SPH GEDUNG PARKIR RAP Vs RAB
SPH GEDUNG PARKIR RAP Vs RAB
2. VALIDITY OF OFFER
2.1. This quotation valid for 1 (one) week from the date of this letter, afterward we reserve the right to review our price structure.
Should you have any further questions, please feel free to contact us. We are looking forward for your feedback. Thank you.
Sincerely Yours,
Kukuh Panuwun
+62 81286456242
KEGIATAN : PEKERJAAN PENGADAAN DAN PEMASANGAN LAMPU PJU AKSESIBILITAS NYIA
PELAKSANA : PT. PEMBANGUNAN PERUMAHAN (PERSERO), TBK
LOKASI PROYEK : KULONPROGO 0.6
0.70 0.70
1 Unit Lampu Penerangan lampu sorot, Tipe FL LED 1x 70Watt unit 36 1,250,000.00 200,000.00 45,000,000.00 7,200,000.00 52,200,000.00
2 Pengadaan dan penarikan kabel NYY 3 x 2.5 mm2 unit 2000 14,175.00 12,500.00 28,350,000.00 25,000,000.00 53,350,000.00
3 Pengadaan dan pemasangan pipa conduit D= 20 mm m 1,500 7,000.00 8,000.00 10,500,000.00 12,000,000.00 22,500,000.00
4 pemasangan angkur, tiang dan grouting pondasi m 6 625,000.00 275,000.00 3,750,000.00 1,650,000.00 5,400,000.00
TOTAL F 133,450,000.00
KEGIATAN : PEKERJAAN PENGADAAN DAN PEMASANGAN LAMPU AREA PARKIR
PELAKSANA : PT. PEMBANGUNAN PERUMAHAN (PERSERO), TBK
LOKASI PROYEK : BANDARA YIA, KULONPROGO
1 Unit Lampu Penerangan lampu sorot, Tipe FL LED 1x 70Watt unit 36 1,785,714.29 285,714.29 64,285,714.29 10,285,714.29 74,571,428.57
2 Pengadaan dan penarikan kabel NYY 3 x 2.5 mm2 unit 2000 23,625.00 17,857.14 47,250,000.00 35,714,285.71 82,964,285.71
3 Pengadaan dan pemasangan pipa conduit D= 20 mm m 1,500 11,666.67 11,428.57 17,500,000.00 17,142,857.14 34,642,857.14
4 pemasangan angkur, tiang, chemical dan grouting pondasi m 6 892,857.14 392,857.14 5,357,142.86 2,357,142.86 7,714,285.71
TOTAL F 199,892,857.14