Drum centrifuge modelling of
displacement piles in sand: data report
GEO: 03287
January 2003
1
Research Fellow, St John’s College, University of Cambridge
2
Honours Student, University of Western Australia
3
Associate Professor, University of Western Australia
SUMMARY
This data report presents the results from a drum centrifuge test conducted to
investigate the horizontal stress distribution during installation and subsequent
loading of a model instrumented pile in sand. The test was conducted using the
University of Western Australia (UWA) 1.2 m diameter drum centrifuge and
comprised 18 pile installations. The model pile was 9 mm square in cross-section, and
equipped with six pressure cells to provide measurements of horizontal stress along
the pile shaft. Three different installation methods were used to mimic jacking and
dynamic techniques. Static and cyclic load tests were carried out. Extension pieces
allowed the shape of the pile to be changed from square to rectangular (with aspect
ratio of either two or six) and the subsequent influence on horizontal stress
distribution to be examined. Tests were carried out at accelerations levels of 50 g and
150 g to examine similitude. Model CPT tests were conducted to characterise the soil
model. This data report presents the results in their entirety without interpretation.
1. Introduction
There are significant uncertainties associated with the prediction of the axial capacity
of displacement piles in sand. Recent experiments involving field-scale instrumented
piles (e.g. Lehane 1992, Chow 1997) have been successful in reducing the level of
this uncertainty, leading to the development of approaches such as those proposed by
Randolph et al. (1994) and Jardine & Chow (1996). Despite the improved reliability
of these methods, which is a direct result of actual measurements of lateral stresses on
pile shafts (Poulos et al. 2001), a number of significant facets require further
investigation, clarification and refinement to enable formulation of more generally
accepted and reliable design approaches. In particular, the factors controlling the
distribution of at-rest horizontal stresses acting on the pile shaft and the mechanisms
controlling horizontal stress changes during pile loading require further investigation.
Another motivation for research lies in the recent development of pile installation
techniques that involve jacking rather than conventional dynamic techniques, which
create unacceptable noise and vibration pollution in urban areas. White et al. (2002)
and Lehane et al. (2003) describe two novel pile jacking systems for the installation of
large pre- formed displacement piles which offer an alternative to bored piling for the
construction of axially- loaded foundations in urban areas. However, if these new
jacking techniques are to become more widely accepted, research is needed to
investigate the influence of the installation method on pile behaviour. Since
conventional design methods have been developed based on historic experience with
dynamically- installed piles, caution is required when these methods are applied to
jacked piles.
2. Background
Lehane’s (1992) field investigations using a heavily instrumented pile equipped with
three lateral pressure cells located at various distances, h, above the pile tip allowed
the horizontal stress at a given soil depth to be recorded on three occasions as multiple
instruments passed that level. These measurements established the importance of the
dimension h on local shaft friction, τs, at a given soil horizon. It was found that the
horizontal stress decreased sharply with distance behind the pile tip, which is in sharp
contrast with conventional design methods (eg. API 1993, Bustamante & Gianeselli
1982). Subsequent design methods have included this phenomenon, which has
become widely known as ‘friction fatigue’ (Lehane & Jardine 1994, Randolph et al.
1994, Jardine & Chow 1996). These methods have included friction fatigue in a semi-
empirical manner (calibrated against field records) rather than using a particular
behavioural model. Few of these records include measurements of local shaft friction,
τs, and even fewer include horizontal stress σ’h . Although Lehane et al. (1993)
established that σ’h and τs can be linked through Coulomb’s simple friction equation,
an additional complication was identified since a sharp variation in σ’h occurs during
loading, as the ‘at-rest’ or ‘statio nary’ value, σ’hs, rises to the failure value, σ’hf.
Dilation of the interface layer and Poisson strains within the pile provide plausible
explanations for this effect. Increases in horizontal stresses have, however, been
recorded whilst loading smooth piles (Lehane & Jardine 1994), suggesting an
alternative mechanism is also operative.
Previous research related to cyclic loading of piles in sand has generally considered
only cyclic loading during the working life. The construction technique, and the
corresponding amount of cyclic loading during installation, have received little
attention. Since few alternatives exist, displacement piles are conventionally installed
by hammering or vibration. The key exceptions are piles installed purely for research,
and equipped with sensitive instrumentation. These piles are often installed by jacking
(e.g. Lehane 1992, Chow 1996).
New pile driving machines, which can install large displacement piles by static force
alone, offer an alternative to conventional dynamic techniques. Pile jacking involves
less load and displacement cycles at the pile-soil interface during installation, and
potentially a different distribution of stationary horizontal stress prior to application of
the working load. Furthermore, the differing residual base stresses and strain history
adjacent to the pile shaft may lead to a difference in the load-displacement response of
a jacked pile compared to a dynamically- installed pile.
These new methods of pile installation are gaining wider acceptance, particularly due
to their lower environmental impact (Lehane et al. 2003, White et al. 2002), and field
data suggest that conventional design methods developed from experience with
dynamically- installed piles may be overly conservative for jacked piles (White et al.
2003, Yetginer et al. 2003).
3. Research objectives
The background described above lead to the following primary research objectives,
which were addressed through a series of pile tests in the UWA drum centrifuge
during December 2002.
(i) Pile aspect ratio (which controls the possibility of horizontal arching)
(ii) Monotonic and cyclic (one-way and two-way) loading
4. Methodology
Eighteen pile installations were conducted in the drum centrifuge to address the
research objectives. In order to investigate the influence of installation method, the
pile was installed (i) by a monotonic push to half of the final pile depth followed by
another monotonic push to the final pile length (ii) by displacement cycles (jacking)
and (iii) by displacement cycles (‘pseudo-dynamic’). Piles of three different aspect
ratios (ratio of width, W, to breadth, B) were used to investigate the possible influence
of horizontal arching. At mid-depth, the installation was paused and a static load test
conducted, before installation continued to the full depth. After reaching full depth,
static and cyclic load tests were conducted. The cyclic load tests involved one-way
compression and tension loading as well as two-way cyclic compression-tension
loading.
Drum centrifuge
The tests described in this report were conducted on the drum centrifuge at the
University of Western Australia (Figure 1), which was commissioned in 1998. The
ring cha nnel of the machine has an outer diameter of 1.2 m, an inner dia meter of 0.8
m, and a channel height of 0.3 m. A full technical description of this facility is
provided by Stewart et al. (1998).
A key feature of the UWA drum centrifuge is the independently-rotating central shaft
and tool table, which can be driven relative to the ring channel by a Dynaserv hollow
stepper motor, and brought to a halt independent of the channel. Mounted on the tool
table is an actuator, onto which instrumented tools can be attached and controlled.
Twin stepper motors allow precise vertical and radial movement of the tool, whilst a
further stepper motor controls a counterbalance. The vertical movement range of the
actuator is sufficient for the central shaft to be halted and the actuator to be moved up
from within the ring channel and ‘parked’ in a safe zone above the protective shield
(Figure 2). Tools can be swapped or cleaned without changing the acceleration level
of the soil within the ring channel. Two tools were used during this research; the
model pile and a miniature CPT probe.
Two PCs are mounted on the tool table; one controls the actuator stepper motors, and
another is for data acquisition. The actuator control PC receives commands from a PC
in the control room via a serial link across the slip rings. Feedback between the
onboard data acquisition PC and the control room PC allows the actuator to be
operated in a load-controlled mode.
Model pile
To measure the horizontal stress acting on the shaft, a model pile was fabricated with
miniature total pressure cells (Kyowa PS-5KA) embedded on the surface (Figure 3).
A square section pile was used so that these flat circular cells could be mounted flush
with the pile surface. The square section also accommodated the attachment of
‘wings’ to the side walls so that the pile’s aspect ratio (i.e. ratio of width, W to
breadth, B) could be modified.
In order to allow a margin of 1.5 mm around the 6 mm diameter pressure cells, a pile
breadth, B, of 9 mm was adopted. The maximum achievable sample depth of 180 mm
limited the pile to a maximum penetration depth of 120 mm (to avoid base effects).
The pile was fabricated from stainless steel. A test piece machined in a similar
manner was found to have a mean centreline average roughness, RA, of 0.55 µm.
Six pressure cells were mounted at four locations behind the pile tip (h/B= 1, 3, 6, and
12) (Figure 4). By instrumenting both sides of the pile close to the tip, a degree of
redundancy was built in and the repeatability of the measurements could be checked.
The pressure cells were glued into slots machined into the face of the pile using
Kyowa RC-19 adhesive, after which the slots were backfilled with clear epoxy
(Figure 5).
All instrumentation cabling passed up through a hole drilled into the shaft and exited
through a 6 mm diameter hole 165 mm above the pile tip. Each pressure cell had an
independent power supply, with a total of 24 cores passing through the pile shaft. The
head of the pile attached to a pile cap which was connected via a 10 kN axial load cell
to the tool table (Figure 6). Two pairs of ‘wings’ attached to either side of the pile to
increase the width, W, to 18 mm and 54 mm respectively (to obtain W/B = 2 and 6).
After construction of the pile, the pressure cells were exercised under air in a
pressurised chamber. No hysteresis was evident in the range 0-500 kPa and linear
calibration factors were established (Table 1).
Soil properties
The tests were carried out using IMDEX silica sand (‘superfine’ fraction). Particle
size analyses and index properties carried out on the batch used in the centrifuge
testing are shown in Figure 7 and Table 2 respectively.
5. Test programme
A total of 18 pile installations were conducted (Table 3), spread around the
circumference of the drum centrifuge as shown in Figure 9. Fifteen tests were
conducted at an acceleration level of 50 g, followed by three tests at 150 g. Each
installation at 50 g was to a final depth, L, of 120 mm (except for test T13) with a
pause at 60 mm depth for a compression load test. On reaching 120 mm depth, a
sequence of load tests was conducted after which the pile was extracted and moved to
the next test location. At 150 g, the installed depth was reduced to 60 mm, to avoid
exceeding the capacity of the axial load cell.
1. Monotonic installation
The pile was pushed continuously downwards (i.e. radially) at a rate of 0.2
mm/s to the required depth.
2. Jacked installation
The pile was installed by cycles of (a) downward jacking at 0.2 mm/s for a
distance of 2 mm (i.e. 1 ‘jack stroke’) followed by (b) extraction at 0.005
mm/s until the pile head load fell below 50 N.
3. Pseudo-dynamic installation
The pile was installed by cycles of downward jacking at 0.2 mm/s for 2 mm
followed by extraction at 0.2 mm/s for 1.5 mm.
6. Results
Data processing
After the raw data were converted into engineering units using the factors shown in
Table 1, four corrections were applied to the data.
The recorded horizontal stress was plotted against axial load for each pressure sensor,
prior to entry into the soil. A linear relationship was observed and a best fit gradient
selected, to be used as the cross-sensitivity correction factor. Measurements of
horizontal stress throughout each test were corrected by multiplying the axial load
with the correction factor. Different correction factors were applied for different pile
aspect ratios. The correction factors applied for each pressure cell during each test are
listed in Table 5.
Comparison of the mean horizontal stress reading just prior to entry and after leaving
the soil indicated the zero drift, which was found to be more than 5 kPa in a total of
15 cases, which are listed in Table 6. In eight cases, the source of the drift was
identified as overloading during extraction, and no correction was made to the
preceding data. In the remaining seven cases, the drift was corrected for by adding
50% of the value to the data for the entire test.
Data presentation
All of the processed data are presented in this report without interpretation, which will
follow in subsequent publications. The CPT data are presented in Figures 10-12. The
pile data are presented according to test in Figures 13-696. An overview of each test is
provided by a plot of pile tip depth against time. Pile head load and horizontal stress
are plotted against both time and pile tip depth. Enlarged plots of each load test are
included. Model scale units are used throughout.
7. Conclusions
Drum centrifuge tests were conducted to investigate the horizo ntal stress distribution
during installation and subsequent mo notonic and cyclic loading of a model
instrumented pile in sand. Eighteen pile installations were conducted involving three
different installation methods and three different pile aspect ratios. One-way and two-
way cyclic load tests were carried out. The results are presented in their entirety
without interpretation.
8. Acknowledgements
The authors acknowledge the excellent technical assistance provided by Mr Bart
Thompson and the staff of the UWA civil engineering workshop. The work described
here forms part of the activities of the Geomechanics division of the Department of
Civil & Resource Engineering at UWA and that of the Centre for Offshore
Foundation Systems also at UWA. This support is gratefully acknowledged. This
work was conducted whilst the first author was an academic visitor to the University
of Western Australia.
9. References
American Petroleum Institute (API). 1993. RP2A: Recommended practice of
planning, designing and constructing fixed offshore platforms- working stress design,
20th edition, Washington 59-61
Chow F.C. 1996. Investigations into the behaviour of displacement piles for offshore
foundations. PhD dissertation, University of London (Imperial College)
Jardine R.J. & Chow F.C. 1996. New design methods for offshore piles. MTD
Publication 96/103. Marine Technology Directorate, London
Lehane B.M., Jardine R.J, Bond A.J. & Frank R. 1993. Mechanisms of shaft friction
in sand from instrumented pile tests. ASCE Journal of Geotechnical Engineering
119(GT1): 19-35.
Lehane B.M. & Jardine R.J. 1994. Shaft capacity of driven piles in sand: a new design
method Proc. Vii Int. Conf. on the Behaviour of Offshore Structures 1:23-36
Lehane B.M., Pennington D. & Clark S. 2003. Jacked end bearing piles in the soft
alluvial sediments of Perth. Australian Geomechanics Journal: in press for Sept. 2003
Poulos H.G. 1989. Pile behaviour - theory and application. Géotechnique 39(3):365-
415
Poulos H.G., Carter J.P. & Small J.C. 2001. Foundations and retaining structures -
Research and practice. Proc. XVth Int. Conf. on Soil Mechanics and Geotechnical
Engineering, Istanbul. 4:2527-2606
Randolph M.F. 1988. The axial capacity of deep foundations in calcareous soil. Proc.
Int. Conference on Calcareous Sediments. Perth, Australia, 2:837-857.
Randolph M.F., Dolwin J. & Beck R. 1994. Design of driven piles in sand
Géotechnique 44(3):427-448
Stewart D.P., Boyle R.S & Randolph M.F. 1998. Experience with a new drum
centrifuge. Proc. Int. Conf. Centrifuge ’98, Tokyo Japan 1:35-40
White D.J., Finlay T.C.R., Bolton M.D. & Bearss G. 2002. Press- in piling: Ground
vibration and noise during pile installation. Proceedings of the International Deep
Foundations Congress. Orlando, USA. ASCE Special Pub lication 116 pp363-371
White D.J., Bolton M.D. & Wako C. 2003. A novel urban foundation system using
pressed- in H-piles. Proc. XIIIth European Conference on Soil Mechanics &
Geotechnical Engineering, Prague: in press
Yetginer A.G., Bolton M.D. & White D.J. 2003. Press- in piling: field testing of cell
foundations. BGA International Conference on Foundations, Dundee: in press
List of tables
List of figures
Figure 13 Test T1, Pile tip depth vs. time (entire test)
Figure 14 Test T1, Pile head load vs. time (entire test)
Figure 15 Test T1, Pile head load vs. pile tip depth (entire test)
Figure 16 Test T1, B1, F1 pressure cells vs. time (entire test)
Figure 17 Test T1, B1, F1 pressure cells vs. pile tip depth (entire test)
Figure 18 Test T1, B2, F2 pressure cells vs. time (entire test)
Figure 19 Test T1, B2, F2 pressure cells vs. pile tip depth (entire test)
Figure 20 Test T1, B3, B4 pressure cells vs. time (entire test)
Figure 21 Test T1, B3, B4 pressure cells vs. pile tip depth (entire test)
Figure 22 Test T1, Pile tip depth vs. time (load test 1: compression at L/2)
Figure 23 Test T1, Pile head load vs. time (load test 1: compression at L/2)
Figure 24 Test T1, Pile head load vs. pile tip depth (load test 1: compression at L/2)
Figure 25 Test T1, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
Figure 26 Test T1, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 27 Test T1, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
Figure 28 Test T1, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 29 Test T1, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
Figure 30 Test T1, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 31 Test T1, Pile tip depth vs. time (load test 2: compression at L)
Figure 32 Test T1, Pile head load vs. time (load test 2: compression at L)
Figure 33 Test T1, Pile head load vs. pile tip depth (load test 2: compression at L)
Figure 34 Test T1, B1, F1 pressure cells vs. time (load test 2: compression at L)
Figure 35 Test T1, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 36 Test T1, B2, F2 pressure cells vs. time (load test 2: compression at L)
Figure 37 Test T1, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 38 Test T1, B3, B4 pressure cells vs. time (load test 2: compression at L)
Figure 39 Test T1, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 40 Test T1, Pile tip depth vs. time (load test 3: cyclic compression at L)
Figure 41 Test T1, Pile head load vs. time (load test 3: cyclic compression at L)
Figure 42 Test T1, Pile head load vs. pile tip depth (load test 3: cyclic compression at L)
Figure 43 Test T1, B1 pressure cell vs. time (load test 3: cyclic compression at L)
Figure 44 Test T1, F1 pressure cell vs. time (load test 3: cyclic compression at L)
Figure 45 Test T1, B1 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
Figure 46 Test T1, F1 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
Figure 47 Test T1, B2 pressure cell vs. time (load test 3: cyclic compression at L)
Figure 48 Test T1, F2 pressure cell vs. time (load test 3: cyclic compression at L)
Figure 49 Test T1, B2 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
Figure 50 Test T1, F2 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
Figure 51 Test T1, B3 pressure cell vs. time (load test 3: cyclic compression at L)
Figure 52 Test T1, B4 pressure cell vs. time (load test 3: cyclic compression at L)
Figure 53 Test T1, B3 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
Figure 54 Test T1, B4 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
Figure 55 Test T2, Pile tip depth vs. time (entire test)
Figure 56 Test T2, Pile head load vs. time (entire test)
Figure 57 Test T2, Pile head load vs. pile tip depth (entire test)
Figure 58 Test T2, B1, F1 pressure cells vs. time (entire test)
Figure 59 Test T2, B1, F1 pressure cells vs. pile tip depth (entire test)
Figure 60 Test T2, B2, F2 pressure cells vs. time (entire test)
Figure 61 Test T2, B2, F2 pressure cells vs. pile tip depth (entire test)
Figure 62 Test T2, B3, B4 pressure cells vs. time (entire test)
Figure 63 Test T2, B3, B4 pressure cells vs. pile tip depth (entire test)
Figure 64 Test T2, Pile tip depth vs. time (load test 1: compression at L/2)
Figure 65 Test T2, Pile head load vs. time (load test 1: compression at L/2)
Figure 66 Test T2, Pile head load vs. pile tip depth (load test 1: compression at L/2)
Figure 67 Test T2, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
Figure 68 Test T2, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 69 Test T2, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
Figure 70 Test T2, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 71 Test T2, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
Figure 72 Test T2, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 73 Test T2, Pile tip depth vs. time (load test 2: compression at L)
Figure 74 Test T2, Pile head load vs. time (load test 2: compression at L)
Figure 75 Test T2, Pile head load vs. pile tip depth (load test 2: compression at L)
Figure 76 Test T2, B1, F1 pressure cells vs. time (load test 2: compression at L)
Figure 77 Test T2, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 78 Test T2, B2, F2 pressure cells vs. time (load test 2: compression at L)
Figure 79 Test T2, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 80 Test T2, B3, B4 pressure cells vs. time (load test 2: compression at L)
Figure 81 Test T2, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 82 Test T2, Pile tip depth vs. time (load test 3: cyclic compression at L)
Figure 83 Test T2, Pile head load vs. time (load test 3: cyclic compression at L)
Figure 84 Test T2, Pile head load vs. pile tip depth (load test 3: cyclic compression at L)
Figure 85 Test T2, B1 pressure cell vs. time (load test 3: cyclic compression at L)
Figure 86 Test T2, F1 pressure cell vs. time (load test 3: cyclic compression at L)
Figure 87 Test T2, B1 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
Figure 88 Test T2, F1 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
Figure 89 Test T2, B2 pressure cell vs. time (load test 3: cyclic compression at L)
Figure 90 Test T2, F2 pressure cell vs. time (load test 3: cyclic compression at L)
Figure 91 Test T2, B2 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
Figure 92 Test T2, F2 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
Figure 93 Test T2, B3 pressure cell vs. time (load test 3: cyclic compression at L)
Figure 94 Test T2, B4 pressure cell vs. time (load test 3: cyclic compression at L)
Figure 95 Test T2, B3 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
Figure 96 Test T2, B4 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
Figure 97 Test T2, Pile tip depth vs. time (load test 4: tension at L)
Figure 98 Test T2, Pile head load vs. time (load test 4: tension at L)
Figure 99 Test T2, Pile head load vs. pile tip depth (load test 4: tension at L)
Figure 100 Test T2, B1, F1 pressure cells vs. time (load test 4: tension at L)
Figure 101 Test T2, B1, F1 pressure cells vs. pile tip depth (load test 4: tension at L)
Figure 102 Test T2, B2, F2 pressure cells vs. time (load test 4: tension at L)
Figure 103 Test T2, B2, F2 pressure cells vs. pile tip depth (load test 4: tension at L)
Figure 104 Test T2, B3, B4 pressure cells vs. time (load test 4: tension at L)
Figure 105 Test T2, B3, B4 pressure cells vs. pile tip depth (load test 4: tension at L)
Figure 106 Test T3, Pile tip depth vs. time (entire test)
Figure 107 Test T3, Pile head load vs. time (entire test)
Figure 108 Test T3, Pile head load vs. pile tip depth (entire test)
Figure 109 Test T3, B1, F1 pressure cells vs. time (entire test)
Figure 110 Test T3, B1, F1 pressure cells vs. pile tip depth (entire test)
Figure 111 Test T3, B2, F2 pressure cells vs. time (entire test)
Figure 112 Test T3, B2, F2 pressure cells vs. pile tip depth (entire test)
Figure 113 Test T3, B3, B4 pressure cells vs. time (entire test)
Figure 114 Test T3, B3, B4 pressure cells vs. pile tip depth (entire test)
Figure 115 Test T3, Pile tip depth vs. time (load test 1: compression at L/2)
Figure 116 Test T3, Pile head load vs. time (load test 1: compression at L/2)
Figure 117 Test T3, Pile head load vs. pile tip depth (load test 1: compression at L/2)
Figure 118 Test T3, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
Figure 119 Test T3, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 120 Test T3, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
Figure 121 Test T3, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 122 Test T3, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
Figure 123 Test T3, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 124 Test T3, Pile tip depth vs. time (load test 2: compression at L)
Figure 125 Test T3, Pile head load vs. time (load test 2: compression at L)
Figure 126 Test T3, Pile head load vs. pile tip depth (load test 2: compression at L)
Figure 127 Test T3, B1, F1 pressure cells vs. time (load test 2: compression at L)
Figure 128 Test T3, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 129 Test T3, B2, F2 pressure cells vs. time (load test 2: compression at L)
Figure 130 Test T3, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 131 Test T3, B3, B4 pressure cells vs. time (load test 2: compression at L)
Figure 132 Test T3, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 133 Test T3, Pile tip depth vs. time (load test 3: cyclic compression at L)
Figure 134 Test T3, Pile head load vs. time (load test 3: cyclic compression at L)
Figure 135 Test T3, Pile head load vs. pile tip depth (load test 3: cyclic compression at L)
Figure 136 Test T3, B1 pressure cell vs. time (load test 3: cyclic compression at L)
Figure 137 Test T3, F1 pressure cell vs. time (load test 3: cyclic compression at L)
Figure 138 Test T3, B1 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
Figure 139 Test T3, F1 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
Figure 140 Test T3, B2 pressure cell vs. time (load test 3: cyclic compression at L)
Figure 141 Test T3, F2 pressure cell vs. time (load test 3: cyclic compression at L)
Figure 142 Test T3, B2 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
Figure 143 Test T3, F2 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
Figure 144 Test T3, B3 pressure cell vs. time (load test 3: cyclic compression at L)
Figure 145 Test T3, B4 pressure cell vs. time (load test 3: cyclic compression at L)
Figure 146 Test T3, B3 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
Figure 147 Test T3, B4 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
Figure 148 Test T3, Pile tip depth vs. time (load test 4: tension at L)
Figure 149 Test T3, Pile head load vs. time (load test 4: tension at L)
Figure 150 Test T3, Pile head load vs. pile tip depth (load test 4: tension at L)
Figure 151 Test T3, B1, F1 pressure cells vs. time (load test 4: tension at L)
Figure 152 Test T3, B1, F1 pressure cells vs. pile tip depth (load test 4: tension at L)
Figure 153 Test T3, B2, F2 pressure cells vs. time (load test 4: tension at L)
Figure 154 Test T3, B2, F2 pressure cells vs. pile tip depth (load test 4: tension at L)
Figure 155 Test T3, B3, B4 pressure cells vs. time (load test 4: tension at L)
Figure 156 Test T3, B3, B4 pressure cells vs. pile tip depth (load test 4: tension at L)
Figure 157 Test T4, Pile tip depth vs. time (entire test)
Figure 158 Test T4, Pile head load vs. time (entire test)
Figure 159 Test T4, Pile head load vs. pile tip depth (entire test)
Figure 160 Test T4, B1, F1 pressure cells vs. time (entire test)
Figure 161 Test T4, B1, F1 pressure cells vs. pile tip depth (entire test)
Figure 162 Test T4, B2, F2 pressure cells vs. time (entire test)
Figure 163 Test T4, B2, F2 pressure cells vs. pile tip depth (entire test)
Figure 164 Test T4, B3, B4 pressure cells vs. time (entire test)
Figure 165 Test T4, B3, B4 pressure cells vs. pile tip depth (entire test)
Figure 166 Test T4, Pile tip depth vs. time (load test 1: compression at L/2)
Figure 167 Test T4, Pile head load vs. time (load test 1: compression at L/2)
Figure 168 Test T4, Pile head load vs. pile tip depth (load test 1: compression at L/2)
Figure 169 Test T4, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
Figure 170 Test T4, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 171 Test T4, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
Figure 172 Test T4, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 173 Test T4, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
Figure 174 Test T4, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 175 Test T4, Pile tip depth vs. time (load test 2: compression at L)
Figure 176 Test T4, Pile head load vs. time (load test 2: compression at L)
Figure 177 Test T4, Pile head load vs. pile tip depth (load test 2: compression at L)
Figure 178 Test T4, B1, F1 pressure cells vs. time (load test 2: compression at L)
Figure 179 Test T4, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 180 Test T4, B2, F2 pressure cells vs. time (load test 2: compression at L)
Figure 181 Test T4, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 182 Test T4, B3, B4 pressure cells vs. time (load test 2: compression at L)
Figure 183 Test T4, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 184 Test T4, Pile tip depth vs. time (load test 3: compression/tension at L)
Figure 185 Test T4, Pile head load vs. time (load test 3: compression/tension at L)
Figure 186 Test T4, Pile head load vs. pile tip depth (load test 3: compression/tension at L)
Figure 187 Test T4, B1 pressure cell vs. time (load test 3: compression/tension at L)
Figure 188 Test T4, F1 pressure cell vs. time (load test 3: compression/tension at L)
Figure 189 Test T4, B1 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
Figure 190 Test T4, F1 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
Figure 191 Test T4, B2 pressure cell vs. time (load test 3: compression/tension at L)
Figure 192 Test T4, F2 pressure cell vs. time (load test 3: compression/tension at L)
Figure 193 Test T4, B2 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
Figure 194 Test T4, F2 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
Figure 195 Test T4, B3 pressure cell vs. time (load test 3: compression/tension at L)
Figure 196 Test T4, B4 pressure cell vs. time (load test 3: compression/tension at L)
Figure 197 Test T4, B3 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
Figure 198 Test T4, B4 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
Figure 199 Test T5, Pile tip depth vs. time (entire test)
Figure 200 Test T5, Pile head load vs. time (entire test)
Figure 201 Test T5, Pile head load vs. pile tip depth (entire test)
Figure 202 Test T5, B1, F1 pressure cells vs. time (entire test)
Figure 203 Test T5, B1, F1 pressure cells vs. pile tip depth (entire test)
Figure 204 Test T5, B2, F2 pressure cells vs. time (entire test)
Figure 205 Test T5, B2, F2 pressure cells vs. pile tip depth (entire test)
Figure 206 Test T5, B3, B4 pressure cells vs. time (entire test)
Figure 207 Test T5, B3, B4 pressure cells vs. pile tip depth (entire test)
Figure 208 Test T5, Pile tip depth vs. time (load test 1: compression at L/2)
Figure 209 Test T5, Pile head load vs. time (load test 1: compression at L/2)
Figure 210 Test T5, Pile head load vs. pile tip depth (load test 1: compression at L/2)
Figure 211 Test T5, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
Figure 212 Test T5, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 213 Test T5, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
Figure 214 Test T5, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 215 Test T5, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
Figure 216 Test T5, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 217 Test T5, Pile tip depth vs. time (load test 2: comp ression at L)
Figure 218 Test T5, Pile head load vs. time (load test 2: compression at L)
Figure 219 Test T5, Pile head load vs. pile tip depth (load test 2: compression at L)
Figure 220 Test T5, B1, F1 pressure cells vs. time (load test 2: compression at L)
Figure 221 Test T5, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 222 Test T5, B2, F2 pressure cells vs. time (load test 2: compression at L)
Figure 223 Test T5, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 224 Test T5, B3, B4 pressure cells vs. time (load test 2: compression at L)
Figure 225 Test T5, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 226 Test T5, Pile tip depth vs. time (load test 3: cyclic tension at L)
Figure 227 Test T5, Pile head load vs. time (load test 3: cyclic tension at L)
Figure 228 Test T5, Pile head load vs. pile tip depth (load test 3: cyclic tension at L)
Figure 229 Test T5, B1 pressure cell vs. time (load test 3: cyclic tension at L)
Figure 230 Test T5, F1 pressure cell vs. time (load test 3: cyclic tension at L)
Figure 231 Test T5, B1 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
Figure 232 Test T5, F1 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
Figure 233 Test T5, B2 pressure cell vs. time (load test 3: cyclic tension at L)
Figure 234 Test T5, F2 pressure cell vs. time (load test 3: cyclic tension at L)
Figure 235 Test T5, B2 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
Figure 236 Test T5, F2 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
Figure 237 Test T5, B3 pressure cell vs. time (load test 3: cyclic tension at L)
Figure 238 Test T5, B4 pressure cell vs. time (load test 3: cyclic tension at L)
Figure 239 Test T5, B3 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
Figure 240 Test T5, B4 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
Figure 241 Test T6, Pile tip depth vs. time (entire test)
Figure 242 Test T6, Pile head load vs. time (entire test)
Figure 243 Test T6, Pile head load vs. pile tip depth (entire test)
Figure 244 Test T6, B1, F1 pressure cells vs. time (entire test)
Figure 245 Test T6, B1, F1 pressure cells vs. pile tip depth (entire test)
Figure 246 Test T6, B2, F2 pressure cells vs. time (entire test)
Figure 247 Test T6, B2, F2 pressure cells vs. pile tip depth (entire test)
Figure 248 Test T6, B3, B4 pressure cells vs. time (entire test)
Figure 249 Test T6, B3, B4 pressure cells vs. pile tip depth (entire test)
Figure 250 Test T6, Pile tip depth vs. time (load test 1: compression at L/2)
Figure 251 Test T6, Pile head load vs. time (load test 1: compression at L/2)
Figure 252 Test T6, Pile head load vs. pile tip depth (load test 1: compression at L/2)
Figure 253 Test T6, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
Figure 254 Test T6, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 255 Test T6, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
Figure 256 Test T6, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 257 Test T6, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
Figure 258 Test T6, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 259 Test T6, Pile tip depth vs. time (load test 2: compression at L)
Figure 260 Test T6, Pile head load vs. time (load test 2: compression at L)
Figure 261 Test T6, Pile head load vs. pile tip depth (load test 2: compression at L)
Figure 262 Test T6, B1, F1 pressure cells vs. time (load test 2: compression at L)
Figure 263 Test T6, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 264 Test T6, B2, F2 pressure cells vs. time (load test 2: compression at L)
Figure 265 Test T6, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 266 Test T6, B3, B4 pressure cells vs. time (load test 2: compression at L)
Figure 267 Test T6, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 268 Test T6, Pile tip depth vs. time (load test 3: compression/tension at L)
Figure 269 Test T6, Pile head load vs. time (load test 3: compression/tension at L)
Figure 270 Test T6, Pile head load vs. pile tip depth (load test 3: compression/tension at L)
Figure 271 Test T6, B1 pressure cell vs. time (load test 3: compression/tension at L)
Figure 272 Test T6, F1 pressure cell vs. time (load test 3: compression/tension at L)
Figure 273 Test T6, B1 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
Figure 274 Test T6, F1 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
Figure 275 Test T6, B2 pressure cell vs. time (load test 3: compression/tension at L)
Figure 276 Test T6, F2 pressure cell vs. time (load test 3: compression/tension at L)
Figure 277 Test T6, B2 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
Figure 278 Test T6, F2 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
Figure 279 Test T6, B3 pressure cell vs. time (load test 3: compression/tension at L)
Figure 280 Test T6, B4 pressure cell vs. time (load test 3: compression/tension at L)
Figure 281 Test T6, B3 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
Figure 282 Test T6, B4 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
Figure 283 Test T7, Pile tip depth vs. time (entire test)
Figure 284 Test T7, Pile head load vs. time (entire test)
Figure 285 Test T7, Pile head load vs. pile tip depth (entire test)
Figure 286 Test T7, B1, F1 pressure cells vs. time (entire test)
Figure 287 Test T7, B1, F1 pressure cells vs. pile tip depth (entire test)
Figure 288 Test T7, B2, F2 pressure cells vs. time (entire test)
Figure 289 Test T7, B2, F2 pressure cells vs. pile tip depth (entire test)
Figure 290 Test T7, B3, B4 pressure cells vs. time (entire test)
Figure 291 Test T7, B3, B4 pressure cells vs. pile tip depth (entire test)
Figure 292 Test T7, Pile tip depth vs. time (load test 1: compression at L/2)
Figure 293 Test T7, Pile head load vs. time (load test 1: compression at L/2)
Figure 294 Test T7, Pile head load vs. pile tip depth (load test 1: compression at L/2)
Figure 295 Test T7, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
Figure 296 Test T7, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 297 Test T7, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
Figure 298 Test T7, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 299 Test T7, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
Figure 300 Test T7, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 301 Test T7, Pile tip depth vs. time (load test 2: compression at L)
Figure 302 Test T7, Pile head load vs. time (load test 2: compression at L)
Figure 303 Test T7, Pile head load vs. pile tip depth (load test 2: compression at L)
Figure 304 Test T7, B1, F1 pressure cells vs. time (load test 2: compression at L)
Figure 305 Test T7, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 306 Test T7, B2, F2 pressure cells vs. time (load test 2: compression at L)
Figure 307 Test T7, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 308 Test T7, B3, B4 pressure cells vs. time (load test 2: compression at L)
Figure 309 Test T7, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 310 Test T7, Pile tip depth vs. time (load test 3: cyclic tension at L)
Figure 311 Test T7, Pile head load vs. time (load test 3: cyclic tension at L)
Figure 312 Test T7, Pile head load vs. pile tip depth (load test 3: cyclic tension at L)
Figure 313 Test T7, B1 pressure cell vs. time (load test 3: cyclic tension at L)
Figure 314 Test T7, F1 pressure cell vs. time (load test 3: cyclic tension at L)
Figure 315 Test T7, B1 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
Figure 316 Test T7, F1 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
Figure 317 Test T7, B2 pressure cell vs. time (load test 3: cyclic tension at L)
Figure 318 Test T7, F2 pressure cell vs. time (load test 3: cyclic tension at L)
Figure 319 Test T7, B2 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
Figure 320 Test T7, F2 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
Figure 321 Test T7, B3 pressure cell vs. time (load test 3: cyclic tension at L)
Figure 322 Test T7, B4 pressure cell vs. time (load test 3: cyclic tension at L)
Figure 323 Test T7, B3 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
Figure 324 Test T7, B4 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
Figure 325 Test T8, Pile tip depth vs. time (entire test)
Figure 326 Test T8, Pile head load vs. time (entire test)
Figure 327 Test T8, Pile head load vs. pile tip depth (entire test)
Figure 328 Test T8, B1, F1 pressure cells vs. time (entire test)
Figure 329 Test T8, B1, F1 pressure cells vs. pile tip depth (entire test)
Figure 330 Test T8, B2, F2 pressure cells vs. time (entire test)
Figure 331 Test T8, B2, F2 pressure cells vs. pile tip depth (entire test)
Figure 332 Test T8, B3, B4 pressure cells vs. time (entire test)
Figure 333 Test T8, B3, B4 pressure cells vs. pile tip depth (entire test)
Figure 334 Test T8, Pile tip depth vs. time (load test 1: compression at L/2)
Figure 335 Test T8, Pile head load vs. time (load test 1: compression at L/2)
Figure 336 Test T8, Pile head load vs. pile tip depth (load test 1: compression at L/2)
Figure 337 Test T8, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
Figure 338 Test T8, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 339 Test T8, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
Figure 340 Test T8, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 341 Test T8, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
Figure 342 Test T8, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 343 Test T8, Pile tip depth vs. time (load test 2: compression at L)
Figure 344 Test T8, Pile head load vs. time (load test 2: compression at L)
Figure 345 Test T8, Pile head load vs. pile tip depth (load test 2: compression at L)
Figure 346 Test T8, B1, F1 pressure cells vs. time (load test 2: compression at L)
Figure 347 Test T8, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 348 Test T8, B2, F2 pressure cells vs. time (load test 2: compression at L)
Figure 349 Test T8, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 350 Test T8, B3, B4 pressure cells vs. time (load test 2: comp ression at L)
Figure 351 Test T8, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 352 Test T8, Pile tip depth vs. time (load test 3: compression/tension at L)
Figure 353 Test T8, Pile head load vs. time (load test 3: compression/tension at L)
Figure 354 Test T8, Pile head load vs. pile tip depth (load test 3: compression/tension at L)
Figure 355 Test T8, B1 pressure cell vs. time (load test 3: compression/tension at L)
Figure 356 Test T8, F1 pressure cell vs. time (load test 3: compression/tension at L)
Figure 357 Test T8, B1 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
Figure 358 Test T8, F1 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
Figure 359 Test T8, B2 pressure cell vs. time (load test 3: compression/tension at L)
Figure 360 Test T8, F2 pressure cell vs. time (load test 3: compression/tension at L)
Figure 361 Test T8, B2 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
Figure 362 Test T8, F2 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
Figure 363 Test T8, B3 pressure cell vs. time (load test 3: compression/tension at L)
Figure 364 Test T8, B4 pressure cell vs. time (load test 3: compression/tension at L)
Figure 365 Test T8, B3 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
Figure 366 Test T8, B4 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
Figure 367 Test T9, Pile tip depth vs. time (entire test)
Figure 368 Test T9, Pile head load vs. time (entire test)
Figure 369 Test T9, Pile head load vs. pile tip depth (entire test)
Figure 370 Test T9, B1, F1 pressure cells vs. time (entire test)
Figure 371 Test T9, B1, F1 pressure cells vs. pile tip depth (entire test)
Figure 372 Test T9, B2, F2 pressure cells vs. time (entire test)
Figure 373 Test T9, B2, F2 pressure cells vs. pile tip depth (entire test)
Figure 374 Test T9, B3, B4 pressure cells vs. time (entire test)
Figure 375 Test T9, B3, B4 pressure cells vs. pile tip depth (entire test)
Figure 376 Test T9, Pile tip depth vs. time (load test 1: compression at L/2)
Figure 377 Test T9, Pile head load vs. time (load test 1: compression at L/2)
Figure 378 Test T9, Pile head load vs. pile tip depth (load test 1: compression at L/2)
Figure 379 Test T9, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
Figure 380 Test T9, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 381 Test T9, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
Figure 382 Test T9, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 383 Test T9, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
Figure 384 Test T9, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 385 Test T9, Pile tip depth vs. time (load test 2: compression at L)
Figure 386 Test T9, Pile head load vs. time (load test 2: compression at L)
Figure 387 Test T9, Pile head load vs. pile tip depth (load test 2: compression at L)
Figure 388 Test T9, B1, F1 pressure cells vs. time (load test 2: compression at L)
Figure 389 Test T9, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 390 Test T9, B2, F2 pressure cells vs. time (load test 2: compression at L)
Figure 391 Test T9, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 392 Test T9, B3, B4 pressure cells vs. time (load test 2: compression at L)
Figure 393 Test T9, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 394 Test T9, Pile tip depth vs. time (load test 3: cyclic tension at L)
Figure 395 Test T9, Pile head load vs. time (load test 3: cyclic tension at L)
Figure 396 Test T9, Pile head load vs. pile tip depth (load test 3: cyclic tension at L)
Figure 397 Test T9, B1 pressure cell vs. time (load test 3: cyclic tension at L)
Figure 398 Test T9, F1 pressure cell vs. time (load test 3: cyclic tension at L)
Figure 399 Test T9, B1 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
Figure 400 Test T9, F1 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
Figure 401 Test T9, B2 pressure cell vs. time (load test 3: cyclic tension at L)
Figure 402 Test T9, F2 pressure cell vs. time (load test 3: cyclic tension at L)
Figure 403 Test T9, B2 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
Figure 404 Test T9, F2 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
Figure 405 Test T9, B3 pressure cell vs. time (load test 3: cyclic tension at L)
Figure 406 Test T9, B4 pressure cell vs. time (load test 3: cyclic tension at L)
Figure 407 Test T9, B3 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
Figure 408 Test T9, B4 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
Figure 409 Test T10, Pile tip depth vs. time (entire test)
Figure 410 Test T10, Pile head load vs. time (entire test)
Figure 411 Test T10, Pile head load vs. pile tip depth (entire test)
Figure 412 Test T10, B1, F1 pressure cells vs. time (entire test)
Figure 413 Test T10, B1, F1 pressure cells vs. pile tip depth (entire test)
Figure 414 Test T10, B2, F2 pressure cells vs. time (entire test)
Figure 415 Test T10, B2, F2 pressure cells vs. pile tip depth (entire test)
Figure 416 Test T10, B3, B4 pressure cells vs. time (entire test)
Figure 417 Test T10, B3, B4 pressure cells vs. pile tip depth (entire test)
Figure 418 Test T10, Pile tip depth vs. time (load test 1: compression at L/2)
Figure 419 Test T10, Pile head load vs. time (load test 1: compression at L/2)
Figure 420 Test T10, Pile head load vs. pile tip depth (load test 1: compression at L/2)
Figure 421 Test T10, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
Figure 422 Test T10, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 423 Test T10, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
Figure 424 Test T10, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 425 Test T10, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
Figure 426 Test T10, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 427 Test T10, Pile tip depth vs. time (load test 2: compression at L)
Figure 428 Test T10, Pile head load vs. time (load test 2: compression at L)
Figure 429 Test T10, Pile head load vs. pile tip depth (load test 2: compression at L)
Figure 430 Test T10, B1, F1 pressure cells vs. time (load test 2: compression at L)
Figure 431 Test T10, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 432 Test T10, B2, F2 pressure cells vs. time (load test 2: compression at L)
Figure 433 Test T10, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 434 Test T10, B3, B4 pressure cells vs. time (load test 2: compression at L)
Figure 435 Test T10, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 436 Test T10, Pile tip depth vs. time (load test 3: tension at L)
Figure 437 Test T10, Pile head load vs. time (load test 3: tension at L)
Figure 438 Test T10, Pile head load vs. pile tip depth (load test 3: tension at L)
Figure 439 Test T10, B1, F1 pressure cells vs. time (load test 3: tension at L)
Figure 440 Test T10, B1, F1 pressure cells vs. pile tip depth (load test 3: tension at L)
Figure 441 Test T10, B2, F2 pressure cells vs. time (load test 3: tension at L)
Figure 442 Test T10, B2, F2 pressure cells vs. pile tip depth (load test 3: tension at L)
Figure 443 Test T10, B3, B4 pressure cells vs. time (load test 3: tension at L)
Figure 444 Test T10, B3, B4 pressure cells vs. pile tip depth (load test 3: tension at L)
Figure 445 Test T11, Pile tip depth vs. time (entire test)
Figure 446 Test T11, Pile head load vs. time (entire test)
Figure 447 Test T11, Pile head load vs. pile tip depth (entire test)
Figure 448 Test T11, B1, F1 pressure cells vs. time (entire test)
Figure 449 Test T11, B1, F1 pressure cells vs. pile tip depth (entire test)
Figure 450 Test T11, B2, F2 pressure cells vs. time (entire test)
Figure 451 Test T11, B2, F2 pressure cells vs. pile tip depth (entire test)
Figure 452 Test T11, B3, B4 pressure cells vs. time (entire test)
Figure 453 Test T11, B3, B4 pressure cells vs. pile tip depth (entire test)
Figure 454 Test T11, Pile tip depth vs. time (load test 1: compression at L/2)
Figure 455 Test T11, Pile head load vs. time (load test 1: compression at L/2)
Figure 456 Test T11, Pile head load vs. pile tip depth (load test 1: compression at L/2)
Figure 457 Test T11, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
Figure 458 Test T11, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 459 Test T11, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
Figure 460 Test T11, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 461 Test T11, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
Figure 462 Test T11, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 463 Test T11, Pile tip depth vs. time (load test 2: compression at L)
Figure 464 Test T11, Pile head load vs. time (load test 2: compression at L)
Figure 465 Test T11, Pile head load vs. pile tip depth (load test 2: compression at L)
Figure 466 Test T11, B1, F1 pressure cells vs. time (load test 2: compression at L)
Figure 467 Test T11, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 468 Test T11, B2, F2 pressure cells vs. time (load test 2: compression at L)
Figure 469 Test T11, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 470 Test T11, B3, B4 pressure cells vs. time (load test 2: compression at L)
Figure 471 Test T11, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 472 Test T11, Pile tip depth vs. time (load test 3: tension at L)
Figure 473 Test T11, Pile head load vs. time (load test 3: tension at L)
Figure 474 Test T11, Pile head load vs. pile tip depth (load test 3: tension at L)
Figure 475 Test T11, B1, F1 pressure cells vs. time (load test 3: tension at L)
Figure 476 Test T11, B1, F1 pressure cells vs. pile tip depth (load test 3: tension at L)
Figure 477 Test T11, B2, F2 pressure cells vs. time (load test 3: tension at L)
Figure 478 Test T11, B2, F2 pressure cells vs. pile tip depth (load test 3: tension at L)
Figure 479 Test T11, B3, B4 pressure cells vs. time (load test 3: tension at L)
Figure 480 Test T11, B3, B4 pressure cells vs. pile tip depth (load test 3: tension at L)
Figure 481 Test T12, Pile tip depth vs. time (entire test)
Figure 482 Test T12, Pile head load vs. time (entire test)
Figure 483 Test T12, Pile head load vs. pile tip depth (entire test)
Figure 484 Test T12, B1, F1 pressure cells vs. time (entire test)
Figure 485 Test T12, B1, F1 pressure cells vs. pile tip depth (entire test)
Figure 486 Test T12, B2, F2 pressure cells vs. time (entire test)
Figure 487 Test T12, B2, F2 pressure cells vs. pile tip depth (entire test)
Figure 488 Test T12, B3, B4 pressure cells vs. time (entire test)
Figure 489 Test T12, B3, B4 pressure cells vs. pile tip depth (entire test)
Figure 490 Test T12, Pile tip depth vs. time (load test 1: compression at L/2)
Figure 491 Test T12, Pile head load vs. time (load test 1: compression at L/2)
Figure 492 Test T12, Pile head load vs. pile tip depth (load test 1: compression at L/2)
Figure 493 Test T12, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
Figure 494 Test T12, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 495 Test T12, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
Figure 496 Test T12, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 497 Test T12, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
Figure 498 Test T12, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 499 Test T12, Pile tip depth vs. time (load test 2: compression at L)
Figure 500 Test T12, Pile head load vs. time (load test 2: compression at L)
Figure 501 Test T12, Pile head load vs. pile tip depth (load test 2: compression at L)
Figure 502 Test T12, B1, F1 pressure cells vs. time (load test 2: compression at L)
Figure 503 Test T12, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 504 Test T12, B2, F2 pressure cells vs. time (load test 2: compression at L)
Figure 505 Test T12, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 506 Test T12, B3, B4 pressure cells vs. time (load test 2: compression at L)
Figure 507 Test T12, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 508 Test T12, Pile tip depth vs. time (load test 3: tension at L)
Figure 509 Test T12, Pile head load vs. time (load test 3: tension at L)
Figure 510 Test T12, Pile head load vs. pile tip depth (load test 3: tension at L)
Figure 511 Test T12, B1, F1 pressure cells vs. time (load test 3: tension at L)
Figure 512 Test T12, B1, F1 pressure cells vs. pile tip depth (load test 3: tension at L)
Figure 513 Test T12, B2, F2 pressure cells vs. time (load test 3: tension at L)
Figure 514 Test T12, B2, F2 pressure cells vs. pile tip depth (load test 3: tension at L)
Figure 515 Test T12, B3, B4 pressure cells vs. time (load test 3: tension at L)
Figure 516 Test T12, B3, B4 pressure cells vs. pile tip depth (load test 3: tension at L)
Figure 517 Test T13, Pile tip depth vs. time (entire test)
Figure 518 Test T13, Pile head load vs. time (entire test)
Figure 519 Test T13, Pile head load vs. pile tip depth (entire test)
Figure 520 Test T13, B1, F1 pressure cells vs. time (entire test)
Figure 521 Test T13, B1, F1 pressure cells vs. pile tip depth (entire test)
Figure 522 Test T13, B2, F2 pressure cells vs. time (entire test)
Figure 523 Test T13, B2, F2 pressure cells vs. pile tip depth (entire test)
Figure 524 Test T13, B3, B4 pressure cells vs. time (entire test)
Figure 525 Test T13, B3, B4 pressure cells vs. pile tip depth (entire test)
Figure 526 Test T13, Pile tip depth vs. time (load test 1: compression at L/2)
Figure 527 Test T13, Pile head load vs. time (load test 1: compression at L/2)
Figure 528 Test T13, Pile head load vs. pile tip depth (load test 1: compression at L/2)
Figure 529 Test T13, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
Figure 530 Test T13, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 531 Test T13, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
Figure 532 Test T13, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 533 Test T13, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
Figure 534 Test T13, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 535 Test T13, Pile tip depth vs. time (load test 2: tension at L/2)
Figure 536 Test T13, Pile head load vs. time (load test 2: tension at L/2)
Figure 537 Test T13, Pile head load vs. pile tip depth (load test 2: tension at L/2)
Figure 538 Test T13, B1, F1 pressure cells vs. time (load test 2: tension at L/2)
Figure 539 Test T13, B1, F1 pressure cells vs. pile tip depth (load test 2: tension at L/2)
Figure 540 Test T13, B2, F2 pressure cells vs. time (load test 2: tension at L/2)
Figure 541 Test T13, B2, F2 pressure cells vs. pile tip depth (load test 2: tension at L/2)
Figure 542 Test T13, B3, B4 pressure cells vs. time (load test 2: tension at L/2)
Figure 543 Test T13, B3, B4 pressure cells vs. pile tip depth (load test 2: tension at L/2)
Figure 544 Test T14, Pile tip depth vs. time (entire test)
Figure 545 Test T14, Pile head load vs. time (entire test)
Figure 546 Test T14, Pile head load vs. pile tip depth (entire test)
Figure 547 Test T14, B1, F1 pressure cells vs. time (entire test)
Figure 548 Test T14, B1, F1 pressure cells vs. pile tip depth (entire test)
Figure 549 Test T14, B2, F2 pressure cells vs. time (entire test)
Figure 550 Test T14, B2, F2 pressure cells vs. pile tip depth (entire test)
Figure 551 Test T14, B3, B4 pressure cells vs. time (entire test)
Figure 552 Test T14, B3, B4 pressure cells vs. pile tip depth (entire test)
Figure 553 Test T14, Pile tip depth vs. time (load test 1: compression at L/2)
Figure 554 Test T14, Pile head load vs. time (load test 1: compression at L/2)
Figure 555 Test T14, Pile head load vs. pile tip depth (load test 1: compression at L/2)
Figure 556 Test T14, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
Figure 557 Test T14, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 558 Test T14, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
Figure 559 Test T14, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 560 Test T14, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
Figure 561 Test T14, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 562 Test T14, Pile tip depth vs. time (load test 2: compression at L)
Figure 563 Test T14, Pile head load vs. time (load test 2: compression at L)
Figure 564 Test T14, Pile head load vs. pile tip depth (load test 2: compression at L)
Figure 565 Test T14, B1, F1 pressure cells vs. time (load test 2: compression at L)
Figure 566 Test T14, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 567 Test T14, B2, F2 pressure cells vs. time (load test 2: compression at L)
Figure 568 Test T14, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 569 Test T14, B3, B4 pressure cells vs. time (load test 2: compression at L)
Figure 570 Test T14, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 571 Test T14, Pile tip depth vs. time (load test 3: tension at L)
Figure 572 Test T14, Pile head load vs. time (load test 3: tension at L)
Figure 573 Test T14, Pile head load vs. pile tip depth (load test 3: tension at L)
Figure 574 Test T14, B1, F1 pressure cells vs. time (load test 3: tension at L)
Figure 575 Test T14, B1, F1 pressure cells vs. pile tip depth (load test 3: tension at L)
Figure 576 Test T14, B2, F2 pressure cells vs. time (load test 3: tension at L)
Figure 577 Test T14, B2, F2 pressure cells vs. pile tip depth (load test 3: tension at L)
Figure 578 Test T14, B3, B4 pressure cells vs. time (load test 3: tension at L)
Figure 579 Test T14, B3, B4 pressure cells vs. pile tip depth (load test 3: tension at L)
Figure 580 Test T15, Pile tip depth vs. time (entire test)
Figure 581 Test T15, Pile head load vs. time (entire test)
Figure 582 Test T15, Pile head load vs. pile tip depth (entire test)
Figure 583 Test T15, B1, F1 pressure cells vs. time (entire test)
Figure 584 Test T15, B1, F1 pressure cells vs. pile tip depth (entire test)
Figure 585 Test T15, B2, F2 pressure cells vs. time (entire test)
Figure 586 Test T15, B2, F2 pressure cells vs. pile tip depth (entire test)
Figure 587 Test T15, B3, B4 pressure cells vs. time (entire test)
Figure 588 Test T15, B3, B4 pressure cells vs. pile tip depth (entire test)
Figure 589 Test T15, Pile tip depth vs. time (load test 1: comp ression at L/2)
Figure 590 Test T15, Pile head load vs. time (load test 1: compression at L/2)
Figure 591 Test T15, Pile head load vs. pile tip depth (load test 1: compression at L/2)
Figure 592 Test T15, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
Figure 593 Test T15, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 594 Test T15, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
Figure 595 Test T15, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 596 Test T15, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
Figure 597 Test T15, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 598 Test T15, Pile tip depth vs. time (load test 2: compression at L)
Figure 599 Test T15, Pile head load vs. time (load test 2: compression at L)
Figure 600 Test T15, Pile head load vs. pile tip depth (load test 2: compression at L)
Figure 601 Test T15, B1, F1 pressure cells vs. time (load test 2: compression at L)
Figure 602 Test T15, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 603 Test T15, B2, F2 pressure cells vs. time (load test 2: compression at L)
Figure 604 Test T15, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 605 Test T15, B3, B4 pressure cells vs. time (load test 2: compression at L)
Figure 606 Test T15, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
Figure 607 Test T15, Pile tip depth vs. time (load test 3: tension at L)
Figure 608 Test T15, Pile head load vs. time (load test 3: tension at L)
Figure 609 Test T15, Pile head load vs. pile tip depth (load test 3: tension at L)
Figure 610 Test T15, B1, F1 pressure cells vs. time (load test 3: tension at L)
Figure 611 Test T15, B1, F1 pressure cells vs. pile tip depth (load test 3: tension at L)
Figure 612 Test T15, B2, F2 pressure cells vs. time (load test 3: tension at L)
Figure 613 Test T15, B2, F2 pressure cells vs. pile tip depth (load test 3: tension at L)
Figure 614 Test T15, B3, B4 pressure cells vs. time (load test 3: tension at L)
Figure 615 Test T15, B3, B4 pressure cells vs. pile tip depth (load test 3: tension at L)
Figure 616 Test T16, Pile tip depth vs. time (entire test)
Figure 617 Test T16, Pile head load vs. time (entire test)
Figure 618 Test T16, Pile head load vs. pile tip depth (entire test)
Figure 619 Test T16, B1, F1 pressure cells vs. time (entire test)
Figure 620 Test T16, B1, F1 pressure cells vs. pile tip depth (entire test)
Figure 621 Test T16, B2, F2 pressure cells vs. time (entire test)
Figure 622 Test T16, B2, F2 pressure cells vs. pile tip depth (entire test)
Figure 623 Test T16, B3, B4 pressure cells vs. time (entire test)
Figure 624 Test T16, B3, B4 pressure cells vs. pile tip depth (entire test)
Figure 625 Test T16, Pile tip depth vs. time (load test 1: compression at L/2)
Figure 626 Test T16, Pile head load vs. time (load test 1: compression at L/2)
Figure 627 Test T16, Pile head load vs. pile tip depth (load test 1: compression at L/2)
Figure 628 Test T16, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
Figure 629 Test T16, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 630 Test T16, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
Figure 631 Test T16, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 632 Test T16, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
Figure 633 Test T16, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 634 Test T16, Pile tip depth vs. time (load test 2: tension at L/2)
Figure 635 Test T16, Pile head load vs. time (load test 2: tension at L/2)
Figure 636 Test T16, Pile head load vs. pile tip depth (load test 2: tension at L/2)
Figure 637 Test T16, B1, F1 pressure cells vs. time (load test 2: tension at L/2)
Figure 638 Test T16, B1, F1 pressure cells vs. pile tip depth (load test 2: tension at L/2)
Figure 639 Test T16, B2, F2 pressure cells vs. time (load test 2: tension at L/2)
Figure 640 Test T16, B2, F2 pressure cells vs. pile tip depth (load test 2: tension at L/2)
Figure 641 Test T16, B3, B4 pressure cells vs. time (load test 2: tension at L/2)
Figure 642 Test T16, B3, B4 pressure cells vs. pile tip depth (load test 2: tension at L/2)
Figure 643 Test T17, Pile tip depth vs. time (entire test)
Figure 644 Test T17, Pile head load vs. time (entire test)
Figure 645 Test T17, Pile head load vs. pile tip depth (entire test)
Figure 646 Test T17, B1, F1 pressure cells vs. time (entire test)
Figure 647 Test T17, B1, F1 pressure cells vs. pile tip depth (entire test)
Figure 648 Test T17, B2, F2 pressure cells vs. time (entire test)
Figure 649 Test T17, B2, F2 pressure cells vs. pile tip depth (entire test)
Figure 650 Test T17, B3, B4 pressure cells vs. time (entire test)
Figure 651 Test T17, B3, B4 pressure cells vs. pile tip depth (entire test)
Figure 652 Test T17, Pile tip depth vs. time (load test 1: compression at L/2)
Figure 653 Test T17, Pile head load vs. time (load test 1: compression at L/2)
Figure 654 Test T17, Pile head load vs. pile tip depth (load test 1: compression at L/2)
Figure 655 Test T17, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
Figure 656 Test T17, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 657 Test T17, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
Figure 658 Test T17, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 659 Test T17, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
Figure 660 Test T17, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 661 Test T17, Pile tip depth vs. time (load test 2: tension at L/2)
Figure 662 Test T17, Pile head load vs. time (load test 2: tension at L/2)
Figure 663 Test T17, Pile head load vs. pile tip depth (load test 2: tension at L/2)
Figure 664 Test T17, B1, F1 pressure cells vs. time (load test 2: tension at L/2)
Figure 665 Test T17, B1, F1 pressure cells vs. pile tip depth (load test 2: tension at L/2)
Figure 666 Test T17, B2, F2 pressure cells vs. time (load test 2: tension at L/2)
Figure 667 Test T17, B2, F2 pressure cells vs. pile tip depth (load test 2: tension at L/2)
Figure 668 Test T17, B3, B4 pressure cells vs. time (load test 2: tension at L/2)
Figure 669 Test T17, B3, B4 pressure cells vs. pile tip depth (load test 2: tension at L/2)
Figure 670 Test T18, Pile tip depth vs. time (entire test)
Figure 671 Test T18, Pile head load vs. time (entire test)
Figure 672 Test T18, Pile head load vs. pile tip depth (entire test)
Figure 673 Test T18, B1, F1 pressure cells vs. time (entire test)
Figure 674 Test T18, B1, F1 pressure cells vs. pile tip depth (entire test)
Figure 675 Test T18, B2, F2 pressure cells vs. time (entire test)
Figure 676 Test T18, B2, F2 pressure cells vs. pile tip depth (entire test)
Figure 677 Test T18, B3, B4 pressure cells vs. time (entire test)
Figure 678 Test T18, B3, B4 pressure cells vs. pile tip depth (entire test)
Figure 679 Test T18, Pile tip depth vs. time (load test 1: compression at L/2)
Figure 680 Test T18, Pile head load vs. time (load test 1: compression at L/2)
Figure 681 Test T18, Pile head load vs. pile tip depth (load test 1: comp ression at L/2)
Figure 682 Test T18, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
Figure 683 Test T18, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 684 Test T18, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
Figure 685 Test T18, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 686 Test T18, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
Figure 687 Test T18, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
Figure 688 Test T18, Pile tip depth vs. time (load test 2: tension at L/2)
Figure 689 Test T18, Pile head load vs. time (load test 2: tension at L/2)
Figure 690 Test T18, Pile head load vs. pile tip depth (load test 2: tension at L/2)
Figure 691 Test T18, B1, F1 pressure cells vs. time (load test 2: tension at L/2)
Figure 692 Test T18, B1, F1 pressure cells vs. pile tip depth (load test 2: tension at L/2)
Figure 693 Test T18, B2, F2 pressure cells vs. time (load test 2: tension at L/2)
Figure 694 Test T18, B2, F2 pressure cells vs. pile tip depth (load test 2: tension at L/2)
Figure 695 Test T18, B3, B4 pressure cells vs. time (load test 2: tension at L/2)
Figure 696 Test T18, B3, B4 pressure cells vs. pile tip depth (load test 2: tension at L/2)
Tables
Instrument Factor
Axial load cell 5.2763 N/bit
Pressure cell B1 (h/B=1) 0.4465 kPa/bit
Pressure cell B2 (h/B=3) 0.4378 kPa/bit
Pressure cell B3 (h/B=6) 0.4322 kPa/bit
Pressure cell B4 (h/B=12) 0.4489 kPa/bit
Pressure cell F1 (h/B=1) 0.4554 kPa/bit
Pressure cell F2 (h/B=3) 0.4458 kPa/bit
CPT (20 MPa) 0.01122 MPa/bit
CPT (50 MPa) 0.02710 MPa/bit
Property Value
D10 particle size 0.100 mm
D50 particle size 0.180 mm
Maximum voids ratio (emax) 0.762
Maximum voids ratio (emax) 0.493
Specific gravity, Gs 2.65
T13-J-A1-g50-LT-C-T-60mm
T3-PD-A1-g50-LT-C-CYC-T
T9-PD-A1-g50-LT-C-CYT-T
T8-PD-A1-g50- LT-C-CY2-T
T5-M-A1-g50-LT-C-CYT-T
T1-M-A1-g50-LT-C-CYC-T
T4-M-A1-g50-LT-C-CY2-T
T2-J-A1-g50-LT-C-CYC-T
T6-J-A1-g50-LT-C-CYT-T
T7-J-A1-g50-LT-C-CYT-T
T16-J-A6-g150-LT-C-T
T17-J-A2-g150-LT-C-T
T18-J-A1-g150-LT-C-T
T10-M-A1-g50-LT-C-T
T11-J-A1-g50-LT-C-T
T14-J-A2-g50-LT-C-T
T15-J-A6-g50- LT-C-T
T12-PD-A1-g50-C-T
Test code
Date (Dec) 13th 16th 16th 16th 17th 17th 17th 17th 18th 18th 18th 18th 18th 19th 19th 19th 19th 20th
Start time 1630 930 1500 1900 900 1200 1800 2300 900 1400 1600 1800 2030 1000 1300 1700 1900 900
Angular position around ring channel 10 20 30 40 50 60 70 80 90 100 110 120 130 145 200 225 165 250
Elevation above base of channel 110 190 110 190 110 190 110 190 110 190 110 190 110 150 150 110 150 190
Sample depth (mm) 180.3 180.6 180.2 180.4 180.5 180.2 180.6 179.2 181.1 181.2 180.8 179.9 181.1 180.7 181.2 179.6 179.7 179.2
Pile aspect ratio, W/B 1 1 1 1 1 1 1 1 1 1 1 1 1 2 6 6 2 1
Acceleration level (g) 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 150 150 150
Installation method
Monotonic installation
Jacked installation
Pseudo dynamic
Load testing
Compression load test at L/2
Compression load test at L
Tension test on extraction L (L/2) (L/2) (L/2)
1-way cyclic compression test
2-way cyclic compression/tension test
1-way cyclic tension test
Key to test codes M Monotonic installation LT Prefix to load test list CY2 2- way cyclic test (compression/tension)
J Jacked installation C Compression test CYC Cyclic compression test
PD Pseudo-driven T Tension test CYT Cyclic tension test
A Aspect ratio (W/B)
g g-level
Date (Dec) 13th 13th 13th 13th 20th 20th 20th 20th 20th 20th 20th 20th
Start time 1010 1018 1128 1140 1130 1135 1140 1145 1200 1205 1210 1215
Angular position around ring channel 0 0 180 180 260 260 270 270 280 280 290 290
Elevation above base of channel 110 190 110 190 110 190 190 110 110 190 190 110
90.00
80.00
Percent passing by mass
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
10 100 1000
T15
210 330
T16
T18 CPT4
CPT3
240 300
270
CPT test
Pile test
45
40
35
Stress (MPa)
30
25
20
15
10
5
0
0 20 40 60 80 100 120 140 160 180
Depth (mm)
45
40
35
Stress (MPa)
30
25
20
15
10
5
0
0 20 40 60 80 100 120 140 160 180
Depth (mm)
45
40
35
Stress (MPa)
30
25
20
15
10
5
0
0 20 40 60 80 100 120 140 160 180
Depth (mm)
120
100
Pile tip depth,z (mm)
80
60
40
20
0
0 2000 4000 6000 8000 10000 12000
Time, t (seconds)
Figure 13 Test T1, Pile tip depth vs. time (entire test)
2000
1800
1600
Pile head load,P (N)
1400
1200
1000
800
600
400
200
0
0 2000 4000 6000 8000 10000 12000
Time, t (seconds)
Figure 14 Test T1, Pile head load vs. time (entire test)
2000
1800
1600
Pile head load,P (N)
1400
1200
1000
800
600
400
200
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 15 Test T1, Pile head load vs. pile tip depth (entire test)
450
400
350 B1 F1
σh,measured (kPa)
300
250
200
150
100
50
0
0 2000 4000 6000 8000 10000 12000
Time, t (seconds)
Figure 16 Test T1, B1, F1 pressure cells vs. time (entire test)
450
400
350 B1 F1
σh,measured (kPa)
300
250
200
150
100
50
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 17 Test T1, B1, F1 pressure cells vs. pile tip depth (entire test)
180
160
B2 F2
140
σh,measured (kPa)
120
100
80
60
40
20
0
0 2000 4000 6000 8000 10000 12000
Time, t (seconds)
Figure 18 Test T1, B2, F2 pressure cells vs. time (entire test)
180
160
140 B2 F2
σh,measured (kPa)
120
100
80
60
40
20
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 19 Test T1, B2, F2 pressure cells vs. pile tip depth (entire test)
140
120
B3 B4
100
σh,measured (kPa)
80
60
40
20
0
0 2000 4000 6000 8000 10000 12000
Time, t (seconds)
Figure 20 Test T1, B3, B4 pressure cells vs. time (entire test)
160
140
120 B3 B4
σh,measured (kPa)
100
80
60
40
20
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 21 Test T1, B3, B4 pressure cells vs. pile tip depth (entire test)
62
61.5
60.5
60
59.5
400 450 500 550 600 650 700 750 800 850 900
Time, t (seconds)
Figure 22 Test T1, Pile tip depth vs. time (load test 1: compression at L/2)
600
500
Pile head load,P (N)
400
300
200
100
0
400 450 500 550 600 650 700 750 800 850 900
Time, t (seconds)
Figure 23 Test T1, Pile head load vs. time (load test 1: compression at L/2)
600
500
Pile head load,P (N)
400
300
200
100
0
59.5 60 60.5 61 61.5 62
Pile tip depth, z (mm)
Figure 24 Test T1, Pile head load vs. pile tip depth (load test 1: compression at L/2)
80
70 B1 F1
60
σh,measured (kPa)
50
40
30
20
10
0
400 450 500 550 600 650 700 750 800 850 900
Time, t (seconds)
Figure 25 Test T1, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
80
70
B1 F1
60
σ h,measured (kPa)
50
40
30
20
10
0
59.5 60 60.5 61 61.5 62
Pile tip depth, z (mm)
Figure 26 Test T1, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
30
B2 F2
25
20
σ h,measured (kPa)
15
10
0
400 450 500 550 600 650 700 750 800 850 900
-5
Time, t (seconds)
Figure 27 Test T1, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
30
25
B2 F2
σh,measured (kPa)
20
15
10
0
59.5 60 60.5 61 61.5 62
Pile tip depth, z (mm)
Figure 28 Test T1, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
B3 B4
5
σh,measured (kPa)
0
400 450 500 550 600 650 700 750 800 850 900
Time, t (seconds)
Figure 29 Test T1, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
5
B3 B4
σh,measured (kPa)
0
59.5 60 60.5 61 61.5 62
Pile tip depth, z (mm)
Figure 30 Test T1, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
121
120.8
120.6
120
119.8
119.6
119.4
119.2
119
1400 1500 1600 1700 1800 1900 2000
Time, t (seconds)
Figure 31 Test T1, Pile tip depth vs. time (load test 2: compression at L)
1800
1600
1400
Pile head load,P (N)
1200
1000
800
600
400
200
0
1400 1500 1600 1700 1800 1900 2000
Time , t (seconds)
Figure 32 Test T1, Pile head load vs. time (load test 2: compression at L)
2000
1800
1600
Pile head load,P (N)
1400
1200
1000
800
600
400
200
0
119.2 119.4 119.6 119.8 120 120.2 120.4 120.6 120.8 121
Pile tip depth, z (mm)
Figure 33 Test T1, Pile head load vs. pile tip depth (load test 2: compression at L)
300
B1 F1
250
150
100
50
0
1400 1500 1600 1700 1800 1900 2000
Time, t (seconds)
Figure 34 Test T1, B1, F1 pressure cells vs. time (load test 2: compression at L)
350
300
250
σh,measured (kPa)
200 B1 F1
150
100
50
0
119.2 119.4 119.6 119.8 120 120.2 120.4 120.6 120.8 121 121.2
Pile tip depth, z (mm)
Figure 35 Test T1, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
180
160 B2 F2
140
120
σh,measured (kPa)
100
80
60
40
20
0
1400 1500 1600 1700 1800 1900 2000
Time, t (seconds)
Figure 36 Test T1, B2, F2 pressure cells vs. time (load test 2: compression at L)
180
160
140
120
σ h,measured (kPa)
B2 F2
100
80
60
40
20
0
119.2 119.4 119.6 119.8 120 120.2 120.4 120.6 120.8 121 121.2
Pile tip depth, z (mm)
Figure 37 Test T1, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
120
B3 B4
100
80
σh,measured (kPa)
60
40
20
0
1400 1500 1600 1700 1800 1900 2000
Time, t (seconds)
Figure 38 Test T1, B3, B4 pressure cells vs. time (load test 2: compression at L)
120
100
80
σh,measured (kPa)
B3 B4
60
40
20
0
119.2 119.4 119.6 119.8 120 120.2 120.4 120.6 120.8 121 121.2
Pile tip depth, z (mm)
Figure 39 Test T1, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
123
122.5
121.5
121
120.5
120
2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000
Time, t (seconds)
Figure 40 Test T1, Pile tip depth vs. time (load test 3: cyclic compression at L)
1000
900
800
Pile head load,P (N)
700
600
500
400
300
200
100
0
2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000
Time, t (seconds)
Figure 41 Test T1, Pile head load vs. time (load test 3: cyclic compression at L)
1000
900
800
Pile head load,P (N)
700
600
500
400
300
200
100
0
120 120.5 121 121.5 122 122.5 123
Pile tip depth, z (mm)
Figure 42 Test T1, Pile head load vs. pile tip depth (load test 3: cyclic compression at L)
200
180 B1
160
σh,measured (kPa) 140
120
100
80
60
40
20
0
2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000
Time, t (seconds)
Figure 43 Test T1, B1 pressure cell vs. time (load test 3: cyclic compression at L)
200
180 F1
160
140
σh,measured (kPa)
120
100
80
60
40
20
0
2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000
Time, t (seconds)
Figure 44 Test T1, F1 pressure cell vs. time (load test 3: cyclic compression at L)
200
180
160
140
σh,measured (kPa)
120
100
80
60
40
20 B1
0
120 120.5 121 121.5 122 122.5 123
Pile tip depth, z (mm)
Figure 45 Test T1, B1 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
200
180
160
140
σh,measured (kPa)
120
100
80
60
40
20 F1
0
120 120.5 121 121.5 122 122.5 123
Pile tip depth, z (mm)
Figure 46 Test T1, F1 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
100
90 B2
80
σ h,measured (kPa)
70
60
50
40
30
20
10
0
2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000
Time, t (seconds)
Figure 47 Test T1, B2 pressure cell vs. time (load test 3: cyclic compression at L)
100
90 F2
80
σ h,measured (kPa)
70
60
50
40
30
20
10
0
2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000
Time, t (seconds)
Figure 48 Test T1, F2 pressure cell vs. time (load test 3: cyclic compression at L)
100
90 B2
80
70
σh,measured (kPa)
60
50
40
30
20
10
0
120 120.5 121 121.5 122 122.5 123
Pile tip depth, z (mm)
Figure 49 Test T1, B2 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
100
90 F2
80
70
σh,measured (kPa)
60
50
40
30
20
10
0
120 120.5 121 121.5 122 122.5 123
Pile tip depth, z (mm)
Figure 50 Test T1, F2 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
40
35 B3
30
σh,measured (kPa)
25
20
15
10
0
2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000
Time, t (seconds)
Figure 51 Test T1, B3 pressure cell vs. time (load test 3: cyclic compression at L)
40
35 B4
σh,measured (kPa) 30
25
20
15
10
0
2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000
Time, t (seconds)
Figure 52 Test T1, B4 pressure cell vs. time (load test 3: cyclic compression at L)
40
35 B3
30
σh,measured (kPa)
25
20
15
10
0
120 120.5 121 121.5 122 122.5 123
Pile tip depth, z (mm)
Figure 53 Test T1, B3 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
40
35 B4
30
σh,measured (kPa)
25
20
15
10
0
120 120.5 121 121.5 122 122.5 123
Pile tip depth, z (mm)
Figure 54 Test T1, B4 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
140
120
100
Pile tip depth,z (mm)
80
60
40
20
0
0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000
Time, t (seconds)
Figure 55 Test T2, Pile tip depth vs. time (entire test)
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000
-500
Time, t (seconds)
Figure 56 Test T2, Pile head load vs. time (entire test)
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 57 Test T2, Pile head load vs. pile tip depth (entire test)
600
500
B1 F1
σh,measured (kPa) 400
300
200
100
0
0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000
Time, t (seconds)
Figure 58 Test T2, B1, F1 pressure cells vs. time (entire test)
600
500
B1 F1
400
σ h,measured (kPa)
300
200
100
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 59 Test T2, B1, F1 pressure cells vs. pile tip depth (entire test)
900
800
700 B2 F2
600
σh,measured (kPa)
500
400
300
200
100
0
0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000
Time, t (seconds)
Figure 60 Test T2, B2, F2 pressure cells vs. time (entire test)
900
800
700 B2 F2
σh,measured (kPa) 600
500
400
300
200
100
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 61 Test T2, B2, F2 pressure cells vs. pile tip depth (entire test)
140
120
B3 B4
100
σh,measured (kPa)
80
60
40
20
0
0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000
Time, t (seconds)
Figure 62 Test T2, B3, B4 pressure cells vs. time (entire test)
140
120
100 B3 B4
σh,measured (kPa)
80
60
40
20
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 63 Test T2, B3, B4 pressure cells vs. pile tip depth (entire test)
62
61.5
60.5
60
59.5
1650 1700 1750 1800 1850 1900 1950 2000 2050 2100
Time, t (seconds)
Figure 64 Test T2, Pile tip depth vs. time (load test 1: compression at L/2)
700
600
500
Pile head load,P (N)
400
300
200
100
0
1650 1700 1750 1800 1850 1900 1950 2000 2050 2100
Time, t (seconds)
Figure 65 Test T2, Pile head load vs. time (load test 1: compression at L/2)
700
600
500
Pile head load,P (N)
400
300
200
100
0
60 60.2 60.4 60.6 60.8 61 61.2 61.4 61.6 61.8 62
Pile tip depth, z (mm)
Figure 66 Test T2, Pile head load vs. pile tip depth (load test 1: compression at L/2)
200
180 B1 F1
160
140
σh,measured (kPa)
120
100
80
60
40
20
0
1650 1700 1750 1800 1850 1900 1950 2000 2050 2100
Time, t (seconds)
Figure 67 Test T2, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
200
180
160 B1 F1
140
σh,measured (kPa)
120
100
80
60
40
20
0
60 60.2 60.4 60.6 60.8 61 61.2 61.4 61.6 61.8 62
Pile tip depth, z (mm)
Figure 68 Test T2, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
100
90 B2 F2
80
70
σh,measured (kPa)
60
50
40
30
20
10
0
1650 1700 1750 1800 1850 1900 1950 2000 2050 2100
Time, t (seconds)
Figure 69 Test T2, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
100
90
80 B2 F2
70
σh,measured (kPa)
60
50
40
30
20
10
0
60 60.2 60.4 60.6 60.8 61 61.2 61.4 61.6 61.8 62
Pile tip depth, z (mm)
Figure 70 Test T2, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
20
18
B3 B4
16
14
σh,measured (kPa)
12
10
8
6
4
2
0
1650 1700 1750 1800 1850 1900 1950 2000 2050 2100
Time, t (seconds)
Figure 71 Test T2, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
20
18
16
B3 B4
14
σh,measured (kPa)
12
10
8
6
4
2
0
60 60.2 60.4 60.6 60.8 61 61.2 61.4 61.6 61.8 62
Pile tip depth, z (mm)
Figure 72 Test T2, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
120.8
120.6
120.4
120
119.8
119.6
119.4
119.2
119
8650 8750 8850 8950 9050 9150 9250
Time, t (seconds)
Figure 73 Test T2, Pile tip depth vs. time (load test 2: compression at L)
2500
2000
Pile head load,P (N)
1500
1000
500
0
8650 8750 8850 8950 9050 9150 9250
Time , t (seconds)
Figure 74 Test T2, Pile head load vs. time (load test 2: compression at L)
2500
2000
Pile head load,P (N)
1500
1000
500
0
119 119.2 119.4 119.6 119.8 120 120.2 120.4 120.6 120.8 121
Pile tip depth, z (mm)
Figure 75 Test T2, Pile head load vs. pile tip depth (load test 2: compression at L)
500
450 B1 F1
400
350
σh,measured (kPa)
300
250
200
150
100
50
0
8650 8750 8850 8950 9050 9150 9250
Time, t (seconds)
Figure 76 Test T2, B1, F1 pressure cells vs. time (load test 2: compression at L)
450
400
350
300
σh,measured (kPa)
B1 F1
250
200
150
100
50
0
119 119.2 119.4 119.6 119.8 120 120.2 120.4 120.6 120.8 121
Pile tip depth, z (mm)
Figure 77 Test T2, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
500
450 B2 F2
400
350
σh,measured (kPa)
300
250
200
150
100
50
0
8650 8750 8850 8950 9050 9150 9250
Time, t (seconds)
Figure 78 Test T2, B2, F2 pressure cells vs. time (load test 2: compression at L)
500
450
400
350
σ h,measured (kPa)
300 B2 F2
250
200
150
100
50
0
119 119.2 119.4 119.6 119.8 120 120.2 120.4 120.6 120.8 121
Pile tip depth, z (mm)
Figure 79 Test T2, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
140
B3 B4
120
100
σh,measured (kPa)
80
60
40
20
0
8650 8750 8850 8950 9050 9150 9250
Time, t (seconds)
Figure 80 Test T2, B3, B4 pressure cells vs. time (load test 2: compression at L)
120
100
80
σh,measured (kPa)
B3 B4
60
40
20
0
119 119.2 119.4 119.6 119.8 120 120.2 120.4 120.6 120.8 121
Pile tip depth, z (mm)
Figure 81 Test T2, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
120.6
120.5
120.4
120.1
120
119.9
119.8
119.7
119.6
9100 10100 11100 12100 13100 14100 15100 16100 17100
Time, t (seconds)
Figure 82 Test T2, Pile tip depth vs. time (load test 3: cyclic compression at L)
900
700
Pile head load, P (N)
500
300
100
-300
Time, t (seconds)
Figure 83 Test T2, Pile head load vs. time (load test 3: cyclic compression at L)
900
800
700
Pile head load,P (N)
600
500
400
300
200
100
0
119.6 119.7 119.8 119.9 120 120.1 120.2 120.3 120.4 120.5 120.6
Pile tip depth, z (mm)
Figure 84 Test T2, Pile head load vs. pile tip depth (load test 3: cyclic compression at L)
200
180 B1
160
140
σh,measured (kPa)
120
100
80
60
40
20
0
9100 10100 11100 12100 13100 14100 15100 16100 17100
Time, t (seconds)
Figure 85 Test T2, B1 pressure cell vs. time (load test 3: cyclic compression at L)
200
180 F1
160
140
σh,measured (kPa)
120
100
80
60
40
20
0
9100 10100 11100 12100 13100 14100 15100 16100 17100
Time, t (seconds)
Figure 86 Test T2, F1 pressure cell vs. time (load test 3: cyclic compression at L)
180
160
140
σh,measured (kPa)
120
100
80
60
40
20 B1
0
119.6 119.7 119.8 119.9 120 120.1 120.2 120.3 120.4 120.5 120.6
Pile tip depth, z (mm)
Figure 87 Test T2, B1 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
180
160
σh,measured (kPa) 140
120
100
80
60
40
20 F1
0
119.6 119.7 119.8 119.9 120 120.1 120.2 120.3 120.4 120.5 120.6
Pile tip depth, z (mm)
Figure 88 Test T2, F1 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
120
100 B2
σh,measured (kPa)
80
60
40
20
0
9100 10100 11100 12100 13100 14100 15100 16100 17100
Time, t (seconds)
Figure 89 Test T2, B2 pressure cell vs. time (load test 3: cyclic compression at L)
120
100 F2
σh,measured (kPa)
80
60
40
20
0
9100 10100 11100 12100 13100 14100 15100 16100 17100
Time, t (seconds)
Figure 90 Test T2, F2 pressure cell vs. time (load test 3: cyclic compression at L)
120
B2
100
σh,measured (kPa)
80
60
40
20
0
119.6 119.7 119.8 119.9 120 120.1 120.2 120.3 120.4 120.5 120.6
Pile tip depth, z (mm)
Figure 91 Test T2, B2 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
120
F2
100
σh,measured (kPa)
80
60
40
20
0
119.6 119.7 119.8 119.9 120 120.1 120.2 120.3 120.4 120.5 120.6
Pile tip depth, z (mm)
Figure 92 Test T2, F2 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
50
45 B3
40
35
σh,measured (kPa)
30
25
20
15
10
5
0
9100 10100 11100 12100 13100 14100 15100 16100 17100
Time, t (seconds)
Figure 93 Test T2, B3 pressure cell vs. time (load test 3: cyclic compression at L)
25
B4
σh,measured (kPa) 20
15
10
0
9100 10100 11100 12100 13100 14100 15100 16100 17100
Time, t (seconds)
Figure 94 Test T2, B4 pressure cell vs. time (load test 3: cyclic compression at L)
50
45 B3
40
35
σh,measured (kPa)
30
25
20
15
10
5
0
119.6 119.7 119.8 119.9 120 120.1 120.2 120.3 120.4 120.5 120.6
Pile tip depth, z (mm)
Figure 95 Test T2, B3 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
25
B4
20
σh,measured (kPa)
15
10
0
119.6 119.7 119.8 119.9 120 120.1 120.2 120.3 120.4 120.5 120.6
Pile tip depth, z (mm)
Figure 96 Test T2, B4 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
140
120
100
60
40
20
0
17500 17600 17700 17800 17900 18000 18100 18200 18300 18400 18500
-20
-40
Time, t (seconds)
Figure 97 Test T2, Pile tip depth vs. time (load test 4: tension at L)
0
17500 17600 17700 17800 17900 18000 18100 18200 18300 18400 18500
-50
Pile head load,P (N)
-100
-150
-200
-250
-300
Time, t (seconds)
Figure 98 Test T2, Pile head load vs. time (load test 4: tension at L)
150
100
50
Pile head load,P (N)
0
-40 -20 0 20 40 60 80 100 120 140
-50
-100
-150
-200
-250
-300
Pile tip depth, z (mm)
Figure 99 Test T2, Pile head load vs. pile tip depth (load test 4: tension at L)
600
B1 F1
500
300
200
100
0
17500 17600 17700 17800 17900 18000 18100 18200 18300 18400 18500
Time, t (seconds)
Figure 100 Test T2, B1, F1 pressure cells vs. time (load test 4: tension at L)
600
500
B1 F1
400
σh,measured (kPa)
300
200
100
0
90 95 100 105 110 115 120 125
Pile tip depth, z (mm)
Figure 101 Test T2, B1, F1 pressure cells vs. pile tip depth (load test 4: tension at L)
900
800 B2 F2
700
600
σh,measured (kPa)
500
400
300
200
100
0
17500 17600 17700 17800 17900 18000 18100 18200 18300 18400 18500
Time, t (seconds)
Figure 102 Test T2, B2, F2 pressure cells vs. time (load test 4: tension at L)
900
800
700 B2 F2
600
σh,measured (kPa) 500
400
300
200
100
0
90 95 100 105 110 115 120 125
Pile tip depth, z (mm)
Figure 103 Test T2, B2, F2 pressure cells vs. pile tip depth (load test 4: tension at L)
140
120 B3 B4
100
σh,measured (kPa)
80
60
40
20
0
17500 17600 17700 17800 17900 18000 18100 18200 18300 18400 18500
-20
Time, t (seconds)
Figure 104 Test T2, B3, B4 pressure cells vs. time (load test 4: tension at L)
140
120
100 B3 B4
σh,measured (kPa)
80
60
40
20
0
90 95 100 105 110 115 120 125
-20
Pile tip depth, z (mm)
Figure 105 Test T2, B3, B4 pressure cells vs. pile tip depth (load test 4: tension at L)
140
120
80
60
40
20
0
0 2000 4000 6000 8000 10000 12000 14000
Time, t (seconds)
Figure 106 Test T3, Pile tip depth vs. time (entire test)
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 2000 4000 6000 8000 10000 12000 14000
-500
Time, t (seconds)
Figure 107 Test T3, Pile head load vs. time (entire test)
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 108 Test T3, Pile head load vs. pile tip depth (entire test)
700
600
B1 F1
500
σh,measured (kPa)
400
300
200
100
0
0 2000 4000 6000 8000 10000 12000 14000
Time, t (seconds)
Figure 109 Test T3, B1, F1 pressure cells vs. time (entire test)
700
600
B1 F1
500
σ h,measured (kPa)
400
300
200
100
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 110 Test T3, B1, F1 pressure cells vs. pile tip depth (entire test)
1000
900
800 B2 F2
700
σh,measured (kPa)
600
500
400
300
200
100
0
0 2000 4000 6000 8000 10000 12000 14000
Time, t (seconds)
Figure 111 Test T3, B2, F2 pressure cells vs. time (entire test)
1000
900
800
B2 F2
σh,measured (kPa) 700
600
500
400
300
200
100
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 112 Test T3, B2, F2 pressure cells vs. pile tip depth (entire test)
200
180
160 B3 B4
140
σh,measured (kPa)
120
100
80
60
40
20
0
0 2000 4000 6000 8000 10000 12000 14000
Time, t (seconds)
Figure 113 Test T3, B3, B4 pressure cells vs. time (entire test)
200
180
160
B3 B4
140
σh,measured (kPa)
120
100
80
60
40
20
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 114 Test T3, B3, B4 pressure cells vs. pile tip depth (entire test)
63
62.5
61.5
61
60.5
60
2500 2600 2700 2800 2900 3000 3100
Time, t (seconds)
Figure 115 Test T3, Pile tip depth vs. time (load test 1: compression at L/2)
700
600
500
Pile head load,P (N)
400
300
200
100
0
2500 2600 2700 2800 2900 3000 3100
Time, t (seconds)
Figure 116 Test T3, Pile head load vs. time (load test 1: compression at L/2)
700
600
500
Pile head load,P (N)
400
300
200
100
0
60.5 61 61.5 62 62.5 63
-100
Pile tip depth, z (mm)
Figure 117 Test T3, Pile head load vs. pile tip depth (load test 1: compression at L/2)
140
B1 F1
120
100
σh,measured (kPa)
80
60
40
20
0
2500 2600 2700 2800 2900 3000 3100
Time, t (seconds)
Figure 118 Test T3, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
140
120
B1 F1
100
σh,measured (kPa)
80
60
40
20
0
60.5 61 61.5 62 62.5 63
Pile tip depth, z (mm)
Figure 119 Test T3, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
60
B2 F2
50
40
σh,measured (kPa)
30
20
10
0
2500 2600 2700 2800 2900 3000 3100
Time, t (seconds)
Figure 120 Test T3, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
45
40
35 B2 F2
30
σh,measured (kPa) 25
20
15
10
0
60.5 61 61.5 62 62.5 63
Pile tip depth, z (mm)
Figure 121 Test T3, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
12
B3 B4
10
σh,measured (kPa)
0
2500 2600 2700 2800 2900 3000 3100
Time, t (seconds)
Figure 122 Test T3, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
12
10
8 B3 B4
σh,measured (kPa)
0
60.5 61 61.5 62 62.5 63
-2
Pile tip depth, z (mm)
Figure 123 Test T3, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
123
122.5
122
Pile tip depth,z (mm)
121.5
121
120.5
120
119.5
119
5275 5375 5475 5575 5675 5775 5875
Time, t (seconds)
Figure 124 Test T3, Pile tip depth vs. time (load test 2: compression at L)
2500
2000
Pile head load,P (N)
1500
1000
500
0
5275 5375 5475 5575 5675 5775 5875
-500
Time , t (seconds)
Figure 125 Test T3, Pile head load vs. time (load test 2: compression at L)
2500
2000
Pile head load,P (N)
1500
1000
500
0
120 120.5 121 121.5 122 122.5 123
-500
Pile tip depth, z (mm)
Figure 126 Test T3, Pile head load vs. pile tip depth (load test 2: compression at L)
300
B1 F1
250
150
100
50
0
5275 5375 5475 5575 5675 5775 5875
Time, t (seconds)
Figure 127 Test T3, B1, F1 pressure cells vs. time (load test 2: compression at L)
300
250
σ h,measured (kPa)
200
B1 F1
150
100
50
0
120 120.5 121 121.5 122 122.5 123
Pile tip depth, z (mm)
Figure 128 Test T3, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
500
450 B2 F2
400
350
σh,measured (kPa)
300
250
200
150
100
50
0
5275 5375 5475 5575 5675 5775 5875
Time, t (seconds)
Figure 129 Test T3, B2, F2 pressure cells vs. time (load test 2: compression at L)
500
450
400
350
σ h,measured (kPa)
300 B2 F2
250
200
150
100
50
0
120 120.5 121 121.5 122 122.5 123
Pile tip depth, z (mm)
Figure 130 Test T3, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
160
B3 B4
140
120
σh,measured (kPa)
100
80
60
40
20
0
5275 5375 5475 5575 5675 5775 5875
Time, t (seconds)
Figure 131 Test T3, B3, B4 pressure cells vs. time (load test 2: compression at L)
160
140
120
σ h,measured (kPa)
100 B3 B4
80
60
40
20
0
120 120.5 121 121.5 122 122.5 123
Pile tip depth, z (mm)
Figure 132 Test T3, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
122.6
122.5
122.4
122.1
122
121.9
121.8
121.7
121.6
5950 6950 7950 8950 9950 10950 11950 12950
Time, t (seconds)
Figure 133 Test T3, Pile tip depth vs. time (load test 3: cyclic compression at L)
1000
900
800
Pile head load,P (N)
700
600
500
400
300
200
100
0
5950 6950 7950 8950 9950 10950 11950 12950
Time, t (seconds)
Figure 134 Test T3, Pile head load vs. time (load test 3: cyclic comp ression at L)
900
800
700
600
Pile head load,P (N)
500
400
300
200
100
0
121.6 121.7 121.8 121.9 122 122.1 122.2 122.3 122.4 122.5 122.6
-100
Pile tip depth, z (mm)
Figure 135 Test T3, Pile head load vs. pile tip depth (load test 3: cyclic compression at L)
120
B1
100
σh,measured (kPa)
80
60
40
20
0
5950 6950 7950 8950 9950 10950 11950 12950
Time, t (seconds)
Figure 136 Test T3, B1 pressure cell vs. time (load test 3: cyclic compression at L)
100
90 F1
80
70
σh,measured (kPa)
60
50
40
30
20
10
0
5950 6950 7950 8950 9950 10950 11950 12950
Time, t (seconds)
Figure 137 Test T3, F1 pressure cell vs. time (load test 3: cyclic compression at L)
120
100
σh,measured (kPa)
80
60
40
20
B1
0
121.6 121.7 121.8 121.9 122 122.1 122.2 122.3 122.4 122.5 122.6
Pile tip depth, z (mm)
Figure 138 Test T3, B1 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
100
90
80
70
σh,measured (kPa)
60
50
40
30
20
10 F1
0
121.6 121.7 121.8 121.9 122 122.1 122.2 122.3 122.4 122.5 122.6
Pile tip depth, z (mm)
Figure 139 Test T3, F1 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
100
90
B2
80
70
σh,measured (kPa)
60
50
40
30
20
10
0
5950 6950 7950 8950 9950 10950 11950 12950
Time, t (seconds)
Figure 140 Test T3, B2 pressure cell vs. time (load test 3: cyclic compression at L)
80
70 F2
60
σh,measured (kPa)
50
40
30
20
10
0
5950 6950 7950 8950 9950 10950 11950 12950
Time, t (seconds)
Figure 141 Test T3, F2 pressure cell vs. time (load test 3: cyclic compression at L)
100
90 B2
80
70
σh,measured (kPa)
60
50
40
30
20
10
0
121.6 121.7 121.8 121.9 122 122.1 122.2 122.3 122.4 122.5 122.6
Pile tip depth, z (mm)
Figure 142 Test T3, B2 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
80
70 F2
60
σh,measured (kPa)
50
40
30
20
10
0
121.6 121.7 121.8 121.9 122 122.1 122.2 122.3 122.4 122.5 122.6
Pile tip depth, z (mm)
Figure 143 Test T3, F2 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
30
B3
25
20
σh,measured (kPa)
15
10
0
5950 6950 7950 8950 9950 10950 11950 12950
Time, t (seconds)
Figure 144 Test T3, B3 pressure cell vs. time (load test 3: cyclic compression at L)
14
12 B4
10
σh,measured (kPa)
0
5950 6950 7950 8950 9950 10950 11950 12950
Time, t (seconds)
Figure 145 Test T3, B4 pressure cell vs. time (load test 3: cyclic compression at L)
25
B3
20
σh,measured (kPa)
15
10
0
121.6 121.7 121.8 121.9 122 122.1 122.2 122.3 122.4 122.5 122.6
Pile tip depth, z (mm)
Figure 146 Test T3, B3 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
14
12 B4
10
σh,measured (kPa)
0
121.6 121.7 121.8 121.9 122 122.1 122.2 122.3 122.4 122.5 122.6
Pile tip depth, z (mm)
Figure 147 Test T3, B4 pressure cell vs. pile tip depth (load test 3: cyclic compression at L)
123
121
119
115
113
111
109
107
105
13200 13300 13400 13500 13600 13700 13800 13900
Time, t (seconds)
Figure 148 Test T3, Pile tip depth vs. time (load test 4: tension at L)
100
50
0
13200 13300 13400 13500 13600 13700 13800 13900
-50
Pile head load,P (N)
-100
-150
-200
-250
-300
-350
-400
Time , t (seconds)
Figure 149 Test T3, Pile head load vs. time (load test 4: tension at L)
1000
800
600
Pile head load,P (N)
400
200
0
105 107 109 111 113 115 117 119 121 123
-200
-400
Pile tip depth, z (mm)
Figure 150 Test T3, Pile head load vs. pile tip depth (load test 4: tension at L)
700
B1 F1
600
500
σh,measured (kPa)
400
300
200
100
0
13200 13300 13400 13500 13600 13700 13800 13900
Time, t (seconds)
Figure 151 Test T3, B1, F1 pressure cells vs. time (load test 4: tension at L)
700
600
B1 F1
500
σh,measured (kPa)
400
300
200
100
0
100 105 110 115 120
Pile tip depth, z (mm)
Figure 152 Test T3, B1, F1 pressure cells vs. pile tip depth (load test 4: tension at L)
1000
900 B2 F2
800
700
σh,measured (kPa)
600
500
400
300
200
100
0
13200 13300 13400 13500 13600 13700 13800 13900
Time, t (seconds)
Figure 153 Test T3, B2, F2 pressure cells vs. time (load test 4: tension at L)
1000
900
800
700
σ h,measured (kPa)
600 B2 F2
500
400
300
200
100
0
100 105 110 115 120
Pile tip depth, z (mm)
Figure 154 Test T3, B2, F2 pressure cells vs. pile tip depth (load test 4: tension at L)
200
180 B3 B4
160
140
σh,measured (kPa)
120
100
80
60
40
20
0
13200 13300 13400 13500 13600 13700 13800 13900
Time, t (seconds)
Figure 155 Test T3, B3, B4 pressure cells vs. time (load test 4: tension at L)
200
180
160
140
σh,measured (kPa)
120 B3 B4
100
80
60
40
20
0
100 105 110 115 120
Pile tip depth, z (mm)
Figure 156 Test T3, B3, B4 pressure cells vs. pile tip depth (load test 4: tension at L)
140
120
100
Pile tip depth,z (mm)
80
60
40
20
0
0 2000 4000 6000 8000 10000 12000 14000 16000
Time, t (seconds)
Figure 157 Test T4, Pile tip depth vs. time (entire test)
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 2000 4000 6000 8000 10000 12000 14000 16000
-500
Time, t (seconds)
Figure 158 Test T4, Pile head load vs. time (entire test)
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 159 Test T4, Pile head load vs. pile tip depth (entire test)
500
450
400 B1 F1
350
σh,measured (kPa)
300
250
200
150
100
50
0
0 2000 4000 6000 8000 10000 12000 14000 16000
Time, t (seconds)
Figure 160 Test T4, B1, F1 pressure cells vs. time (entire test)
500
450
400 B1 F1
350
σ h,measured (kPa)
300
250
200
150
100
50
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 161 Test T4, B1, F1 pressure cells vs. pile tip depth (entire test)
400
350
B2 F2
300
σh,measured (kPa)
250
200
150
100
50
0
0 2000 4000 6000 8000 10000 12000 14000 16000
Time, t (seconds)
Figure 162 Test T4, B2, F2 pressure cells vs. time (entire test)
400
350
300 B2 F2
σh,measured (kPa)
250
200
150
100
50
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 163 Test T4, B2, F2 pressure cells vs. pile tip depth (entire test)
160
140
B3 B4
120
σh,measured (kPa)
100
80
60
40
20
0
0 2000 4000 6000 8000 10000 12000 14000 16000
Time, t (seconds)
Figure 164 Test T4, B3, B4 pressure cells vs. time (entire test)
160
140
120 B3 B4
σh,measured (kPa)
100
80
60
40
20
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 165 Test T4, B3, B4 pressure cells vs. pile tip depth (entire test)
61.5
61.3
61.1
60.5
60.3
60.1
59.9
59.7
59.5
525 575 625 675 725 775 825 875 925 975
Time, t (seconds)
Figure 166 Test T4, Pile tip depth vs. time (load test 1: compression at L/2)
800
700
600
Pile head load,P (N)
500
400
300
200
100
0
525 575 625 675 725 775 825 875 925 975
Time, t (seconds)
Figure 167 Test T4, Pile head load vs. time (load test 1: compression at L/2)
800
700
600
Pile head load,P (N)
500
400
300
200
100
0
59.5 59.7 59.9 60.1 60.3 60.5 60.7 60.9 61.1 61.3 61.5
Pile tip depth, z (mm)
Figure 168 Test T4, Pile head load vs. pile tip depth (load test 1: compression at L/2)
160
140 B1 F1
120
σh,measured (kPa)
100
80
60
40
20
0
525 575 625 675 725 775 825 875 925 975
Time, t (seconds)
Figure 169 Test T4, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
160
140
B1 F1
120
σh,measured (kPa)
100
80
60
40
20
0
59.5 59.7 59.9 60.1 60.3 60.5 60.7 60.9 61.1 61.3 61.5
Pile tip depth, z (mm)
Figure 170 Test T4, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
120
B2 F2
100
80
σh,measured (kPa)
60
40
20
0
525 575 625 675 725 775 825 875 925 975
Time, t (seconds)
Figure 171 Test T4, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
120
100
B2 F2
80
σh,measured (kPa)
60
40
20
0
59.5 59.7 59.9 60.1 60.3 60.5 60.7 60.9 61.1 61.3 61.5
Pile tip depth, z (mm)
Figure 172 Test T4, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
10
8 B3 B4
6
σh,measured (kPa)
0
525 575 625 675 725 775 825 875 925 975
-2
-4
Time, t (seconds)
Figure 173 Test T4, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
10
6 B3 B4
σh,measured (kPa)
0
59.5 59.7 59.9 60.1 60.3 60.5 60.7 60.9 61.1 61.3 61.5
-2
-4
Pile tip depth, z (mm)
Figure 174 Test T4, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
122
121.5
121
Pile tip depth,z (mm)
120.5
120
119.5
119
118.5
1550 1650 1750 1850 1950 2050 2150 2250
Time, t (seconds)
Figure 175 Test T4, Pile tip depth vs. time (load test 2: compression at L)
2500
2000
Pile head load,P (N)
1500
1000
500
0
1550 1650 1750 1850 1950 2050 2150 2250
Time , t (seconds)
Figure 176 Test T4, Pile head load vs. time (load test 2: compression at L)
2500
2000
Pile head load,P (N)
1500
1000
500
0
118.5 119 119.5 120 120.5 121 121.5 122
Pile tip depth, z (mm)
Figure 177 Test T4, Pile head load vs. pile tip depth (load test 2: compression at L)
500
450 B1 F1
400
250
200
150
100
50
0
1550 1650 1750 1850 1950 2050 2150 2250
Time, t (seconds)
Figure 178 Test T4, B1, F1 pressure cells vs. time (load test 2: compression at L)
500
450
400
350
σh,measured (kPa)
300
250
200 B1 F1
150
100
50
0
118.5 119 119.5 120 120.5 121 121.5 122
Pile tip depth, z (mm)
Figure 179 Test T4, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
400
B2 F2
350
300
σh,measured (kPa)
250
200
150
100
50
0
1550 1650 1750 1850 1950 2050 2150 2250
Time, t (seconds)
Figure 180 Test T4, B2, F2 pressure cells vs. time (load test 2: compression at L)
400
350
300 B2 F2
σ h,measured (kPa) 250
200
150
100
50
0
118.5 119 119.5 120 120.5 121 121.5 122
Pile tip depth, z (mm)
Figure 181 Test T4, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
140
B3 B4
120
100
σ h,measured (kPa)
80
60
40
20
0
1550 1650 1750 1850 1950 2050 2150 2250
-20
Time, t (seconds)
Figure 182 Test T4, B3, B4 pressure cells vs. time (load test 2: compression at L)
140
120
100 B3 B4
σh,measured (kPa)
80
60
40
20
0
118.5 119 119.5 120 120.5 121 121.5 122
-20
Pile tip depth, z (mm)
Figure 183 Test T4, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
123
122
121
119
118
117
116
115
2350 4350 6350 8350 10350 12350 14350
Time, t (seconds)
Figure 184 Test T4, Pile tip depth vs. time (load test 3: compression/tension at L)
900
800
700
600
Pile head load,P (N)
500
400
300
200
100
0
-1002350 4350 6350 8350 10350 12350 14350
-200
Time, t (seconds)
Figure 185 Test T4, Pile head load vs. time (load test 3: compression/tension at L)
900
800
700
600
Pile head load,P (N)
500
400
300
200
100
0
-100115 116 117 118 119 120 121 122 123
-200
Pile tip depth, z (mm)
Figure 186 Test T4, Pile head load vs. pile tip depth (load test 3: comp ression/tension at L)
300
B1
250
σh,measured (kPa)
200
150
100
50
0
2350 4350 6350 8350 10350 12350 14350
Time, t (seconds)
Figure 187 Test T4, B1 pressure cell vs. time (load test 3: compression/tension at L)
250
F1
200
σh,measured (kPa)
150
100
50
0
2350 4350 6350 8350 10350 12350 14350
Time, t (seconds)
Figure 188 Test T4, F1 pressure cell vs. time (load test 3: compression/tension at L)
300
250
σh,measured (kPa)
200
150
100
50
B1
0
115 116 117 118 119 120 121 122 123
Pile tip depth, z (mm)
Figure 189 Test T4, B1 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
250
150
100
50
F1
0
115 116 117 118 119 120 121 122 123
Pile tip depth, z (mm)
Figure 190 Test T4, F1 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
400
350
B2
300
σh,measured (kPa)
250
200
150
100
50
0
-502350 4350 6350 8350 10350 12350 14350
Time, t (seconds)
Figure 191 Test T4, B2 pressure cell vs. time (load test 3: compression/tension at L)
400
350
F2
300
σh,measured (kPa)
250
200
150
100
50
0
-502350 4350 6350 8350 10350 12350 14350
Time, t (seconds)
Figure 192 Test T4, F2 pressure cell vs. time (load test 3: compression/tension at L)
400
350 B2
300
σh,measured (kPa)
250
200
150
100
50
0
-50 115 116 117 118 119 120 121 122 123
Figure 193 Test T4, B2 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
400
350 F2
300
σh,measured (kPa)
250
200
150
100
50
0
-50 115 116 117 118 119 120 121 122 123
Figure 194 Test T4, F2 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
140
120 B3
100
σh,measured (kPa)
80
60
40
20
0
2350 4350 6350 8350 10350 12350 14350
-20
Time, t (seconds)
Figure 195 Test T4, B3 pressure cell vs. time (load test 3: compression/tension at L)
35
30 B4
25
σh,measured (kPa)
20
15
10
0
2350 4350 6350 8350 10350 12350 14350
Time, t (seconds)
Figure 196 Test T4, B4 pressure cell vs. time (load test 3: compression/tension at L)
140
120 B3
100
σh,measured (kPa)
80
60
40
20
0
115 116 117 118 119 120 121 122 123
-20
Pile tip depth, z (mm)
Figure 197 Test T4, B3 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
35
30 B4
25
σh,measured (kPa)
20
15
10
0
115 116 117 118 119 120 121 122 123
Pile tip depth, z (mm)
Figure 198 Test T4, B4 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
140
120
80
60
40
20
0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
Time, t (seconds)
Figure 199 Test T5, Pile tip depth vs. time (entire test)
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
-500
Time, t (seconds)
Figure 200 Test T5, Pile head load vs. time (entire test)
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 201 Test T5, Pile head load vs. pile tip depth (entire test)
450
400
350 B1 F1
σh,measured (kPa) 300
250
200
150
100
50
0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
Time, t (seconds)
Figure 202 Test T5, B1, F1 pressure cells vs. time (entire test)
450
400
350 B1 F1
300
σ h,measured (kPa)
250
200
150
100
50
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 203 Test T5, B1, F1 pressure cells vs. pile tip depth (entire test)
400
350
B2 F2
300
σh,measured (kPa)
250
200
150
100
50
0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
Time, t (seconds)
Figure 204 Test T5, B2, F2 pressure cells vs. time (entire test)
400
350
250
200
150
100
50
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 205 Test T5, B2, F2 pressure cells vs. pile tip depth (entire test)
120
100
B3 B4
80
σh,measured (kPa)
60
40
20
0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
Time, t (seconds)
Figure 206 Test T5, B3, B4 pressure cells vs. time (entire test)
120
100
B3 B4
80
σh,measured (kPa)
60
40
20
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 207 Test T5, B3, B4 pressure cells vs. pile tip depth (entire test)
61.5
61.3
61.1
60.5
60.3
60.1
59.9
59.7
59.5
600 650 700 750 800 850 900 950 1000
Time, t (seconds)
Figure 208 Test T5, Pile tip depth vs. time (load test 1: compression at L/2)
700
600
500
Pile head load,P (N)
400
300
200
100
0
600 650 700 750 800 850 900 950 1000
Time, t (seconds)
Figure 209 Test T5, Pile head load vs. time (load test 1: compression at L/2)
700
600
500
Pile head load,P (N)
400
300
200
100
0
59.5 59.7 59.9 60.1 60.3 60.5 60.7 60.9 61.1 61.3 61.5
Pile tip depth, z (mm)
Figure 210 Test T5, Pile head load vs. pile tip depth (load test 1: compression at L/2)
120
B1 F1
100
80
σh,measured (kPa)
60
40
20
0
600 650 700 750 800 850 900 950 1000
Time, t (seconds)
Figure 211 Test T5, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
120
100
B1 F1
80
σ h,measured (kPa)
60
40
20
0
59.5 59.7 59.9 60.1 60.3 60.5 60.7 60.9 61.1 61.3 61.5
Pile tip depth, z (mm)
Figure 212 Test T5, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
70
B2 F2
60
50
σh,measured (kPa)
40
30
20
10
0
600 650 700 750 800 850 900 950 1000
Time, t (seconds)
Figure 213 Test T5, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
70
60
B2 F2
σ h,measured (kPa) 50
40
30
20
10
0
59.5 59.7 59.9 60.1 60.3 60.5 60.7 60.9 61.1 61.3 61.5
Pile tip depth, z (mm)
Figure 214 Test T5, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
7
B3 B4
6
5
σh,measured (kPa)
3
2
1
0
-2
Time, t (seconds)
Figure 215 Test T5, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
6
B3 B4
5
σ h,measured (kPa)
0
59.5 59.7 59.9 60.1 60.3 60.5 60.7 60.9 61.1 61.3 61.5
-1
-2
Pile tip depth, z (mm)
Figure 216 Test T5, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
121
120.8
120.6
120
119.8
119.6
119.4
119.2
119
1500 1550 1600 1650 1700 1750 1800 1850 1900 1950 2000
Time, t (seconds)
Figure 217 Test T5, Pile tip depth vs. time (load test 2: compression at L)
2000
1800
1600
Pile head load,P (N)
1400
1200
1000
800
600
400
200
0
1500 1550 1600 1650 1700 1750 1800 1850 1900 1950 2000
Time , t (seconds)
Figure 218 Test T5, Pile head load vs. time (load test 2: compression at L)
2000
1800
1600
Pile head load,P (N)
1400
1200
1000
800
600
400
200
0
119 119.2 119.4 119.6 119.8 120 120.2 120.4 120.6 120.8 121
Pile tip depth, z (mm)
Figure 219 Test T5, Pile head load vs. pile tip depth (load test 2: compression at L)
400
B1 F1
350
300
200
150
100
50
0
1500 1550 1600 1650 1700 1750 1800 1850 1900 1950 2000
Time, t (seconds)
Figure 220 Test T5, B1, F1 pressure cells vs. time (load test 2: compression at L)
400
350
300
σ h,measured (kPa)
250
200
150
B1 F1
100
50
0
119 119.2 119.4 119.6 119.8 120 120.2 120.4 120.6 120.8 121
Pile tip depth, z (mm)
Figure 221 Test T5, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
350
B2 F2
300
250
σh,measured (kPa)
200
150
100
50
0
1500 1550 1600 1650 1700 1750 1800 1850 1900 1950 2000
Time, t (seconds)
Figure 222 Test T5, B2, F2 pressure cells vs. time (load test 2: compression at L)
350
300
B2 F2
250
σh,measured (kPa)
200
150
100
50
0
119 119.2 119.4 119.6 119.8 120 120.2 120.4 120.6 120.8 121
Pile tip depth, z (mm)
Figure 223 Test T5, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
120
B3 B4
100
80
σh,measured (kPa)
60
40
20
0
1500 1550 1600 1650 1700 1750 1800 1850 1900 1950 2000
-20
Time, t (seconds)
Figure 224 Test T5, B3, B4 pressure cells vs. time (load test 2: compression at L)
120
100
80
σ h,measured (kPa)
60
40 B3 B4
20
0
119 119.2 119.4 119.6 119.8 120 120.2 120.4 120.6 120.8 121
-20
Pile tip depth, z (mm)
Figure 225 Test T5, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
120.5
120
119.5
118.5
118
117.5
117
116.5
116
2000 3000 4000 5000 6000 7000 8000 9000
Time, t (seconds)
Figure 226 Test T5, Pile tip depth vs. time (load test 3: cyclic tension at L)
80
60
40
20
Pile head load,P (N)
0
2000 3000 4000 5000 6000 7000 8000 9000
-20
-40
-60
-80
-100
-120
Time, t (seconds)
Figure 227 Test T5, Pile head load vs. time (load test 3: cyclic tension at L)
80
60
40
20
Pile head load,P (N)
0
116 116.5 117 117.5 118 118.5 119 119.5 120 120.5
-20
-40
-60
-80
-100
-120
Pile tip depth, z (mm)
Figure 228 Test T5, Pile head load vs. pile tip depth (load test 3: cyclic tension at L)
140
B1
120
100
σh,measured (kPa)
80
60
40
20
0
2000 3000 4000 5000 6000 7000 8000 9000
Time, t (seconds)
Figure 229 Test T5, B1 pressure cell vs. time (load test 3: cyclic tension at L)
140
F1
120
100
σh,measured (kPa)
80
60
40
20
0
2000 3000 4000 5000 6000 7000 8000 9000
Time, t (seconds)
Figure 230 Test T5, F1 pressure cell vs. time (load test 3: cyclic tension at L)
140
120
100
σh,measured (kPa)
80
60
40
20 B1
0
116 116.5 117 117.5 118 118.5 119 119.5 120 120.5
Pile tip depth, z (mm)
Figure 231 Test T5, B1 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
140
120
100
σh,measured (kPa)
80
60
40
20 F1
0
116 116.5 117 117.5 118 118.5 119 119.5 120 120.5
Pile tip depth, z (mm)
Figure 232 Test T5, F1 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
200
180
B2
160
140
σh,measured (kPa)
120
100
80
60
40
20
0
2000 3000 4000 5000 6000 7000 8000 9000
Time, t (seconds)
Figure 233 Test T5, B2 pressure cell vs. time (load test 3: cyclic tension at L)
200
180
F2
160
140
σh,measured (kPa)
120
100
80
60
40
20
0
2000 3000 4000 5000 6000 7000 8000 9000
Time, t (seconds)
Figure 234 Test T5, F2 pressure cell vs. time (load test 3: cyclic tension at L)
200
180 B2
160
140
σh,measured (kPa)
120
100
80
60
40
20
0
116 116.5 117 117.5 118 118.5 119 119.5 120 120.5
Pile tip depth, z (mm)
Figure 235 Test T5, B2 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
200
180 F2
160
140
σh,measured (kPa)
120
100
80
60
40
20
0
116 116.5 117 117.5 118 118.5 119 119.5 120 120.5
Pile tip depth, z (mm)
Figure 236 Test T5, F2 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
12
B3
10
8
σh,measured (kPa)
0
2000 3000 4000 5000 6000 7000 8000 9000
Time, t (seconds)
Figure 237 Test T5, B3 pressure cell vs. time (load test 3: cyclic tension at L)
3
B4
2
1
σh,measured (kPa)
0
2000 3000 4000 5000 6000 7000 8000 9000
-1
-2
-3
Time, t (seconds)
Figure 238 Test T5, B4 pressure cell vs. time (load test 3: cyclic tension at L)
12
B3
10
8
σh,measured (kPa)
0
116 116.5 117 117.5 118 118.5 119 119.5 120 120.5
Pile tip depth, z (mm)
Figure 239 Test T5, B3 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
B4
2
1
σh,measured (kPa)
0
116 116.5 117 117.5 118 118.5 119 119.5 120 120.5
-1
-2
-3
Pile tip depth, z (mm)
Figure 240 Test T5, B4 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
140
120
100
Pile tip depth,z (mm)
80
60
40
20
0
0 5000 10000 15000 20000
Time, t (seconds)
Figure 241 Test T6, Pile tip depth vs. time (entire test)
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 5000 10000 15000 20000
-500
Time, t (seconds)
Figure 242 Test T6, Pile head load vs. time (entire test)
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 243 Test T6, Pile head load vs. pile tip depth (entire test)
600
500
B1 F1
σh,measured (kPa) 400
300
200
100
0
0 5000 10000 15000 20000
Time, t (seconds)
Figure 244 Test T6, B1, F1 pressure cells vs. time (entire test)
600
500
B1 F1
400
σ h,measured (kPa)
300
200
100
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 245 Test T6, B1, F1 pressure cells vs. pile tip depth (entire test)
900
800
700 B2 F2
600
σh,measured (kPa)
500
400
300
200
100
0
0 5000 10000 15000 20000
Time, t (seconds)
Figure 246 Test T6, B2, F2 pressure cells vs. time (entire test)
900
800
700 B2 F2
σh,measured (kPa) 600
500
400
300
200
100
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 247 Test T6, B2, F2 pressure cells vs. pile tip depth (entire test)
140
120
B3 B4
100
σh,measured (kPa)
80
60
40
20
0
0 5000 10000 15000 20000
Time, t (seconds)
Figure 248 Test T6, B3, B4 pressure cells vs. time (entire test)
140
120
100 B3 B4
σh,measured (kPa)
80
60
40
20
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 249 Test T6, B3, B4 pressure cells vs. pile tip depth (entire test)
62
61.8
61.6
61
60.8
60.6
60.4
60.2
60
725 775 825 875 925 975 1025 1075 1125
Time, t (seconds)
Figure 250 Test T6, Pile tip depth vs. time (load test 1: compression at L/2)
700
600
500
Pile head load,P (N)
400
300
200
100
0
725 775 825 875 925 975 1025 1075 1125
Time, t (seconds)
Figure 251 Test T6, Pile head load vs. time (load test 1: compression at L/2)
700
600
500
Pile head load,P (N)
400
300
200
100
0
60 60.2 60.4 60.6 60.8 61 61.2 61.4 61.6 61.8 62
Pile tip depth, z (mm)
Figure 252 Test T6, Pile head load vs. pile tip depth (load test 1: compression at L/2)
160
140 B1 F1
120
σh,measured (kPa)
100
80
60
40
20
0
725 775 825 875 925 975 1025 1075 1125
Time, t (seconds)
Figure 253 Test T6, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
160
140
B1 F1
120
σ h,measured (kPa)
100
80
60
40
20
0
60 60.2 60.4 60.6 60.8 61 61.2 61.4 61.6 61.8 62
Pile tip depth, z (mm)
Figure 254 Test T6, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
100
90 B2 F2
80
70
σh,measured (kPa)
60
50
40
30
20
10
0
725 775 825 875 925 975 1025 1075 1125
Time, t (seconds)
Figure 255 Test T6, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
100
90
80 B2 F2
70
σh,measured (kPa)
60
50
40
30
20
10
0
60 60.2 60.4 60.6 60.8 61 61.2 61.4 61.6 61.8 62
Pile tip depth, z (mm)
Figure 256 Test T6, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
14
12 B3 B4
10
σh,measured (kPa)
0
725 775 825 875 925 975 1025 1075 1125
Time, t (seconds)
Figure 257 Test T6, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
14
12
10 B3 B4
σh,measured (kPa)
0
60 60.2 60.4 60.6 60.8 61 61.2 61.4 61.6 61.8 62
Pile tip depth, z (mm)
Figure 258 Test T6, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
122.8
121.8
121.3
120.8
3400 3500 3600 3700 3800 3900 4000 4100
Time, t (seconds)
Figure 259 Test T6, Pile tip depth vs. time (load test 2: compression at L)
2500
2000
Pile head load,P (N)
1500
1000
500
0
3400 3500 3600 3700 3800 3900 4000 4100
Time , t (seconds)
Figure 260 Test T6, Pile head load vs. time (load test 2: compression at L)
2500
2000
Pile head load,P (N)
1500
1000
500
0
120.8 121.3 121.8 122.3 122.8
Pile tip depth, z (mm)
Figure 261 Test T6, Pile head load vs. pile tip depth (load test 2: compression at L)
500
450 B1 F1
400
350
σh,measured (kPa) 300
250
200
150
100
50
0
3400 3500 3600 3700 3800 3900 4000 4100
Time, t (seconds)
Figure 262 Test T6, B1, F1 pressure cells vs. time (load test 2: compression at L)
500
450
400
350
σ h,measured (kPa)
300 B1 F1
250
200
150
100
50
0
120.8 121.3 121.8 122.3 122.8
Pile tip depth, z (mm)
Figure 263 Test T6, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
500
450 B2 F2
400
350
σh,measured (kPa)
300
250
200
150
100
50
0
3400 3500 3600 3700 3800 3900 4000 4100
Time, t (seconds)
Figure 264 Test T6, B2, F2 pressure cells vs. time (load test 2: compression at L)
500
450
400
350
Figure 265 Test T6, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
140
B3 B4
120
100
σh,measured (kPa)
80
60
40
20
0
3400 3500 3600 3700 3800 3900 4000 4100
-20
Time, t (seconds)
Figure 266 Test T6, B3, B4 pressure cells vs. time (load test 2: compression at L)
140
120
100
σh,measured (kPa)
80
B3 B4
60
40
20
0
120.8 121.3 121.8 122.3 122.8
-20
Pile tip depth, z (mm)
Figure 267 Test T6, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
123.5
123
122
121.5
121
4100 6100 8100 10100 12100 14100 16100 18100 20100
Time, t (seconds)
Figure 268 Test T6, Pile tip depth vs. time (load test 3: compression/tension at L)
1000
800
Pile head load,P (N)
600
400
200
0
4100 6100 8100 10100 12100 14100 16100 18100 20100
-200
Time, t (seconds)
Figure 269 Test T6, Pile head load vs. time (load test 3: compression/tension at L)
1000
800
Pile head load,P (N)
600
400
200
0
121 121.5 122 122.5 123 123.5
-200
Pile tip depth, z (mm)
Figure 270 Test T6, Pile head load vs. pile tip depth (load test 3: compression/tension at L)
180
160 B1
σh,measured (kPa) 140
120
100
80
60
40
20
0
4100 6100 8100 10100 12100 14100 16100 18100 20100
Time, t (seconds)
Figure 271 Test T6, B1 pressure cell vs. time (load test 3: compression/tension at L)
200
180 F1
160
140
σh,measured (kPa)
120
100
80
60
40
20
0
4100 6100 8100 10100 12100 14100 16100 18100 20100
Time, t (seconds)
Figure 272 Test T6, F1 pressure cell vs. time (load test 3: compression/tension at L)
180
160
140
σh,measured (kPa)
120
100
80
60
40
20 B1
0
121 121.5 122 122.5 123 123.5
Pile tip depth, z (mm)
Figure 273 Test T6, B1 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
200
180
160
140
σh,measured (kPa)
120
100
80
60
40
20 F1
0
121 121.5 122 122.5 123 123.5
Pile tip depth, z (mm)
Figure 274 Test T6, F1 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
300
250 B2
σh,measured (kPa)
200
150
100
50
0
4100 6100 8100 10100 12100 14100 16100 18100 20100
Time, t (seconds)
Figure 275 Test T6, B2 pressure cell vs. time (load test 3: compression/tension at L)
300
250 F2
σh,measured (kPa)
200
150
100
50
0
4100 6100 8100 10100 12100 14100 16100 18100 20100
Time, t (seconds)
Figure 276 Test T6, F2 pressure cell vs. time (load test 3: compression/tension at L)
300
B2
250
σh,measured (kPa)
200
150
100
50
0
121 121.5 122 122.5 123 123.5
Pile tip depth, z (mm)
Figure 277 Test T6, B2 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
300
F2
250
σh,measured (kPa)
200
150
100
50
0
121 121.5 122 122.5 123 123.5
Pile tip depth, z (mm)
Figure 278 Test T6, F2 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
120
B3
100
80
σh,measured (kPa)
60
40
20
0
4100 6100 8100 10100 12100 14100 16100 18100 20100
-20
Time, t (seconds)
Figure 279 Test T6, B3 pressure cell vs. time (load test 3: compression/tension at L)
30
B4
25
20
σh,measured (kPa)
15
10
0
4100 6100 8100 10100 12100 14100 16100 18100 20100
-5
Time, t (seconds)
Figure 280 Test T6, B4 pressure cell vs. time (load test 3: compression/tension at L)
120
100 B3
80
σh,measured (kPa)
60
40
20
0
121 121.5 122 122.5 123 123.5
-20
Pile tip depth, z (mm)
Figure 281 Test T6, B3 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
30
25 B4
20
σh,measured (kPa)
15
10
0
121 121.5 122 122.5 123 123.5
-5
Pile tip depth, z (mm)
Figure 282 Test T6, B4 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
140
120
100
Pile tip depth,z (mm)
80
60
40
20
0
0 2000 4000 6000 8000 10000 12000 14000 16000 18000
Time, t (seconds)
Figure 283 Test T7, Pile tip depth vs. time (entire test)
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 2000 4000 6000 8000 10000 12000 14000 16000 18000
-500
Time, t (seconds)
Figure 284 Test T7, Pile head load vs. time (entire test)
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 285 Test T7, Pile head load vs. pile tip depth (entire test)
600
500
B1 F1
σh,measured (kPa) 400
300
200
100
0
0 2000 4000 6000 8000 10000 12000 14000 16000 18000
Time, t (seconds)
Figure 286 Test T7, B1, F1 pressure cells vs. time (entire test)
600
500
B1 F1
400
σ h,measured (kPa)
300
200
100
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 287 Test T7, B1, F1 pressure cells vs. pile tip depth (entire test)
900
800
700 B2 F2
600
σh,measured (kPa)
500
400
300
200
100
0
0 2000 4000 6000 8000 10000 12000 14000 16000 18000
Time, t (seconds)
Figure 288 Test T7, B2, F2 pressure cells vs. time (entire test)
900
800
700 B2 F2
σh,measured (kPa) 600
500
400
300
200
100
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 289 Test T7, B2, F2 pressure cells vs. pile tip depth (entire test)
160
140
B3 B4
120
σh,measured (kPa)
100
80
60
40
20
0
0 2000 4000 6000 8000 10000 12000 14000 16000 18000
Time, t (seconds)
Figure 290 Test T7, B3, B4 pressure cells vs. time (entire test)
160
140
120 B3 B4
σh,measured (kPa)
100
80
60
40
20
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 291 Test T7, B3, B4 pressure cells vs. pile tip depth (entire test)
62
61.5
60.5
60
59.5
650 700 750 800 850 900 950 1000 1050
Time, t (seconds)
Figure 292 Test T7, Pile tip depth vs. time (load test 1: compression at L/2)
600
500
Pile head load,P (N)
400
300
200
100
0
650 700 750 800 850 900 950 1000 1050
Time, t (seconds)
Figure 293 Test T7, Pile head load vs. time (load test 1: compression at L/2)
600
500
Pile head load,P (N)
400
300
200
100
0
59.5 60 60.5 61 61.5 62
Pile tip depth, z (mm)
Figure 294 Test T7, Pile head load vs. pile tip depth (load test 1: compression at L/2)
140
B1 F1
120
100
σh,measured (kPa)
80
60
40
20
0
650 700 750 800 850 900 950 1000 1050
Time, t (seconds)
Figure 295 Test T7, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
140
120
B1 F1
100
σ h,measured (kPa)
80
60
40
20
0
59.5 60 60.5 61 61.5 62
Pile tip depth, z (mm)
Figure 296 Test T7, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
120
B2 F2
100
80
σh,measured (kPa)
60
40
20
0
650 700 750 800 850 900 950 1000 1050
Time, t (seconds)
Figure 297 Test T7, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
120
100
B2 F2
σh,measured (kPa)
80
60
40
20
0
59.5 60 60.5 61 61.5 62
Pile tip depth, z (mm)
Figure 298 Test T7, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
14
12 B3 B4
10
σh,measured (kPa)
0
650 700 750 800 850 900 950 1000 1050
Time, t (seconds)
Figure 299 Test T7, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
14
12
10 B3 B4
σh,measured (kPa)
0
59.5 60 60.5 61 61.5 62
Pile tip depth, z (mm)
Figure 300 Test T7, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
121
120
119.5
119
2625 2725 2825 2925 3025 3125
Time, t (seconds)
Figure 301 Test T7, Pile tip depth vs. time (load test 2: compression at L)
2500
2000
Pile head load,P (N)
1500
1000
500
0
2625 2675 2725 2775 2825 2875 2925 2975 3025 3075 3125
Time , t (seconds)
Figure 302 Test T7, Pile head load vs. time (load test 2: compression at L)
2500
2000
Pile head load,P (N)
1500
1000
500
0
119 119.5 120 120.5 121
Pile tip depth, z (mm)
Figure 303 Test T7, Pile head load vs. pile tip depth (load test 2: compression at L)
450
400 B1 F1
350
σh,measured (kPa) 300
250
200
150
100
50
0
2625 2675 2725 2775 2825 2875 2925 2975 3025 3075 3125
Time, t (seconds)
Figure 304 Test T7, B1, F1 pressure cells vs. time (load test 2: compression at L)
450
400
350
σ h,measured (kPa)
300
B1 F1
250
200
150
100
50
0
119 119.5 120 120.5 121
Pile tip depth, z (mm)
Figure 305 Test T7, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
450
400 B2 F2
350
300
σh,measured (kPa)
250
200
150
100
50
0
2625 2675 2725 2775 2825 2875 2925 2975 3025 3075 3125
Time, t (seconds)
Figure 306 Test T7, B2, F2 pressure cells vs. time (load test 2: compression at L)
450
400
350
σ h,measured (kPa)
300
B2 F2
250
200
150
100
50
0
119 119.5 120 120.5 121
Pile tip depth, z (mm)
Figure 307 Test T7, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
120
B3 B4
100
80
σh,measured (kPa)
60
40
20
0
2625 2675 2725 2775 2825 2875 2925 2975 3025 3075 3125
-20
Time, t (seconds)
Figure 308 Test T7, B3, B4 pressure cells vs. time (load test 2: compression at L)
120
100
80
σh,measured (kPa)
60 B3 B4
40
20
0
119 119.5 120 120.5 121
-20
Pile tip depth, z (mm)
Figure 309 Test T7, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
120.2
120.1
119.9
119.8
119.7
119.6
3200 5200 7200 9200 11200 13200 15200
Time, t (seconds)
Figure 310 Test T7, Pile tip depth vs. time (load test 3: cyclic tension at L)
60
40
20
Pile head load,P (N)
0
3200 5200 7200 9200 11200 13200 15200
-20
-40
-60
-80
-100
Time, t (seconds)
Figure 311 Test T7, Pile head load vs. time (load test 3: cyclic tension at L)
60
40
20
Pile head load,P (N)
0
119.6 119.7 119.8 119.9 120 120.1 120.2
-20
-40
-60
-80
-100
Pile tip depth, z (mm)
Figure 312 Test T7, Pile head load vs. pile tip depth (load test 3: cyclic tension at L)
140
B1
120
100
σh,measured (kPa)
80
60
40
20
0
3200 5200 7200 9200 11200 13200 15200
Time, t (seconds)
Figure 313 Test T7, B1 pressure cell vs. time (load test 3: cyclic tension at L)
140
F1
120
100
σh,measured (kPa)
80
60
40
20
0
3200 5200 7200 9200 11200 13200 15200
Time, t (seconds)
Figure 314 Test T7, F1 pressure cell vs. time (load test 3: cyclic tension at L)
140
120
100
σh,measured (kPa)
80
60
40
20 B1
0
119.6 119.7 119.8 119.9 120 120.1 120.2
Pile tip depth, z (mm)
Figure 315 Test T7, B1 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
140
120
100
σh,measured (kPa)
80
60
40
20 F1
0
119.6 119.7 119.8 119.9 120 120.1 120.2
Pile tip depth, z (mm)
Figure 316 Test T7, F1 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
45
40
B2
35
σh,measured (kPa)
30
25
20
15
10
5
0
3200 5200 7200 9200 11200 13200 15200
Time, t (seconds)
Figure 317 Test T7, B2 pressure cell vs. time (load test 3: cyclic tension at L)
40
35 F2
30
σh,measured (kPa)
25
20
15
10
0
3200 5200 7200 9200 11200 13200 15200
Time, t (seconds)
Figure 318 Test T7, F2 pressure cell vs. time (load test 3: cyclic tension at L)
45
40 B2
σh,measured (kPa) 35
30
25
20
15
10
5
0
119.6 119.7 119.8 119.9 120 120.1 120.2
Pile tip depth, z (mm)
Figure 319 Test T7, B2 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
40
35 F2
30
σh,measured (kPa)
25
20
15
10
0
119.6 119.7 119.8 119.9 120 120.1 120.2
Pile tip depth, z (mm)
Figure 320 Test T7, F2 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
10
B3
8
6
σh,measured (kPa)
0
3200 5200 7200 9200 11200 13200 15200
-2
-4
Time, t (seconds)
Figure 321 Test T7, B3 pressure cell vs. time (load test 3: cyclic tension at L)
9
8 B4
7
6
σh,measured (kPa)
4
3
1
0
3200 5200 7200 9200 11200 13200 15200
Time, t (seconds)
Figure 322 Test T7, B4 pressure cell vs. time (load test 3: cyclic tension at L)
10
8 B3
6
σh,measured (kPa)
0
119.6 119.7 119.8 119.9 120 120.1 120.2
-2
-4
Pile tip depth, z (mm)
Figure 323 Test T7, B3 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
8 B4
7
6
σh,measured (kPa)
4
3
1
0
119.6 119.7 119.8 119.9 120 120.1 120.2
Pile tip depth, z (mm)
Figure 324 Test T7, B4 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
140
120
80
60
40
20
0
0 5000 10000 15000 20000 25000
Time, t (seconds)
Figure 325 Test T8, Pile tip depth vs. time (entire test)
3000
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 5000 10000 15000 20000 25000
-500
Time, t (seconds)
Figure 326 Test T8, Pile head load vs. time (entire test)
3000
2500
Pile head load,P (N)
2000
1500
1000
500
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 327 Test T8, Pile head load vs. pile tip depth (entire test)
500
450
400
B1 F1
350
σh,measured (kPa)
300
250
200
150
100
50
0
0 5000 10000 15000 20000 25000
Time, t (seconds)
Figure 328 Test T8, B1, F1 pressure cells vs. time (entire test)
500
450
400 B1 F1
350
σ h,measured (kPa)
300
250
200
150
100
50
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 329 Test T8, B1, F1 pressure cells vs. pile tip depth (entire test)
1000
900
800 B2 F2
700
σh,measured (kPa)
600
500
400
300
200
100
0
0 5000 10000 15000 20000 25000
Time, t (seconds)
Figure 330 Test T8, B2, F2 pressure cells vs. time (entire test)
1000
900
800
B2 F2
σh,measured (kPa) 700
600
500
400
300
200
100
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 331 Test T8, B2, F2 pressure cells vs. pile tip depth (entire test)
300
250
B3 B4
200
σh,measured (kPa)
150
100
50
0
0 5000 10000 15000 20000 25000
Time, t (seconds)
Figure 332 Test T8, B3, B4 pressure cells vs. time (entire test)
300
250
B3 B4
200
σh,measured (kPa)
150
100
50
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 333 Test T8, B3, B4 pressure cells vs. pile tip depth (entire test)
62.5
62
61
60.5
60
59.5
2250 2350 2450 2550 2650 2750 2850
Time, t (seconds)
Figure 334 Test T8, Pile tip depth vs. time (load test 1: compression at L/2)
900
800
700
600
Pile head load,P (N)
500
400
300
200
100
0
2250 2350 2450 2550 2650 2750 2850
-100
Time, t (seconds)
Figure 335 Test T8, Pile head load vs. time (load test 1: compression at L/2)
900
800
700
600
Pile head load,P (N)
500
400
300
200
100
0
59.5 60 60.5 61 61.5 62 62.5
-100
Pile tip depth, z (mm)
Figure 336 Test T8, Pile head load vs. pile tip depth (load test 1: compression at L/2)
120
B1 F1
100
σh,measured (kPa) 80
60
40
20
0
2250 2350 2450 2550 2650 2750 2850
Time, t (seconds)
Figure 337 Test T8, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
120
100
B1 F1
σ h,measured (kPa)
80
60
40
20
0
59.5 60 60.5 61 61.5 62 62.5
Pile tip depth, z (mm)
Figure 338 Test T8, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
80
70 B2 F2
60
50
σh,measured (kPa)
40
30
20
10
0
2250 2350 2450 2550 2650 2750 2850
-10
Time, t (seconds)
Figure 339 Test T8, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
80
70
60 B2 F2
50
σh,measured (kPa) 40
30
20
10
0
59.5 60 60.5 61 61.5 62 62.5
-10
Pile tip depth, z (mm)
Figure 340 Test T8, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
10
B3 B4
8
6
σh,measured (kPa)
0
2250 2350 2450 2550 2650 2750 2850
-2
Time, t (seconds)
Figure 341 Test T8, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
10
8
B3 B4
6
σh,measured (kPa)
0
59.5 60 60.5 61 61.5 62 62.5
-2
Pile tip depth, z (mm)
Figure 342 Test T8, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
123.5
123
122
121.5
121
120.5
5100 5200 5300 5400 5500 5600 5700 5800 5900
Time, t (seconds)
Figure 343 Test T8, Pile tip depth vs. time (load test 2: compression at L)
3000
2500
2000
Pile head load,P (N)
1500
1000
500
0
5100 5200 5300 5400 5500 5600 5700 5800 5900
-500
Time , t (seconds)
Figure 344 Test T8, Pile head load vs. time (load test 2: compression at L)
3000
2500
2000
Pile head load,P (N)
1500
1000
500
0
120.5 121 121.5 122 122.5 123 123.5
-500
Pile tip depth, z (mm)
Figure 345 Test T8, Pile head load vs. pile tip depth (load test 2: compression at L)
350
B1 F1
300
250
σh,measured (kPa)
200
150
100
50
0
5100 5200 5300 5400 5500 5600 5700 5800 5900
Time, t (seconds)
Figure 346 Test T8, B1, F1 pressure cells vs. time (load test 2: compression at L)
350
300
250
σ h,measured (kPa)
200 B1 F1
150
100
50
0
120.5 121 121.5 122 122.5 123 123.5
Pile tip depth, z (mm)
Figure 347 Test T8, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
350
B2 F2
300
250
σh,measured (kPa)
200
150
100
50
0
5100 5200 5300 5400 5500 5600 5700 5800 5900
Time, t (seconds)
Figure 348 Test T8, B2, F2 pressure cells vs. time (load test 2: compression at L)
350
300
250
150
100
50
0
120.5 121 121.5 122 122.5 123 123.5
Pile tip depth, z (mm)
Figure 349 Test T8, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
250
B3 B4
200
150
σh,measured (kPa)
100
50
0
5100 5200 5300 5400 5500 5600 5700 5800 5900
-50
Time, t (seconds)
Figure 350 Test T8, B3, B4 pressure cells vs. time (load test 2: compression at L)
250
200
150
σh,measured (kPa)
B3 B4
100
50
0
120.5 121 121.5 122 122.5 123 123.5
-50
Pile tip depth, z (mm)
Figure 351 Test T8, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
123.5
123
122
121.5
121
5900 7900 9900 11900 13900 15900 17900 19900 21900
Time, t (seconds)
Figure 352 Test T8, Pile tip depth vs. time (load test 3: compression/tension at L)
1000
800
Pile head load, P (N)
600
400
200
0
5900 7900 9900 11900 13900 15900 17900 19900 21900
-200
Time, t (seconds)
Figure 353 Test T8, Pile head load vs. time (load test 3: compression/tension at L)
1000
800
Pile head load,P (N)
600
400
200
0
121 121.5 122 122.5 123 123.5
-200
Pile tip depth, z (mm)
Figure 354 Test T8, Pile head load vs. pile tip depth (load test 3: compression/tension at L)
160
140 B1
σh,measured (kPa) 120
100
80
60
40
20
0
5900 7900 9900 11900 13900 15900 17900 19900 21900
Time, t (seconds)
Figure 355 Test T8, B1 pressure cell vs. time (load test 3: compression/tension at L)
160
140 F1
120
σh,measured (kPa)
100
80
60
40
20
0
5900 7900 9900 11900 13900 15900 17900 19900 21900
Time, t (seconds)
Figure 356 Test T8, F1 pressure cell vs. time (load test 3: compression/tension at L)
160
140
120
σh,measured (kPa)
100
80
60
40
20 B1
0
121 121.5 122 122.5 123 123.5
Pile tip depth, z (mm)
Figure 357 Test T8, B1 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
160
140
σh,measured (kPa) 120
100
80
60
40
20 F1
0
121 121.5 122 122.5 123 123.5
Pile tip depth, z (mm)
Figure 358 Test T8, F1 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
300
250 B2
200
σh,measured (kPa)
150
100
50
0
5900 7900 9900 11900 13900 15900 17900 19900 21900
-50
Time, t (seconds)
Figure 359 Test T8, B2 pressure cell vs. time (load test 3: compression/tension at L)
300
250 F2
200
σh,measured (kPa)
150
100
50
0
5900 7900 9900 11900 13900 15900 17900 19900 21900
-50
Time, t (seconds)
Figure 360 Test T8, F2 pressure cell vs. time (load test 3: compression/tension at L)
300
250 B2
200
σh,measured (kPa)
150
100
50
0
121 121.5 122 122.5 123 123.5
-50
Pile tip depth, z (mm)
Figure 361 Test T8, B2 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
300
250 F2
200
σh,measured (kPa)
150
100
50
0
121 121.5 122 122.5 123 123.5
-50
Pile tip depth, z (mm)
Figure 362 Test T8, F2 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
160
140 B3
120
100
σh,measured (kPa)
80
60
40
20
0
5900 7900 9900 11900 13900 15900 17900 19900 21900
-20
Time, t (seconds)
Figure 363 Test T8, B3 pressure cell vs. time (load test 3: compression/tension at L)
30
B4
25
20
σh,measured (kPa)
15
10
0
5900 7900 9900 11900 13900 15900 17900 19900 21900
Time, t (seconds)
Figure 364 Test T8, B4 pressure cell vs. time (load test 3: compression/tension at L)
160
140 B3
120
100
σh,measured (kPa)
80
60
40
20
0
121 121.5 122 122.5 123 123.5
-20
Pile tip depth, z (mm)
Figure 365 Test T8, B3 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
30
B4
25
20
σh,measured (kPa)
15
10
0
121 121.5 122 122.5 123 123.5
Pile tip depth, z (mm)
Figure 366 Test T8, B4 pressure cell vs. pile tip depth (load test 3: compression/tension at L)
140
120
100
Pile tip depth,z (mm)
80
60
40
20
0
0 2000 4000 6000 8000 10000 12000 14000
Time, t (seconds)
Figure 367 Test T9, Pile tip depth vs. time (entire test)
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 2000 4000 6000 8000 10000 12000 14000
-500
Time, t (seconds)
Figure 368 Test T9, Pile head load vs. time (entire test)
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 369 Test T9, Pile head load vs. pile tip depth (entire test)
400
350
300 B1 F1
σh,measured (kPa)
250
200
150
100
50
0
0 2000 4000 6000 8000 10000 12000 14000
Time, t (seconds)
Figure 370 Test T9, B1, F1 pressure cells vs. time (entire test)
400
350
B1 F1
300
σ h,measured (kPa)
250
200
150
100
50
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 371 Test T9, B1, F1 pressure cells vs. pile tip depth (entire test)
900
800
700 B2 F2
600
σh,measured (kPa)
500
400
300
200
100
0
0 2000 4000 6000 8000 10000 12000 14000
Time, t (seconds)
Figure 372 Test T9, B2, F2 pressure cells vs. time (entire test)
900
800
700 B2 F2
σh,measured (kPa) 600
500
400
300
200
100
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 373 Test T9, B2, F2 pressure cells vs. pile tip depth (entire test)
250
200 B3 B4
σh,measured (kPa)
150
100
50
0
0 2000 4000 6000 8000 10000 12000 14000
Time, t (seconds)
Figure 374 Test T9, B3, B4 pressure cells vs. time (entire test)
250
200
B3 B4
σh,measured (kPa)
150
100
50
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 375 Test T9, B3, B4 pressure cells vs. pile tip depth (entire test)
63
62.5
61.5
61
60.5
60
2300 2400 2500 2600 2700 2800 2900
Time, t (seconds)
Figure 376 Test T9, Pile tip depth vs. time (load test 1: compression at L/2)
700
600
500
Pile head load,P (N)
400
300
200
100
0
2300 2400 2500 2600 2700 2800 2900
-100
Time, t (seconds)
Figure 377 Test T9, Pile head load vs. time (load test 1: compression at L/2)
700
600
500
Pile head load,P (N)
400
300
200
100
0
60 60.5 61 61.5 62 62.5 63
-100
Pile tip depth, z (mm)
Figure 378 Test T9, Pile head load vs. pile tip depth (load test 1: compression at L/2)
120
B1 F1
100
σh,measured (kPa) 80
60
40
20
0
2300 2400 2500 2600 2700 2800 2900
Time, t (seconds)
Figure 379 Test T9, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
120
100
B1 F1
σ h,measured (kPa)
80
60
40
20
0
60 60.5 61 61.5 62 62.5 63
Pile tip depth, z (mm)
Figure 380 Test T9, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
70
60 B2 F2
50
σh,measured (kPa)
40
30
20
10
0
2300 2400 2500 2600 2700 2800 2900
-10
Time, t (seconds)
Figure 381 Test T9, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
70
60
50 B2 F2
σh,measured (kPa)
40
30
20
10
0
60 60.5 61 61.5 62 62.5 63
-10
Pile tip depth, z (mm)
Figure 382 Test T9, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
12
10 B3 B4
8
σh,measured (kPa)
0
2300 2400 2500 2600 2700 2800 2900
-2
Time, t (seconds)
Figure 383 Test T9, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
12
10
8 B3 B4
σh,measured (kPa)
0
60 60.5 61 61.5 62 62.5 63
-2
Pile tip depth, z (mm)
Figure 384 Test T9, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
123.5
123
122.5
121.5
121
120.5
120
119.5
119
5100 5200 5300 5400 5500 5600 5700 5800 5900 6000
Time, t (seconds)
Figure 385 Test T9, Pile tip depth vs. time (load test 2: compression at L)
2500
2000
Pile head load,P (N)
1500
1000
500
0
5100 5200 5300 5400 5500 5600 5700 5800 5900 6000
-500
Time , t (seconds)
Figure 386 Test T9, Pile head load vs. time (load test 2: compression at L)
2500
2000
Pile head load,P (N)
1500
1000
500
0
120 120.5 121 121.5 122 122.5 123 123.5
-500
Pile tip depth, z (mm)
Figure 387 Test T9, Pile head load vs. pile tip depth (load test 2: compression at L)
300
B1 F1
250
150
100
50
0
5100 5200 5300 5400 5500 5600 5700 5800 5900 6000
Time, t (seconds)
Figure 388 Test T9, B1, F1 pressure cells vs. time (load test 2: compression at L)
300
250
σ h,measured (kPa)
200
B1 F1
150
100
50
0
120 120.5 121 121.5 122 122.5 123 123.5
Pile tip depth, z (mm)
Figure 389 Test T9, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
600
B2 F2
500
400
σh,measured (kPa)
300
200
100
0
5100 5200 5300 5400 5500 5600 5700 5800 5900 6000
Time, t (seconds)
Figure 390 Test T9, B2, F2 pressure cells vs. time (load test 2: compression at L)
600
500
σ h,measured (kPa)
400
B2 F2
300
200
100
0
120 120.5 121 121.5 122 122.5 123 123.5
Pile tip depth, z (mm)
Figure 391 Test T9, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
250
B3 B4
200
150
σh,measured (kPa)
100
50
0
5100 5200 5300 5400 5500 5600 5700 5800 5900
-50
Time, t (seconds)
Figure 392 Test T9, B3, B4 pressure cells vs. time (load test 2: compression at L)
250
200
150
σh,measured (kPa)
B3 B4
100
50
0
120 120.5 121 121.5 122 122.5 123 123.5
-50
Pile tip depth, z (mm)
Figure 393 Test T9, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
123
122
121
119
118
117
116
6000 7000 8000 9000 10000 11000 12000 13000 14000
Time, t (seconds)
Figure 394 Test T9, Pile tip depth vs. time (load test 3: cyclic tension at L)
100
50
0
Pile head load,P (N)
-100
-150
-200
-250
-300
Time, t (seconds)
Figure 395 Test T9, Pile head load vs. time (load test 3: cyclic tension at L)
100
50
0
Pile head load,P (N)
-100
-150
-200
-250
-300
Pile tip depth, z (mm)
Figure 396 Test T9, Pile head load vs. pile tip depth (load test 3: cyclic tension at L)
400
350 B1
300
250
σh,measured (kPa)
200
150
100
50
Time, t (seconds)
Figure 397 Test T9, B1 pressure cell vs. time (load test 3: cyclic tension at L)
400
350 F1
300
250
σh,measured (kPa)
200
150
100
50
Time, t (seconds)
Figure 398 Test T9, F1 pressure cell vs. time (load test 3: cyclic tension at L)
400
350
300
250
σh,measured (kPa)
200
150
100
50
0 B1
-50 116 117 118 119 120 121 122 123
Figure 399 Test T9, B1 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
400
350
300
250
σh,measured (kPa)
200
150
100
50
0 F1
-50 116 117 118 119 120 121 122 123
Figure 400 Test T9, F1 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
800
700
B2
600
σh,measured (kPa)
500
400
300
200
100
0
-1006000 7000 8000 9000 10000 11000 12000 13000 14000
Time, t (seconds)
Figure 401 Test T9, B2 pressure cell vs. time (load test 3: cyclic tension at L)
900
800
F2
700
600
σh,measured (kPa)
500
400
300
200
100
0
-1006000 7000 8000 9000 10000 11000 12000 13000 14000
Time, t (seconds)
Figure 402 Test T9, F2 pressure cell vs. time (load test 3: cyclic tension at L)
800
700 B2
σh,measured (kPa) 600
500
400
300
200
100
0
-100 116 117 118 119 120 121 122 123
Figure 403 Test T9, B2 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
900
800 F2
700
600
σh,measured (kPa)
500
400
300
200
100
0
-100 116 117 118 119 120 121 122 123
Figure 404 Test T9, F2 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
250
B3
200
σh,measured (kPa)
150
100
50
0
6000 7000 8000 9000 10000 11000 12000 13000 14000
Time, t (seconds)
Figure 405 Test T9, B3 pressure cell vs. time (load test 3: cyclic tension at L)
6
5 B4
4
σh,measured (kPa)
0
6000 7000 8000 9000 10000 11000 12000 13000 14000
-1
-2
Time, t (seconds)
Figure 406 Test T9, B4 pressure cell vs. time (load test 3: cyclic tension at L)
250
B3
200
σh,measured (kPa)
150
100
50
0
116 117 118 119 120 121 122 123
Pile tip depth, z (mm)
Figure 407 Test T9, B3 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
5 B4
4
σh,measured (kPa)
0
116 117 118 119 120 121 122 123
-1
-2
Pile tip depth, z (mm)
Figure 408 Test T9, B4 pressure cell vs. pile tip depth (load test 3: cyclic tension at L)
140
120
100
Pile tip depth,z (mm)
80
60
40
20
0
0 1000 2000 3000 4000 5000 6000 7000
Time, t (seconds)
Figure 409 Test T10, Pile tip depth vs. time (entire test)
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 1000 2000 3000 4000 5000 6000 7000
-500
Time, t (seconds)
Figure 410 Test T10, Pile head load vs. time (entire test)
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 411 Test T10, Pile head load vs. pile tip depth (entire test)
450
400
350 B1 F1
σh,measured (kPa) 300
250
200
150
100
50
0
0 1000 2000 3000 4000 5000 6000 7000
Time, t (seconds)
Figure 412 Test T10, B1, F1 pressure cells vs. time (entire test)
450
400
350 B1 F1
300
σ h,measured (kPa)
250
200
150
100
50
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 413 Test T10, B1, F1 pressure cells vs. pile tip depth (entire test)
500
450
400 B2 F2
350
σh,measured (kPa)
300
250
200
150
100
50
0
0 1000 2000 3000 4000 5000 6000 7000
Time, t (seconds)
Figure 414 Test T10, B2, F2 pressure cells vs. time (entire test)
500
450
400
B2 F2
σh,measured (kPa) 350
300
250
200
150
100
50
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 415 Test T10, B2, F2 pressure cells vs. pile tip depth (entire test)
140
120
B3 B4
100
σh,measured (kPa)
80
60
40
20
0
0 1000 2000 3000 4000 5000 6000 7000
Time, t (seconds)
Figure 416 Test T10, B3, B4 pressure cells vs. time (entire test)
140
120
100 B3 B4
σh,measured (kPa)
80
60
40
20
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 417 Test T10, B3, B4 pressure cells vs. pile tip depth (entire test)
62
61.5
60.5
60
59.5
59
400 500 600 700 800 900
Time, t (seconds)
Figure 418 Test T10, Pile tip depth vs. time (load test 1: compression at L/2)
700
600
500
Pile head load,P (N)
400
300
200
100
0
400 500 600 700 800 900
-100
Time, t (seconds)
Figure 419 Test T10, Pile head load vs. time (load test 1: compression at L/2)
700
600
500
Pile head load,P (N)
400
300
200
100
0
59 59.5 60 60.5 61 61.5 62
-100
Pile tip depth, z (mm)
Figure 420 Test T10, Pile head load vs. pile tip depth (load test 1: compression at L/2)
140
B1 F1
120
100
σh,measured (kPa)
80
60
40
20
0
400 500 600 700 800 900
Time, t (seconds)
Figure 421 Test T10, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
140
120
B1 F1
100
σ h,measured (kPa)
80
60
40
20
0
59 59.5 60 60.5 61 61.5 62
Pile tip depth, z (mm)
Figure 422 Test T10, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
140
B2 F2
120
100
σh,measured (kPa)
80
60
40
20
0
400 500 600 700 800 900
Time, t (seconds)
Figure 423 Test T10, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
140
120
B2 F2
100
σh,measured (kPa)
80
60
40
20
0
59 59.5 60 60.5 61 61.5 62
Pile tip depth, z (mm)
Figure 424 Test T10, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
10
9
B3 B4
8
7
σh,measured (kPa)
6
5
4
3
2
1
0
400 500 600 700 800 900
Time, t (seconds)
Figure 425 Test T10, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
10
9
8
B3 B4
7
σh,measured (kPa)
6
5
4
3
2
1
0
59 59.5 60 60.5 61 61.5 62
Pile tip depth, z (mm)
Figure 426 Test T10, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
122
121.5
121
120
119.5
119
118.5
1500 1600 1700 1800 1900 2000 2100 2200 2300
Time, t (seconds)
Figure 427 Test T10, Pile tip depth vs. time (load test 2: compression at L)
2500
2000
Pile head load,P (N)
1500
1000
500
0
1500 1600 1700 1800 1900 2000 2100 2200 2300
Time, t (seconds)
Figure 428 Test T10, Pile head load vs. time (load test 2: compression at L)
2500
2000
Pile head load,P (N)
1500
1000
500
0
118.5 119 119.5 120 120.5 121 121.5 122
Pile tip depth, z (mm)
Figure 429 Test T10, Pile head load vs. pile tip depth (load test 2: compression at L)
450
400 B1 F1
350
σh,measured (kPa) 300
250
200
150
100
50
0
1500 1600 1700 1800 1900 2000 2100 2200 2300
Time, t (seconds)
Figure 430 Test T10, B1, F1 pressure cells vs. time (load test 2: compression at L)
450
400
350 B1 F1
σ h,measured (kPa)
300
250
200
150
100
50
0
118.5 119 119.5 120 120.5 121 121.5 122
Pile tip depth, z (mm)
Figure 431 Test T10, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
350
B2 F2
300
250
σh,measured (kPa)
200
150
100
50
0
1500 1600 1700 1800 1900 2000 2100 2200 2300
Time, t (seconds)
Figure 432 Test T10, B2, F2 pressure cells vs. time (load test 2: compression at L)
350
300
B2 F2
250
σh,measured (kPa)
200
150
100
50
0
118.5 119 119.5 120 120.5 121 121.5 122
Pile tip depth, z (mm)
Figure 433 Test T10, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
140
120 B3 B4
100
σh,measured (kPa)
80
60
40
20
0
1500 1600 1700 1800 1900 2000 2100 2200 2300
Time, t (seconds)
Figure 434 Test T10, B3, B4 pressure cells vs. time (load test 2: compression at L)
140
120
100 B3 B4
σh,measured (kPa)
80
60
40
20
0
118.5 119 119.5 120 120.5 121 121.5 122
Pile tip depth, z (mm)
Figure 435 Test T10, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
120
115
105
100
95
90
2300 2800 3300 3800 4300 4800 5300 5800 6300
Time, t (seconds)
Figure 436 Test T10, Pile tip depth vs. time (load test 3: tension at L)
50
0
2300 2800 3300 3800 4300 4800 5300 5800 6300
Pile head load,P (N)
-50
-100
-150
-200
-250
Time, t (seconds)
Figure 437 Test T10, Pile head load vs. time (load test 3: tension at L)
50
0
90 95 100 105 110 115 120
Pile head load,P (N)
-50
-100
-150
-200
-250
Pile tip depth, z (mm)
Figure 438 Test T10, Pile head load vs. pile tip depth (load test 3: tension at L)
300
B1 F1
250
150
100
50
0
2300 2800 3300 3800 4300 4800 5300 5800 6300
Time, t (seconds)
Figure 439 Test T10, B1, F1 pressure cells vs. time (load test 3: tension at L)
300
250
B1 F1
200
σh,measured (kPa)
150
100
50
0
90 95 100 105 110 115 120
Pile tip depth, z (mm)
Figure 440 Test T10, B1, F1 pressure cells vs. pile tip depth (load test 3: tension at L)
500
450 B2 F2
400
350
σh,measured (kPa)
300
250
200
150
100
50
0
2300 2800 3300 3800 4300 4800 5300 5800 6300
Time, t (seconds)
Figure 441 Test T10, B2, F2 pressure cells vs. time (load test 3: tension at L)
500
450
400 B2 F2
350
σh,measured (kPa)
300
250
200
150
100
50
0
90 95 100 105 110 115 120
Pile tip depth, z (mm)
Figure 442 Test T10, B2, F2 pressure cells vs. pile tip depth (load test 3: tension at L)
45
40 B3 B4
35
σh,measured (kPa)
30
25
20
15
10
5
0
2300 2800 3300 3800 4300 4800 5300 5800 6300
Time, t (seconds)
Figure 443 Test T10, B3, B4 pressure cells vs. time (load test 3: tension at L)
45
40
35
B3 B4
σh,measured (kPa)
30
25
20
15
10
0
90 95 100 105 110 115 120
Pile tip depth, z (mm)
Figure 444 Test T10, B3, B4 pressure cells vs. pile tip depth (load test 3: tension at L)
140
120
80
60
40
20
0
0 1000 2000 3000 4000 5000 6000 7000 8000
Time, t (seconds)
Figure 445 Test T11, Pile tip depth vs. time (entire test)
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 1000 2000 3000 4000 5000 6000 7000 8000
-500
Time, t (seconds)
Figure 446 Test T11, Pile head load vs. time (entire test)
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 447 Test T11, Pile head load vs. pile tip depth (entire test)
500
450
400
B1 F1
σh,measured (kPa) 350
300
250
200
150
100
50
0
0 1000 2000 3000 4000 5000 6000 7000 8000
Time, t (seconds)
Figure 448 Test T11, B1, F1 pressure cells vs. time (entire test)
500
450
400 B1 F1
350
σ h,measured (kPa)
300
250
200
150
100
50
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 449 Test T11, B1, F1 pressure cells vs. pile tip depth (entire test)
900
800
700 B2 F2
600
σh,measured (kPa)
500
400
300
200
100
0
0 1000 2000 3000 4000 5000 6000 7000 8000
Time, t (seconds)
Figure 450 Test T11, B2, F2 pressure cells vs. time (entire test)
900
800
700 B2 F2
σh,measured (kPa) 600
500
400
300
200
100
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 451 Test T11, B2, F2 pressure cells vs. pile tip depth (entire test)
180
160
140 B3 B4
120
σh,measured (kPa)
100
80
60
40
20
0
0 1000 2000 3000 4000 5000 6000 7000 8000
Time, t (seconds)
Figure 452 Test T11, B3, B4 pressure cells vs. time (entire test)
180
160
140
B3 B4
120
σh,measured (kPa)
100
80
60
40
20
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 453 Test T11, B3, B4 pressure cells vs. pile tip depth (entire test)
62
61.5
60.5
60
59.5
675 725 775 825 875 925 975 1025 1075
Time, t (seconds)
Figure 454 Test T11, Pile tip depth vs. time (load test 1: compression at L/2)
700
600
500
Pile head load,P (N)
400
300
200
100
0
675 725 775 825 875 925 975 1025 1075
Time, t (seconds)
Figure 455 Test T11, Pile head load vs. time (load test 1: compression at L/2)
700
600
500
Pile head load,P (N)
400
300
200
100
0
59.5 60 60.5 61 61.5 62
Pile tip depth, z (mm)
Figure 456 Test T11, Pile head load vs. pile tip depth (load test 1: compression at L/2)
140
B1 F1
120
100
σh,measured (kPa)
80
60
40
20
0
675 725 775 825 875 925 975 1025 1075
Time, t (seconds)
Figure 457 Test T11, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
140
120
B1 F1
100
σ h,measured (kPa)
80
60
40
20
0
59.5 60 60.5 61 61.5 62
Pile tip depth, z (mm)
Figure 458 Test T11, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
120
B2 F2
100
80
σh,measured (kPa)
60
40
20
0
675 725 775 825 875 925 975 1025 1075
Time, t (seconds)
Figure 459 Test T11, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
120
100
B2 F2
σh,measured (kPa)
80
60
40
20
0
59.5 60 60.5 61 61.5 62
Pile tip depth, z (mm)
Figure 460 Test T11, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
8
B3 B4
7
6
σh,measured (kPa)
4
3
2
1
0
675 725 775 825 875 925 975 1025 1075
-1
Time, t (seconds)
Figure 461 Test T11, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
9
8
7
B3 B4
6
σh,measured (kPa)
5
4
3
2
1
0
-159.5 60 60.5 61 61.5 62
Figure 462 Test T11, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
123
122.5
122
121
120.5
120
119.5
119
3050 3150 3250 3350 3450 3550 3650 3750
Time, t (seconds)
Figure 463 Test T11, Pile tip depth vs. time (load test 2: compression at L)
2500
2000
Pile head load,P (N)
1500
1000
500
0
3050 3150 3250 3350 3450 3550 3650 3750
Time, t (seconds)
Figure 464 Test T11, Pile head load vs. time (load test 2: compression at L)
2500
2000
Pile head load,P (N)
1500
1000
500
0
119 119.5 120 120.5 121 121.5 122 122.5 123
Pile tip depth, z (mm)
Figure 465 Test T11, Pile head load vs. pile tip depth (load test 2: compression at L)
500
450 B1 F1
400
σh,measured (kPa) 350
300
250
200
150
100
50
0
3050 3150 3250 3350 3450 3550 3650 3750
Time, t (seconds)
Figure 466 Test T11, B1, F1 pressure cells vs. time (load test 2: compression at L)
500
450
400 B1 F1
350
σ h,measured (kPa)
300
250
200
150
100
50
0
119 119.5 120 120.5 121 121.5 122 122.5 123
Pile tip depth, z (mm)
Figure 467 Test T11, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
800
700 B2 F2
600
σh,measured (kPa)
500
400
300
200
100
0
3050 3150 3250 3350 3450 3550 3650 3750
Time, t (seconds)
Figure 468 Test T11, B2, F2 pressure cells vs. time (load test 2: compression at L)
800
700
600 B2 F2
σh,measured (kPa)
500
400
300
200
100
0
119 119.5 120 120.5 121 121.5 122 122.5 123
Pile tip depth, z (mm)
Figure 469 Test T11, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
180
160 B3 B4
140
σh,measured (kPa)
120
100
80
60
40
20
0
3050 3150 3250 3350 3450 3550 3650 3750
Time, t (seconds)
Figure 470 Test T11, B3, B4 pressure cells vs. time (load test 2: compression at L)
180
160
140
B3 B4
σh,measured (kPa)
120
100
80
60
40
20
0
119 119.5 120 120.5 121 121.5 122 122.5 123
Pile tip depth, z (mm)
Figure 471 Test T11, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
125
120
115
105
100
95
90
3750 4250 4750 5250 5750 6250 6750 7250
Time, t (seconds)
Figure 472 Test T11, Pile tip depth vs. time (load test 3: tension at L)
150
100
50
Pile head load,P (N)
0
3750 4250 4750 5250 5750 6250 6750 7250
-50
-100
-150
-200
-250
-300
Time, t (seconds)
Figure 473 Test T11, Pile head load vs. time (load test 3: tension at L)
150
100
50
Pile head load,P (N)
0
90 95 100 105 110 115 120 125
-50
-100
-150
-200
-250
-300
Pile tip depth, z (mm)
Figure 474 Test T11, Pile head load vs. pile tip depth (load test 3: tension at L)
350
B1 F1
300
250
σh,measured (kPa)
200
150
100
50
0
3750 4250 4750 5250 5750 6250 6750 7250
Time, t (seconds)
Figure 475 Test T11, B1, F1 pressure cells vs. time (load test 3: tension at L)
350
300
B1 F1
250
σh,measured (kPa)
200
150
100
50
0
90 95 100 105 110 115 120 125
Pile tip depth, z (mm)
Figure 476 Test T11, B1, F1 pressure cells vs. pile tip depth (load test 3: tension at L)
900
800 B2 F2
700
600
σh,measured (kPa)
500
400
300
200
100
0
3750 4250 4750 5250 5750 6250 6750 7250
Time, t (seconds)
Figure 477 Test T11, B2, F2 pressure cells vs. time (load test 3: tension at L)
900
800
700 B2 F2
600
400
300
200
100
0
90 95 100 105 110 115 120 125
Pile tip depth, z (mm)
Figure 478 Test T11, B2, F2 pressure cells vs. pile tip depth (load test 3: tension at L)
90
80
B3 B4
70
60
σh,measured (kPa)
50
40
30
20
10
0
3750 4250 4750 5250 5750 6250 6750 7250
-10
Time, t (seconds)
Figure 479 Test T11, B3, B4 pressure cells vs. time (load test 3: tension at L)
90
80
70
B3 B4
60
σh,measured (kPa)
50
40
30
20
10
0
90 95 100 105 110 115 120 125
-10
Pile tip depth, z (mm)
Figure 480 Test T11, B3, B4 pressure cells vs. pile tip depth (load test 3: tension at L)
140
120
80
60
40
20
0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
Time, t (seconds)
Figure 481 Test T12, Pile tip depth vs. time (entire test)
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
-500
Time, t (seconds)
Figure 482 Test T12, Pile head load vs. time (entire test)
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 483 Test T12, Pile head load vs. pile tip depth (entire test)
700
600
B1 F1
500
σh,measured (kPa)
400
300
200
100
0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
Time, t (seconds)
Figure 484 Test T12, B1, F1 pressure cells vs. time (entire test)
700
600
B1 F1
500
σ h,measured (kPa)
400
300
200
100
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 485 Test T12, B1, F1 pressure cells vs. pile tip depth (entire test)
900
800
700 B2 F2
600
σh,measured (kPa)
500
400
300
200
100
0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
Time, t (seconds)
Figure 486 Test T12, B2, F2 pressure cells vs. time (entire test)
900
800
700 B2 F2
600
σh,measured (kPa)
500
400
300
200
100
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 487 Test T12, B2, F2 pressure cells vs. pile tip depth (entire test)
250
200 B3 B4
σh,measured (kPa)
150
100
50
0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
Time, t (seconds)
Figure 488 Test T12, B3, B4 pressure cells vs. time (entire test)
250
200
B3 B4
σh,measured (kPa)
150
100
50
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 489 Test T12, B3, B4 pressure cells vs. pile tip depth (entire test)
63.5
63
62.5
61.5
61
60.5
60
2300 2400 2500 2600 2700 2800 2900 3000
Time, t (seconds)
Figure 490 Test T12, Pile tip depth vs. time (load test 1: compression at L/2)
900
800
700
600
Pile head load,P (N)
500
400
300
200
100
0
2300 2400 2500 2600 2700 2800 2900 3000
-100
Time, t (seconds)
Figure 491 Test T12, Pile head load vs. time (load test 1: compression at L/2)
900
800
700
600
Pile head load,P (N)
500
400
300
200
100
0
60 60.5 61 61.5 62 62.5 63 63.5
-100
Pile tip depth, z (mm)
Figure 492 Test T12, Pile head load vs. pile tip depth (load test 1: compression at L/2)
160
140 B1 F1
120
σh,measured (kPa)
100
80
60
40
20
0
2300 2400 2500 2600 2700 2800 2900 3000
Time, t (seconds)
Figure 493 Test T12, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
160
140
B1 F1
120
σ h,measured (kPa)
100
80
60
40
20
0
60 60.5 61 61.5 62 62.5 63 63.5
Pile tip depth, z (mm)
Figure 494 Test T12, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
100
B2 F2
80
60
σh,measured (kPa)
40
20
0
2300 2400 2500 2600 2700 2800 2900 3000
-20
Time, t (seconds)
Figure 495 Test T12, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
100
80
B2 F2
60
σh,measured (kPa) 40
20
0
60 60.5 61 61.5 62 62.5 63 63.5
-20
Pile tip depth, z (mm)
Figure 496 Test T12, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
12
10 B3 B4
8
σh,measured (kPa)
0
2300 2400 2500 2600 2700 2800 2900 3000
-2
Time, t (seconds)
Figure 497 Test T12, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
12
10
8 B3 B4
σh,measured (kPa)
0
60 60.5 61 61.5 62 62.5 63 63.5
-2
Pile tip depth, z (mm)
Figure 498 Test T12, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
124
123.5
123
122
121.5
121
120.5
5200 5300 5400 5500 5600 5700 5800 5900 6000
Time, t (seconds)
Figure 499 Test T12, Pile tip depth vs. time (load test 2: compression at L)
2500
2000
Pile head load,P (N)
1500
1000
500
0
5200 5300 5400 5500 5600 5700 5800 5900 6000
-500
Time, t (seconds)
Figure 500 Test T12, Pile head load vs. time (load test 2: compression at L)
2500
2000
Pile head load,P (N)
1500
1000
500
0
120.5 121 121.5 122 122.5 123 123.5 124
-500
Pile tip depth, z (mm)
Figure 501 Test T12, Pile head load vs. pile tip depth (load test 2: compression at L)
400
350 B1 F1
300
σh,measured (kPa)
250
200
150
100
50
0
5200 5300 5400 5500 5600 5700 5800 5900 6000
Time, t (seconds)
Figure 502 Test T12, B1, F1 pressure cells vs. time (load test 2: compression at L)
400
350
B1 F1
300
σ h,measured (kPa)
250
200
150
100
50
0
120.5 121 121.5 122 122.5 123 123.5 124
Pile tip depth, z (mm)
Figure 503 Test T12, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
450
400 B2 F2
350
300
σh,measured (kPa)
250
200
150
100
50
0
5200 5300 5400 5500 5600 5700 5800 5900 6000
Time, t (seconds)
Figure 504 Test T12, B2, F2 pressure cells vs. time (load test 2: compression at L)
450
400
350 B2 F2
σh,measured (kPa)
300
250
200
150
100
50
0
120.5 121 121.5 122 122.5 123 123.5 124
Pile tip depth, z (mm)
Figure 505 Test T12, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
250
B3 B4
200
150
σh,measured (kPa)
100
50
0
5200 5300 5400 5500 5600 5700 5800 5900 6000
-50
Time, t (seconds)
Figure 506 Test T12, B3, B4 pressure cells vs. time (load test 2: compression at L)
250
200
B3 B4
150
σh,measured (kPa)
100
50
0
120.5 121 121.5 122 122.5 123 123.5 124
-50
Pile tip depth, z (mm)
Figure 507 Test T12, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
125
120
115
105
100
95
90
6050 6550 7050 7550 8050 8550 9050
Time, t (seconds)
Figure 508 Test T12, Pile tip depth vs. time (load test 3: tension at L)
50
0
6050 6550 7050 7550 8050 8550 9050
-50
Pile head load,P (N)
-100
-150
-200
-250
-300
Time, t (seconds)
Figure 509 Test T12, Pile head load vs. time (load test 3: tension at L)
50
0
90 95 100 105 110 115 120 125
-50
Pile head load,P (N)
-100
-150
-200
-250
-300
Pile tip depth, z (mm)
Figure 510 Test T12, Pile head load vs. pile tip depth (load test 3: tension at L)
700
B1 F1
600
500
σh,measured (kPa)
400
300
200
100
0
6050 6550 7050 7550 8050 8550 9050
Time, t (seconds)
Figure 511 Test T12, B1, F1 pressure cells vs. time (load test 3: tension at L)
700
600
B1 F1
500
σh,measured (kPa)
400
300
200
100
0
90 95 100 105 110 115 120 125
Pile tip depth, z (mm)
Figure 512 Test T12, B1, F1 pressure cells vs. pile tip depth (load test 3: tension at L)
900
800 B2 F2
700
600
σh,measured (kPa)
500
400
300
200
100
0
6050 6550 7050 7550 8050 8550 9050
Time, t (seconds)
Figure 513 Test T12, B2, F2 pressure cells vs. time (load test 3: tension at L)
900
800
700 B2 F2
600
σh,measured (kPa) 500
400
300
200
100
0
90 95 100 105 110 115 120 125
Pile tip depth, z (mm)
Figure 514 Test T12, B2, F2 pressure cells vs. pile tip depth (load test 3: tension at L)
160
140 B3 B4
120
100
σh,measured (kPa)
80
60
40
20
0
6050 6550 7050 7550 8050 8550 9050
-20
Time, t (seconds)
Figure 515 Test T12, B3, B4 pressure cells vs. time (load test 3: tension at L)
160
140
120
B3 B4
100
σh,measured (kPa)
80
60
40
20
0
90 95 100 105 110 115 120 125
-20
Pile tip depth, z (mm)
Figure 516 Test T12, B3, B4 pressure cells vs. pile tip depth (load test 3: tension at L)
70
60
50
Pile tip depth,z (mm)
40
30
20
10
0
0 500 1000 1500 2000 2500
Time, t (seconds)
Figure 517 Test T13, Pile tip depth vs. time (entire test)
700
600
500
Pile head load,P (N)
400
300
200
100
0
0 500 1000 1500 2000 2500
-100
Time, t (seconds)
Figure 518 Test T13, Pile head load vs. time (entire test)
700
600
500
Pile head load,P (N)
400
300
200
100
0
0 10 20 30 40 50 60 70
Pile tip depth, z (mm)
Figure 519 Test T13, Pile head load vs. pile tip depth (entire test)
140
120
B1 F1
100
σh,measured (kPa)
80
60
40
20
0
0 500 1000 1500 2000 2500
Time, t (seconds)
Figure 520 Test T13, B1, F1 pressure cells vs. time (entire test)
140
120
B1 F1
100
σ h,measured (kPa)
80
60
40
20
0
0 10 20 30 40 50 60 70
Pile tip depth, z (mm)
Figure 521 Test T13, B1, F1 pressure cells vs. pile tip depth (entire test)
200
180
160 B2 F2
140
σh,measured (kPa)
120
100
80
60
40
20
0
0 500 1000 1500 2000 2500
Time, t (seconds)
Figure 522 Test T13, B2, F2 pressure cells vs. time (entire test)
200
180
160
B2 F2
140
σh,measured (kPa)
120
100
80
60
40
20
0
0 10 20 30 40 50 60 70
Pile tip depth, z (mm)
Figure 523 Test T13, B2, F2 pressure cells vs. pile tip depth (entire test)
7
B3 B4
6
σh,measured (kPa)
0
0 500 1000 1500 2000 2500
Time, t (seconds)
Figure 524 Test T13, B3, B4 pressure cells vs. time (entire test)
6 B3 B4
σh,measured (kPa)
0
0 10 20 30 40 50 60 70
Pile tip depth, z (mm)
Figure 525 Test T13, B3, B4 pressure cells vs. pile tip depth (entire test)
62
61.5
60.5
60
59.5
59
650 750 850 950 1050 1150
Time, t (seconds)
Figure 526 Test T13, Pile tip depth vs. time (load test 1: compression at L/2)
700
600
500
Pile head load,P (N)
400
300
200
100
0
650 750 850 950 1050 1150
-100
Time, t (seconds)
Figure 527 Test T13, Pile head load vs. time (load test 1: compression at L/2)
700
600
500
Pile head load,P (N)
400
300
200
100
0
59 59.5 60 60.5 61 61.5 62
Pile tip depth, z (mm)
Figure 528 Test T13, Pile head load vs. pile tip depth (load test 1: compression at L/2)
140
B1 F1
120
100
σh,measured (kPa)
80
60
40
20
0
650 750 850 950 1050 1150
Time, t (seconds)
Figure 529 Test T13, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
140
120
B1 F1
100
σ h,measured (kPa)
80
60
40
20
0
59 59.5 60 60.5 61 61.5 62
Pile tip depth, z (mm)
Figure 530 Test T13, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
180
160 B2 F2
140
120
σh,measured (kPa)
100
80
60
40
20
0
651 751 851 951 1051 1151
Time, t (seconds)
Figure 531 Test T13, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
180
160
140 B2 F2
σh,measured (kPa)
120
100
80
60
40
20
0
59 59.5 60 60.5 61 61.5 62
Pile tip depth, z (mm)
Figure 532 Test T13, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
7
B3 B4
6
5
σh,measured (kPa)
3
2
1
0
-2
Time, t (seconds)
Figure 533 Test T13, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
8
7
6
B3 B4
5
σh,measured (kPa)
4
3
2
1
0
-1 59 59.5 60 60.5 61 61.5 62
-2
Pile tip depth, z (mm)
Figure 534 Test T13, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
65
60
50
45
40
1175 1375 1575 1775 1975 2175
Time, t (seconds)
Figure 535 Test T13, Pile tip depth vs. time (load test 2: tension at L/2)
80
60
40
Pile head load,P (N)
20
0
1175 1375 1575 1775 1975 2175
-20
-40
-60
Time, t (seconds)
Figure 536 Test T13, Pile head load vs. time (load test 2: tension at L/2)
80
60
40
Pile head load,P (N)
20
0
40 45 50 55 60 65
-20
-40
-60
Pile tip depth, z (mm)
Figure 537 Test T13, Pile head load vs. pile tip depth (load test 2: tension at L/2)
30
B1 F1
25
σh,measured (kPa) 20
15
10
0
1175 1375 1575 1775 1975 2175
-5
Time, t (seconds)
Figure 538 Test T13, B1, F1 pressure cells vs. time (load test 2: tension at L/2)
30
25
B1 F1
20
σh,measured (kPa)
15
10
0
40 45 50 55 60 65
-5
Pile tip depth, z (mm)
Figure 539 Test T13, B1, F1 pressure cells vs. pile tip depth (load test 2: tension at L/2)
50
B2 F2
40
30
σh,measured (kPa)
20
10
0
1175 1375 1575 1775 1975 2175
-10
Time, t (seconds)
Figure 540 Test T13, B2, F2 pressure cells vs. time (load test 2: tension at L/2)
50
40
B2 F2
30
σh,measured (kPa)
20
10
0
40 45 50 55 60 65
-10
Pile tip depth, z (mm)
Figure 541 Test T13, B2, F2 pressure cells vs. pile tip depth (load test 2: tension at L/2)
3.5
3
B3 B4
2.5
2
σh,measured (kPa)
1.5
1
0.5
0
-0.51175 1375 1575 1775 1975 2175
-1
-1.5
-2
Time, t (seconds)
Figure 542 Test T13, B3, B4 pressure cells vs. time (load test 2: tension at L/2)
3.5
3
2.5
2 B3 B4
σh,measured (kPa)
1.5
1
0.5
0
-0.5 40 45 50 55 60 65
-1
-1.5
-2
Pile tip depth, z (mm)
Figure 543 Test T13, B3, B4 pressure cells vs. pile tip depth (load test 2: tension at L/2)
140
120
100
Pile tip depth,z (mm)
80
60
40
20
0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
Time, t (seconds)
Figure 544 Test T14, Pile tip depth vs. time (entire test)
4000
3500
3000
2500
Pile head load,P (N)
2000
1500
1000
500
0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
-500
-1000
Time, t (seconds)
Figure 545 Test T14, Pile head load vs. time (entire test)
4000
3500
3000
Pile head load,P (N)
2500
2000
1500
1000
500
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 546 Test T14, Pile head load vs. pile tip depth (entire test)
500
450
400
B1 F1
350
σh,measured (kPa)
300
250
200
150
100
50
0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
Time, t (seconds)
Figure 547 Test T14, B1, F1 pressure cells vs. time (entire test)
500
450
400 B1 F1
350
σ h,measured (kPa)
300
250
200
150
100
50
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 548 Test T14, B1, F1 pressure cells vs. pile tip depth (entire test)
800
700
B2 F2
600
σh,measured (kPa)
500
400
300
200
100
0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
Time, t (seconds)
Figure 549 Test T14, B2, F2 pressure cells vs. time (entire test)
800
700
600 B2 F2
σh,measured (kPa)
500
400
300
200
100
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 550 Test T14, B2, F2 pressure cells vs. pile tip depth (entire test)
180
160
140 B3 B4
120
σh,measured (kPa)
100
80
60
40
20
0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
Time, t (seconds)
Figure 551 Test T14, B3, B4 pressure cells vs. time (entire test)
180
160
140
B3 B4
120
σh,measured (kPa)
100
80
60
40
20
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 552 Test T14, B3, B4 pressure cells vs. pile tip depth (entire test)
62
61.5
60.5
60
59.5
800 900 1000 1100 1200 1300
Time, t (seconds)
Figure 553 Test T14, Pile tip depth vs. time (load test 1: compression at L/2)
1200
1000
Pile head load,P (N)
800
600
400
200
0
800 900 1000 1100 1200 1300
Time, t (seconds)
Figure 554 Test T14, Pile head load vs. time (load test 1: compression at L/2)
1200
1000
Pile head load,P (N)
800
600
400
200
0
59.5 60 60.5 61 61.5 62
Pile tip depth, z (mm)
Figure 555 Test T14, Pile head load vs. pile tip depth (load test 1: compression at L/2)
70
B1 F1
60
50
σh,measured (kPa)
40
30
20
10
0
800 900 1000 1100 1200 1300
Time, t (seconds)
Figure 556 Test T14, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
70
60
B1 F1
50
σh,measured (kPa)
40
30
20
10
0
59.5 60 60.5 61 61.5 62
Pile tip depth, z (mm)
Figure 557 Test T14, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
60
B2 F2
50
40
σh,measured (kPa)
30
20
10
0
800 900 1000 1100 1200 1300
Time, t (seconds)
Figure 558 Test T14, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
60
50
B2 F2
40
σh,measured (kPa)
30
20
10
0
59.5 60 60.5 61 61.5 62
Pile tip depth, z (mm)
Figure 559 Test T14, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
12
10 B3 B4
8
σh,measured (kPa)
0
800 900 1000 1100 1200 1300
-2
Time, t (seconds)
Figure 560 Test T14, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
12
10
8 B3 B4
σh,measured (kPa)
0
59.5 60 60.5 61 61.5 62
-2
Pile tip depth, z (mm)
Figure 561 Test T14, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
124.5
124
123
122.5
122
5000 5100 5200 5300 5400 5500 5600 5700 5800
Time, t (seconds)
Figure 562 Test T14, Pile tip depth vs. time (load test 2: compression at L)
4000
3500
3000
Pile head load,P (N)
2500
2000
1500
1000
500
0
5000 5100 5200 5300 5400 5500 5600 5700 5800
-500
Time, t (seconds)
Figure 563 Test T14, Pile head load vs. time (load test 2: compression at L)
4000
3500
3000
Pile head load,P (N)
2500
2000
1500
1000
500
0
122 122.5 123 123.5 124 124.5
-500
Pile tip depth, z (mm)
Figure 564 Test T14, Pile head load vs. pile tip depth (load test 2: compression at L)
300
B1 F1
250
150
100
50
0
5000 5100 5200 5300 5400 5500 5600 5700 5800
Time, t (seconds)
Figure 565 Test T14, B1, F1 pressure cells vs. time (load test 2: compression at L)
300
250
B1 F1
σ h,measured (kPa)
200
150
100
50
0
122 122.5 123 123.5 124 124.5
Pile tip depth, z (mm)
Figure 566 Test T14, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
300
B2 F2
250
200
σh,measured (kPa)
150
100
50
0
5000 5100 5200 5300 5400 5500 5600 5700 5800
Time, t (seconds)
Figure 567 Test T14, B2, F2 pressure cells vs. time (load test 2: compression at L)
300
250
B2 F2
σh,measured (kPa)
200
150
100
50
0
122 122.5 123 123.5 124 124.5
Pile tip depth, z (mm)
Figure 568 Test T14, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
160
140 B3 B4
120
σh,measured (kPa)
100
80
60
40
20
0
5000 5100 5200 5300 5400 5500 5600 5700 5800
Time, t (seconds)
Figure 569 Test T14, B3, B4 pressure cells vs. time (load test 2: compression at L)
160
140
120 B3 B4
σh,measured (kPa)
100
80
60
40
20
0
122 122.5 123 123.5 124 124.5
Pile tip depth, z (mm)
Figure 570 Test T14, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
125
120
115
105
100
95
90
5800 6300 6800 7300 7800 8300 8800
Time, t (seconds)
Figure 571 Test T14, Pile tip depth vs. time (load test 3: tension at L)
0
5800 6300 6800 7300 7800 8300 8800
-100
Pile head load,P (N)
-200
-300
-400
-500
-600
Time, t (seconds)
Figure 572 Test T14, Pile head load vs. time (load test 3: tension at L)
0
90 95 100 105 110 115 120 125
-100
Pile head load,P (N)
-200
-300
-400
-500
-600
Pile tip depth, z (mm)
Figure 573 Test T14, Pile head load vs. pile tip depth (load test 3: tension at L)
500
450 B1 F1
400
350
σh,measured (kPa)
300
250
200
150
100
50
0
5800 6300 6800 7300 7800 8300 8800
Time, t (seconds)
Figure 574 Test T14, B1, F1 pressure cells vs. time (load test 3: tension at L)
500
450
400 B1 F1
350
σh,measured (kPa)
300
250
200
150
100
50
0
90 95 100 105 110 115 120 125
Pile tip depth, z (mm)
Figure 575 Test T14, B1, F1 pressure cells vs. pile tip depth (load test 3: tension at L)
800
700 B2 F2
600
σh,measured (kPa)
500
400
300
200
100
0
5800 6300 6800 7300 7800 8300 8800
Time, t (seconds)
Figure 576 Test T14, B2, F2 pressure cells vs. time (load test 3: tension at L)
800
700
600 B2 F2
σh,measured (kPa)
500
400
300
200
100
0
90 95 100 105 110 115 120 125
Pile tip depth, z (mm)
Figure 577 Test T14, B2, F2 pressure cells vs. pile tip depth (load test 3: tension at L)
120
B3 B4
100
σh,measured (kPa)
80
60
40
20
0
5800 6300 6800 7300 7800 8300 8800
Time, t (seconds)
Figure 578 Test T14, B3, B4 pressure cells vs. time (load test 3: tension at L)
120
100
B3 B4
σh,measured (kPa)
80
60
40
20
0
90 95 100 105 110 115 120 125
Pile tip depth, z (mm)
Figure 579 Test T14, B3, B4 pressure cells vs. pile tip depth (load test 3: tension at L)
140
120
80
60
40
20
0
0 2000 4000 6000 8000 10000 12000
Time, t (seconds)
Figure 580 Test T15, Pile tip depth vs. time (entire test)
12000
10000
8000
Pile head load,P (N)
6000
4000
2000
0
0 2000 4000 6000 8000 10000 12000
-2000
Time, t (seconds)
Figure 581 Test T15, Pile head load vs. time (entire test)
12000
10000
Pile head load,P (N)
8000
6000
4000
2000
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 582 Test T15, Pile head load vs. pile tip depth (entire test)
450
400
350 B1 F1
σh,measured (kPa) 300
250
200
150
100
50
0
0 2000 4000 6000 8000 10000 12000
Time, t (seconds)
Figure 583 Test T15, B1, F1 pressure cells vs. time (entire test)
450
400
350 B1 F1
300
σ h,measured (kPa)
250
200
150
100
50
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 584 Test T15, B1, F1 pressure cells vs. pile tip depth (entire test)
800
700
B2 F2
600
σh,measured (kPa)
500
400
300
200
100
0
0 2000 4000 6000 8000 10000 12000
Time, t (seconds)
Figure 585 Test T15, B2, F2 pressure cells vs. time (entire test)
800
700
600 B2 F2
σh,measured (kPa)
500
400
300
200
100
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 586 Test T15, B2, F2 pressure cells vs. pile tip depth (entire test)
180
160
140 B3 B4
120
σh,measured (kPa)
100
80
60
40
20
0
0 2000 4000 6000 8000 10000 12000
Time, t (seconds)
Figure 587 Test T15, B3, B4 pressure cells vs. time (entire test)
180
160
140
B3 B4
120
σh,measured (kPa)
100
80
60
40
20
0
0 20 40 60 80 100 120 140
Pile tip depth, z (mm)
Figure 588 Test T15, B3, B4 pressure cells vs. pile tip depth (entire test)
62
61.8
61.6
61
60.8
60.6
60.4
60.2
60
1250 1300 1350 1400 1450 1500 1550 1600 1650 1700
Time, t (seconds)
Figure 589 Test T15, Pile tip depth vs. time (load test 1: compression at L/2)
3000
2500
Pile head load,P (N)
2000
1500
1000
500
0
1250 1300 1350 1400 1450 1500 1550 1600 1650 1700
Time, t (seconds)
Figure 590 Test T15, Pile head load vs. time (load test 1: compression at L/2)
3000
2500
Pile head load,P (N)
2000
1500
1000
500
0
60 60.2 60.4 60.6 60.8 61 61.2 61.4 61.6 61.8 62
Pile tip depth, z (mm)
Figure 591 Test T15, Pile head load vs. pile tip depth (load test 1: compression at L/2)
40
35 B1 F1
30
σh,measured (kPa)
25
20
15
10
0
1250 1300 1350 1400 1450 1500 1550 1600 1650 1700
Time, t (seconds)
Figure 592 Test T15, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
40
35
B1 F1
30
σ h,measured (kPa)
25
20
15
10
0
60 60.2 60.4 60.6 60.8 61 61.2 61.4 61.6 61.8 62
Pile tip depth, z (mm)
Figure 593 Test T15, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
50
45 B2 F2
40
35
σh,measured (kPa)
30
25
20
15
10
5
0
1250 1300 1350 1400 1450 1500 1550 1600 1650 1700
Time, t (seconds)
Figure 594 Test T15, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
50
45
40 B2 F2
35
σh,measured (kPa)
30
25
20
15
10
5
0
60 60.2 60.4 60.6 60.8 61 61.2 61.4 61.6 61.8 62
Pile tip depth, z (mm)
Figure 595 Test T15, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
8
B3 B4
7
6
σh,measured (kPa)
4
3
2
1
0
1250 1300 1350 1400 1450 1500 1550 1600 1650 1700
-1
Time, t (seconds)
Figure 596 Test T15, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
9
8
7
B3 B4
6
σh,measured (kPa)
5
4
3
2
1
0
-1 60 60.2 60.4 60.6 60.8 61 61.2 61.4 61.6 61.8 62
Figure 597 Test T15, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
126
125
124
122
121
120
119
7200 7400 7600 7800 8000 8200
Time, t (seconds)
Figure 598 Test T15, Pile tip depth vs. time (load test 2: compression at L)
12000
10000
8000
Pile head load,P (N)
6000
4000
2000
0
7200 7400 7600 7800 8000 8200
-2000
Time, t (seconds)
Figure 599 Test T15, Pile head load vs. time (load test 2: compression at L)
12000
10000
8000
Pile head load,P (N)
6000
4000
2000
0
119 120 121 122 123 124 125 126
-2000
Pile tip depth, z (mm)
Figure 600 Test T15, Pile head load vs. pile tip depth (load test 2: compression at L)
250
B1 F1
200
σh,measured (kPa)
150
100
50
0
7200 7400 7600 7800 8000 8200
Time, t (seconds)
Figure 601 Test T15, B1, F1 pressure cells vs. time (load test 2: compression at L)
300
250
B1 F1
200
σ h,measured (kPa)
150
100
50
0
119 120 121 122 123 124 125 126
-50
Pile tip depth, z (mm)
Figure 602 Test T15, B1, F1 pressure cells vs. pile tip depth (load test 2: compression at L)
350
B2 F2
300
250
σh,measured (kPa)
200
150
100
50
0
7200 7400 7600 7800 8000 8200
Time, t (seconds)
Figure 603 Test T15, B2, F2 pressure cells vs. time (load test 2: compression at L)
350
300
B2 F2
250
σh,measured (kPa)
200
150
100
50
0
119 120 121 122 123 124 125 126
Pile tip depth, z (mm)
Figure 604 Test T15, B2, F2 pressure cells vs. pile tip depth (load test 2: compression at L)
180
160 B3 B4
140
σh,measured (kPa)
120
100
80
60
40
20
0
7200 7400 7600 7800 8000 8200
Time, t (seconds)
Figure 605 Test T15, B3, B4 pressure cells vs. time (load test 2: compression at L)
180
160
140
B3 B4
σh,measured (kPa)
120
100
80
60
40
20
0
119 120 121 122 123 124 125 126
Pile tip depth, z (mm)
Figure 606 Test T15, B3, B4 pressure cells vs. pile tip depth (load test 2: compression at L)
125
120
115
105
100
95
90
85
80
8200 8700 9200 9700 10200 10700
Time, t (seconds)
Figure 607 Test T15, Pile tip depth vs. time (load test 3: tension at L)
0
8200 8700 9200 9700 10200 10700
-200
Pile head load,P (N)
-400
-600
-800
-1000
-1200
Time, t (seconds)
Figure 608 Test T15, Pile head load vs. time (load test 3: tension at L)
0
80 85 90 95 100 105 110 115 120 125
-200
Pile head load,P (N)
-400
-600
-800
-1000
-1200
Pile tip depth, z (mm)
Figure 609 Test T15, Pile head load vs. pile tip depth (load test 3: tension at L)
450
400 B1 F1
350
250
200
150
100
50
0
8200 8700 9200 9700 10200 10700
-50
Time, t (seconds)
Figure 610 Test T15, B1, F1 pressure cells vs. time (load test 3: tension at L)
450
400
350 B1 F1
300
σh,measured (kPa)
250
200
150
100
50
0
Figure 611 Test T15, B1, F1 pressure cells vs. pile tip depth (load test 3: tension at L)
800
700 B2 F2
600
σh,measured (kPa)
500
400
300
200
100
0
8200 8700 9200 9700 10200 10700
Time, t (seconds)
Figure 612 Test T15, B2, F2 pressure cells vs. time (load test 3: tension at L)
800
700
600 B2 F2
σh,measured (kPa)
500
400
300
200
100
0
80 85 90 95 100 105 110 115 120 125
Pile tip depth, z (mm)
Figure 613 Test T15, B2, F2 pressure cells vs. pile tip depth (load test 3: tension at L)
100
90
B3 B4
80
70
σh,measured (kPa)
60
50
40
30
20
10
0
8200 8700 9200 9700 10200 10700
Time, t (seconds)
Figure 614 Test T15, B3, B4 pressure cells vs. time (load test 3: tension at L)
100
90
80
B3 B4
70
σh,measured (kPa)
60
50
40
30
20
10
0
80 85 90 95 100 105 110 115 120 125
Pile tip depth, z (mm)
Figure 615 Test T15, B3, B4 pressure cells vs. pile tip depth (load test 3: tension at L)
70
60
50
Pile tip depth,z (mm)
40
30
20
10
0
0 1000 2000 3000 4000 5000 6000
Time, t (seconds)
Figure 616 Test T16, Pile tip depth vs. time (entire test)
8000
7000
6000
5000
Pile head load,P (N)
4000
3000
2000
1000
0
0 1000 2000 3000 4000 5000 6000
-1000
-2000
Time, t (seconds)
Figure 617 Test T16, Pile head load vs. time (entire test)
8000
7000
6000
Pile head load,P (N)
5000
4000
3000
2000
1000
0
0 10 20 30 40 50 60 70
Pile tip depth, z (mm)
Figure 618 Test T16, Pile head load vs. pile tip depth (entire test)
400
350
300 B1 F1
σh,measured (kPa)
250
200
150
100
50
0
0 1000 2000 3000 4000 5000 6000
Time, t (seconds)
Figure 619 Test T16, B1, F1 pressure cells vs. time (entire test)
400
350
300 B1 F1
σ h,measured (kPa)
250
200
150
100
50
0
0 10 20 30 40 50 60 70
Pile tip depth, z (mm)
Figure 620 Test T16, B1, F1 pressure cells vs. pile tip depth (entire test)
300
250
B2 F2
200
σh,measured (kPa)
150
100
50
0
0 1000 2000 3000 4000 5000 6000
Time, t (seconds)
Figure 621 Test T16, B2, F2 pressure cells vs. time (entire test)
300
250
B2 F2
200
σh,measured (kPa)
150
100
50
0
0 10 20 30 40 50 60 70
Pile tip depth, z (mm)
Figure 622 Test T16, B2, F2 pressure cells vs. pile tip depth (entire test)
50
45
40 B3 B4
35
σh,measured (kPa)
30
25
20
15
10
5
0
0 1000 2000 3000 4000 5000 6000
Time, t (seconds)
Figure 623 Test T16, B3, B4 pressure cells vs. time (entire test)
50
45
40
B3 B4
35
σh,measured (kPa)
30
25
20
15
10
5
0
0 10 20 30 40 50 60 70
Pile tip depth, z (mm)
Figure 624 Test T16, B3, B4 pressure cells vs. pile tip depth (entire test)
62.5
62
61.5
60.5
60
59.5
59
58.5
58
3800 3900 4000 4100 4200 4300 4400 4500 4600
Time, t (seconds)
Figure 625 Test T16, Pile tip depth vs. time (load test 1: compression at L/2)
8000
7000
6000
Pile head load,P (N)
5000
4000
3000
2000
1000
0
3800 3900 4000 4100 4200 4300 4400 4500 4600
Time, t (seconds)
Figure 626 Test T16, Pile head load vs. time (load test 1: compression at L/2)
8000
7000
6000
Pile head load,P (N)
5000
4000
3000
2000
1000
0
58 58.5 59 59.5 60 60.5 61 61.5 62 62.5
Pile tip depth, z (mm)
Figure 627 Test T16, Pile head load vs. pile tip depth (load test 1: compression at L/2)
300
B1 F1
250
150
100
50
0
3800 3900 4000 4100 4200 4300 4400 4500 4600
Time, t (seconds)
Figure 628 Test T16, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
300
250
B1 F1
σ h,measured (kPa)
200
150
100
50
0
58 58.5 59 59.5 60 60.5 61 61.5 62 62.5
Pile tip depth, z (mm)
Figure 629 Test T16, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
250
B2 F2
200
σh,measured (kPa)
150
100
50
0
3800 3900 4000 4100 4200 4300 4400 4500 4600
Time, t (seconds)
Figure 630 Test T16, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
250
200 B2 F2
σh,measured (kPa)
150
100
50
0
58 58.5 59 59.5 60 60.5 61 61.5 62 62.5
Pile tip depth, z (mm)
Figure 631 Test T16, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
50
B3 B4
40
30
σh,measured (kPa)
20
10
0
3800 3900 4000 4100 4200 4300 4400 4500 4600
-10
Time, t (seconds)
Figure 632 Test T16, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
50
40
B3 B4
30
σh,measured (kPa)
20
10
0
58 58.5 59 59.5 60 60.5 61 61.5 62 62.5
-10
Pile tip depth, z (mm)
Figure 633 Test T16, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
60
59
58
55
54
53
52
51
50
4500 4600 4700 4800 4900 5000 5100 5200
Time, t (seconds)
Figure 634 Test T16, Pile tip depth vs. time (load test 2: tension at L/2)
200
0
4500 4600 4700 4800 4900 5000 5100 5200
-200
Pile head load,P (N)
-400
-600
-800
-1000
-1200
Time, t (seconds)
Figure 635 Test T16, Pile head load vs. time (load test 2: tension at L/2)
200
0
50 51 52 53 54 55 56 57 58 59 60
-200
Pile head load,P (N)
-400
-600
-800
-1000
-1200
Pile tip depth, z (mm)
Figure 636 Test T16, Pile head load vs. pile tip depth (load test 2: tension at L/2)
400
350 B1 F1
300
250
σh,measured (kPa)
200
150
100
50
0
4500 4600 4700 4800 4900 5000 5100 5200
-50
Time, t (seconds)
Figure 637 Test T16, B1, F1 pressure cells vs. time (load test 2: tension at L/2)
400
350
300 B1 F1
250
σh,measured (kPa)
200
150
100
50
0
50 51 52 53 54 55 56 57 58 59 60
-50
Pile tip depth, z (mm)
Figure 638 Test T16, B1, F1 pressure cells vs. pile tip depth (load test 2: tension at L/2)
300
B2 F2
250
200
σh,measured (kPa)
150
100
50
0
4500 4600 4700 4800 4900 5000 5100 5200
-50
Time, t (seconds)
Figure 639 Test T16, B2, F2 pressure cells vs. time (load test 2: tension at L/2)
300
250
B2 F2
200
σh,measured (kPa)
150
100
50
0
50 51 52 53 54 55 56 57 58 59 60
-50
Pile tip depth, z (mm)
Figure 640 Test T16, B2, F2 pressure cells vs. pile tip depth (load test 2: tension at L/2)
4 B3 B4
3
σh,measured (kPa)
0
4500 4600 4700 4800 4900 5000 5100 5200
-1
-2
Time, t (seconds)
Figure 641 Test T16, B3, B4 pressure cells vs. time (load test 2: tension at L/2)
3 B3 B4
σh,measured (kPa)
0
50 51 52 53 54 55 56 57 58 59 60
-1
-2
Pile tip depth, z (mm)
Figure 642 Test T16, B3, B4 pressure cells vs. pile tip depth (load test 2: tension at L/2)
70
60
40
30
20
10
0
0 500 1000 1500 2000 2500 3000 3500 4000
Time, t (seconds)
Figure 643 Test T17, Pile tip depth vs. time (entire test)
3000
2500
2000
Pile head load,P (N)
1500
1000
500
0
0 500 1000 1500 2000 2500 3000 3500 4000
-500
Time, t (seconds)
Figure 644 Test T17, Pile head load vs. time (entire test)
3000
2500
Pile head load,P (N)
2000
1500
1000
500
0
0 10 20 30 40 50 60 70
Pile tip depth, z (mm)
Figure 645 Test T17, Pile head load vs. pile tip depth (entire test)
300
250
B1 F1
σh,measured (kPa) 200
150
100
50
0
0 500 1000 1500 2000 2500 3000 3500 4000
Time, t (seconds)
Figure 646 Test T17, B1, F1 pressure cells vs. time (entire test)
300
250
B1 F1
200
σ h,measured (kPa)
150
100
50
0
0 10 20 30 40 50 60 70
Pile tip depth, z (mm)
Figure 647 Test T17, B1, F1 pressure cells vs. pile tip depth (entire test)
300
250
B2 F2
200
σh,measured (kPa)
150
100
50
0
0 500 1000 1500 2000 2500 3000 3500 4000
Time, t (seconds)
Figure 648 Test T17, B2, F2 pressure cells vs. time (entire test)
300
250
B2 F2
σh,measured (kPa) 200
150
100
50
0
0 10 20 30 40 50 60 70
Pile tip depth, z (mm)
Figure 649 Test T17, B2, F2 pressure cells vs. pile tip depth (entire test)
50
45
40 B3 B4
35
σh,measured (kPa)
30
25
20
15
10
5
0
0 500 1000 1500 2000 2500 3000 3500 4000
Time, t (seconds)
Figure 650 Test T17, B3, B4 pressure cells vs. time (entire test)
50
45
40
B3 B4
35
σh,measured (kPa)
30
25
20
15
10
5
0
0 10 20 30 40 50 60 70
Pile tip depth, z (mm)
Figure 651 Test T17, B3, B4 pressure cells vs. pile tip depth (entire test)
64
63.5
63
62
61.5
61
60.5
60
1450 1500 1550 1600 1650 1700 1750 1800 1850 1900 1950
Time, t (seconds)
Figure 652 Test T17, Pile tip depth vs. time (load test 1: compression at L/2)
3000
2500
Pile head load,P (N)
2000
1500
1000
500
0
1450 1500 1550 1600 1650 1700 1750 1800 1850 1900 1950
Time, t (seconds)
Figure 653 Test T17, Pile head load vs. time (load test 1: compression at L/2)
3000
2500
Pile head load,P (N)
2000
1500
1000
500
0
60 60.5 61 61.5 62 62.5 63 63.5 64
Pile tip depth, z (mm)
Figure 654 Test T17, Pile head load vs. pile tip depth (load test 1: compression at L/2)
300
B1 F1
250
150
100
50
0
1450 1500 1550 1600 1650 1700 1750 1800 1850 1900 1950
Time, t (seconds)
Figure 655 Test T17, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
300
250
B1 F1
σ h,measured (kPa)
200
150
100
50
0
60 60.5 61 61.5 62 62.5 63 63.5 64
Pile tip depth, z (mm)
Figure 656 Test T17, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
300
B2 F2
250
200
σh,measured (kPa)
150
100
50
0
1450 1500 1550 1600 1650 1700 1750 1800 1850 1900 1950
Time, t (seconds)
Figure 657 Test T17, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
300
250
B2 F2
σh,measured (kPa)
200
150
100
50
0
60 60.5 61 61.5 62 62.5 63 63.5 64
Pile tip depth, z (mm)
Figure 658 Test T17, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
50
B3 B4
40
30
σh,measured (kPa)
20
10
0
1450 1500 1550 1600 1650 1700 1750 1800 1850 1900 1950
-10
Time, t (seconds)
Figure 659 Test T17, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
50
40
B3 B4
30
σh,measured (kPa)
20
10
0
60 60.5 61 61.5 62 62.5 63 63.5 64
-10
Pile tip depth, z (mm)
Figure 660 Test T17, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
60
50
30
20
10
0
1900 2100 2300 2500 2700 2900 3100 3300
Time, t (seconds)
Figure 661 Test T17, Pile tip depth vs. time (load test 2: tension at L/2)
100
50
0
1900 2100 2300 2500 2700 2900 3100 3300
Pile head load,P (N)
-50
-100
-150
-200
-250
-300
-350
Time, t (seconds)
Figure 662 Test T17, Pile head load vs. time (load test 2: tension at L/2)
100
50
0
0 10 20 30 40 50 60
Pile head load,P (N)
-50
-100
-150
-200
-250
-300
-350
Pile tip depth, z (mm)
Figure 663 Test T17, Pile head load vs. pile tip depth (load test 2: tension at L/2)
250
B1 F1
200
σh,measured (kPa)
150
100
50
0
1900 2100 2300 2500 2700 2900 3100 3300
Time, t (seconds)
Figure 664 Test T17, B1, F1 pressure cells vs. time (load test 2: tension at L/2)
250
200 B1 F1
σh,measured (kPa)
150
100
50
0
0 10 20 30 40 50 60
Pile tip depth, z (mm)
Figure 665 Test T17, B1, F1 pressure cells vs. pile tip depth (load test 2: tension at L/2)
180
160 B2 F2
140
120
σh,measured (kPa)
100
80
60
40
20
0
Time, t (seconds)
Figure 666 Test T17, B2, F2 pressure cells vs. time (load test 2: tension at L/2)
180
160
140
B2 F2
120
σh,measured (kPa)
100
80
60
40
20
0
0 10 20 30 40 50 60
-20
Pile tip depth, z (mm)
Figure 667 Test T17, B2, F2 pressure cells vs. pile tip depth (load test 2: tension at L/2)
12
B3 B4
10
σh,measured (kPa)
0
1900 2100 2300 2500 2700 2900 3100 3300
Time, t (seconds)
Figure 668 Test T17, B3, B4 pressure cells vs. time (load test 2: tension at L/2)
12
10
B3 B4
σh,measured (kPa)
0
0 10 20 30 40 50 60
Pile tip depth, z (mm)
Figure 669 Test T17, B3, B4 pressure cells vs. pile tip depth (load test 2: tension at L/2)
70
60
40
30
20
10
0
0 500 1000 1500 2000 2500 3000
Time, t (seconds)
Figure 670 Test T18, Pile tip depth vs. time (entire test)
1600
1400
1200
1000
Pile head load,P (N)
800
600
400
200
0
0 500 1000 1500 2000 2500 3000
-200
-400
Time, t (seconds)
Figure 671 Test T18, Pile head load vs. time (entire test)
1600
1400
1200
Pile head load,P (N)
1000
800
600
400
200
0
0 10 20 30 40 50 60 70
Pile tip depth, z (mm)
Figure 672 Test T18, Pile head load vs. pile tip depth (entire test)
300
250
B1 F1
σh,measured (kPa) 200
150
100
50
0
0 500 1000 1500 2000 2500 3000
Time, t (seconds)
Figure 673 Test T18, B1, F1 pressure cells vs. time (entire test)
300
250
B1 F1
200
σ h,measured (kPa)
150
100
50
0
0 10 20 30 40 50 60 70
Pile tip depth, z (mm)
Figure 674 Test T18, B1, F1 pressure cells vs. pile tip depth (entire test)
250
200 B2 F2
σh,measured (kPa)
150
100
50
0
0 500 1000 1500 2000 2500 3000
Time, t (seconds)
Figure 675 Test T18, B2, F2 pressure cells vs. time (entire test)
250
200
B2 F2
σh,measured (kPa)
150
100
50
0
0 10 20 30 40 50 60 70
Pile tip depth, z (mm)
Figure 676 Test T18, B2, F2 pressure cells vs. pile tip depth (entire test)
30
25
B3 B4
20
σh,measured (kPa)
15
10
0
0 500 1000 1500 2000 2500 3000
Time, t (seconds)
Figure 677 Test T18, B3, B4 pressure cells vs. time (entire test)
30
25
B3 B4
20
σh,measured (kPa)
15
10
0
0 10 20 30 40 50 60 70
Pile tip depth, z (mm)
Figure 678 Test T18, B3, B4 pressure cells vs. pile tip depth (entire test)
63
62.5
61.5
61
60.5
60
1000 1050 1100 1150 1200 1250 1300
Time, t (seconds)
Figure 679 Test T18, Pile tip depth vs. time (load test 1: compression at L/2)
1600
1400
1200
Pile head load,P (N)
1000
800
600
400
200
0
1000 1050 1100 1150 1200 1250 1300
Time, t (seconds)
Figure 680 Test T18, Pile head load vs. time (load test 1: compression at L/2)
1600
1400
1200
Pile head load,P (N)
1000
800
600
400
200
0
60 60.5 61 61.5 62 62.5 63
Pile tip depth, z (mm)
Figure 681 Test T18, Pile head load vs. pile tip depth (load test 1: compression at L/2)
300
B1 F1
250
150
100
50
0
1000 1050 1100 1150 1200 1250 1300
Time, t (seconds)
Figure 682 Test T18, B1, F1 pressure cells vs. time (load test 1: compression at L/2)
300
250
B1 F1
200
σ h,measured (kPa)
150
100
50
0
60 60.5 61 61.5 62 62.5 63
Pile tip depth, z (mm)
Figure 683 Test T18, B1, F1 pressure cells vs. pile tip depth (load test 1: compression at L/2)
250
B2 F2
200
σh,measured (kPa)
150
100
50
0
1000 1050 1100 1150 1200 1250 1300
Time, t (seconds)
Figure 684 Test T18, B2, F2 pressure cells vs. time (load test 1: compression at L/2)
250
200
B2 F2
σ h,measured (kPa)
150
100
50
0
60 60.5 61 61.5 62 62.5 63
Pile tip depth, z (mm)
Figure 685 Test T18, B2, F2 pressure cells vs. pile tip depth (load test 1: compression at L/2)
30
25 B3 B4
20
σh,measured (kPa)
15
10
0
1000 1050 1100 1150 1200 1250 1300
-5
Time, t (seconds)
Figure 686 Test T18, B3, B4 pressure cells vs. time (load test 1: compression at L/2)
30
25
20 B3 B4
σ h,measured (kPa)
15
10
0
60 60.5 61 61.5 62 62.5 63
-5
Pile tip depth, z (mm)
Figure 687 Test T18, B3, B4 pressure cells vs. pile tip depth (load test 1: compression at L/2)
60
50
30
20
10
0
1250 1450 1650 1850 2050 2250 2450 2650
Time, t (seconds)
Figure 688 Test T18, Pile tip depth vs. time (load test 2: tension at L/2)
50
0
1250 1450 1650 1850 2050 2250 2450 2650
Pile head load,P (N)
-50
-100
-150
-200
Time, t (seconds)
Figure 689 Test T18, Pile head load vs. time (load test 2: tension at L/2)
50
0
0 10 20 30 40 50 60
Pile head load,P (N)
-50
-100
-150
-200
Pile tip depth, z (mm)
Figure 690 Test T18, Pile head load vs. pile tip depth (load test 2: tension at L/2)
140
120 B1 F1
100
σh,measured (kPa)
80
60
40
20
0
1250 1450 1650 1850 2050 2250 2450 2650
-20
Time, t (seconds)
Figure 691 Test T18, B1, F1 pressure cells vs. time (load test 2: tension at L/2)
140
120
100 B1 F1
σh,measured (kPa)
80
60
40
20
0
0 10 20 30 40 50 60
-20
Pile tip depth, z (mm)
Figure 692 Test T18, B1, F1 pressure cells vs. pile tip depth (load test 2: tension at L/2)
50
45 B2 F2
40
35
σh,measured (kPa)
30
25
20
15
10
5
0
1250 1450 1650 1850 2050 2250 2450 2650
Time, t (seconds)
Figure 693 Test T18, B2, F2 pressure cells vs. time (load test 2: tension at L/2)
50
45
40 B2 F2
35
σh,measured (kPa)
30
25
20
15
10
5
0
0 10 20 30 40 50 60
Pile tip depth, z (mm)
Figure 694 Test T18, B2, F2 pressure cells vs. pile tip depth (load test 2: tension at L/2)
10
8 B3 B4
6
σh,measured (kPa)
0
1250 1450 1650 1850 2050 2250 2450 2650
-2
-4
Time, t (seconds)
Figure 695 Test T18, B3, B4 pressure cells vs. time (load test 2: tension at L/2)
10
6 B3 B4
σh,measured (kPa)
0
0 10 20 30 40 50 60
-2
-4
Pile tip depth, z (mm)
Figure 696 Test T18, B3, B4 pressure cells vs. pile tip depth (load test 2: tension at L/2)