Professional Documents
Culture Documents
F/Y: 076/77
A Key Staff
B Supporting Staff
III Tools and Equipment for Survey LS 10% of Manpower Cost 429,098.90
VIII Cost of Consulting Services & Report Preparation Per Bridges =VI / No. Of Bridges 588,186.81