-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80
OD STATE, LOT-3
Bridge at Chainage km. : 195+727 (MJBR)
AT UP STREAM AT 350M
Highest Flood Level (HFL) = 576.331 m
Lowest Bed Level (LBL) = 570.603 m
R
Rugosity
i Co-efficient
C ffi i (N) = 0 040
0.040
580
578
576
4
574
572
570
-90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90
OD STATE, LOT-3
B id att Ch
Bridge Chainage
i k
km. : 195+727 (MJBR)
AT BRIDGE SITE
580
578
576
574
572
570
-65 -55 -45 -35 -25 -15 -5 5 15 25 35 45 55 65 75
OD STATE, LOT-3
Bridge at Chainage km. : 195+727 (MJBR)
AT DOWNSTREAM AT 350M
Highest Flood Level = 576 097
576.097 m
Lowest Bed Level = 570.348 m
Rugosity Co-efficient = 0.040
Using Manning's Formula
Wetted
Relative Area(A)
NSL (m) Distance (m) Offset (m) Perimetre (P)
Distance (m) (m²)
(m)
‐92.4165 576.212 11.5335 0.00
‐80.883 575.712 9.706 0.38 2.22 11.54
‐71.177 575.212 6.2825 0.88 6.16 9.72
‐64.8945 575.27 3.4946 0.83 5.38 6.28
‐61.3999 575.712 5.4281 0.38 2.12 3.52
‐55.9718 575.213 7.2922 0.88 3.44 5.45
‐48.6796 575.884 4.4506 0.21 4.00 7.32
‐44.229 574.562 5.0234 1.53 3.89 4.64
‐39.2056 572.162 5.7499 3.93 13.74 5.57
‐33.4557 570.348 4.2632 5.75 27.84 6.03
‐29.1925 570.62 4.2436 5.48 23.93 4.27
‐24.9489 570.689 9.0541 5.41 23.10 4.24
‐15.8948 571.448 9.1809 4.65 45.53 9.09
‐6.7139 572.078 6.7139 4.02 39.79 9.20
0 572.19 10.3 3.91 26.61 6.71
10.3 572.361 6.1592 3.74 39.36 10.30
16.4592 572.938 6.6661 3.16 21.23 6.19
23.1253
23 1253 572.59
572 59 9.3713
9 3713 3.51
3 51 22.22
22 22 6.68
6 68
32.4966 575.448 10.8957 0.65 19.47 9.80
43.3923 577.384 2.0814 0.00 3.54 10.92
45.4737 578.104 2.6608
48.1345 578.604 9.1074
57.2419 578.704 13.9096
71.1515 578.64 16.7849
87.9364 579.037
Sum 333.57
333 57 137 47
137.47
Hydraulic Mean Depth (R) = A/P = 2.43
Bed Slope = S = 0.00098
Velocity = V = 1.42 m/s
Discharge (Q) = AV = 472.25 Cumec
578
576
574
572
570
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80
OD STATE, LOT-3
Bridge at Chainage km. : 195+727 (MJBR)
AT DOWNSTREAM AT 350M
Highest Flood Level = 575.986 m
Lowest Bed Level = 570.198 m
Rugosity Co-efficient = 0.040
578
576
574
572
570
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
OD STATE, LOT-3
CALCULATION OF DESIGN DISCHARGE
Chainage at km. : 195+727 (MJBR)
Highest Flood Level (HFL) = 576.219 m
Lowest Bed Level (LBL) = 570.593 m
D I S C H A R G E C A L C U LA T I O N S
(A) USING DICKEN'S FORMULA :
(Referring Clause 4.1, IRC : SP 13 - 2004)
Where, Q = Peak runoff in cumec
M = Catchment area in sq. km. = 208.072
C = 11 - 14 where the annual rainfall is 60 to 120 cm.
= 14 - 19 where the annual rainfall is more than 120 cm.
The average rainfall of last 10 years in Nabarangpur district is 1400 mm
So, on an average considering C = 15
DESIGN DISCHARGE (As per clause no. 6.2.1, IRC SP 13 2004) = 688.73 Cumec
SCOUR CALCULATION BY USING LACEY'S EQUATION
Chainage km. : 195+727 (MJBR)