You are on page 1of 3

PT.

Mandala Putera Prima


Ruko Pejaten Town House No. 3-4
Jl. Salihara I Pasar Minggu Jakarta 12520
(P) +62 21 78848389
(F) +62 21 78848397
QUOTATION
No: 001/LTG/Q-MPP/RF/III/20
This quotation is subject to the terms and conditions as stipulated in this letter, unless otherwise specifically agreed in separate contract
CLIENT: Date : Maret 27th, 2020
PT. PEMBANGUNAN PERUMAHAN (PERSERO), TBK. Subject : Quotation of PJU Akses
PJU Aksesibilitas - NYIA, KULONPROGO
Revisi I

Attn : Bpk. Untung Susilo From : KKH


Phone : Cc :
Fax : Attached : BOQ
Email : Email : kukuh@mandalapp.com

Dear Pak Untung,


Kindly please find our quotation as following:

UNIT PRICE UNIT PRICE


NO. DESCRIPTION VOL UNIT
(IDR) (IDR)

1 PEKERJAAN PENGADAAN DAN PEMASANGAN LAMPU AREA PARKIR 1 ls 199,892,857.14 199,892,857.14

TOTAL (IDR): 199,892,857.14


PPN 10% (IDR): 19,989,285.71 +
GRAND TOTAL (IDR): 219,882,142.86

1. TERM & CONDITIONS


1.1. Price are exclude 10% PPN & PPH
1.2. Term of Payment:
- 50%, DP 50% after finished

1.3. Services Condition:


- Delivery point: Franco on Site, NYIA, Kulonprogo, Yogyakarta

2. VALIDITY OF OFFER
2.1. This quotation valid for 1 (one) week from the date of this letter, afterward we reserve the right to review our price structure.

Should you have any further questions, please feel free to contact us. We are looking forward for your feedback. Thank you.

Sincerely Yours,

legitimate w/o signature

Kukuh Panuwun
+62 81286456242
KEGIATAN : PEKERJAAN PENGADAAN DAN PEMASANGAN LAMPU PJU AKSESIBILITAS NYIA
PELAKSANA : PT. PEMBANGUNAN PERUMAHAN (PERSERO), TBK
LOKASI PROYEK : KULONPROGO 0.6
0.70 0.70

Harga Satuan Jumlah Harga Total Harga Material &


No. Uraian Sat Volume Material Upah Material Upah Upah
Rp Rp Rp Rp Rp
1 2 3 4 5 6 7=4x5 8=4x6 9=7+8

1 Unit Lampu Penerangan lampu sorot, Tipe FL LED 1x 70Watt unit 36 1,250,000.00 200,000.00 45,000,000.00 7,200,000.00 52,200,000.00

2 Pengadaan dan penarikan kabel NYY 3 x 2.5 mm2 unit 2000 14,175.00 12,500.00 28,350,000.00 25,000,000.00 53,350,000.00

3 Pengadaan dan pemasangan pipa conduit D= 20 mm m 1,500 7,000.00 8,000.00 10,500,000.00 12,000,000.00 22,500,000.00
4 pemasangan angkur, tiang dan grouting pondasi m 6 625,000.00 275,000.00 3,750,000.00 1,650,000.00 5,400,000.00

TOTAL F 133,450,000.00
KEGIATAN : PEKERJAAN PENGADAAN DAN PEMASANGAN LAMPU AREA PARKIR
PELAKSANA : PT. PEMBANGUNAN PERUMAHAN (PERSERO), TBK
LOKASI PROYEK : BANDARA YIA, KULONPROGO

Harga Satuan Jumlah Harga Total Harga Material &


No. Uraian Sat Volume Material Upah Material Upah Upah
Rp Rp Rp Rp Rp
1 2 3 4 5 6 7=4x5 8=4x6 9=7+8

1 Unit Lampu Penerangan lampu sorot, Tipe FL LED 1x 70Watt unit 36 1,785,714.29 285,714.29 64,285,714.29 10,285,714.29 74,571,428.57
2 Pengadaan dan penarikan kabel NYY 3 x 2.5 mm2 unit 2000 23,625.00 17,857.14 47,250,000.00 35,714,285.71 82,964,285.71
3 Pengadaan dan pemasangan pipa conduit D= 20 mm m 1,500 11,666.67 11,428.57 17,500,000.00 17,142,857.14 34,642,857.14
4 pemasangan angkur, tiang, chemical dan grouting pondasi m 6 892,857.14 392,857.14 5,357,142.86 2,357,142.86 7,714,285.71

TOTAL F 199,892,857.14