S.N. Description of work Nos. length(m) Breadth(m) Height(m) Quantity units Remarks
1 Window Grill
8 1.2192 0.34 (48"*13")
8 1.2 0.3556 (48"*14")
8 1.2192 0.47 (48"*18.5")
Prepared By:
Lakshman Khanal
Analysis of Rates
Item No :-
Description :- Gabion ( 8 gauge) supply
Unit:- 1 kg
Rate of 1 kg. Gabion (8 gauge) at bhotewodar 85.00
transportation from bhoteodar to
Nepaldanda by vehicle 0.114 0.11
transportation from Nepaldanda to
site by vehicle 0.15 0.15
Load/Unload 0.24 0.24
13 % VAT 11.05
Total per kg 96.55
Item No :-
Description :- Gabion ( 10 gauge) supply
Unit:- 1 kg
Rate of 1 kg. Gabion (10 gauge) at Bhotewodar 85.00
transportation from bhoteodar to
Nepaldanda by vehicle 0.114 0.11
transportation from Nepaldanda to
site by vehicle 0.15 0.15
Load/Unload 0.24 0.24
13 % VAT 11.05
Total per kg 96.55
Item No :-
Description :- Gabion (12 gauge) supply
Unit:- 1 kg
Rate of 1 kg. Gabion (12 gauge) at Bhotewodar 86.00
transportation from bhoteodar to
Nepaldanda by vehicle 0.114 0.11
transportation from Nepaldanda to
site by vehicle 0.15 0.15
Load/Unload 0.24 0.24
13% VAT 11.18
97.68