STUP Consultants P. LTD: Design of Strom Water Drain
STUP Consultants P. LTD: Design of Strom Water Drain
OFFICE OF ORIGIN
VASHI, NAVI MUMBAI
OWNER
KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY
CONTRACTOR CLIENT
PROJECT
CONSTRUCTION OF ELEVATED ROAD BETWEEN JINZIRA BAZAAR AND
BATANAGAR ON BUDGE BUDGE TRUNK ROAD IN KOLKATA
TITLE
DESIGN OF STROM WATER DRAIN
2
Thus load intensity = 40/1.25 /( 0.600 x 0.713 ) = 74.854 kN / m - Part udl
2
74.854 kN / m
0.600
1.100
2
Main reinforcement required, Ast = M/sstjd = 411 mm / M width
Date: 28-Feb-2015 Note No: 4
8121/E/DN -017(R0)
2
Base pressure, pb = 14.000 / (w+2(t3+c)) = 11.667 kN/M
2
Design BM, M = 0.00 x 0.60 + 7.00 x 0.55 - 11.667 x 0.600 /2
= 1.750 kN-m/M
2
Base pressure, pb = 16.750 / (w+2(t3+c)) = 12.885 kN/M
2
Design BM, M = 0.00 x 0.65 + 8.38 x 0.58 - 12.885 x 0.650 /2
= 2.094 kN-m/M
2
Base pressure, pb = 19.094 / (w+2(t3+c)) = 14.144 kN/M
2
Design BM, M = 0.00 x 0.68 + 9.55 x 0.59 - 14.144 x 0.675 /2
= 2.387 kN-m/M
2
Main reinforcement required, Ast = M/sstjd = 652 mm / M width
2
Base pressure, pb = 25.594 / (w+2(t3+c)) = 18.958 kN/M
2
Design BM, M = 0.00 x 0.68 + 12.80 x 0.59 - 18.958 x 0.675 /2
= 3.199 kN-m/M
2
Main reinforcement required, Ast = M/sstjd = 652 mm / M width - bottom face
2
126 mm / M width - top face