Case History
Project : Ma’aden Aluminium Complex
Rolling Mill – Slitter Pit
Background
Ras Al-Kher Ma’aden Aluminium Complex is the largest of
its kind in the world, which is a joint venture between the
Saudi Mining Company, Ma’aden, and Alcoa. The complex
comprises of Alumina Refinery, Aluminium Smelter, Rolling
Mill and other related infrastructure.
Project Task
The Slitter Pit is a structure that goes 20m below the
ground level, where a huge Slitter Machine will be installed.
The pit was constructed using Steel Sheet Piling.
Site Conditions:
Constructive Solution
Among the three options that the client had, namely: Bituminous membrane, PVC membrane and Proofex Engage
system, Proofex Engage was chosen for the following advantages:
Supercast SW30 and Supercast PVC Watafoil were installed in the construction joints.
Project Photos 1/2
Installation of Proofex Engage Pre-applied Waterproof Membrane
Image 1: Steel Sheet Piling in Loose Sandy Soil Image 2: Steel Sheet Piling – Going 20 meters deep
Image 3: Applying Proofex Engage rolls on the floor Image 4: Proofex LM applied on the corners of the pre-applied
Proofex Engage membrane
Image 5: Proofex Engage applied on the floor and the walls as a “Tanking”, ready for the installation of Steel Reinforcement installation
Image 6: Steel Reinforcement Installation on Proofex Engage Image 7: Steel Reinforcement laid directly on Proofex Engage
Membrane Membrane – Ready for concreting
Image 8: Final Upper Termination after pouring the 20m walls Image 9: Soil Settlement – Proofex Engage Waterproofing
membrane not affected