Question from Muhammad Asim Ullah Khan (AAA Partnership Pvt. Ltd.) at 01:05 PM on 07/13/2019
M/s. Arcop & M&B
Dear Mr. Sohaib & Rafeeque,
Please clarify the following queries highlighted in attached drawing pertaining to the Hospital Building-1 6th Floor Rev-6 preliminary observations given
below,
1. Kindly provide the dimensions of columns that are reducing on the 6th floor highlighted in the attached drawing.
2. Please provide references/Dimensions of all openings which are missing.
3. It has been observed that the references/dimensions of projections not mentioned at Grid N102.9-125.4 & E118.6-E63.7. Please Provide the
missing dimensions in order to meet design criteria.
4. Kindly provide the section of expansion joint at Grid E118.6-E126.4 and N.110.4 highlighted in an attached drawing for clarification.
5. It has been noticed that section 2-2 and section 2a-2a doesn't match with the projection shown in GA Plan which shows 1750mm in section and
2050mm in G.A Plan. Please clarify. Also, provide the dimensions of Section 3-3.
Regards,
Muhammad Asim Ullah Khan
Attachments:
FR-06 (6TH. FLOOR FRAMING AND REINF.PLAN) (003) Layout1 REV 6.pdf
All Replies:
Response from Muhammad Asim Ullah Khan (The Indus Hospital) at 11:50 AM on 10/29/2019
M/s. Arcop & M/s. M&B
Dear Sohaib and Rafeeque,
Please find attached Query/RFI Sheet #105 rev9 pertaining to HB-1 sixth floor slab which is self-explanatory.
Regards,
Muhammad Asim Ullah Khan
Attachments:
FR-06 (6TH. FLOOR FRAMING AND REINF rev10.pdf TIHK Query Sheet No.105. rev09.xlsx
Response from Muhammad Asim Ullah Khan (AAA Partnership Pvt. Ltd.) at 11:42 AM on 09/07/2019
CRITICAL REMINDER 2
This is with reference to an email dated Thu 05-Sep-19 regarding 6th floor IFC drawing FR-06 Rev-10, furthermore please note that RFI #105 rev8 still
not resolved till to date.
kindly issue 6th floor drawings at the earliest delay in issuance may lead to additional claims.
Regards,
Muhammad Asim Ullah Khan
Attachments:
Regards,
Sohaib.
Attachments:
Response_AAA Query Sheet No. 105 Revised (23-08-2019).pdf CO-06.pdf
Would appreciate if you can help us understand what preparatory work is being affected due to the connecting bridge detail. Please elaborate more on
this.
Also, please share the approved shop drawings with us for HB-1 6th Floor and the pour schedule.
Regards,
Sohaib.
Attachments:
Response from Muhammad Asim Ullah Khan (AAA Partnership Pvt. Ltd.) at 05:22 PM on 08/23/2019
M/s. Arcop
Dear Mr. Sohaib
Reminder-1
Please immediately resolve the connecting bridge query as the preparatory work is affecting and also resolve other queries as raised vide RFI #105
rev-8.
Regards,
Muhammad Asim Ullah Khan
Attachments:
AAA Query Sheet No. 105 Revised (23-08-2019).xlsx
Regards,
Sohaib.
Attachments:
Response from Muhammad Asim Ullah Khan (AAA Partnership Pvt. Ltd.) at 10:48 AM on 08/09/2019
M/s. Arcop
Dear Mr. Sohaib
Would appreciate if the planned date of a query response is provided enabling Project Manager to plan accordingly.
Regards,
Muhammad Asim Ullah Khan
Attachments:
Refer to the attached sketch for clarification on column C-13A and PC-13B.
With this we have covered all the RFI#105 points pertaining to 6th Floor.
Kindly, issue the relevant information to the contractor and advice them to proceed with their work.
Regards,
Sohaib.
Attachments:
FR-05 (5TH.pdf
Response from Muhammad Asim Ullah Khan (AAA Partnership Pvt. Ltd.) at 03:27 PM on 08/03/2019
M/s. Arcop & M&B
Dear Mr. Sohaib & Rafeeque,
Please be noted that the response as per attached sheet is not fulfilling the contractual requirements of RFI some details/ clarification are still required
and need to be incorporated and issued as clouded. Further the 6 floor queries should have now been concluded to avoid claims/ escalation.
Best Regards,
Muhammad Asim Ullah Khan
Attachments:
Response from Muhammad Rafeeque Ahmed Alvi (Mushtaq & Bilal Consulting Engineers) at
11:55 AM on 08/02/2019
Dear Mr. Asim,
Please see the attached response for your record and further process.
Regards,
Rafiq Alvi
Attachments:
AAA Query Sheet No. 105 Revised (31-07-2019).pdf
Please find attached 6th floor GA part Plans revised as per M&B drawings issued on 31st July, 2019.
Regards,
Sohaib.
Attachments:
A-A06h11-R-02.pdf A-A06f11-R-02.pdf A-A06e11-R-02.pdf A-A06-110-R-02.pdf
Response from Muhammad Asim Ullah Khan (AAA Partnership Pvt. Ltd.) at 05:58 PM on 07/31/2019
M/s. Arcop & M&B
Dear Mr. Sohaib & Rafeeque,
This is with Reference to RFI #105 rev07, The some subjected queries still not resolved yet pertaining to 5th Floor and 6th Floor Rev-8. Kindly clarify
the Previous and some additional queries highlighted in attached drawings.
Attachments:
Query # 105 rev07.rar CO-05 (REV-03).pdf CO-02.pdf CO-01.pdf CO-06.pdf FR-06 (6TH. FLOOR FRAMING AND REINF (1).pdf FR-05 (5TH. FLOOR
FRAMING AND REINF.pdf
Regards,
Sohaib.
Attachments:
GA-01 GENERAL ARANGEMENT PLAN A0 (1).pdf FR-06 (6TH. FLOOR FRAMING AND REINF.pdf FR-05 (5TH. FLOOR FRAMING AND
REINF.pdf CO-06.pdf CO-01.pdf
Kindly, refer to the revised HB-1 6th floor GA Plan IFC drawing uploaded in procore and also sent to you via email today in response to RFI# 105.
Regards,
Sohaib.
Attachments:
Response from Muhammad Rafeeque Ahmed Alvi (Mushtaq & Bilal Consulting Engineers) at
04:45 PM on 07/26/2019
Dear Mr. Asim,
1. (Reference to the RFI #105 on dated 24-July-19, Supplementary query pertaining to Point-1): The size of column C21B at Grid N35.4 / E71.8
shows 700x1000 in revised IFC drawing of 6th Floor Rev-7 as this column had already been cast of size 1000x1200 up to 6th-floor slab,
furthermore, elevation drawing (CO-06 Rev-1) needs to be revised with respect to casted column size. Noted. For columns already cast
below 6th Floor slab, follow "Case-1" in sketch SK-FR5B (issued on 11-04-2019).
2. The discrepancy has been observed between structure and Architecture drawing regarding the size of columns at Grid N35.4/102.9/125.4/192.9
& E71.8 highlighted in the attached drawing. Please follow structural drawings only for execution of structural items.
3. Kindly Provide the section details of highlighted Projection. Please follow 'Section 3-3' for projection details as shown in IFC drawing.
5. As discussed, kindly confirm the top level of C-13A & PC-13B which were commented on shop drawing (dated 17-May-19) to be provided at a
later stage. Architect to respond.
Attachments:
Response from Muhammad Asim Ullah Khan (AAA Partnership Pvt. Ltd.) at 06:42 PM on 07/25/2019
M/s. Arcop
Dear Mr. Sohaib,
Reference to the drawings issued by Arcop on 22-July-19 in response to RFI # 105 following are the additional observations which need to be resolved
by the Consultants as listed below,
1. (Reference to the RFI #105 on dated 24-July-19, Supplementary query pertaining to Point-1) The size of column C21B at Grid N35.4 / E71.8
shows 700x1000 in revised IFC drawing of 6th Floor Rev-7 as this column had already been casted of size 1000x1200 up to 6th-floor slab,
furthermore, elevation drawing (CO-06 Rev-1) needs to be revised with respect to casted column size.
2. The size of column C20B shows 700x1000 in revised Column elevation drawing C0-06 rev-01 between 5th to 6th Floor as this column shows of
size 1000x1000 on 5th Floor G.A Plan. Confirmation required.
3. Kindly provide the reducing dimension of Typ. Column C-9 on 5th floor G.A Plan as column section shown in elevation C-01 Rev-3 of size
450x900 between 5th to 6th floor.
4. The discrepancy has been observed regarding size of Column PC-20B between revised elevation,6th Floor G.A Plan Rev-7 & 5th Floor G.A
Plan Rev-10 which shows 1200x1200 in Revised Elevation, 700x1000 in 6th Floor Rev-7 and 1000x1000 in 5th Floor Rev-10. Please note that
the column dowels are of size 1000x1000 on 5th floor as per previous drawings. Clarification required for further execution.
5. Column at Grid N102.9 & E103.0 shows the inappropriate location in revised IFC drawing of 6th Floor Rev-7 which needs to be flushed with the
external face of beam 5B-15A as already approved in THC Submittal:259.1.
6. Provide the R.C details of Column C20C Jacketing below 4th floor.
Regards,
Muhammad Asim Ullah khan
Attachments:
FR-06 (6TH. FLOOR FRAMING AND REINF.pdf FR-05 (5TH. FLOOR FRAMING AND REINF.pdf CO-06.pdf RFI #105 (25-07-19).rar
Response from Muhammad Asim Ullah Khan (AAA Partnership Pvt. Ltd.) at 09:16 PM on 07/24/2019
M/s. Arcop
Dear Mr. Sohaib,
Reference to the drawings issued by Arcop on 22-July-19 in response to RFI # 105 following are the additional observations which need to be resolved
by the Consultants as listed below,
1. The discrepancy has been observed between structure and Architecture drawing regarding size of columns at Grid N35.4/102.9/125.4/192.9 &
E71.8 highlighted in attached drawing
2. Please Provide the Continuation details of Column C6A From the 5th Floor as this Column has already been terminated at 5th Floor as per
previous IFC Drawing FR-05 Rev-9. Please Provide.
3. Kindly Provide the section details of highlighted Projection.
4. Connecting Bridge R.C details required between Building 1 and 2 as highlighted in attached drawing.
5. Sleeves R.C details G.A Plan required.
6. As discussed, Kindly confirm the top level of C-13A & PC-13B which were commented on shop drawing (dated 17-May-19) to be provided at
later stage.
Regards,
Muhammad Asim Ullah Khan
Attachments:
FR-06 (6TH. FLOOR FRAMING AND REINF.pdf
Response from Muhammad Asim Ullah Khan (AAA Partnership Pvt. Ltd.) at 11:48 AM on 07/23/2019
M/s. Arcop
Dear Mr. Sohaib,
Reference to the drawings issued by Arcop on 22-July-19 in response to RFI # 105 following are the observations which need to be resolved by the
Consultants.
1. 6th Floor Beam 6b-12 dimensions doesn't match as per the given description highlighted in attached drawing. Please Clarify. (NEW)
2. Please provide the References/Dimension of highlighted openings in Architecture Drawing (A-A06-110-C-00) at Grid N87.9 – 95.4/71.8 TO 79.6,
N132.9-140.4 & E110.8-118.6, N147.9-N159.4/E68.0-79.6 & N177.9-185.4 / E110.8-118.6. (NEW)
3. Kindly provide the dimensions of columns that are reducing on the 6th floor highlighted in the attached drawing. (PREVIOUS)
4. It has been observed that girders of the connecting bridge are coming in projection at Grid N125.4-132.9 & E68.0. Please clarify and confirm.
(PREVIOUS)
5. Kindly revised the revision no. of 6th Floor as the current Revision no. will be 7th issued on 22-July-19. (NEW)
6. Revision history needs to be correct. (NEW)
Regards,
Muhammad Asim Ullah Khan
Attachments:
A-A06-110-C-00.pdf FR-06 (6TH. FLOOR FRAMING AND REINF RFI.pdf
Kindly, refer to the drawings sent via email on Monday 22nd July, in response to RFI# 105.
Regards,
Sohaib.
Attachments:
Response from Muhammad Rafeeque Ahmed Alvi (Mushtaq & Bilal Consulting Engineers) at
05:20 PM on 07/19/2019
Dear Mr. Asim,
1. It has been observed that girders of the connecting bridge are penetrating in projection at Grid N125.4-132.9 & E68.0 which needs to be correct.
Please clarify and confirm. (NEW) Noted and corrected in revised drawings.
2. Please provide the Elevation /Section details of highlighted columns C-6A & C-7A at Grid N-35.4-192.9 & E68.0 as these were already
terminated on the slab floor below. (NEW) Noted. The details of highlighted columns shall be provided separately.
3. Kindly confirm the location of multiple openings at Grid N57.9-65.4 & E118.6 as the location of openings doesn't match with the 5th floor. Please
Confirm. (NEW) Architect to respond.
4. Sleeves details and Architectural drawing required of 6th floor at the earliest. (NEW) Architect to respond.
6. Kindly provide the dimensions of columns that are reducing on the 6th floor highlighted in the attached drawing. (PREVIOUS) Noted and
complied.
7. Please provide references/Dimensions of all openings which are missing. (PREVIOUS) Architect to respond.
8. It has been observed that the references/dimensions of projections not mentioned at Grid N102.9-125.4 & E118.6-E63.7. Please Provide the
missing dimensions in order to meet design criteria. (PREVIOUS) Architect to respond.
9. Kindly provide the section of expansion joint at Grid E118.6-E126.4 and N.110.4 highlighted in an attached drawing for clarification. (PREVIOUS)
Noted. Will be provided in revised drawings.
10. Sleeves details and architectural drawing required of 6th floor. Same as Point-4.
Attachments:
Response from Muhammad Asim Ullah Khan (AAA Partnership Pvt. Ltd.) at 12:58 PM on 07/18/2019
M/s. Arcop & M&B
Dear Mr. Sohaib & Rafeeque,
This is with reference to the email received on dated Wednesday, July 17, 2019, at 05:47 pm, The Subjected queries still not resolved yet pertaining
to 6th Floor Rev-6. Kindly clarify the Previous and some additional queries highlighted in attached drawing.
1. It has been observed that girders of the connecting bridge are penetrating in projection at Grid N125.4-132.9 & E68.0 which needs to be correct.
Please clarify and confirm. (NEW)
2. Please provide the Elevation /Section details of highlighted columns C-6A & C-7A at Grid N-35.4-192.9 & E68.0 as these were already
terminated on the slab floor below. (NEW)
3. Kindly confirm the location of multiple openings at Grid N57.9-65.4 & E118.6 as the location of openings doesn't match with the 5th floor. Please
Confirm. (NEW)
4. Sleeves details and Architectural drawing required of 6th floor at the earliest. (NEW)
5. Drawing issue date needs to be correct.(NEW)
6. Kindly provide the dimensions of columns that are reducing on the 6th floor highlighted in the attached drawing. (PREVIOUS)
7. Please provide references/Dimensions of all openings which are missing. (PREVIOUS)
8. It has been observed that the references/dimensions of projections not mentioned at Grid N102.9-125.4 & E118.6-E63.7. Please Provide the
missing dimensions in order to meet design criteria. (PREVIOUS)
9. Kindly provide the section of expansion joint at Grid E118.6-E126.4 and N.110.4 highlighted in an attached drawing for clarification. (PREVIOUS)
10. Sleeves details and architectural drawing required of 6th floor.
Regards,
Muhammad Asim Ullah Khan
Attachments:
FR-06 Rev 6 17-07-19.pdf
Response from Muhammad Asim Ullah Khan (AAA Partnership Pvt. Ltd.) at 12:05 PM on 07/17/2019
M/s. Arcop & M&B
Dear Mr. Sohaib & Rafeeque,
This is with Reference to RFI #105, The Subjected queries still not resolved yet pertaining to 6th Floor Rev-6. Kindly clarify the Previous and some
additional queries highlighted in attached drawing.
1. Kindly confirm the location of multiple openings at Grid N57.9-65.4 & E118.6 as the location of openings doesn't match with the 5th floor. Please
Confirm. (NEW)
2. Kindly provide the dimensions of columns that are reducing on the 6th floor highlighted in the attached drawing.
3. Please provide references/Dimensions of all openings which are missing. (PREVIOUS)
4. It has been observed that the references/dimensions of projections not mentioned at Grid N102.9-125.4 & E118.6-E63.7. Please Provide the
missing dimensions in order to meet design criteria. (PREVIOUS)
5. Kindly provide the section of expansion joint at Grid E118.6-E126.4 and N.110.4 highlighted in an attached drawing for clarification. (PREVIOUS)
Regards,
Muhammad Asim Ullah Khan
Attachments:
FR-06 Rev 6.pdf
Response from Muhammad Rafeeque Ahmed Alvi (Mushtaq & Bilal Consulting Engineers) at
04:06 PM on 07/15/2019
Dear Mr. Asim,
1. Kindly provide the dimensions of columns that are reducing on the 6th floor highlighted in the attached drawing. Noted and complied.
2. Please provide references/Dimensions of all openings which are missing. Architect to respond.
3. It has been observed that the references/dimensions of projections not mentioned at Grid N102.9-125.4 & E118.6-E63.7. Please Provide the
missing dimensions in order to meet design criteria. Architect to respond.
4. Kindly provide the section of expansion joint at Grid E118.6-E126.4 and N.110.4 highlighted in an attached drawing for clarification. Noted. Will
be provided in revised drawing.
5. It has been noticed that section 2-2 and section 2a-2a doesn't match with the projection shown in GA Plan which shows 1750mm in section and
2050mm in G.A Plan. Please clarify. Also, provide the dimensions of Section 3-3. Noted and complied.
Attachments: