Major Work Done in Banglar Agradoot ( 21-Jun-20 to 05-Sep-20)

SL Work Items Condition at the time of Maintenance Carried Out Reference Remark/Result
Work
1 Decontamination Out of service, pedal, so Pedal repaired, all seals replaced ( around 100 seals) in hot DWD 22nd Decontamination
Shower many seals & valve water & normal water line, finally made decontamination June, shower in working
broken shower in working condition after extensive maintenance job condition.
2 Draft Gauge Draft meter Gauge too DWD
meter, Air inlet rusted to rotate, save all 25th,27th
line to BW P/P, rusted, Air inlet line to June,
Sea chest blow BW p/p never touched, it
through system was too rusted to
operate, sea chest blow
through system never
been used & checked
3 Manual Fixed DWD 27th
Pump June,
4 Deck Seal DWD 28th
System, Over June
board valve
5 Combination DWD 28th
Ladder June
Pneumatic Motor
6 Accommodation DWD 28th
Ladder June
Pneumatic Motor
7 Fwd & Aft Void
Tank
8 Ballast Tank
Drawing & Plan
9 VECS System
10 Deck Drain Pump
11 Tank Cleaning Dwd 5,6,7
Machine July-20
12 Water Driven
Blower
13 Fixed Gas
Detection System