You are on page 1of 1

NEW PUMP STATION PS-56A AND FORCE-MAIN TO SWTP-9, JUBAIL Form No.

: MAC-CIF-010

FIELD SURVEY REPORT


Report No.: Date:
Location: Description Drawing No.: Activity:
Instrument description: Serial No.: Calib Date: Climate: Elev. ±0.000: Controlling Points:
Model No.: Exp. Date:
Surveying Coordinates Designed Actual Difference
Design Coordinates Actual Coordinates Remarks
Item No. Points No. (Difference (mm) Elevation Elevation Elevation (mm)
(Grid Line) NORTHING EASTING NORTHING EASTING (+)∆ N (-)∆ N (+)∆ E (-)∆ E (mm) (mm) (+) (-)

DESCRIPTION MACO SURVEYOR MACO MARAFIQ/ILF


Name
Sign
Date

You might also like