RADIOGRAPHY JOBS PLANNED IN QAFCO-2 Nov'2012

No Of FW Joints Expected Time PROPOSED REQUIRED


RADIOGRAPHY CORDEN Specific
PMP No./ WS Job Permit Pipe Size RT Pipe Thickness
S.No Plant
No
Job Description Job Coord. Contractor Iso Dwg No WO Number
Number
Unit Number RT to be Date SOURCE Location of X- Affected 24 hrs Job
(inch) Complet Total in MM From To OFF Ray
Done STRENGTH
ed USED in Curie DISTANCE

1 Ammonia 2 A2-07 Replace burner gas line C.P Singh Descon 31295498 R-299275 8 7 40 sch 07-11/11/13 2:00 AM 6:00AM 16 Ci 20 Meters PU Reformer HDR
D.9343 651.XXXX

2 Ammonia 2 A2-07 Replace burner gas line C.P Singh Descon 31295498 R-299275 6 6 40 sch 07-11/11/13 2:00 AM 6:00AM 16 Ci 20 Meters 611.GB1008 Reformer HDR
D.9343 651.XXXX
RADIOGRAPHY JOBS PLANNED IN QAFCO-5 JAN'2014
No Of FW Joints Expected Time PROPOSED REQUIRED
RADIOGRAPHY CORDEN Specific
PMP No./ WS Job Permit Pipe Size RT Pipe Thickness
S.No Plant
No
Job Description Job Coord. Contractor Iso Dwg No WO Number
Number
Unit Number RT to be Date SOURCE Location of X- Affected 24 hrs Job
(inch) Complet Total in MM From To OFF Ray
Done STRENGTH
ed USED in Curie DISTANCE

Provide Automatic level


22-01-2014
control using condensate E1053-
1 Ammonia 5 A5-02 M. RANARAJAN DANEM D.9359 SHT-02 31430106/1 2 5 SCH80 TO 2:00 AM 6:00AM 16 Ci 20 Meters
and make up to distillation 02-02-2014 CY03566
column C1053

Provide Automatic level


22-01-2014
control using condensate E1053-
2 Ammonia 5 A5-02 M. RANARAJAN DANEM D.9359 SHT-02 31430106/1 1 2 SCH80 TO 2:00 AM 6:00AM 16 Ci 20 Meters
and make up to distillation 02-02-2014 CY03566
column C1053