Government of Nepal

Ministry of Physical Infrastructure and Transport


Department of Roads

Crystal Engineering & Management Consultant


Jadibuti, Kathmandu
Quotation Sheet
DETAIL ENGINEERING SURVEY, SOIL INVESTIGATION, DETAILED HYDROLOGICAL STUDY AND REPORT PREPARATION (DPR) OF BRIDGE

F/Y: 076/77

Location: Nawalprasi Unit (Nos.) 1.00

Terrain: Hilly DPR Quantity : 20.00

Quantity (md) for


Rate Sum of Qty of
Qty for
S.N. Professional / Supporting Staff Unit per man-day DS, Travel, FW & Adjustment Total Quantity Cost
Desk Report Travel
(FY 076-77) Study Travel Field Work Preparation RP (for 1 Bridge)

A Key Staff

i Geologist / Eng. Geologist / Geo-Technical md 5276 2 1 2 9 14 212.8 1 227.8 1,201,872.80


Engineer
ii Hydrologist md 5276 2 1 2 2 7 106.4 1 114.4 603,574.40

B Supporting Staff

i Surveyor / Sub Engineer md 2827 1 1 20 10 32 486.4 1 519.4 1,468,343.80

ii Support Staff / Helper / Camp Worker md 690 4 1 20 66 91 1383.2 1474.2 1,017,198.00

I Total of Manpower 4,290,989.00

II Transportation of Personals LS 10% of Manpower Cost 429,098.90

III Tools and Equipment for Survey LS 10% of Manpower Cost 429,098.90

IV Stationary and Logistic Support LS 5% of Manpower Cost 214,549.45


Detailed Soil Investigation (Drilling of
V Borehole & Laboratory Tests)Each Nos. 160000 40 40 40.0 6,400,000.00
Brehole @ 20m Depth
VI Total Cost of Consulting Services (For 20 Bridges) =(I+II+III+IV+V) 11,763,736.25

VIII Cost of Consulting Services & Report Preparation Per Bridges =VI / No. Of Bridges 588,186.81

Prepared By: Checked By: Approved By: