Observations of PDMC
Page 5 of Item 19 Plunger References for rates may be RUIDP Approved Rates
Sr. Referen Details Observation Compliances
No. ce Of Observations
43 valve given. Tonk Project
Approved makes may be
mentioned.
Page 6 of Item 20,21,22 References for rates may be Updated in Revised Report
43 given
Page 6 of GRAND It should be for Rising Main Updated in Revised Report
43 TOTAL instead of FOR
DISTRIBUTION SYSTEM
4 Estimate for
Providing
Proposed
Internal Water
Distribution
System Using
HDPE & DI
pipe
Page 9 of Pipe length 167.96 km pipe length is Distribution Designs and Estimate
43 provided whereas per been updated in the revised DPR.
modeling, the length is The new development are not kn
155.497 Km as per sheet 95 present and it is proposed to take l
of 107 Table 32, Adding dia. 10% extra.
10% for all diameters cannot
be justified. The additional
length should have been
marked on drawing and
hydraulic designs should
have been done for entire
system. In fact, as the
distribution system layout is
to be developed for 2045, the
terminal pipelines can be
laid later on.
Estimate is done
considering, DI Pipes
1,20,752 M (71%) And
HDPE pipes are
considered 47210 M (29%)
for total 167692 M.
Whereas Hydraulic
modeling/Design is done
considering DI Pipes -10254
M(6.6%) and HDPE pipes
145254 M (73.4%)and total
155499 M.
7 Estimate for References for rates/R.A.s LS rates given after Market Survey
Construction and details for L.S. rates Rate Analysis
Of New may be attached with
Pumping estimates.
Stations, Other
Buildings,
Campus
Development
Sr. Referen Details Observation Compliances
No. ce Of Observations
Works,
Boundary Wall
Around New
Campuses And
Repair/Rehabil
itation of
Existing Pump
Houses
8 Rehabilitation Details of qty calculations Attached in revised estimate
of SE, Ex. En, and references for rates to be
AEN & Other provided
Existing
Buildings
9 Estimate for Quotations for market rates Attached in Updated estimate
Instrumentatio to be attached
n. Automation
and Scada
10 Estimate for References for rates to be Updated in revised estimate
Construction provided.
Of 11/.43 KV
Electric
SubStation
And Dedicated
Power Feeders
11 Estimate for References for rates to be Market Rate
Rehabilitation provided.
Work at
CHAPI
HEADWORKS