You are on page 1of 3

Current Well Configuration

28NE-27S
API-10: 0403066690 Battery: 999110 Original KB Elev: Spud Date/Time: 08/30/2019
Field Name: ELK HILLS Test Facility: Ground elevation: 730.20 (ft) Last Well Status:
Country: USA Coord E/W: 6,147,201.54 (usft) KB To Ground: Well Class.:
State: CALIFORNIA Coord N/S: 2,292,341.73 (usft) Ref. Datum: Original DF @744.20ft (above Mean Sea Level)
County: KERN Casing Flange: CAMERON, C-21, 11.000, 3000

Wellbores/Sidetracks
Wellbore Wellbore label Start Date Parent wellbore Top MD Top TVD Btm MD Btm TVD PBMD PBTVD BH Coord X BH Coord Y
No. (ft) (ft) (ft) (ft) (ft) (ft) (usft) (usft)

00 ORIGINAL HOLE 08/30/2019 --None-- 0.0 0.0 3,681.0 3,492.8 3,328.0 6,146,519.27 2,292,607.04

Casing and Liner


Jts Length Nominal OD Nominal ID Drift ID Weight Grade Connection Top MD Btm MD
(ft) (in) (in) (in) (ppf) (ft) (ft)
PRE-SET CONDUCTOR Installed: 08/22/2019 Wellbore No. 00
Casing 1 40.00 16.000 15.500 15.499 42.05 K-55 WELD ON 14.0 54.0
SURFACE CASING Installed: 08/30/2019 Wellbore No. 00
Casing 9 343.10 9.625 8.921 8.765 36.00 K-55 BTC 14.0 357.1
Float Collar 1 1.35 10.500 8.921 8.765 36.00 K-55 BTC 357.1 358.5
Casing 1 38.00 9.625 8.921 8.765 36.00 K-55 BTC 358.5 396.5
GUIDE SHOE 1 1.57 10.500 8.921 8.765 36.00 K-55 BTC 396.5 398.0
PRODUCTION CASING Installed: 09/02/2019 Wellbore No. 00
Casing 92 3,624.14 7.000 6.366 6.241 23.00 K-55 BTC 14.0 3,638.1
FLOAT COLLAR 1 1.35 7.000 6.366 6.241 23.00 K-55 BTC 3,638.1 3,639.5
Casing 1 39.89 7.000 6.366 6.241 23.00 K-55 BTC 3,639.5 3,679.4
GUIDE SHOE 1 1.60 7.000 6.366 6.241 23.00 K-55 BTC 3,679.4 3,681.0
SCREEN / SLOTTED LINER Installed: 09/19/2019 Wellbore No. 00
Casing 1 9.52 6.000 4.892 23.00 K-55 BTC 3,249.1 3,258.6
Casing 1 9.02 4.500 4.000 11.60 N-80 HYD 511 3,258.6 3,267.7
Casing 1 20.08 4.500 4.000 11.60 N-80 HYD 511 3,267.7 3,287.7
SLOTTED LINER 1 38.70 4.500 4.000 11.60 N-80 HYD 511 3,287.7 3,326.4
Casing 1 1.56 4.500 0.000 11.60 N-80 HYD 511 3,326.4 3,328.0

Perforations
Wellbore Date Shot Formation Top MD Btm MD Shot density Phasing Shot Diam. Interval type Status Status date
No. (ft) (ft) (shot/ft) (°) (in)
00 09/13/2019 3,294.0 3,306.0 6.00 30.00 0.380 PERFORATED OPEN 09/13/2019
00 09/13/2019 3,294.0 3,306.0 6.00 30.00 0.750 PERFORATED OPEN 09/13/2019
00 09/13/2019 3,306.0 3,318.0 6.00 30.00 0.750 PERFORATED OPEN 09/13/2019
00 09/13/2019 3,306.0 3,318.0 6.00 30.00 0.380 PERFORATED OPEN 09/13/2019

Other Wellbore Equipment


Jts Nominal OD Nominal ID Weight Grade Connection Top MD Btm MD Length Additional Description
(in) (in) (ppf) (ft) (ft) (ft)
PLUG BACK Installed: 09/18/2019 Wellbore No. 00
BRIDGE PLUG 1 7.000 23.00 3,328.0 3,333.0 5.00
TUBING STRING Installed: 09/20/2019 Wellbore No. 00
TUBING HANGER 1 2.875 2.441 G-2 EUE 8RD 14.0 14.0 0.01 Top Flange
PUP JOINT(S) - POLY-LINED 2 2.875 1.901 6.50 J-55 EUE 8RD 14.0 26.1 12.05
TUBING JOINT(S) - POLY-LINED 102 2.875 1.901 6.50 N-80 EUE 8RD 26.1 3,210.6 3,184.53
CROSSOVER 1 2.875 1.995 J-55 EUE 8RD 3,210.6 3,211.7 1.09 Plasma Coated
TUBING JOINT(S) 3 2.375 1.995 4.70 13CR EUE 8RD 3,211.7 3,304.2 92.49
Seating Nipple 1 2.375 1.780 13CR EUE 8RD 3,304.2 3,305.0 0.80

Rod String
ROD STRING Installed: 09/20/2019 Wellbore No. 00
Component Name Jts Nominal OD Grade Top MD Btm MD Length Additional Description
(in) (ft) (ft) (ft)
POLISHED ROD 1 1.250 4140 14.0 44.0 30.00
PONY ROD 3 0.875 D 44.0 60.0 16.00
ROD(S) 105 0.875 D 60.0 3,210.0 3,150.00
RODS (8 PER) 3 0.750 N97 3,210.0 3,300.0 90.00
INSERT PUMP 1 1.500 3,300.0 3,316.0 16.00 20-150-RHBC-16-3-1

11/19/2019 4:08 pm V0.93 Page 1 of 3


Rod Pump Details
Status Date 9/20/2019 Max. stroke length 124.00 (in) Barrel Material STEEL NICARB
API / Model DNB7223 Clearance -0.002 (in) Travel Valve Ball Material TITANIUM - ALT
Pump type ROD Special Feature Travel Valve Seat Material TITANIUM CARBIDE
API Description 20-150-RHBC-16-3-1 Hold-Down Type CUP STYLE Stand Valve Ball Material TITANIUM - ALT
Pump supplier DISTRIBUTION NOW Plunger Material SPRAY METAL Stand Valve Seat Material TITANIUM CARBIDE
Pump Depth: 3,305.0
Install comments TOTAL FIT -0.002 SOZ WATER READY ACID SAND PUMP
Remarks

Event Work History


Event Name Start date End date Prim. Reason Sec. Reason End Status Field Cost Total
Hrs

DEV COMPLETION 09/11/2019 09/21/2019 CASED HOLE SAND CONTROL -SLOTTED


FINISHED
LINER- SUCCESS 147,883.56 85.50
DEV DRILLING 08/30/2019 09/02/2019 ORIG DRILL DIR PRODUCER FINISHED - SUCCESS 371,830.93 83.00

11/19/2019 4:08 pm V0.93 Page 2 of 3


11/19/2019 4:08 pm V0.93 Page 3 of 3

You might also like