Bikaner

SLTC Sanction Amount


S.No. Description (Rupees In
lacs.)
Provision for DI K-7 class rising mains of different sizes to pump water to different OHSRs
584.55
1 (Diameter 250-500 mm = 7800 meters length)
Provision for construction for new RCC Over head Service Reservoir in different Parts of the city
171.50
2 (1Number - 1400 kl capacity)

Provision for Water Distribution System consisting of HDPE & DI pipe (HDPE Diameter 90-
699.86
225 mm = 35534 meters & DI Diameter 250-400 mm = 6794 meters length)
3
Provision for consumer meters and making House Service connections (Domestic Non AMR =
619.36
4 24433 Numbers & Non Domestic AMR = 2176 Numbers)
5 Provision for Pumping Machinery and Electromechanical equipment in pump houses 94.17
6 Provision for Construction Of Master Control Center and Consumer Care Center 59.00
Provision for Road restoration work for the road cutting done in laying of rising mains,
82.00
7 distribution and house service connections.
Provision for instrumentation, Automation and SCADA for efficient operations of Water Supply
576.56
7 System.
8 Provision for 11/.43 KV GSS and dedicated power feeders, cables, etc. 24.14
Provision for software and hardware for implementation of Integrated Management System for
111.00
10 end to end management of the UWSS

Information Education and communication (IEC) activities in the project area to create
40.00
awareness and motivate people to discontinue use of underground tanks and boosters.
11
Provision for Leak detection equipment, T&P and water quality testing equipment and energy
20.35
9 efficient lighting in Office building, Pump houses and campus
10 Provisions for repair of Water Treatment Plant at Bichhwal and Shobhasar 117.63
11 Provisions for rejuvenation of existing Ground water sources 70.05
12 Provision for repair works at Goga Gate OHSR 37.94
13 Provisions for Repair works at Raw Water Reservoir at Bichhwal and Shobhasar 73.99
14 Provisions for repair of electromechanical equipments at various Head Works 92.47
Net Sanctioned Cost (Rs in Lacs) 3474.58
Net Sanctioned Cost (Rs in Crores) 34.75
CHURU
SLTC Sanction Amount
S.No. Description (Rupees
In lacs.)
Provision for consumer meters and making House Service connections (Domestic Non
283.38
1 AMR = 5628 Numbers & Non Domestic AMR = 656 Numbers)

Provision for Water Distribution System consisting of HDPE & DI pipe (HDPE Diameter
261.61
90-225 mm = 28241 meters & DI Diameter of 250 mm = 545 meters length)
2
Provision for construction for new RCC Over head Service Reservoir and rejuvenation of
225.88
3 existing OHSR (3 Numbers, capacity ranging from 250-700 kl)
Provision of construction of new RCC CWR and repair & rehabilitation of RCC Clear
187.00
4 water Reservoirs at Churu (1 Number of capacity 5000 kl)
Provision for DI K-7 class rising mains of different sizes to pump water to different
113.07
5 OHSRs (Diameter 150-600 mm = 2728 meters length)
Provision for Pumping Machinery and Electromechanical equipment in pump houses at
31.98
6 Churu
Provision for Construction Of Master control room and consumer care center, And minor 40.55
7 changes in the Existing Pump House PMC
Provision for Road restoration work for the road cutting done in laying of rising mains,
83.08
8 distribution and house service connections.
Provision for instrumentation, Automation and SCADA for efficient operations of Water
347.76
9 Supply System.
10 Provision for Stand-by Transformers at 3 Pump Houses 16.80
Provision for Renovation/Rehabilitation of Valves & Accessories, Electrical Equipments
3.10
11 Installed on Various Pumps at Karamsana Pump House at RWR

Provision for Renovation/Rehabilitation of Valves & Accessories, Electrical Equipments


18.90
Installed on Various Pumps at Karamsana Raw water Pump House (Buffer)
12
Provision For Repair/Rehabilitation work of Existing Water Treatment Plants Of 2500
174.30
13 Cum/Hr Capacity at Karamasana

Provision for Renovation/Rehabilitation of Valves & Accessories, Electrical Equipments


11.90
Installed on Various Pumps at Karamsana Clear water Pump House
14
Provision for Repair work of Valves & Accessories, Electrical Equipments Installed on
19.20
15 Various Pumps at Shawa Pump House
Provision for Repair work of Valves & Accessories, Electrical Equipments Installed on
11.80
16 Various Pumps at Bhaleri Pump House
Provision for Rehabilitation of Existing 900 mm PSCC Pipeline From Karamsana to 73.20
17 Churu (110.70 km length)
Provision for software and hardware for implementation of Integrated Management
111.00
18 System for end to end management of the UWSS
Provision for Information Education and communication (IEC) activities in the project
area to create awareness and motivate people to discontinue use of underground tanks 40.00
19 and boosters.

Provision for Leak detection equipment, T&P and water quality testing equipment 25.00
20
Net Sanctioned Cost (Rs in Lacs) 2079.50
Net Sanctioned Cost (Rs in Crores) 20.79
UDAIPUR TOWN
AMRUT / SMART CITY
Sanction Amount
S.No. Description
(Rupees In
lacs.)
Provision for DI K-7 class rising mains of different sizes to pump water to different WTPs
1 174.07
(Diameter 250-600 mm = 1665 meters length)
Provision of construction of new RCC CWR and repair & rehabilitation of RCC Clear
2 241.50
water Reservoirs (2 Number of capacity 240 & 5100 kl)
Provision for Water Distribution System consisting of DI pipe (DI Diameter 100 - 600
3 1847.79
mm = 88210 meters length)

Provision for consumer meters and making House Service connections (Domestic Non
4 861.86
AMR = 18000 Numbers & Non Domestic AMR = 1025 Numbers)

5 Provision for Pumping Machinery and Electromechanical equipment in pump houses 283.08
6 Provision for construction of new Water Treatment Plant of capacity 23.70 MLD 1455.44
Provision for Construction Of Master Control Center and Consumer Care Center and
7 162.30
repair of existing Pumping Station
Provision for Road restoration work for the road cutting done in laying of rising mains,
8 146.00
distribution and house service connections.
Provision for instrumentation, Automation and SCADA for efficient operations of Water
9 113.29
Supply System.
10 Provision for 11/.43 KV GSS and dedicated power feeders, cables, etc. 99.29
11 Provision for provisional sum items 63.50
Provision for software and hardware for implementation of Integrated Management
12 111.00
System for end to end management of the UWSS

Information Education and communication (IEC) activities in the project area to create
13 36.00
awareness and motivate people to discontinue use of underground tanks and boosters.

Provision for Leak detection equipment, T&P and water quality testing equipment and
14 20.35
energy efficient lighting in Office building, Pump houses and campus

Provision for preparation of SIP by the contractor for implementation of performance


15 56.15
based contract
Net Sanctioned Cost (Rs in Lacs) 5671.62
Net Sanctioned Cost (Rs in Crores) 56.72
CHITTORGARH
SLTC Sanction Amount
S.No. Description
(Rupees In lacs.)
Provision for DI K-7 class rising mains of different sizes to pump water to different
1 632.24
OHSRs (Diameter 100-350 mm = 20403 meters length)
Provision of construction of new RCC CWR and repair & rehabilitation of RCC Clear
2 45.06
water Reservoirs (3 Number of capacity range from 100 - 175 kl)
Provision for construction for new RCC Over head Service Reservoir and rejuvenation of
3 593.95
existing OHSR (9 Numbers, capacity range from 200 - 600 kl)

Provision for Water Distribution System consisting of HDPE & DI pipe (HDPE Diameter
4 2097.63
90-140 mm = 46008 meters & DI Diameter 100-400 mm = 88495 meters length)

Provision for consumer meters and making House Service connections (Domestic Non
5 256.07
AMR = 10898 Numbers & Non Domestic AMR = 281 Numbers)

6 Provisionn for Pumping Machinery and Electromechanical equipment in pump houses 138.68

Provision for Construction Of New Pumping Stations, Other Buildings, boundary wall,
7 campus development works and Repair/Rehabilitation of Existing pumping stations and 387.60
other buildings.
Provision for Road restoration work for the road cutting done in laying of rising mains,
8 338.96
distribution and house service connections.
Provision for instrumentation, Automation and SCADA for efficient operations of Water
9 556.70
Supply System.
10 Provision for 11/.43 KV GSS and dedicated power feeders. 264.81

Provision for Leak detection equipmen, T&P and water quality testing equipment and
11 25.00
energy efficient lighting in Office building, Pump houses and campus

Provision for software and hardware for implementation of Integrated Management


12 111.00
System for end to end management of the UWSS

Information Education and communication (IEC) activities in the project area to create
13 22.46
awareness and motivate people to discontinue use of underground tanks and boosters.

14 Utility Shifting Charges 30.00


Net Sanctioned Cost (Rs in Lacs) 5500.17
Net Sanctioned Cost (Rs in Crores) 55.00
JODHPUR
SLTC Sanction Amount
S.No. Description
(Rupees In lacs.)
Provisionn for replacement of old and inefficient Pumping Machinery with energy efficient pumps and
1 237.74
provision for other Electromechanical equipment
Provision for consumer meters for non-domestic, Industrial connections and domestic meters for new
2 153.36
proposed distribution. (Non AMR - 4903 Numbers)

3 Provision for rehabilitation of 2 nos. existing reservoir to prevent loss of water due to leakage. 24.00

Provision for software and hardware for implementation of Integrated Management System having
4 modules of complaint redrassal system with provision for consumer care centres, modernised billing, 111.00
asset management on GIS platform. (IMIS)
Construction of consumer care centre and rehabilitation of SE office building to create central control
5 22.00
room
Provision for Water Distribution System consisting of HDPE & DI pipe to improve distribution system
6 in areas not covered under ongoing AFD project. (HDPE Diameter 110 - 160 mm = 24355 meters & 316.82
DI Diameter 150 - 400 mm = 2750 meters length)
7 Provision for rehabilitation of Kailana WTP not included in the on-going AFD project 100.44
Provision for Road restoration work for the road cutting done in laying of distribution and house
8 36.58
service connections.
9 Provision for Leak detection equipmen and T&P . 4.20
Information Education and communication (IEC) activities in the project area to create awareness
10 9.81
and motivate people to discontinue use of underground tanks and boosters.
Net Sanctioned Cost (Rs in Lacs) 1015.95
Net Sanctioned Cost (Rs in Crores) 10.16
Ajmer
SLTC Sanction Amount
S.No. Description (Rupees
In lacs.)
1 Provision for motorized valves, valve chambers, etc. in existing rising mains 352.37
Provision of construction of new RCC CWR and repair & rehabilitation of RCC Clear
2 112.95
water Reservoirs (2 Numbers of capacity 900 & 1200 kl)
Provision for Water Distribution System consisting of DI pipe (DI Diameter 100 - 400
3 625.94
mm = 19729 meters length)

Provision for consumer meters and making House Service connections (Domestic Non
4 425.52
AMR = 13171 Numbers & Non Domestic AMR = 1345 Numbers)

5 Provisionn for Pumping Machinery and Electromechanical equipment in pump houses 197.39

Provision for Construction Of New Pumping Stations, Other Buildings, boundary wall,
6 157.62
campus development works and Repair/Rehabilitation of Existing pumping stations

Provision for Road restoration work for the road cutting done in laying of rising mains,
7 32.79
distribution and house service connections.
Provision for instrumentation, Automation and SCADA for efficient operations of Water
8 798.93
Supply System.
9 Provision for 11/.43 KV GSS and power management system. 92.24
Provision for software and hardware for implementation of Integrated Management
10 111.00
System for end to end management of the UWSS

Information Education and communication (IEC) activities in the project area to create
11 41.00
awareness and motivate people to discontinue use of underground tanks and boosters.

Provision for Leak detection equipment, T&P and water quality testing equipment and
12 20.70
energy efficient lighting in Office building, Pump houses and campus
Provisional sum for shifting of utilities, miscellaneous civil works and other necessary
13 30.00
works.
Net Sanctioned Cost (Rs in Lacs) 2998.45
Net Sanctioned Cost (Rs in Crores) 29.98
JAIPUR
SLTC Sanction Amount (Rupees In lacs.)
S.No. Description
ABD AREA PAN CITY AREA TOTAL

Provision for Water Distribution System consisting of DI pipe (DI


1 761.56 761.56
Diameter 100 - 300 mm = 37248 meters length)
Provision for consumer meters and making House Service
2 connections (Domestic Non AMR = 70283 Numbers & Non 533.71 1346.61 1880.32
Domestic AMR = 8202 Numbers)
Provisionn for Pumping Machinery and Electromechanical
3 121.35 40.40 161.75
equipment in pump houses

Provision for Road restoration work for the road cutting done in
4 278.92 278.92
laying of rising mains, distribution and house service connections.

Provision for instrumentation, Automation and SCADA for efficient


5 203.96 1322.80 1526.76
operations of Water Supply System.
6 Provision for instrumentation and automation of Valves 86.67 86.67
Provision for Leak detection equipment, T&P and water quality
7 testing equipment and energy efficient lighting in Office building, 14.20 14.20
Pump houses and campus
Provision for software and hardware for implementation of
Integrated Management System for end to end management of the
8 111.00 72.54 183.54
UWSS and costruction of IMIS Building in PHED (HQ) Campus, Jal
Bhawan, Jaipur
Information Education and communication (IEC) activities in the
9 project area to create awareness and motivate people to 39.84 39.84
discontinue use of underground tanks and boosters.
Provisional sum for shifting of utility lines, poles, repair to
10 45.00 45.00
water/sewer service connections, property approaches, etc

11 Preparation of comprehensive System Improvement Plan (SIP) 21.51 21.51

Net Sanctioned Cost (Rupees in Lacs) 2217.72 2782.35 5000.07


Net Sanctioned Cost (Rupees in Crores) 22.18 27.82 50.00
GANGAPUR CITY
SLTC Sanction Amount
S.No. Description
(Rupees In lacs.)
Provision for DI K-7 class rising mains of different sizes to pump water to different OHSRs (Diameter
1 755.98
100-450 mm = 28409 meters length)
Provision of construction of new RCC CWR and repair & rehabilitation of RCC Clear water Reservoirs
2 66.61
(1 Number of capacity 1100 kl)
Provision for construction for new RCC Over head Service Reservoir and rejuvenation of existing
3 891.50
OHSR (7 Numbers, capacity range from 450 - 1500 kl)
Provision for Water Distribution System consisting of HDPE & DI pipe (HDPE Diameter 90-225 mm
4 2263.72
= 232933 meters & DI Diameter 250-350 mm = 22615 meters length)
Provision for consumer meters and making House Service connections (Domestic Non AMR = 19650
5 760.35
Numbers & Non Domestic AMR = 185 Numbers)
6 Provisionn for Pumping Machinery and Electromechanical equipment in pump houses 75.25

Provision for Construction Of New Pumping Stations, Other Buildings, boundary wall, campus
7 172.63
development works and Repair/Rehabilitation of Existing pumping stations and other buildings.

Provision for Road restoration work for the road cutting done in laying of rising mains, distribution and
8 573.87
house service connections.

8 Provision for instrumentation, Automation and SCADA for efficient operations of Water Supply System. 184.25
9 Provision for 11/.43 KV GSS and dedicated power feeders. 60.79
Provision for software and hardware for implementation of Integrated Management System for end to
11 111.00
end management of the UWSS
Information Educaation and communication (IEC) activities in the project area to create awareness
12 40.00
and motivate people to discontinue use of underground tanks and boosters.
Provision for Leak detection equipmen, T&P and water quality testing equipment and energy efficient
10 25.00
lighting in Office building, Pump houses and campus
Total Sanctioned Cost (Rs in Lacs) 5980.95
Net Sanctioned Cost (Rupees in Crores) 59.81
DHOLPUR
S.No. Description

Provision for DI K-7 class rising mains of different sizes to pump water to different
1
OHSRs (Diameter 150-250 mm = 300 meters length)
Provision of construction of new RCC CWR and repair & rehabilitation of RCC Clear
2
water Reservoirs (1 Number of capacity 300 kl)
Provision for construction for new RCC Over head Service Reservoir and rejuvenation of
3
existing OHSR (3 Numbers, capacity range from 700 - 1250 kl)

Provision for Water Distribution System consisting of HDPE & DI pipe (HDPE Diameter
4
90 - 225 mm = 176580 meters & DI Diameter 250-450 mm = 14169 meters length)

Provision for consumer meters and making House Service connections (Domestic Non
5
AMR = 10450 Numbers & Non Domestic AMR = 550 Numbers)

6 Provisionn for Pumping Machinery and Electromechanical equipment in pump houses

Provision for Construction of New Pumping Stations, Other Buildings, boundary wall,
7 campus development works and Repair/Rehabilitation of Existing pumping stations and
other buildings.
8 Provision for rehabilitation rejuvination of 5.4 and 9.6 MLD filter plants
Provision for Road restoration work for the road cutting done in laying of rising mains,
9
distribution and house service connections.
Provision for instrumentation, Automation and SCADA for efficient operations of Water
10
Supply System.
11 Provision for 11/.43 KV GSS and dedicated power feeders.
Provision for software and hardware for implementation of Integrated Management
12
System for end to end management of the UWSS

Information Education and communication (IEC) activities in the project area to create
13
awareness and motivate people to discontinue use of underground tanks and boosters.

14 Provision for Leak detection equipmen, T&P and water quality testing equipment
Net Sanctioned Cost (Rs in Lacs)
Net Sanctioned Cost (Rs in Crores)
SLTC Sanction Amount
(Rupees
In lacs.)
19.45

32.05

401.11

1830.93

464.80

268.00

90.94

88.00
472.38

243.52
78.98
111.00

40.00

25.70
4166.86
41.67
Hindaun City
S.No. Description

Construction of 200mm.dia tube well with M.S. casing pipe with providing & Installation
1
of pump set in T/W, G.I.pipe, cable, electric installation etc. (12 Numbers)

Provision of construction of new RCC CWR and repair & rehabilitation of RCC Clear
2
water Reservoirs (2 Numbers of capacity 100 & 200 kl)
Provision for DI K-7 class rising mains of different sizes to pump water to different
3
OHSRs (Diameter 100-300 mm = 13465 meters length)
Provision for Water Distribution System consisting of HDPE (HDPE Diameter 90 - 110
4
mm = 32300 meters length)

Provision for consumer meters and making House Service connections (Domestic Non
5
AMR = 17785 Numbers & Non Domestic AMR = 215 Numbers)

6 Provision for pumping machinery and other electro mechanical items


Construction of Master Control Center, Consumer Care Center, Service Road for
7
tubewells & Solar Powered Street Lights for service road & tubewells
Provision for Road restoration work for the road cutting done in laying of rising mains,
8
distribution and house service connections.
Provision for instrumentation, Automation and SCADA for efficient operations of Water
9
Supply System.
10 Provision for 11/.43 KV GSS and dedicated power feeders.
Provision for software and hardware for implementation of Integrated Management
11
System for end to end management of the UWSS

Information Education and communication (IEC) activities in the project area to create
12
awareness and motivate people to discontinue use of underground tanks and boosters.

Provision for Leak detection equipment, T&P and water quality testing equipment and
13
energy efficient lighting in Office building, Pump houses and campus

Dismantling of existing two out of service ESRs at Old City (900 KL) and Mohan Nagar
14
(675 KL)
Net Sanctioned Cost (Rupees in Lacs)
Net Sanctioned Cost (Rs in Crores)
SLTC Sanction Amount
(Rupees In
lacs.)

53.03

16.13

305.33

188.66

744.47

263.40
116.42

171.72

6.46
25.00
111.00

36.00

5.00

15.00
2057.60
20.58
SAWAI MADHOPUR
SLTC Sanction Amount
S.No. Description
(Rupees In lacs.)

Provision for DI K-7 class rising mains of different sizes to pump water to
1 797.04
different OHSRs (Diameter 100-350 mm = 33339 meters length)

Provision of construction of new RCC CWR and repair & rehabilitation of


2 77.25
RCC Clear water Reservoirs (1 Number of capacity 500 kl)

Provision for construction for new RCC Over head Service Reservoir
3 and rejuvenation of existing OHSR (6 Numbers, capacity range from 248.25
150 - 700 kl)
Provision for Water Distribution System consisting of HDPE & DI pipe
4 (HDPE Diameter 90-225 mm = 96072 meters & DI Diameter 100-350 1620.47
mm = 17935 meters length)
Provision for consumer meters and making House Service connections
5 (Domestic Non AMR = 9698 Numbers & Non Domestic AMR = 302 421.42
Numbers)
Provisionn for Pumping Machinery and Electromechanical equipment in
6 83.36
pump houses

Provision for Construction Of New Pumping Stations, Other Buildings,


7 boundary wall, campus development works and Repair/Rehabilitation of 225.37
Existing pumping stations and other buildings.

Provision for Road restoration work for the road cutting done in laying of
8 508.99
rising mains, distribution and house service connections.
Provision for instrumentation, Automation and SCADA for efficient
9 540.94
operations of Water Supply System.
10 Provision for 11/.43 KV GSS and dedicated power feeders. 38.06
Provision for Leak detection equipmen, T&P and water quality testing
11 equipment and energy efficient lighting in Office building, Pump houses 20.35
and campus

Provision for software and hardware for implementation of Integrated


12 111.00
Management System for end to end management of the UWSS

Information Education and communication (IEC) activities in the project


13 area to create awareness and motivate people to discontinue use of 40.00
underground tanks and boosters.
Net Sanctioned Cost (Rupees in Lacs) 4732.50
Net Sanctioned Cost (Rs in Crores) 47.33
BHARATPUR
SLTC Sanction Amount
S.No. Description (Rupees
In lacs.)
Provision for DI K-7 class rising mains of different sizes to pump water to different
1 907.15
OHSRs (Diameter 100-400 mm = 18648 meters length)
2 Provision of Repair of Existing RCC Clear water Reservoirs 1.38

Provision for construction for new RCC Over head Service Reservoir and rejuvenation of
3 1322.22
existing OHSR (12 Numbers, capacity range from 600 - 1000 kl)

Provision for Water Distribution System consisting of HDPE & DI pipe (HDPE Diameter
4 1613.27
90-225 mm = 160066 meters & DI Diameter 250-400 mm = 16830 meters length)

Provision for consumer meters and making House Service connections (Domestic Non
5 522.88
AMR = 20000 Numbers & Non Domestic AMR = 1486 Numbers)

6 Provisionn for Pumping Machinery and Electromechanical equipment in pump houses 19.36

Provision for Construction Of New Pumping Stations, Other Buildings, boundary wall,
7 49.00
campus development works and Repair/Rehabilitation of Existing pumping stations

Provision for Road restoration work for the road cutting done in laying of rising mains,
8 89.76
distribution and house service connections.
Provision for instrumentation, Automation and SCADA for efficient operations of Water
9 248.16
Supply System.
10 Provision for 11/.43 KV GSS and dedicated power feeders. 10.65
Provision for software and hardware for implementation of Integrated Management
11 111.00
System for end to end management of the UWSS

Information Education and communication (IEC) activities in the project area to create
12 42.97
awareness and motivate people to discontinue use of underground tanks and boosters.

Provision for Leak detection equipmen, T&P and water quality testing equipment and
13 20.70
energy efficient lighting in Office building, Pump houses and campus

Net Sanctioned Cost (Rs in Lacs) 4958.49


Net Sanctioned Cost (Rs in Crores) 49.58
Nagaur
SLTC Sanction Amount
S.No. Description (Rupees
In lacs.)
Provision for DI K-7 class rising mains of different sizes to pump water to different
1 431.16
OHSRs (Diameter 100-350 mm = 15457 meters length)
Provision for construction for New RCC Over head Service Reservoir/ head works and
2 Repair of Existing OHSRs/CWRs/Pump Houses in different Parts of the city (1 Number 188.20
of capacity 1000 kl)

Provision for Water Distribution System consisting of HDPE & DI pipe (HDPE
Diameter 90-200 mm = 211826 meters & DI Diameter 250-300 mm = 7153 meters
3 2724.80
length) along with consumer water meters and making House Service connections
(Domestic Non AMR = 27332 Numbers & Non Domestic AMR = 846 Numbers)

Provision for Construction Of New Pumping Stations, Other Buildings, boundary wall,
4 241.51
campus development works and Repair/Rehabilitation of Existing pumping stations

Provision for Road restoration work for the road cutting done in laying of rising mains,
5 1104.62
distribution and house service connections.
Provision for instrumentation, Automation and SCADA for efficient operations of Water
6 128.99
Supply System.
Provision for software and hardware for implementation of Integrated Management
7 111.00
System for end to end management of the UWSS

Information Education and communication (IEC) activities in the project area to create
8 56.36
awareness and motivate people to discontinue use of underground tanks and boosters.

Provision for Leak detection equipmen, T&P and water quality testing equipment and
9 20.00
energy efficient lighting in Office building, Pump houses and campus

Net Sanctioned Cost (Rs in Lacs) 5006.63


Net Sanctioned Cost (Rs in Crores) 50.07
Bhiwadi
SLTC Sanction Amount
S.No. Description (Rupees
In lacs.)
Provision for DI K-7 class rising mains of different sizes to pump water to different
1 185.83
OHSRs (Diameter 200-300 mm = 7170 meters length)
Provision for construction for New RCC Over head Service Reservoir/ head works and
2 Repair of Existing OHSRs/CWRs/Pump Houses in different Parts of the city (4 Numbers, 449.00
capacity range from capacity 700 - 900 kl)

Provision for Water Distribution System consisting of HDPE & DI pipe (HDPE Diameter
3 363.56
90-200 mm = 58287 meters & DI Diameter 250-300 mm = 1244 meters length)

Provision for Construction Of New Pumping Stations, Other Buildings, boundary wall,
4 118.91
campus development works and Repair/Rehabilitation of Existing pumping stations

Provision for Road restoration work for the road cutting done in laying of rising mains,
5 333.65
distribution and house service connections.
Provision for instrumentation, Automation and SCADA for efficient operations of Water
6 120.35
Supply System.
Provision for software and hardware for implementation of Integrated Management
7 111.00
System for end to end management of the UWSS

Information Education and communication (IEC) activities in the project area to create
8 15.00
awareness and motivate people to discontinue use of underground tanks and boosters.

Provision of Solar Based RO System (3 Numbers, Near Bus Stand, Harchandpura & KEI
9 60.00
Factory)

Provision for Leak detection equipmen, T&P and water quality testing equipment and
10 20.00
energy efficient lighting in Office building, Pump houses and campus

Net Sanctioned Cost (Rs in Lacs) 1777.30


Net Sanctioned Cost (Rs in Crores) 17.77
Sikar
SLTC Sanction Amount
S.No. Description (Rupees
In lacs.)
Provision for construction of source 25 Nos. tube wells for year 2021 with provision for
1 replacement of submersible pump set of existing tube wells by energy efficient pump 252.31
sets (5 star) (25 Numbers)
Provision for DI K-7 class / HDPE rising mains of different sizes to pump water to
2 different OHSRs (HDPE Diameter 110-200 mm = 14822 meters & DI Diameter 250- 375.21
350 mm = 4643 meters length)
Provision for construction for New RCC Over head Service Reservoirs/ RCC CWRs/
head works and Repair of Existing OHSRs/CWRs/Pump Houses in different Parts of the
3 339.79
city (3 Numbers OHSRs, capacity range from capacity 400 - 600 kl & 1 number CWR of
capacity 500 kl)

Provision for Water Distribution System consisting of HDPE & DI pipe (HDPE
Diameter 90-200 mm = 82935 meters & DI Diameter 250-300 mm = 767 meters length)
4 1032.11
along with consumer water meters and making House Service connections (Domestic
Non AMR = 11640 Numbers & Non Domestic AMR = 360 Numbers)

Provision for Construction Of New Pumping Stations, Other Buildings, boundary wall,
5 262.26
campus development works and Repair/Rehabilitation of Existing pumping stations

Provision for Road restoration work for the road cutting done in laying of rising mains,
6 461.72
distribution and house service connections.
Provision for instrumentation, Automation and SCADA for efficient operations of Water
7 112.22
Supply System.
Provision for software and hardware for implementation of Integrated Management
8 111.00
System for end to end management of the UWSS

Information Education and communication (IEC) activities in the project area to create
9 24.00
awareness and motivate people to discontinue use of underground tanks and boosters.

Provision for Leak detection equipmen, T&P and water quality testing equipment and
10 20.00
energy efficient lighting in Office building, Pump houses and campus

Sub-Total (Rs in Lacs) 2990.62


Provision for Utility Shifting Charges @3% 59.81
Net Sanctioned Cost (Rs in Lacs) 3050.43
Net Sanctioned Cost (Rs in Crores) 30.50
ALWAR
S.No. Description

Construction of 200mm.dia tube well with M.S. casing pipe with providing & Installation
1 of pump set in T/W, G.I.pipe, cable, electric installation etc.
(61 Numbers)
Provision for DI K-7 class rising mains of different sizes to pump water to different
2
OHSRs (Diameter 100-500 mm = 45075 meters length)
Provision of construction of new RCC CWR and repair & rehabilitation of RCC Clear
3
water Reservoirs (5 Numbers of capacity range from 200 - 1250 kl)
Provision for construction for new RCC Over head Service Reservoir and rejuvenation of
4
existing OHSR (8 Numbers, capacity range from 400 - 2050 kl)

Provision for Water Distribution System consisting of HDPE & DI pipe (HDPE Diameter
5
90-225 mm = 387330 meters & DI Diameter 250-500 mm = 20347 meters length)

Provision for consumer meters and making House Service connections (Domestic Non
6
AMR = 12472 Numbers & Non Domestic AMR = 249 Numbers)

7 Provisionn for Pumping Machinery and Electromechanical equipment in pump houses

Provision for Construction Of New Pumping Stations, Other Buildings, boundary wall,
8 campus development works and Repair/Rehabilitation of Existing pumping stations and
other buildings.
Provision for Road restoration work for the road cutting done in laying of rising mains,
9
distribution and house service connections.
Provision for instrumentation, Automation and SCADA for efficient operations of Water
10
Supply System.
11 Provision for 11/.43 KV GSS and dedicated power feeders.
Provision for software and hardware for implementation of Integrated Management
12
System for end to end management of the UWSS

Information Education and communication (IEC) activities in the project area to create
13
awareness and motivate people to discontinue use of underground tanks and boosters.

Provision for Leak detection equipmen, T&P and water quality testing equipment and
14
energy efficient lighting in Office building, Pump houses and campus

15 Provision for construction of Store cum J.En. Office Buidling At Alwar


Net Sanctioned Cost (Rs in Lacs)
Net Sanctioned Cost (Rs in Crores)
SLTC Sanction Amount
(Rupees
In lacs.)

345.51

1493.98

203.92

812.43

3647.43

535.09

158.93

288.38

872.11

259.17
273.26
111.00

29.00

20.70

11.24
9062.15
90.62
JHALAWAR
SLTC Sanction Amount
S.No. Description (Rupees
In lacs.)
Expansion capacity of 18 MLD WTP at Chhapi to 36 MLD by Construction of additional
1 units of flash mixer, clariflocculator, filters etc including yard piping and complete 396.00
integration with the existing unit. (18 MLD Capacity)
Provision for DI K-7 class rising mains of different sizes to pump water to different
2 647.49
OHSRs (Diameter 200-350 mm = 13320 meters length)
Provision of construction of new RCC CWR and repair & rehabilitation of RCC Clear
3 92.50
water Reservoirs (3 Numbers of capacity range from 150 - 1500 kl)
Provision for construction for new RCC Over head Service Reservoir and rejuvenation of
4 595.63
existing OHSR (6 Numbers, capacity range from 450 - 1250 kl)
Provision for Water Distribution System consisting of DI pipe (Diameter 100-450 mm =
5 3428.49
163960 meters length)

Provision for consumer meters and making House Service connections (Domestic Non
6 600.62
AMR = 12430 Numbers & Non Domestic AMR = 1044 Numbers)

7 Provisionn for Pumping Machinery and Electromechanical equipment in pump houses 285.38

Provision for Construction Of New Pumping Stations, Other Buildings, boundary wall,
8 123.00
campus development works and Repair/Rehabilitation of Existing pumping stations

Provision for Road restoration work for the road cutting done in laying of rising mains,
9 726.35
distribution and house service connections.
10 Rehabilitation of SE, Ex. En, AEN & Other Existing Buildings 32.27
Provision for instrumentation, Automation and SCADA for efficient operations of Water
11 348.17
Supply System.
12 Provision for 11/.43 KV GSS and dedicated power feeders. 46.76
Provision for software and hardware for implementation of Integrated Management
13 111.00
System for end to end management of the UWSS

Information Education and communication (IEC) activities in the project area to create
14 26.95
awareness and motivate people to discontinue use of underground tanks and boosters.

Provision for Leak detection equipmen, T&P and water quality testing equipment and
15 20.70
energy efficient lighting in Office building, Pump houses and campus
16 Provision for construction of Store At Rari Ke Balaji- Jhalawar 11.24
17 Rehabilitation of Existing WTP at Chhapi 16.18
18 Rising of Height of Anicut at Bindu Deh by 500 mm 10.51
19 Detailed Estimate for Construction of Brick Masonary Room over Valve Chamber. 4.10
Net Sanctioned Cost (Rs in Lacs) 7523.34
Net Sanctioned Cost (Rs in Crores) 75.23
Baran
S.N Description

Provision for DI K-7 class rising mains of different sizes to pump water to different OHSRs
1
(Diameter 150-450 mm = 35905 meters length)
Provision of construction of new RCC CWR and repair & rehabilitation of RCC Clear water
2
Reservoirs (2 Numbers of capacity 850 & 1600 kl)
Provision for construction for new RCC Over head Service Reservoir and rejuvenation of existing
3
OHSR (12 Numbers, capacity range from 250 - 1500 kl)

Provision for Water Distribution System consisting of HDPE & DI pipe (HDPE Diameter 90-225
4
mm = 303994 meters & DI Diameter 250-500 mm = 30845 meters length)

Provision for consumer meters and making House Service connections (Domestic Non AMR =
5
7232 Numbers & Non Domestic AMR = 381 Numbers)
6 Provision for Pumping Machinery and Electromechanical equipment in pump houses
Provision for Construction Of New Pumping Stations And Other Buildings And Repair/
7 Rehabilitation of Existing pumping stations and other buildings.
Provision for Road restoration work for the road cutting done in laying of rising mains,
8 distribution and house service connections.
Provision for instrumentation, Automation and SCADA for efficient operations of Water Supply
9 System.
Provision for 11/.43 KV GSS and dedicated power feeders.
10

Provision for software and hardware for implementation of Integrated Management System for
11 end to end management of the UWSS
Information Education and communication (IEC) activities in the project area to create awareness
12 and motivate people to discontinue use of underground tanks and boosters.
Provision for Leak detection equipment, T&P and water quality testing equipment
13

Net Sanctioned Cost (Rs in Lacs)


Net Sanctioned Cost (Rs in Crores)
SLTC Sanction Amount
(Rupees In
lacs.)
1,176.40

123.89

1,024.58

3,275.91

318.21

180.86
521.72

572.36

348.97

112.05

111

40

25

7,830.95
78.31
Bundi
S. No. Description

Provision for DI K-7 class rising mains of different sizes to pump water to
1
different OHSRs (Diameter 100-300 mm = 11826 meters length)
Provision of construction of new RCC CWR and repair & rehabilitation of RCC
2
Clear water Reservoirs (01 Number of capacity 500 kl)

Provision for construction for new RCC Over head Service Reservoir and
3
rejuvenation of existing OHSR (09 Numbers, capacity range from 300 - 950 kl)

Provision for Water Distribution System consisting of HDPE & DI pipe (HDPE
4 Diameter 90-225 mm = 150334 meters & DI Diameter 250-450 mm = 13153
meters length)

Provision for consumer meters and making House Service connections


5
(Domestic Non AMR = 14400 Numbers & Non Domestic AMR = 432 Numbers)

6 Provision for Pumping Machinery and Electromechanical equipment in pump


houses
Provision for Construction Of New Pumping Stations, Other Buildings, boundary
7 wall, campus development works and Repair/Rehabilitation of Existing pumping
stations and other buildings.

8 Provision for Road restoration work for the road cutting done in laying of rising
mains, distribution and house service connections.

9 Provision for instrumentation, Automation and SCADA for efficient operations of


Water Supply System.
10 Provision for 11/.43 KV GSS and dedicated power feeders.
Provision for software and hardware for implementation of Integrated
11
Management System for end to end management of the UWSS
Information Education and communication (IEC) activities in the project area to
12 create awareness and motivate people to discontinue use of underground tanks
and boosters.
Provision for Leak detection equipment, T&P and water quality testing
13 equipment and energy efficient lighting in Office building, Pump houses and
campus
14 Provision for construction of Store Building At Bundi
Net Sanctioned Cost (Rs in Lacs)
Net Sanctioned Cost (Rs in Crores)
SLTC Sanction Amount
(Rupees In lacs.)

342.67

40.75

679.38

1636.50

583.80

35.73

143.70

681.29

208.74

87.06
111.00

50.00

25.00

11.24
4636.86
46.37
KOTA City
SLTC Sanction Amount
S.No. Description
(Rs In Lacs) without smart provisions

Provision for Water Distribution System consisting of DI pipe


1 3807.89
(Diameter 100-500 mm = 187657 meters length)
Provision for consumer meters and making House Service connections
2 (Domestic Non AMR = 55535 Numbers & Non Domestic AMR = 600 2264.95
Numbers)

Provision for Road restoration work for the road cutting done in laying
3 696.26
of rising mains, distribution and house service connections.

4 Provision for Installation of Bulk Flow Meter at Inlet of DMA. 64.60

Provision for software and hardware for implementation of Integrated


5 111.00
Management System for end to end management of the UWSS

Information Education and communication (IEC) activities in the project


6 area to create awareness and motivate people to discontinue use of 80.00
underground tanks and boosters.
Net Sanctioned Cost (Rs in Lacs) 7024.70
Net Sanctioned Cost (Rs in Crores) 70.25
Sujangarh
S.No. Description

Provision for Water Distribution System consisting of HDPE pipe to provide water
1 supply facility in uncovered areas to achieve target of 100% coverage by safe
drinking water. (Diameter 90-110 mm = 37071 meters length)

Provision for consumer meters and making House Service connections (Domestic
2
Non AMR = 19000 Numbers & Non Domestic AMR = 1000 Numbers)

Provision rehabilitation of existing Clear Water Reservoirs to prevent leakages and to


3
increase the useful service life
Provision for Road restoration work for the road cutting done in laying of distribution
4
lines and making house service connections.

5 Provision for Construction Of Master Control Center and Consumer Care Center

Provision for software and hardware for implementation of Integrated Management


6
System (IMIS) for end to end management of the UWSS and to provide

Information Education and communication (IEC) activities in the project area to


7 create awareness and motivate people to discontinue use of underground tanks and
boosters.

8 Provision for Leak detection equipmen, T&P and water quality testing equipment
Net Sanctioned Cost (Rs in Lacs)
Net Sanctioned Cost (Rs in Crores)
SLTC Sanction Amount

(Rupees In lacs.)

177.47

857.45

2.00

61.10

32.00

111.00

40.00

25.00
1306.02
13.06
Beawar
SLTC Sanction Amount
S.No. Description (Rupees
In lacs.)
Provision for DI K-7 class rising mains of different sizes to pump water to different OHSRs (Diameter
1 516.13
200-500 mm = 10049 meters length)
Provision for construction for new RCC Over head Service Reservoir and rejuvenation of existing
2 220.66
OHSR (02 Numbers of capacity 500 & 1000 kl)
Provision for Water Distribution System consisting of HDPE & DI pipe (HDPE Diameter 90-225 mm
3 659.64
= 53750 meters & DI Diameter 100-350 mm = 10363 meters length)
Provision for consumer meters and making House Service connections (Domestic Non AMR = 28520
4 826.89
Numbers & Non Domestic AMR = 800 Numbers)
Provision for Road restoration work for the road cutting done in laying of rising mains, distribution
5 117.73
and house service connections.
Provision for instrumentation, Automation and SCADA for efficient operations of Water Supply
6 278.37
System.
Provision for software and hardware for implementation of Integrated Management System for end to
7 111.00
end management of the UWSS
Information Education and communication (IEC) activities in the project area to create awareness
8 80.00
and motivate people to discontinue use of underground tanks and boosters.
Provision for Leak detection equipmen, T&P and water quality testing equipment and energy efficient
9 18.00
lighting in Office building, Pump houses and campus
10 Provision for Construction of Master Control Centre with provision for consumer care centre. 22.00
11 Provision for Electric Connection in OHSR Campus for operation of SCADA Instruments 2.55
Net Sanctioned Cost (Rs in Lacs) 2852.97
Net Sanctioned Cost (Rs in Crores) 28.53
Bhilwara
S.No. Description SLTC Sanction Amount
(Rupees In
lacs.)
Provision for consumer meters and making House Service connections
1 (Domestic Non AMR = 47330 Numbers & Non Domestic AMR = 5092 1618.14
Numbers)
Provision for Road restoration work for the road cutting done in making
2 house service connections. 150.00
Provision for rehabilitation of existing service RCC over head service
3 reservoirs to prevent leakages and increase there useful service life. 146.64

Provision for Rehabilitation/Rejuventaion of 27.4 MLD Water Treatment


4 Plant to improve the quality of treated water and increase the usefull 108.28
service life of WTP
Repair of Raw Water Reservoir to prevent leakages and increase usefull
5 service life 29.04
Estimate for Pumping machinery and Other Electromechanical
6 Equipments at INTAKE at MEJA DAM 77.58
Provision for constuction of IMIS Centre and Consumer Care Centre
7 32.00
Provision for software and hardware for implementation of Integrated
8 Management System for end to end management of the UWSS 111.00

Information Education and communication (IEC) activities in the project


9 area to create awareness and motivate people to discontinue use of 40.00
underground tanks and boosters.
Provision for Leak detection equipmen, T&P and water quality testing
equipment and Provision for energy efficient LED Lights in replacement
10 of incandesant Lamp / CFL in Pump houses, and PHED campuses. 20.70

Net Sanctioned Cost (Rs in Lacs) 2333.38


Net Sanctioned Cost (Rs in Crores) 23.33
Kishangarh
Total Amount as per A &
S.No. Description F under State Plan
(Rs in Lacs)

Provision for GIS Mapping, Consumer Survey and Preparation Of System


1 220.99
Improvement Plan (SIP)

Provision for DI K-7 class rising mains of different sizes to pump water to
2 547.46
different OHSRs (Diameter 150-350 mm = 21248 meters length)

Provision for construction for new RCC Over head Service Reservoir and
3 rejuvenation of existing OHSR (15 Numbers of capacity range from 250 - 1,348.25
1100 kl)
Provision for Water Distribution System consisting of HDPE & DI pipe
4 (HDPE Diameter 90-225 mm = 495302 meters & DI Diameter 100-500 mm = 7,112.57
140910 meters length)
Provision for consumer meters and making House Service connections
5 (Domestic Non AMR = 28650 Numbers & Non Domestic AMR = 1500 1,286.17
Numbers)
Provisionn for Pumping Machinery and Electromechanical equipment in pump
6 184.67
houses

Provision for Construction Of New Pumping Stations And Other Buildings And
7 168.70
Repair/Rehabilitation of Existing pumping stations and other buildings.

Provision for Road restoration work for the road cutting done in laying of
8 1,192.45
rising mains, distribution and house service connections.
Provision for instrumentation, Automation and SCADA for efficient operations
9 476.68
of Water Supply System.
10 Provision for 11/.43 KV GSS and dedicated power feeders. 203.58
Provision for software and hardware for implementation of Integrated
11 111.00
Management System for end to end management of the UWSS
Information Education and communication (IEC) activities in the project area
12 to create awareness and motivate people to discontinue use of underground 60.00
tanks and boosters.
Provision for Leak detection equipmen, T&P and water quality testing
13 20.00
equipment
Net Sanctioned Cost (Rs in Lacs) 12,912.52
Net Sanctioned Cost (Rs in Crores) 129.13