Professional Documents
Culture Documents
_________________________________________________________________________________________
Notes
1) HOO policies and procedures cited in this document are available from HOO HSE Department via the
nominated Project/Works sponsor.
2) Contractors are advised that HOO polices and procedure which they are not familiar with should be
requested and evaluated to ensure compliance with their requirements.
1.2 General Notes on Usage of this Document and its Application ............................................................................... 12
3.3 Organisation........................................................................................................................................................... 18
4.4 Supervisors............................................................................................................................................................. 24
5.3 Orientation............................................................................................................................................................. 28
5.21 Scaffolding............................................................................................................................................................ 31
5.26 Barricades............................................................................................................................................................. 32
6.3 Contractor Method Statement And Risk Assessment Approval Process ................................................................. 38
7.5 NORM..................................................................................................................................................................... 40
9.9 Ladders................................................................................................................................................................... 52
11.7 Access................................................................................................................................................................... 59
15.1 General................................................................................................................................................................. 69
See HOO Permit to Work procedure for more detail on permits, isolations and SIMOPS. ............................................ 70
18.1 General................................................................................................................................................................. 75
19.1 General................................................................................................................................................................. 76
19.4 Responsibilities..................................................................................................................................................... 78
19.8.3 Ventilation......................................................................................................................................................... 81
Construction pigging operations See Table below for documents required at each
5 Upgrades to safety systems that impact process safety: Fire and Gas stage of the Bidding process.
Contract Type Medium Pre Tender Stage Tender Stage Contract Award Stage
Internal Evaluation
At Tender stage: HOO HSE Evidence of similar work Evidence of similar work Evidence of similar work
will assess the Work-scope Basic overview of company HSE Contractors HSE Management system Detailed HSE plan showing compliance
with the Dept and provides management system. showing detailed structure and policy- with HOO HSE requirements with
detailed requirements. Approval certificates ISO-OSHAS procedures relative to workscope. For Identified controls ref work.
At Contract Award: HOO example a typical HSE Plan for similar
Equipment list Process Safety procedures.
HSE will evaluate
Identified controls ref work work. Approval certificates ISO-OSHAS
Contractors detailed HSE
Plan and provides feedback. Show evidence of emergency response. Detailed Equipment list
Typical requirements Example, a typical ERP. Note ATEX- LOLAR Certs, etc.
Section 4.0: Contractor’s Approval certificates ISO-OSHAS Detailed RA-MS- procedure.
Management Equipment list: Note ATEX as required. PTW experience or statement of
Section 5.0: Safe Systems
Identified controls ref work. compliance.
of work
Section 6.0: RA-MS Evidence of Process Safety experience CV of key project personnel.
Section 9.0 Scaffolding Evidence of RA-MS–PTW experience. Emergency response compliance.
Section 10.0 Welding-Hot Example CV’s of Key project personnel.
work
Section 12.0 lifting Notes
equipment Contractors should note: The foregoing items are for illustration on selecting items from this document. Contractors must
Section 15.0 PTW evaluate their precise work-scope and determine the necessary parts of this document to apply.
Section 7.0 Process Safety. HOO will review and evaluate each Contractor’s submission in relation to the documents presented against the requirements
of the workscope.
Contractor: Provide a HSE An internal check-sheet will be developed by HOO for each workscope. This will be used across the range of Bidders-Tender
Plan covering the actual submissions, so the evaluation is objective and fair.
work. Provide detailed Contractors should show their best case at each stage above, to allow a smooth evaluation and minimum Fax queries.
procedures as necessary Contractors can provide additional data if they feel it explains their submission better.
Prior to submission of Tenders, Contractor’s can contact HOO HSE Department via the Project Engineer for an explanation of
requirements.
After contract award the formal HSE Plan and documentation is expected from the selected Contractor.
HOO will participate in the Kick off meeting after contract award as required.
Contract Type Large Pre Tender Stage Tender Stage Contract Award Stage
At Pre & Tender stage:
HOO HSE will assess Evidence of similar work & Evidence of similar work and client’s list Evidence of similar work
the Work-scope and Clients list. Contractors HSE Management system Detailed HSE plan showing compliance
provides detailed Basic overview of company HSE showing detailed structure and policy- with HOO HSE requirements with
requirements. management system. procedures relative to workscope. For Identified controls ref work.
Approval certificates ISO-OSHAS example a typical HSE Plan for similar Process Safety procedures.
At Contract Award:
Equipment list. work. Approval certificates ISO-OSHAS
HOO HSE will evaluate
Contractors detailed Identified controls ref work Show evidence of emergency response. Detailed Equipment list
HSE Planning. Evidence of Process Safety Example a typical ERP. Note ATEX- LOLAR Certs, etc.
experience. Approval certificates ISO-OSHAS Detailed RA-MS procedure.
At Implementation Equipment list PTW compliance either procedure or
stage: HOO will monitor
Note ATEX equipment as required. statement.
and approve
Contractors detailed Identified controls ref work. Detailed procedures for the work.
procedures as Evidence of Process Safety experience Emergency response plan.
necessary. Evidence of RA-MS –PTW experience. CV’s of key project personnel.
Example CV’s of Key project personnel
Typical requirements
All sections required at Notes
Contract award. Contractors should note: The foregoing items are for illustration on selecting items from this document. Contractors
must evaluate their precise work-scope and determine the necessary parts of this document to apply.
See Table for HOO will review and evaluate each Contractor’s submission in relation to the documents presented against the
documents required at requirements of the workscope.
each stage An internal check-sheet will be developed by HOO for each workscope. This will be used across the range of Bidders-
Tender submissions, so the evaluation is objective and fair.
Contractors should show their best case at each stage above, to allow a smooth evaluation and minimum Fax queries.
Contractors can provide additional data if they feel it explains their submission better.
Prior to submission of Tenders, Contractor’s can contact HOO HSE Department via the Project Engineer for an
explanation of requirements.
After contract award the formal HSE Plan and documentation is expected from the selected Contractor.
HOO will participate in the Kick off meeting after contract award as required.
Because HSE is of primary importance to HOO, every employer and supervisor shall hold the
prevention of job related injuries as their highest priority. This means HSE is placed above cost and
production issues.
Each employer is responsible and will be held accountable for: identifying, analysing, eliminating or
controlling all hazards through implementation of an aggressive pro-active HSE Program, from task
inception through to task completion.
Supervisors shall ensure compliance with HSE rules, laws and regulations as they apply to their
respective operations. These rules, regulations and laws include, but are not limited to all HSE
protection requirements.
Every employee is expected to perform their work according to established safe practices and to use
all the safety equipment and devices provided. They are expected to comply with these
requirements to ensure their own safety and also alert to unsafe practices of their fellow employees.
Employees are responsible for active participation in site HSE programs, suggestion systems,
training activities and the immediate reporting of: all injuries, unsafe practices or conditions they
observe to their supervisor/Foremen. Safety is everyone’s responsibility irrespective of position.
Through dedicated commitment to HSE by all employees the objective of Zero Incidents is more
directly attainable.
--------------------------------------------------------------
Manager
HSE Department
Tripoli
All practical measures will be taken to protect the environment, these shall include:
Addressing environmental issues proactively and reponding expeditiously on all environnmental
incidents.
Thoroughly investigating all environmental incidents, establishing root causes and implementing
measures to prevent a recurrence.
Minimizing the use and wastage of natural resources and energy consumption by constant
monitoring the implementation of effective conservation measures.
Segregating waste and used construction materials, such as: metal, timber, rubble, etc and
placing them in suitable discrete containers prior to removal from the work site.
Food waste shall be placed in suitable containers and disposed of in a regulated: burn pit. This
waste shall be collected separately and each field location shall provide for suitable collection
and disposal of such waste. No food waste shall be disposed of, through drainage systems.
Actively prevent the release or discharge of: oils, grease, fuels, lubricants, paints, solvents, acids
or alkali chemicals, or contaminated waste waters, into the temporary or permanent drainage
systems, or onto the ground.
Closely controlling the introduction of harmful substances and aggressive chemicals to the work
site. Where possible, less harmful substances or aggressive chemicals will be sought and used
as a substitute.
Implementing dust control measures, either by enclosing the dust generating activity or by
surface wetting and damping. Reducing vehicle movements in and around station machinery will
also be considered.
Implementing a pest control program, which will include good housekeeping practice, the timely
removal of all food waste, and the close monitoring and subsequent extermination of: rats, mice,
cockroaches, flies, mosquitos, or other pests. Pest control measures shall be carried out on a
monthly basis where drainage systems are concerned.
Monitoring Noise Levels around machinery and construction activities. Where noise is found to
be a nuisance, or in excess of the first action level (85dB) noise reduction measures shall be
implemented either by improving the: engineering, maintenance or method of operation.
Educating the work force in the foregoing policy requirements and applicable standards.
--------------------------------------------------------------
Manager
HSE Department
Tripoli
Contractor’s management shall ensure that HSE responsibilities, authorities, accountabilities and
competencies are clearly defined, documented, communicated and exercised at all levels.
Contractor’s management shall ensure that individual and team contributions to HSE performance
are recognised and considered during performance appraisals.
HOO operates: a weapons, alcohol and drug free policy on all its sites. Contractor shall comply and
ensure that Contractor’s Personnel comply with HOO requirements in this respect.
Contractor shall ensure that its HSE policy and HSE Plan are available at the site to all HOO and
Contractor’s Personnel in their working languages and shall ensure that all Contractor’s Personnel
comply with the requirements of both the HSE Policy and the HSE Plan.
3.3 Organisation
Contractor shall provide sufficient and appropriate manpower and supervision in his organisation;
with clear responsibilities and reporting structure to ensure that HSE performance is not
compromised.
Contractor shall ensure that no individual works at the site unless he has been fully inducted.
Medically, physically and mentally fit to carry out the duties to which they are assigned in respect
of the work.
Aged eighteen years or above, where they are employed to work on hazardous worksites.
Contractor shall maintain records of individual Contractor’s personnel who have been trained in
Company and HOO requirements, for example: induction-Permit to work-evacuation-rescue and
specific assigned tasks. (This is not a comprehensive list)
Contractor shall formally demonstrate the level of competence and experience of all HSE personnel
proposed for site work. They shall submit CV data to HOO for approval. HOO reserve the right to
sanction or otherwise, personnel proposed for work at its locations.
3.9 Subcontractors
Contractor shall ensure that all its Subcontractors comply with HOO requirements. They shall
receive a copy of and comply with the requirements of the HSE Plan accepted by HOO.
Subcontractors shall also be familiar with reporting and documentation requirements as stated by
HOO to the Contractor.
At the worksite the Contractor shall ensure that effective Toolbox Talks are undertaken.
Relevant and applicable Health, Safety, Security and Environmental Legislation for all places where
Work is performed;
Objectives.
Confirmation of Contractors HSE Plan to be implemented including verification that roles and
responsibilities have been clearly defined and understood.
Explanation of the Company's HSE policy, basic HSE rules and work procedures. Contractor
is encouraged to develop their own HSE System, but it must meet HOO requirements as
detailed in this document relative to the work.
Confirmation of the scope and schedule of HSE activities for example; HSE meetings, audits
and reviews.
Contact with third parties to ensure their role in emergency response plans is known.
Confirmation that HSE induction and training plans are in place and ready for start up.
The meeting(s) should be used as an opportunity to clarify or raise new HSE issues that may not
have been covered in the contract documentation.
However, as part of his submission, the contractor is required to state his own proposals within the
framework described. In particular, the contractor should:
Review his workscope relative to section 1.1,1.2 and 1.3 of this document, and formulate his
HSE Plan on these requirements.
Develop his own hazard assessment (JHA-MS) of the work described for the contract.
Define his execution proposals.
The contractor should confirm his proposed use of: policies, procedures, standards, controls, etc and
show that these comply with HOO requirements, or add to them where he believes the contract
guidelines are insufficient. He should:
Demonstrate familiarity with the type of work involved
Confirm his understanding that these guidelines represent minimum standards.
NOTE: These guidelines are designed to indicate the key features of the Contractor’s HSE Plan but
are not necessarily exhaustive. HOO have additional policies and procedures examples are: Journey
management, No smoking Policy, Safe driving, Permit to Work, Hazard incident notification and
investigation, etc. Contractors unfamiliar with these documents can request them via their project
sponsor. The Contractor may add to the list where needed. Conversely, items in the guidelines may
not apply to some contracts. See section 1.1 above
They will ensure each crewmember has the knowledge; correct tools, equipment, fitments, electrical
appliances for the task at hand. They will ensure the applicable PTW is in place supported by a risk
assessment and TBT. Each employee is wearing the correct PPE to ensure safe execution of the
work. They will conduct toolbox talks in conjunction with HSE to ensure each employee is aware of
his duty and any work related hazards are recognised and actioned, the correct equipment is in
place and all PTW requirements are met.
All contractor staff have the authority and are encouraged to stop unsafe work or activities that is not
in compliance with HOO requirements, the contractors site safety plan, the PTW, or local rules and
regulations whether the work or activity is under their direct control or not.
4.7 Drivers/Operators
All drivers and operators must hold a current valid license for the vehicle/equipment being operated.
Vehicles and plant shall be certified as required and subject to an ongoing maintenance program.
All HOO sites and national speed limits must be strictly adhered to. Vehicles are only permitted to
park within designated parking areas.
No vehicles are permitted within the bounded region of: tanks, vessels, process areas, at main
processing plants or outstations, without prior authorisation from the Location Fire Safety Supervisor
(FSS).
All vehicle drivers and passengers shall wear seat belts; the maximum number of people allowed in
a vehicle is dictated by the number of seat belts.
5.1 Introduction
The performance of work in the safest possible manner can only be realized when the work has
been carefully planned, risks evaluated, and appropriate procedures followed. The safe work
practices utilized during the construction-works activity at all HOO sites shall consider the applicable:
HSE standards and procedures, government regulations and international specifications as
appropriate to the workscope. In each case, the most stringent requirement will be implemented.
Guidelines issued by Authorities such as: UK-HSE Executive, OSHA, NIOSH, Euro-Norms, etc, shall
be considered as/if necessary.
The Contractor shall produce a specific site HSE Plan which shall be submitted to HOO HSE
Department, Tripoli, for evaluation before work commences. The Contractor shall demonstrate in this
plan their commitment to HSE and their methodology for managing the workscope in compliance
with these requirements. This shall extend to all site activity and be implemented and understood at
site level by all Contractors personnel.
Supervisors in charge of work activity shall outline the procedures to be followed by their crew,
incorporating HOO General Requirements found in this document and the Contractors HSE Plan.
These safe work practices shall be followed by all employees both HOO and Contractors.
These General HSE Requirements are not meant to be all encompassing and therefore, during
the course of the project, HOO HSE Department may issue additional safe working guidelines or
rules, which must be followed. For example, findings from an incident investigation may require
companywide implementation.
During the course of a Contract any deviations from these Guidelines must be approved in
writing by HOO HSE Department, prior to the work being performed.
5.3 Orientation
All foremen, tradesmen and workers are required to attend the HOO Safety Orientation Course.
All job site personnel are required to attend before beginning work on the project. More detailed
training such as PTW and LOTO shall be scheduled as appropriate by the Contractor in conjunction
with HOO.
5.8 Injuries
All personnel must report any injuries to their supervisor/safety representative. All medical treatment
cases, regardless of severity, must be reported and treatment obtained. In addition, all incidents,
regardless of severity, must be reported to the HOO Safety Dept immediately. The Contractor shall
provide a monthly summery of HSE accidents-incidents in a monthly report.
5.21 Scaffolding
All scaffolding must meet HOO minimum standards and will be used with a Scaffold tagging system.
A Scafftag label shall be placed in a visible location on the scaffold before work is allowed to
commence. Incomplete or partially dismantled scaffolding shall also be tagged to indicate clearly to
personnel that it is not safe for use, or it is being modified.
5.24 Excavation
A designated competent person must be present during excavation works. Excavation walls must be
sloped at a 45-degree angle with dedicated access and egress in place. Underground services must
be considered and all work must take place under a: Permit to Work (PTW). Consult HOO Location
Safety Department regarding all excavations.
5.26 Barricades
Observe all barricades and utilize the appropriate tape when securing an area. Some barriers may
need to be metal framed. Consult the HOO Location Safety Department as required.
5.28 Emergencies
Personnel must be always aware where to go and what to do in the event of an emergency. Signs
and instructions shall be posted on all notice boards and office, canteen facilities, etc. Induction of
new personnel at sites shall include a section on mustering and emergency response. Consult HOO
Safety Department at the particular facility for applicable local rules.
Disposed of safely. Loose gear, material / equipment should be removed at the end of the work shift
and stowed properly.
Timber with protruding nails a serious hazard and must not be allowed to accumulate. Protruding
nails must be removed and disposed of correctly.
All access ways must remain free of obstruction at all times, a clear access in and out of lay-down
areas / fabrication area, store gangways, etc in the event of an emergency.
All disposable items shall be discarded in compliance with HOO Environmental Policy
5.33 Chemicals
Contractor shall give the specific site HOO FSS and/or Environmental specialist written notice within
a reasonable timescale before the delivery or removal from the worksite of any substance which is
toxic or hazardous to health, or, potentially harmful to the environment. Contractors shall assess the
risks to both personnel and the environment. Details of the precautions to be taken with the chemical
including PPE when using, handling, transporting, storing or other contact means with the substance
will also be considered by a Risk assessment (RA) or JHA-MS as appropriate. This study will cover
the detailed usage of the particular chemical, including disposal. A suitable dedicated storage area
shall be allocated by HOO at each site and Contractor shall ensure at all times the chemical is
suitably: stored, packaged and labelled.
A current MSDS sheet shall be available at the location for each chemical in use or proposed for
use. Contractors shall note the position of showers and eye baths at the particular site.
LIKELIHOOD
1 2 3 4 5
Very Unlikely Unlikely Possible Likely Very likely
Practically impossible as Highly unusual Realistic / known scenario Significant possibility that Almost certain that loss
the controls are highly combination of events in which one or more key a key control fails leading occurs as controls are
People Environment Value Reputation effective and reliable in leading to failure of in controls fail leading to directly to loss. absent or insufficient to
either preventing an event place controls. loss, but the failure of either prevent an event
occurring or stopping its these controls is occurring or stop its
escalation. unexpected. escalation.
Permanent partial
disabling injury / Medium scale (1- Short term national Medium / Ensure
3 illness; Restricted 2km2); Short term 1M - 10M (USD) concern. Close Reduction To
work case / Lost time impact (months). scrutiny of operations. ALARP
case.
Controls are measures / systems which are used to minimise the risk of a hazard resulting in an incident. Controls to reduce risk can be thought of as preventative and stops an event from occurring in the first
place, or reactive, and reduces the severity of an event, should the event occur. The hierarchy of controls must always be followed.
Method statements are required to support PTW applications and to reduce Risks in carrying out
Work. The following points are not an exhaustive list and is to be used as a guide to assist in
developing a Method Statement. Both a Method Statement and a Job Hazard Analysis of the activity
sequence should be completed at site utilizing personnel from all disciplines involved in the task, for
example; engineer, supervisor, foreman, crane driver, welder and labourer.
Table of Contents;
Provide equipment list of all major items state if ATEX compliance is required for: mechanical
and electrical equipment. Note scaffolding, lifting equipment, excavation equipment and, welding
plant, etc.
Provide an applicable list of materials and tools being used to undertake each task, state if non
sparking tools are required.
Show by means of a sketch where large equipment such as cranes, compressors, pumps,
welding machines etc, will be sited in relation to the process equipment.
State transport management regarding access and egress around the work site for vehicles,
equipment, personnel etc.
State if ground impact data is required for crane use or heavy lifts.
State personnel list (positions and numbers only). Names are not required.
Provide copies of current test and/or compliance certificates for: cranes, lifting gear and ATEX
equipment. These should be in an Appendix to the Method Statement;
Provide MSDS if and when applicable. These should be in an Appendix to the Method
Statement.
State pre task activities prior to commencement of work, e.g. the following shall be reviewed and
communicated to all personnel: PTW compliance, task specific TBT, and certificates for usage of
equipment.
Contractor makes the changes (if required) to the document Contractor liaises
as agreed by the Committee members direct with HOO field
based Project Owner
HOO Field based Project Owner forwards the document to the Document is returned
HOO Tripoli based Project Owner for review and/or comment to the Contractor for
amendment
Document is not
HOO LP&E Manager returns the document along with any approved. Comments
comments to the HOO Tripoli based Project Owner and/or requirements for
amendment are detailed
7.1 Introduction
The American Institution of Chemical Engineers (AIChE) defines Process Safety as: a disciplined
framework for managing the integrity of hazardous operating systems and processes by applying
good design principles, engineering, operating, and maintenance practices. It differs from
Occupational Safety (Baker Report) as the consequence of failure is usually catastrophic, resulting in
multiple deaths and injuries and the total or partial loss of the affected assets. Several recent
incidents such as the: Texas City and Bunsfield fires, the McCondo blowout, etc, testify to this.
Therefore, special precautions such as those inherent in the discipline of Process Safety are
required, when dealing with hydrocarbon inventories and their management.
7.5 NORM
Naturally occurring radioactive material (NORM) may be present in process equipment at some
HOO facilities, for example Ghani and Amal. It may also be present in liquid discharges from certain
plant items. Special precautions are required for dealing with this hazard which is applicable to the
type and level of radiation present. Therefore a survey shall be conducted on the equipment and the
radiation levels present shall be established. From this data the level of control and precautions
necessary shall be formulated. Contractors shall consult HOO Location Safety Department, for
guidelines as required. See Appendix 02 for details.
8.3 Clothing
Suitable clothing is required for the work being performed. All personnel must wear full protective
clothing at all times. This includes long sleeve shirt or coveralls with collars, a vest or T-shirt is not
acceptable, nor is shorts. The wearing of safety footwear is required and footwear that covers the
ankle is strongly recommended. No soft soled, sport shoes or sandals are permitted. Fire retardant
clothing is required during all welding operations.
9.0 Scaffolding-Access-Ladders
Scaffold planks must be at least 25 mm or 38 mm thick by 225 mm wide timber (dependent on the
type of use and transom spacing), as specified in the Code of Practice for Scaffolding, Standard.
Scaffold planks must be secured in place by either wire or cleats and must extend over the end
supports at least 50mm - but not more than 4 times the thickness of the board or plank.
Scaffolds platforms must be at least three planks wide; should this be the case then the scaffold
frame should also be 3 board wide structure, the practice of large frame scaffolds having only 3
boards placed onto it as a platform shall not be permitted at HOO locations. No employee may work
from a single plank.
Scaffold planks must be visually inspected before each use. Damaged scaffold planks must be
destroyed immediately, or removed from the location.
Where a scaffolding structure is no longer required for its original purpose, the scaffolding shall be
dismantled and closed in the scaffolding register log.
9.8 Definitions
Base-dimension is the meter square measurement of the scaffold frame, for example:
The scaffold frame = 3x3
measurement is:
The meter square is: = 9
Maximum Height is therefore: = 9 metres
9.9 Ladders
All types of ladders are available for employees' use. There is no excuse for using a makeshift
means of access to a work area.
All manufactured ladders used on any project-works undertaken must be of a heavy duty,
industrial type, with non-skid safety feet. (A- frame) ladders will have centre support bars and are
for use on concrete floorings only.
All ladders shall be inspected for damage, only those ladders that are deemed suitable and pass
the inspection shall be used.
Broken or damaged ladders must not be used and are to be removed from the project-work area
immediately.
The practice of splicing short ladders together to make a longer ladder, shall not be permitted at any
HOO location, the minimum length of any ladder for a scaffold is three metres. And should extend
one metre above the working platform. All ladders will be tied off at the top to prevent tipping, sliding
or being knocked over.
Ladders must not be placed against movable objects, cable trays, small bore pipes, gas lines or
air lines.
The base of the ladder must be set back a safe distance from the vertical - approximately one
fourth of the working length of the ladder.
Ladders used for access to a floor or platform must extend at least 1 meter above the landing.
Ladders over 6 meters high require the use of ladder safety devices (retractable lifelines, fall
bars, hoops etc.) a rest platforms shall be erected at the 4 meter point of any such access.
gas compound or using any existing gas storage area, contractors must first obtain permission from
HOO Safety Department.
Both check valves and flashback arrestors are required between the torch and hose and between
the hose and gauge. Decanting/Discharging/Emptying of Acetylene cylinders is strictly forbidden.
11.4 Inspections
Each excavation or trench will be inspected daily by a competent person and the permit will be
reviewed and initialled.
This provides the documentation of the daily check. If evidence of cave-ins, ground water, toxic
atmosphere or slides is apparent, all work in the excavation shall cease until necessary precautions
have been taken to safeguard workers.
11.6 Shafts
Personnel working in drilled shaft or bell-bottom holes must be protected by a substantial casing
which extends the full depth of the shaft for protection of sand fill. When working in such holes,
employees must wear a safety harness secured to a lifeline and tripod/winch mechanism, which is to
be attended by a safety watcher full-time. Confined space procedures shall also be implemented and
the potential for toxicity H2S evaluated by the HOO Safety Department.
12.4 Inspections
The inspection and testing, by an approved person/company, is to be made before using any sling.
Such examination and testing shall be at least once every 12 months. A certificate, verifying such
examination shall be submitted to HOO Safety Department.
A daily inspection shall be carried out on all slings, fastenings and attachments used “in the field”
before any use. Damaged or defective slings will be immediately removed from service and
destroyed. Chains and wire rope slings shall be inspected for damage or defect before any use, all
equipment should be stamped with the SWL (safe working load)
13.2 Definitions
Fall Hazards are a common occurrence on most jobs, but especially where poor planning is allowed
and enforcement is inadequate. This shall not be the case within HOO facilities. The following
standards shall be complied with in all cases and shall not be modified except with the approval of
the HOO Safety Department or where required by Local Law/legislation.
Safety Harnesses - Company standard includes Y-type dual 1.82 meters lanyards with locking snap
hooks and a shock-absorbing device. Some types of work may require slight modifications to this
standard such as, sliding back d-rings or two side d-rings used only for positioning. All modifications
shall be prior approved by HOO Safety Department. The harness must comply with B.S. EN 1497
Safety harness shock absorbing devices must meet the specification, which reduce the arresting
force on the employee to 818 kg or less.
Positioning Belts - Positioning belts, i.e., belts used to physically hold the employee by means of a
belt, in position and prevent a fall, must restrict any free fall to 61cm or less and the anchorage must
be capable of supporting at least twice the potential impact load in case of a fall.
i.e. - Rodman's belt for supporting an ironworker while tying rebar in a wall, or a full body harness
with two additional "D" rings on the sides.
Tie-Off Points - All tie-off points shall be at waist height or above. When straddling a beam, it is
permissible to tie off to that beam. All tie-off points and supports shall be capable of supporting the
load per person attached. Lanyards shall be rigged as short as possible so as to minimize the
potential fall distance but at no time shall it exceed 1.82 meters. The potential fall distance includes
the effective length of the lanyard plus the vertical distance from the tie-off point to the lanyard
attachment point on the harness when the tie-off is below the harness "D " ring.
13.6.2 Structures
The weight of each component in excess of 500 kg shall be clearly marked on it.
Erectors must be fully informed of the correct erection sequence, by their supervisor, prior to
each stage of work commencing.
Where planking or safety nets would interfere with the safe erection of a structure, the use of
safety harnesses with safety lines are accepted as alternative protection.
A tight platform made of planks at least 38mm thick or equivalent material of adequate strength
must be installed within every two storey’s or 8 meters, whichever is less, in elevator shafts
below the level where people are working.
During the construction of a building, there must be at least one stairway installed to within four
floors or 5.5 meters, whichever is less.
A tubular steel scaffold Temp stairs is acceptable as a stairway.
Every stairway and landing must be provided with handrails of adequate strength to a height of at
least 1.1 meters, measured vertically from the nose of the tread to the top of the rail.
Vertical access provisions should, whenever possible, be fixed to the steel prior to it being lifted into
position. Where this is not possible, permanent access (i.e., stairways or permanent metal ladders)
shall be installed as early as possible.
Where horizontal access along structural members is required as much work as possible is to be
completed, before the steel is lifted into position. This includes:
The fixing of handrails or lifelines for use in conjunction with safety harnesses or inertia reels.
The fixing of access ladders should take place before any columns are raised into place.
The fixing of scaffold tubes to the lower flange of an I-beam to allow a working platform to be
erected.
Where scaffold tubes are used, they shall not support a working platform wider than three boards, or
one lightweight staging without being picked up and braced back.
Where there is no ladder access, permanent stairway, etc., leading onto a working platform, as
described above. Employees shall use a man riding basket or aerial lift which shall be tested,
certified and the SWL marked clearly on the basket.
All steel erectors working at height must be provided with a pouch and belt or other such means of
securing tools, nuts and bolts to prevent them dropping on personnel who may be working below.
The work area shall have a barricade directly below persons working at height and warning signs:
Men Working Above will be posted.
15.1 General
A Permit-to-Work system is in place at all HOO facilities. It is a safety procedure designed to protect
personnel and plant. It consists of organized and pre-defined systems and forms a clear record of all
foreseeable hazards, which have been considered in advance. Correct operation of the system
requires that:
Only one HOO authorities issues permits to allow personnel to work. (Operating Authority)
Only authorized supervisors shall request and receive permits.(Performing Authorities)
Only one HOO authority is certified to isolate plant-equipment. (Isolation Authority)
17.0 Radiography
18.1 General
Only tools in safe working condition are to be used. Compliance with all of the manufacturer's
instructions is mandatory. The Contractor will instigate a maintenance program for hand tools, this
will include a: scheduled inspection and repair routine and the ability to quarantine tools not suitable
for use. In addition, the following safe practices are to be observed.
Inspect tools in use daily to ensure that they are in proper working order. Damaged or defective
tools must be repaired or replaced immediately.
Power saws, grinders, and other power tools must have proper guards in place at all times.
Power tools must be hoisted or lowered by a hand line, never by the power cord or hose.
Power cords and hoses must be kept out of walkways and off stairs and ladders. They must be
placed so as not to create a tripping hazard for employees or be subjected to damage from
equipment or materials. When strung overhead the Hose/Line must be at least 2 meters high at
their lowest point and secured to a handrail if working at height on a scaffolding platform.
19.1 General
The HOO procedures for confined area entry are based on best industry practices and the necessity
of recognizing, evaluating and eliminating, or controlling confined space hazards prior to entry.
The safety of all personnel in such cases shall be primary and shall mandate strict compliance with
the guidelines set forth.
19.2 Definitions
Confined Space - A space large enough for a worker to enter, but is not designed for continuous
occupancy and in which access or egress is restricted. Typical confined areas include utility
manholes, sewers, excavations, with H2S in mind, open tanks and stacks, silos, vessels and vessel
skirts, etc.
Permit Confined Space - A space that meets the above conditions and contains or has the potential
to contain, dangerous air contaminants, an oxygen deficiency, or material that can engulf an
occupant, or a space that has an internal configuration that may lead to an occupant being trapped
and/or asphyxiated by other recognized serious hazards.
19.3 Confined Space Hazards
The hazards associated with confined space entry are not always seen, smelled, heard or felt. The
most common conditions that constitute hazards during confined space entry and the methods used
to measure them include:
Note* Cannot be smelled at lethal concentrations due to a paralysing effect on the olfactory system.
Other potentially hazardous gases, fumes and vapour hazards, are created by construction/works
operations such as: welding, cutting, painting, cleaning, jetting, etc. These substances include zinc,
cadmium, chromium, magnesium etc. If these substances are allowed to accumulate, they can
cause both acute and chronic injury and illness. Appropriate MSDS must be reviewed for the proper
precautions to take. Toxic gases/vapours and dusts are measured using pump-type monitors
designed for specific substances. The HOO Location Safety Department will give assistance by
determining the proper monitor to use.
Naturally Occurring Radioactive Material (NORM): Some process equipment may be contaminated
with NORM residue at some HOO locations. Before an entry permit is issued a NORM survey shall
be carried out. If NORM is confirmed, the emitter type shall dictate the applicable safety measures
required. A specialist Contractor shall carry out this work. Contact the HOO location Safety
Department for advice.
Pyrophropic Iron Sulphide: This is a highly hazardous material and requires specialist handling. It
can be found in enclosures Vessels-Tanks-Pipes etc subjected to H2S and oxygen deprivation.
19.4 Responsibilities
Contractor Management is responsible for overall compliance with this program and an ongoing
review of its effectiveness to ensure the following persons (as applicable) are capable of safely
performing all functions indicated.
The Entry Supervisor is responsible for ensuring the safety of all entrants. Before any worker enters
the confined space he shall ensure they are fully aware of the exposures and hazards, the safety
measures to be implemented and actions in the event of an emergency. He shall ensure that all
permit requirements are complied with and authorizes entry by verifying and signing the permit.
Should conditions deteriorate or change from that stated on the permit he will immediately order the
evacuation of the space and cancel the permit. He is also responsible for cancelling the permit upon
completion of the work.
The Air-Tester must be qualified through knowledge and experience and be competent in identifying
the potential exposures and the correct equipment necessary to perform all required testing.
The Safety Watch/Standby Man is responsible for ensuring there is no unauthorized entry, the
confined space entrants are made aware of any deterioration of conditions, identifying signs of
overexposure and requesting the Rescue Team to respond if he cannot evacuate the entrants
without entering the space.
Entrants are responsible for knowing the hazards of the space and signs of over exposure.
Following the instructions of the Entry Supervisor and the Safety Watch/Standby Man and
compliance with all Permit to Work requirements.
The following procedures are to be implemented during the performance of designated work
requiring entry into any confined space within any HOO facility. No person shall enter any confined
space until it has been evaluated accordingly.
In addition, HOO procedures on Permit-to-Work, Lockout/Tag-out, Emergency Procedures,
Respiratory Protection Program and Basic Safety Requirements must also be reviewed for
applicable safety measures.
These data shall be available prior to any testing taking place. The HOO Location Safety
Department and the Contractors Safety Supervisor will review all necessary actions to be taken and
identify them on the Confined Space Entry Permit.
19.8.3 Ventilation
Every confined space, regardless of its contents, must be ventilated to eliminate the potential for
oxygen deficiency and the accumulation of combustibles or toxic substances. The space must be
sufficiently ventilated so that levels of combustibles do not exceed 10 percent of their lower
explosive limit (LEL), toxic substance levels must not exceed their respective threshold limit values
(TLV). The most efficient way to vent a space is to introduce fresh air near the bottom of the space
and discharge it near the top. The system of positive ventilation used for any confined space must
be designed to maintain a constant flow of fresh air through all areas of the space.
After the space has been cleaned, purged, and ventilated, the atmosphere is re-tested. If the
atmosphere still tests positive for any hazard, further cleaning, purging, and ventilation may be
necessary.
19.9.2 Rescue
Rescue procedures will be developed based on local conditions and requirements. Rescue must not
be attempt unless a rescue plan and team has been formulated by the HOO Location Safety
Department and the necessary training, equipment and action plan has been put in place.
19.9.4 Training
Orientation- All personnel will be instructed in the basics of Confined Space Entry Procedures. This
shall include how to recognize a confined space, the potential hazards; the prohibitions against entry
into any confined space without authorization by Permit and exclusions, as determined by HOO
Location Safety Department that a space does not require a permit.
All persons with a role in vessel entry/confined space, e.g. those who may authorize entry, those
who will enter confined spaces, or perform the Safety Watch/Standby Man role and those selected
for a Rescue Team, shall be adequately trained by the HOO Location Safety Department as
required.
HOO require Contractors to implement a journey management plan for any vehicle journey beyond
the facility boundaries or nearest local town. (e.g. Ghani Field to Tibisti etc). An example of journey
management checklists is attached in Appendix 07. They are taken from the HOO procedure.
Zone 0: An area in which an explosive gas atmosphere is present continuously or for long periods.
(Explosive atmosphere for more than 1000h/yr)
Zone 1: An area in which an explosive gas atmosphere is likely to occur in normal operation.
(Explosive atmosphere for more than 10, but less than 1000 h/yr)
Zone 2: An area in which an explosive gas atmosphere is not likely to occur in normal operation and,
if it occurs, will only exist for a short time. (Explosive atmosphere for less than 10h/yr, but still
sufficiently likely as to require controls over ignition sources.)
NORM Baseline surveys: of all facilities where NORM is present or suspected shall be carried out.
The survey results shall be forwarded to HSE Manager.
The baseline survey shall include where applicable: Radiation dose-rate at the external surfaces of
the surveyed equipment showing the various Radiation Levels.
Where an external dose-rate greater than 0.38 micro Sieverts per hour is measured at the surface of
any equipment, a NORM area survey shall be carried out at a distance of 0.3 meters from the
contaminated equipment.
Operational NORM checks: shall be undertaken prior to intrusive operations on any
equipment/vessel suspected of having NORM contamination using field radiation detection
instrumentation. Based upon the results of these surveys, and the radiation type present, control
measures shall be established to carry out work safely. A sample of material may be forwarded to an
analytical laboratory for detailed analysis. Operational NORM checks shall include the following:
Man-entry into NORM contaminated vessels.
Cleaning of NORM contaminated equipment.
Internal inspection of NORM contaminated vessels.
Maintenance and repair of NORM contaminated equipment.
Other similar work scenarios/situations which involve opening up/handling of potentially NORM
contaminated objects.
Safety of Personnel:
All personnel involved in intrusive work in NORM contaminated areas or with NORM contaminated
equipment shall follow workers protection and contamination control guidelines Workers entering
NORM contaminated vessels or conducting intrusive work on NORM contaminated equipment shall
adhere to the following guidelines:
Personnel required to work with NORM must be trained in the associated hazards.
All NORM operations shall be covered by a safe system of work which shall identify the hazards and
highlight the precautions to be taken.
Any item or area with detectable levels of NORM contamination shall be subject to radiological
controls.
Appropriate PPE shall be worn (which may include but not be restricted to):
Tyvek coveralls
Neoprene, PVC, or NBR gloves
An emergency response plan: should form part of the established work procedure for any task,
however this is additionally important where NORM is present or suspected. The emergency
response plan should acknowledge the need for additional precautions due to NORM and should
include, but not be limited to:
How to report an emergency? Including method of reporting: telephone numbers or radio call signs.
Who the emergency should be reported to?
Emergency equipment required on site.
Adequate number of personnel trained in emergency response.
The need for emergency standby crews where confined space entry is involved.
Adequate supervision and accountability of personnel, including details of all personnel on site.
Adequate reporting and notification procedures in the event of an emergency.
Safety briefings and tool box talks should include information about emergency response and the
controlling plan.
Disposal of Norm Waste
NORM contaminated waste shall not be dispatched for unrestricted release. For temporary storage,
NORM waste shall be kept in suitable containers, which comply with the following requirements.
Are in good condition with no visible indications of internal or external corrosion, and made of a
durable material such that it provides adequate containment of the NORM waste during the storage
period.
Made of or lined with, materials that will not react with, or be incompatible with, the NORM waste to
be containerized so that the ability of the container is not impaired or compromised.
Be resistant to degradation from Ultra Violet radiation.
Be closed and sealed during storage, and practical to open and reseal when it is necessary to add or
remove waste.
The regulations apply to all equipment intended for use in explosive atmospheres, whether electrical
or mechanical, including protective systems. There are two categories of equipment: Cat I, for mining
and: Cat II, for surface industries.
Manufacturers who apply ATEX provisions and affix the CE marking and the Ex marking are able to
sell their equipment anywhere within the European union without any further requirements with
respect to the risks covered being applied.
The directive covers a large range of equipment, potentially including equipment used on fixed
offshore platforms, petrochemical plants, mines, and other areas where a potentially explosive
atmosphere may be present.
In very broad terms, there are three preconditions for the directive to apply: the equipment must
have its own effective source of ignition;
- be intended for use in a potentially explosive atmosphere (air mixtures);
- be under normal atmospheric conditions.
The temperature classification of the equipment and the surface temperature or any parts of the
equipment that may be exposed to the hazardous atmosphere should be tested that it does not
exceed 80% of the auto-ignition temperature of the specific gas or vapour in the area where the
equipment is intended to be used. The temperature classification on the electrical equipment label
will be one of the following (in degree Celsius).
Temperature class or ignition temperature of the gas or vapour involved.
Temperature Maximum Surface Ignition Temperature
Classification Temperature, °C of gas or vapour, °C
T1 450 >450
T2 300 >300
T3 200 >200
T4 135 >135
T5 100 >100
T6 85 >85
Methane 580 °C
Hydrogen 560 °C
Propane 493 °C
Ethylene 425 °C
Acetylene 305 °C
Naphtha 290 °C
Note: The surface of a high pressure steam pipe may be above the auto-ignition temperature of
some fuel/air mixtures.
Correct selection of electrical equipment for hazardous areas requires the following information:
USA °C EU-UK °C
T3 - 200 T6 - 85
The foregoing table tells us that the surface temperature of a piece of equipment with a temperature
classification of T3 will not rise above 200 °C using either system.
If several different flammable materials are present within a particular area, the material that gives
the highest classification dictates the overall area classification. Consideration should be shown for
flammable material that may be generated due to interaction between chemical species.
Summary of Ignition Sources - Identification and Control
Flames.
Direct fired space and process heating.
Use of smoking material, lighters, matches etc.
Cutting and welding flames.
Hot surfaces.
Heated process vessels such as dryers and furnaces.
Pyrophoric Iron Sulphide (PIS) Formation: These deposits are formed in process equipment when
hydrogen sulfide (H2S) reacts with metal surfaces in atmospheres with little or no oxygen. These
deposits will ignite rapidly when exposed to air and will consequently ignite any hydrocarbon-air
mixture present.
Applicable Specifications: ANSI-API Recommended Practice 2016: Guidelines and Procedures for
Entering and Cleaning Petroleum Storage Tanks.
8.2.2.1 Water Wetting: During vapor and gas freeing and ventilation, wetting dissipates heat buildup
and isolates the pyrophoric iron sulfide deposits from air, thereby reducing the possibility for a
spontaneous ignition while the tank contains vapors in the explosive (flammable) range. Employers
(owners/operators and contractors) and entry supervisors shall establish and implement procedures
to provide for wetting all internal surfaces of these tanks with water, until the flammable vapors have
been removed.
8.2.2.2 Inerting: Alternately, employers (owners/operators and contractors) and entry supervisors
may establish and implement procedures for the use of inert gas to purge vapors and gas from the
tank and to keep air out of the tank. As long as the tank’s atmosphere remains inert and below the
lower explosive (flammable) limit, there is no potential for pyrophoric ignition. The inert gas purge
should be maintained until all pyrophoric iron sulfide scale, dust, deposits and sludge are removed
from the tank.
CAUTION: The use of inert gas to blanket sulfur containing products in storage tanks may increase
pyrophoric deposit formation in these tanks over a period of time, by reducing the oxygen content of
the atmosphere. (See Section 5.6 for inert gas purging requirements.)
8.2.3 Removing Deposits: Employers (owners/operators and contractors) shall establish and entry
supervisors shall implement procedures for the removal of pyrophoric iron sulfide deposits from tank
shell and roof surfaces using water or steam to prevent ignition, including, but not limited to, the
following:
8.2.3.1 Depending on the type of tank and product contained, follow the procedures in this
recommended practice to remove as much product as possible through existing lines and then
isolate all lines except foam lines (where provided).
8.2.3.3 With all other manholes still closed, start the educator at a low rate of flow to create a slight
negative pressure inside the tank.
CAUTION: Keep the negative pressure inside the tank at a minimum to prevent shell and roof plates
from buckling and causing major tank damage. This establishes a pressure differential to prevent the
release of vapor or gas and hydrogen sulfide (H2S) at ground level when the second manhole is
opened.
8.2.3.4 Connect and bond one (or more) large water spray/ fog nozzle(s) or steam nozzle(s) to the
open manhole. Without delay, turn on the water spray/fog or steam and immediately turn on the air
eductor at full capacity.
8.2.3.5 Steam or water spray/fog the tank so that the interior surfaces are thoroughly wet with
condensate throughout the ventilation operation and until all iron sulfide is removed from the tank.
CAUTION: Spraying/fogging steam or water into tanks produces an electrostatically charged mist.
See ANSI/API Standard 2015 and ANSI/API Recommended Practice 2016 for precautionary
measures when using steam and for electrical bonding requirements for the air blower and for the
water spray/fog and steam injection nozzles.
8.2.3.6 After the tank has been vapor freed, continue the application of the water spray/fog or steam
during ventilation. With workers staying outside of the tank, inject high-pressure water streams (with
the nozzles bonded to the tank to prevent electrostatic buildup) through the open manhole to knock
down all loose pyrophoric iron sulfide dust, scale, deposits and residue and to break up sludge.
CAUTION: Atmospheric testing should be conducted during this operation as the potential exists for
the release of hydrogen sulfide (H2S) and additional flammable vapors from the residue and sludge.
8.2.4 Handling and Disposal of Deposits: Iron sulfide scale, dust, deposits, residue, and sludge
removed from the tank shall be kept from contacting air and igniting by wetting (or inerting) until
treated or removed to a safe area. Sour water and pyrophoric iron sulfide deposits shall be disposed
of in accordance with regulatory requirements and facility procedures.
In certain situations, the introduction of water is not permissible for example, in sour systems,
because of corrosion, and in cryogenic systems, because of the risk of process freezing.
Safety Issues: Owning to the nature of PIS reaction and the presence of hydrocarbons in enclosed
process equipment, care shall be exercised with entry into this equipment. As noted above a
specific MS supported by a JHA shall then be carried out to support a PTW application.
The initial evaluation of the equipment and historical data shall be used to determine the preliminary
level of control necessary to carry out that specific work.
Feedback data from initial evaluation shall be used to determine the exact controls appropriate to the
work-scope. In all cases equipment shall be considered hazardous unless evidence is available to
the contrary.
Concentration
ppm Effect Action Required
H2S Vol %
0.00001 1 Olfactory nerve limit. –
0.001 10 Smells like rotten eggs. TWA
(8-hour workday).
0.005 50 Paralysis of olfactory organs when influenced for 3 Place the exposed person in fresh
to 15 minutes. Pricking sensation in eyes and air. Call for medical assistance.
throat.
0.02 200 Instantaneous paralysis of olfactory organs. Strong As above.
nuisance in eyes and breathing organs.
0.03 300 Disturbance of sense of equilibrium. Difficulty in Remove the exposed person to fresh
breathing after 30 to 45 minutes; possibly air. In case of suspended respiration,
suspended respiration. administer artificial resuscitation. Call
for medical assistance.
0.07 700 Unconsciousness after less than Remove the exposed person to fresh
15 minutes. When influenced for more than 30 air. In case of suspended respiration,
minutes, can be fatal. administer artificial resuscitation. Call
for medical assistance.
0.1 1000 Fatal if no immediate effort is made. Rescue and provide immediate
medical intervention.
Short-term exposure limit: 15 ppm; this level represents a 15-minute time-weighted exposure that
should not be exceeded more than four times per day with at least
60 minutes between exposures in this range.
Acceptable ceiling concentration: 20 ppm; concentrations at this level should not be exceeded at any
time.
Number Title
Head Protection
BS EN 443 Specification for protective helmets for fire fighters
BS EN 812 Specification for industrial scalp protectors
BS EN 397 Part 1 Industrial safety helmets specification for construction and
performance
Eye and Face Protection
BS EN 175 Specification for equipment for eye, face and neck protection against non-
ionizing radiation arising during welding and similar operations
BS EN 165 Glossary of terms for personal eye protection
BS 7028:1988 Guide for selection, use and maintenance of eye protection for industrial and
other uses
BS EN 169 Personal eye protection: Filters for welding and related techniques
BS EN 170 Personal eye protection: Ultraviolet filters
BS EN 171 Personal eye protection: Infrared filters
BS EN 166 Personal eye protection: Specifications
Hearing Protection
BS EN 352 Hearing protectors safety requirements and testing
Part 1 Ear muffs
Part 2 Earplugs
BS EN 458 Hearing protectors: Recommendations for selection, use, care and
maintenance – guidance document
Respiratory Protection
BS EN 132 Respiratory protective devices – definitions
BS EN 133 Respiratory protective devices – classification
BS EN 134 Respiratory protective devices – nomenclature of components
BS EN 135 Respiratory protective devices – list of equivalent terms
BS EN 136 Parts for full face-masks for respiratory protective devices, Part 10
Specification for full face-masks for special use
BS EN 137 Specification for respiratory protective devices – self-contained open-circuit
compressed air breathing apparatus
BS EN 139 Respiratory protective devices – compressed air line breathing apparatus for
use with full face-mask, half mask or mouthpiece assembly – requirements,
testing, marking
BS EN 141 Specification for gas filters and combined filters used in respiratory
protective equipment
BS EN 143 Specification for particle filters used in respiratory protective devices
BS EN 146 Respiratory protective devices – specification for powered particle filtering
devices incorporating helmets or hoods
BS EN 147 Respiratory protective devices – specification for power assisted particle
filtering devices incorporating full face-masks, half masks or quarter masks
BS EN 149 Specification for filtering half masks to protect against particles
BS EN 400 Respiratory protective devices for self-rescue – self-contained closed-circuit
breathing apparatus – compressed oxygen escape apparatus – requirement,
testing, marking
BS EN 402 Specification for respiratory protective devices for escape – self-contained
open-circuit compressed air breathing apparatus with full face-mask or
mouthpiece assembly
BS EN 403 Specification for filtering respiratory protective devices with hood for self-
rescue from fire
BS EN 404 Respiratory protective devices for self-rescue – filter self-rescuer
Hand Protection
BS EN 421 Protective gloves against ionizing radiation to include irradiation and
contamination
BS EN 374 Parts 1 to 5 – Protective gloves against chemicals and micro-organisms
BS EN 381 Parts 1 to 6 – Protective gloves for users of hand held chain saws
BS EN 407 Protective gloves against thermal hazards
BS EN 420 General requirements for gloves
Body Protection
BS EN 343 Protective clothing against foul weather
BS EN 381 Parts 1 to 6: Protective clothing for users of hand held chain saws
BS EN 393 Lifejackets and personal buoyancy aids: buoyancy aids, 50N
BS EN 394 Lifejackets and personal buoyancy aids: additional items
BS EN 395 Lifejackets and personal buoyancy aids: lifejackets, 100 N
BS EN 396 Lifejackets and personal buoyancy aids: lifejackets, 150 N
BS EN 399 Lifejackets and personal buoyancy aids: lifejackets, 275 N
BS EN 465 Protective clothing: protection against liquid chemicals: performance
requirements: Type 4 equipment: protective suits with spray-tight
connections between different parts of the protective suit
BS EN 466 Chemical protective clothing: protection against liquid chemicals (including
liquid aerosols): performance requirements: Type 3 equipment: chemical
protective clothing with liquid-tight connections between different parts of the
clothing
BS EN 467 Protective clothing: protection against liquid chemicals: performance
requirements: Type 5 equipment garments providing chemical protection to
parts of the body
BS EN 469 Protective clothing for firefighters
BS EN 470 Protective clothing for use in welding and similar activities
BS EN 471 High visibility warning clothing
BS EN 510 Protective clothing against the risk of being caught up in moving parts
Foot Protection
BS EN 345 Specification for safety footwear for professional use
BS EN 346 Specification for protective footwear for professional use
BS EN 347 Specification for occupational footwear for professional use
Belts, Harnesses/Lifelines
BS EN 354 Personal protective equipment against falls from a height – lanyards
BS EN 355 Personal protective equipment against falls from a height – energy
absorbers
BS EN 361 Personal protective equipment against falls from a height – full body harness
BS EN 362 Personal protective equipment against falls from a height – connectors
BS EN 363 Personal protective equipment against falls from a height – fall arrest
systems
BS EN 365 Personal protective equipment against falls from a height – general
requirements for instructions for use and for marking
FOR CONTRACTORS.
SIGN-OFF CERTIFICATE
Please read this document and indicate your compliance with its requirements by signing below.
_________________________________________________________________________________
I hereby confirm that I have received a copy of: HOO Contractors General HSE Requirements.
I understand that as (Company Name :…..……………………….) Senior Site Representative, it is
my responsibility to ensure, that all supervision and personnel who report to me, will comply with and
ultimately be held accountable for the: safe performance of the work-scope at HOO facilities.
I accept that these requirements are a minimum HSE standard and will be improved upon as
necessary by the requirements of the particular work-scope.
I further understand and agree that compliance with this document does not relieve me or my
company of its responsibilities for adherence with any governmental HSE requirements which may
apply to the work performed.
Signature:
Name (Print):
Title:
Company:
Date: