ACTION PLAN

Name of the establishment:


Measurement
Date updated: juni 2020
criteria/Quantitative
objective
(Quantitative target linked to the
situation/objective, to be set if
Repair project possible
Value and able to be used)
(State the unit) Date

Locker fe meal 1

Lobby

2
Rest room lobby

Pagar pembatas kaca


lobby/BPR

3
Area Parkir

Area Depan lobby

Hotel/Bank bpr

Hotel/Atm

Hotel/Bank bpr

Vip parkir
Parkir area

Parkir area

Parkir motor

Plafon depan lobby

Smoking area

Panel 1/2/3/5

Store f&b
ACTION PLAN

Action plan
(Implement an action plan enabling the target objective(s) to be achieved

Action Deadline Status


Panting,instal drain
Progres
floor,ceramik
Merubah semua lampu
di area lobby ke LED Done

Pasang exhoust

Painting pembatas
kaca lobby

Memindahkan Lampu
sorot

Membuat Garden
landcape

Putus listrik bank bpr Done

Putus listrik atm

Putus ac Done

Painting vip parkir (garis) Done


Bantalan roda mobil

Painting parkir area (garis) Done

Painting parkir motor ( garis) Done

Silent plafon

Painting Smoking area

Pasang box untuk kabel tv

Tutub plafon bekas menhul


Remark
ACTION PLAN
Name of the establishment:
Measurement
Date updated: juli 2020
criteria/Quantitative
objective
(Quantitative target linked to the
situation/objective, to be set if
Repair project possible
Value and able to be used)
(State the unit) Date

Locker fe meal 1

Lobby

2
Rest room lobby

Pagar pembatas kaca


lobby/BPR

3
Area Parkir

Area Depan lobby

Hotel/Bank bpr

Hotel/Atm

Hotel/Bank bpr
Vip parkir

Parkir area

Parkir area

Parkir motor

Plafon depan lobby

Smoking area

Panel 1/2/3/5

Store f&b
ACTION PLAN

Action plan
(Implement an action plan enabling the target objective(s) to be achieved

Action Deadline Status


Panting,instal drain
Progres
floor,ceramik
Merubah semua lampu
di area lobby ke LED Done

Pasang exhoust

Painting pembatas
kaca lobby DONE

Memindahkan Lampu
sorot DONE

Membuat Garden
landcape

Putus listrik bank bpr Done

Putus listrik atm DONE

Putus ac Done
Painting vip parkir (garis) Done

Bantalan roda mobil

Painting parkir area (garis) Done

Painting parkir motor ( garis) Done

Silent plafon

Painting Smoking area DONE

Pasang box untuk kabel tv

Tutub plafon bekas menhul


Remark
ACTION PLAN
Name of the establishment:
Measurement
Date updated: agust
criteria/Quantitative
objective
(Quantitative target linked to the
situation/objective, to be set if
Repair project possible
Value and able to be used)
(State the unit) Date

Locker fe meal 1
pintu kaca Lobby 2

Rest room lobby 2

Area Parkir 3

Area Depan lobby

koridor parkir

meeting room

hand sanitizer lift out in

restroom lobby,
3
resto,karyawan
Parkir area na

Plafon depan lobby

painting loker restroom male and


female

Panel 1/2/3/5

Store f&b
ACTION PLAN

agustus 2020
Action plan
(Implement an action plan enabling the target objective(s) to be achieved

Action Deadline Status


Panting,instal drain
Progres
floor,ceramik
potong kaca by vendor

Pasang exhoust

pasang saklar doble


done
lampu spot parkir

Membuat Garden
landcape

tutup ceiling yang


done
ambrol

touch up 29 juli done

pembuatan tempat ackrilik done

pemasangan sensor gerak done


Bantalan roda mobil

Silent plafon

all

Pasang box untuk


kabel tv

Tutub plafon bekas


done
menhul
Remark