Professional Documents
Culture Documents
V3 BOQ Multicurrency Template
V3 BOQ Multicurrency Template
Name of Work:
Contract No:
Name of the
Bidder/
Bidding Firm /
Company :
PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is lia
are allowed to enter the Bidder Name and Values only )
1 2 4 5 12 13
1 Laying and Jointing PVC Pipe. Heading
1.01 Brick work in C.M 1:5 mix including all labour charges 10.0000 Nos INR
etc complete
1.02 Brick work in C.M 1:5 mix using 2nd class ground 10.0000 Nos INR
moulded chamber burnt bricks with including cost
1.03 Plastering in C.M 1:5-12 mm thick with including cost 1500.0000 Nos INR
and conveyance of all materials and including all
and conveyance of all materials and including all
1.04 labour charges
Plastering etc1:5-12
in C.M complete
mm thick with including cost 12.0000 Nos INR
labour charges etc complete
and conveyance of all materials and in
1.05 b) CI bend 22.5° (250mm dia) 1.0000 Nos INR
2 Construction of chamber for 100mm sluice plates 1.0000 Nos INR
3 Construction of chamber for 100mm sluices valve 1.0000 Nos INR
4 Supplying, Conveying and fixing spls. Including ea 1.0000 Nos INR
5 Supplying, Conveying and fixing spls. Including eart 1.0000 Nos INR
6 Construction of chamber for 100mm sluice plates 1.0000 Nos INR
7 Construction of chamber for 100mm sluices valve 1.0000 Nos INR
8 Laying and Jointing PVC Pipe. Heading
8.01 Plain Cement Concrete 1:4:8 (one cement four fine 1.0000 Nos INR
aggregates and eight coarse aggregates) using
8.02 Brick work in C.M 1:5 mix using 2nd class ground 1.0000 Nos INR
moulded chamber burnt bricks with including cost
8.03 Construction of chamber for 100mm sluices valve 1.0000 Nos INR
9 The Total value of Schedule1 1.0000 Nos INR
Total in Figures
ent columns, else the bidder is liable to be rejected for this tender. Bidders
nly )
NUMBER # TEXT #
TOTAL AMOUNT, It TOTAL AMOUNT
will be convert in In Words
Rs. P
53 55
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
Please Enable Macros to View BoQ information
Q information