Date Operation Done

˃ Signed internship contract


th
Monday 6 ˃ Meet with Mr.Boolaky (Main supervisor)
July 2020 ˃ Assigned to cassis telecom to field intervention unit
˃ Day spend with planners and Mrs.Hoshma -> explained working of
the company
˃ Background information about the multiple steps involved in planning
a connection from central office to subscribers’ home.
˃ Meet with colleagues
Tuesday 7th ˃ Background information about fibre splitter (1:8, 1:2)
July 2020 ˃ Underground cables (manholes-> triangular)
˃ Overhead cables (poles)
˃ Investigate breakdown at pailles.
˃ Start at 7hr30 am
Wednesday 8th ˃ Supervisor Mr.Jeenah and another (to confirm name later).
July 2020 ˃ Provided technical assistance to fix myT (4K) connection. (Attorney
Chambers)
˃ Survey on cameras connection around Port Louis
˃ Changed damaged ONT at tranquebar (Snack place)
(Learned about connector, LOS , PON, TEL Ports, LAN Ports)
˃ Set up new connection for Mauritius Meteo at pailles. Set up new
Phone connection (RJ 11 vs RJ 45)
˃ Set up new ONT Connection via optic fibre. Learned about the splicing
operation. First remove Protective coating, then skin down until the
fibre is reached. Use apparatus to obtain a straight cut. clean with
alcohol to first. Same operation for the other end of the cables. clamp
the fibres in the splicing machine. check for loss. if satisfactory then,
put protective coating and melt to fix splice.)
˃ Arrange cable in ATB and then connect to ONT via a drop cable.
˃ Placement of new ONT and Telephone line at champ de mars.
(Beharry bookmaker).
Thursday 9th ˃ Investigate cameras status around P-Louis (12 cameras total) check if
July 2020 connected to optic fibre.
˃ Set up an MA Box in Astor Court.
˃ MA Box functions
o Connect to an FDP using a patch code cable as input.
o Box has 8 TEL port and 4 DATA ports.
o Even values are at top.
o Indexes are alternate.
o Take a fibre connection and split in into 8 TEL port.
˃ Learned about connecting RJ11 using clamp.
˃ Learned about 4 twisted paired cables and their order
˃ Orange, blue, green and brown.
˃ Connect from old setup into MA box.
˃ Returned Home at 2 pm.
Friday 10th July ˃ Remove optic fibre from Silver Wing Travel
2020 ˃ Installation of 4k STB in Hons. Jagatpal office .
o Order of Twister pair for RJ45 Connection
o Setup of myT Box and initiation of new line
˃ Fixed damaged drop at champ de mars.
˃ Test connection using optic power meter
˃ Repaired damaged patch cord for ONT at tranquebar
Date Operation Done
˃ Investigate fault at valerent street – fault DP (high power)
Monday 13th ˃ Changed damaged drop cable at boutike 107
July 2020 ˃ Report damaged column to laval
˃ Repaired damaged splicing near Pere laval college
˃ Repaired damaged drop cable in roche bois.
˃ Leaned how to use meter power to determine root of problem
˃ Learned how to use laser for debugging purposes
˃ Learned how to use connectors & brackets
˃ Investigate faulty FDP at valerent street
th
Tuesday 14 ˃ Repaired damaged splicing at IISS
July 2020 ˃ Replaced 3 damaged telephone
˃ Investigated and repaired fluctuation in power. Changed defective
ONT with new one.
˃ Investigate problem using web portal. (Power reading)
˃ Use of power meter to read light power. Repaired damaged drop
cable in valerent street
˃ Changed old telephone and line codes at 3 locations
Wednesday ˃ Change damaged drop cable near Nicolay school
15th July 2020 ˃ Repaired damaged splicing at 2 location.
˃ Use laser to locate faults.
Thursday 16th ˃ Repaired damaged splicing at Abercrombie & Municipality of Port
July 2020 Louis
˃ Replaced damaged patch cords and line code

Friday 18th July ˃ Repaired damaged line code St-Croix.


2020 ˃ Fixed incoming call on PABX system
˃ Replaced damaged power supply for business boost router
Date Operation Done
˃
Monday 20th
July 2020

˃
th
Tuesday 21
July 2020

˃
Wednesday
22th July 2020

Thursday 23th ˃
July 2020

Friday 24th July ˃


2020