QUALITY CONTROL REQUIREMENTS

Sub-Annexure B15
SEGMENTAL PAVING (Specification 254)

ACTIVITY KEY QUALITY VERIFICATION MAXIMUM MINIMUM TEST


REQUIREMENTS LOT SIZE TEST METHOD
FREQUENCY

Materials Supply Material Quality - Supplier's


documentary evidence and
certification.
Base Geometry One layer One cross Survey
2
5000m , max 1 section per
day's 25m
placement
2
Surface Quality " 10 per 200m 3m Straight Edge
or lot
Edge Restraints Refer ‘Minor Concrete Works’ 1 day’s 1 per 10 lin m Measure/Survey
placement
Laying Paver Units Joint Width 1 day's All joints Measure
placement
Geometry 1 day's One cross Survey
placement section per
15m
2
Surface Quality 1 day's 10 per 200m 3m Straight Edge
placement or lot