0 Design of Substructure
2.1 Design of Pier
Section of Pier
A B C A' 1.475 A
0.50 TPL 251.00
1.0
2.500 2.500 2.00
4.50
BPL 249.00
8.00
HFL 249.50
2.75 7.53
2.50
9.23 MSL 243.77
SBL 243.47
1.70 1.70
Non -Seismic
max = 271.14 kN/m² max = 241.68 kN/m²
min = 182.70 kN/m² (corres.) min = 212.15 kN/m²
B= 213.10 kN/m² B= 222.30 kN/m²
C= 240.74 kN/m² C= 231.53 kN/m²
C' = 258.59 kN/m² C' = 237.42 kN/m²
Moment at C:
Due to soil pressure 986.92 kN.m 901.06 kN.m
Due to self wt. of slab 154.28 kN.m 154.28 kN.m
Resultant moment = 832.65 kN.m 746.78 kN.m
Seismic
max = 455.83 kN/m² max = 279.97 kN/m²
min = 22.95 kN/m² (corres.) min = 198.81 kN/m²
B= 171.75 kN/m²
kN/m B= 226.71 kN/m²
kN/m
C= 307.03 kN/m² C= 252.07 kN/m²
C' = 394.42 kN/m² C' = 268.25 kN/m²
Moment at C:
Due to soil pressure 1536.06 kN.m 1023.46 kN.m
Due to self wt. of slab 154.28 kN.m 154.28 kN.m
Resultant moment = 1381.78 kN.m 869.19 kN.m
Shear force at C:
Due to soil pressure 482.52 kN 316.60 kN
Due to self wt. of slab 46.31 kN 47.12 kN
Resultant Shear = 436.21 kN 269.47 kN
Total nos 27
Shear reinforcement
Provide nominal reinforcement
reinforcement.
Providing 12 mm dia bars-8 legged @ spacing of 300 mm