EQ(z+)+0.3EQ(x+))+0.75Lr

L+0.7(EQ(z-)+0.3EQ(x-))+0.75Lr

x+)+0.3(EQz+))+0.75 L ADDITIONAL NEW LOAD COMB

x-)+0.3(Eqz-))+0.75 L ADDITIONAL NEW LOAD COMB

z+)+0.3(EQx+))+0.75 L ADDITIONAL NEW LOAD COMB

z-)+0.3(Eqx-))+0.75 L ADDITIONAL NEW LOAD COMB

terial and reinforcement design.

L+Th+I1)+1.6(SP+WT)+0.5Lr
1.6 16 1.6 3 0.5
L+Th+I2)+1.6(SP+WT)+0.5Lr
1.6 16 1.6 3 0.5
L+Th+I3)+1.6(SP+WT)+0.5Lr
1.6 16 1.6 3 0.5
L+Th+I4)+1.6(SP+WT)+0.5Lr
1.6 16 1.6 3 0.5
L+Th+I5)+1.6(SP+WT)+0.5Lr
1.6 16 1.6 3 0.5
L+Th+I6)+1.6(SP+WT)+0.5Lr
1.6 16 1.6 3 0.5
L+Th+I7)+1.6(SP+WT)+0.5Lr
1.6 16 1.6 3 0.5
L+Th+I8)+1.6(SP+WT)+0.5Lr
1.6 16 1.6 3 0.5
L+Th+I9)+1.6(SP+WT)+0.5Lr
1.6 16 1.6 3 0.5
L+Th+I10)+1.6(SP+WT)+0.5Lr

1.6 16 1.6 3 0.5


L+Th+I11)+1.6(SP+WT)+0.5Lr
1.6 16 1.6 3 0.5
L+Th+I12)+1.6(SP+WT)+0.5Lr
1.6 16 1.6 3 0.5
r+1.0(L+Th)+1.6(SP+WT)

r+1.6(SP+WT)+0.5Wx

r+1.6(SP+WT)+0.5Wz

0(L+Th)+1.6(SP+WT)+1.0(EQ(x+)+0.3EQ(z+))
0 1.6 16 1.6 9 1.0 11 0.3
0(L+Th)+1.6(SP+WT)+1.0(EQ(x-)+0.3EQ(z-))
1.6 16 1.6 10 1.0 12 0.3
0(L+Th)+1.6(SP+WT)+1.0(EQ(z+)+0.3EQ(x+))
0 1.6 16 1.6 11 1.0 9 0.3
0(L+Th)+1.6(SP+WT)+1.0(EQ(z-)+0.3EQ(x-))
0 1.6 16 1.6 12 1.0 10 0.3
Th+SP+WT)+1.0Wx

Th+SP+WT)+1.0Wz

6(Th+SP+WT)+1.0(EQ(x+)+0.3EQ(z+))
16 1.6 9 1.0 11 0.3
6(Th+SP+WT)+1.0(EQ(x-)+0.3EQ(z-))
16 1.6 10 1.0 12 0.3
6(Th+SP+WT)+1.0(EQ(z+)+0.3EQ(x+))
16 1.6 11 1.0 9 0.3
6(Th+SP+WT)+1.0(EQ(z-)+0.3EQ(x-))
16 1.6 12 1.0 10 0.3

SP+WT)+1.6L+0.5Lr

SP+WT)+1.0L+1.0Wx+0.5Lr

SP+WT)+1.0L+1.0Wz+0.5Lr
SP+WT)+1.6(L+I1)+0.5Lr

SP+WT)+1.6(L+I2)+0.5Lr

SP+WT)+1.6(L+I3)+0.5Lr

SP+WT)+1.6(L+I4)+0.5Lr

SP+WT)+1.6(L+I5)+0.5Lr

SP+WT)+1.6(L+I6)+0.5Lr

SP+WT)+1.6(L+I7)+0.5Lr

SP+WT)+1.6(L+I8)+0.5Lr

SP+WT)+1.6(L+I9)+0.5Lr

SP+WT)+1.6(L+I10)+0.5Lr

SP+WT)+1.6(L+I11)+0.5Lr

SP+WT)+1.6(L+I12)+0.5Lr

SP+WT)+1.0Wx

SP+WT)+1.0Wz

6(SP+WT)+1.0(EQ(x+)+0.3EQ(z+))

6(SP+WT)+1.0(EQ(x-)+0.3EQ(z-))

6(SP+WT)+1.0(EQ(z+)+0.3EQ(x+))

6(SP+WT)+1.0(EQ(z-)+0.3EQ(x-))

You might also like