DESIGN OF DISTRIBUTORY HEAD REGULATOR

NAME OF PROJECT : CROSS REGULATOR AT RD 57.460

DESIGN DATA :

1 Full supply discharge of distributory 20.00 Cumec

2 Full supply level of distributory 249.85 m

3 Bed level of distributory 246.65 m

4 Bed width of distributory 5.00 m

5 Average bed level of parent channel 246.95 m

6 F.S.L. of parent channel 250.15 m

7 Safe exit gradient for canal bed material 1/4

8 Lacey's silt factor 1

(1) FIXATION OF CREST LEVEL AND WATERWAY :

Generally the crest level of the distributory head regulator is kept 0.3 to 0.6 m higher than
its upstream floor level
Adopt crest level of the regulator = 246.95 + 0.5
= 247.45
Head regulators are generally provided with a very wide and shallow waterway. The drowned weir
formula is therefore, used for calculating the discharge.

Q = 2/3 C1 L Ö2g X h3/2 + C2 L d Ö2gh --------(1)

Where, C1 = 0.577 , C2 = 0.80


L = Clear length of waterway
h = Difference of u/s & d/s water levels
= 250.15 - 249.85
= 0.30 m
d = Depth of d/s water level above the crest
= 249.85 - 247.45
= 2.40 m
Substituting the above values in equation (1),
20.00 = 0.2800 X L + 4.6581 X L
:. L = 4.05 m
Minimum clear waterway = 60 % of bed width of offtaking canal
= 3.00 m
Thus clear waterway required = 4.05 m
Provide 2 bays of 3.75 m each giving a clear waterway of 7.50 m

Program by - Sunil K Goyal 1 Checked by - P.P.Pareek


Office of Director Dam
575461512.xls
I.D.R.,Jaipur

Hence O.K.

Program by - Sunil K Goyal 2 Checked by - P.P.Pareek


Office of Director Dam
575461512.xls
I.D.R.,Jaipur

(2) LEVEL AND LENGTH OF DOWNSTREAM FLOOR

The discharge and length of waterway is given by,


Q= 20.00 Cumec, l = 7.50 m

20.00
Discharge intensity q = --------- = 2.67 cumec/m
7.5
Head loss = u.s. F.S.L. - d.s. F.S.L.
= 250.15 - 249.85
= 0.30 m

for, q = 2.67 cumec/m and HL = 0.30 m


D/s specific energy Ef2 (from Blench curves) = 1.63 m
Cistern floor level required = D/s F.S.L. - Ef2
= 249.85 - 1.63
= 248.22 m

U/s specific energy , Ef1 = Ef2 + HL


= 1.63 + 0.30
= 1.93 m
from energy of flow curves
Prejump Depth D1 corresponding to Ef1 = 0.50 m
Postjump Depth D2 corresponding to Ef2 = 1.46 m
Length of cistern floor required = 5 (D2 - D1)
4.78 m
The downstream floor may be provided at R.L. 246.65 with a horizontal length
of 5.00 m. (from energy consideration)
(4) Depth of sheet piles from scour considerations :
U/S sheet pile :

As per IS 6531 : 1994, on the upstream side of the head regulator, cut-off should be provided
to the same depth as the cut-off stream of diversion work, if it exists or may be calculated as
below :-
Discharge intensity 'q' = 2.67 cumec/m
Depth of scour 'R' = 1.35{q /f}
2 1/3
= 2.60 m
Anticipated scour = 1.5 R = 3.89 m

R.L. of the bottom of scour hole = 250.15 - 3.89


= 246.26 m
yd
Minimum depth of u/s cutoff below bed level = + 0.5
2
(where yd is water depth im m at u/s ) = 2.10 m
R.L. of the bottom of scour hole = 244.85
(by minimum depth consideration)
Provide sheet pile line down to elevation 244.80 m

Program by - Sunil K Goyal 3 Checked by - P.P.Pareek


Office of Director Dam
575461512.xls
I.D.R.,Jaipur

D/S sheet pile :

Discharge intensity 'q' = 2.67 cumec/m


Depth of scour 'R' = 1.35{q2/f}1/3 = 2.60 m
Anticipated scour = 2 R = 5.19 m

R.L. of the bottom of scour hole = 249.85 - 5.19


= 244.66 m
yd
Minimum depth of d/s cutoff below bed level = + 0.5
2
(where yd is water depth im m at d/s ) = 2.10 m
R.L. of the bottom of scour hole = 244.55 m
(by minimum depth consideration)
Provide sheet pile line down to elevation 244.50 m

(5) Total floor length and exit gradient

The exit gradient should be checked for the condition that the canal is completely closed
when high flood is passing in the river; this provides the worst static condition.

Maximum static head = 250.15 - 246.65


= 3.50 m

Depth of d.s. cut off = 246.65 - 244.50


= 2.15 m

Since, H 1
GE = ---- ---------
d pÖl
Hence,
1 GE.d
----------- = ------------ = 0.154
pÖl H
From Khosla's exit gradient curve a = 7.53
Hence requirement of total floor length b = a.d
= 16.18 m

Adopt total floor length = 17.00 m


Therefore,
length of d/s floor = 2/3 X total impervious length
= 11.33 m
The floor length shall be provided as below:-

Downstream horizontal floor = 11.00 m


D/s glacis length with ( 2 :1 slope) = 1.60 m
Crest width = 2.00 m
U/s glacis length with ( 1 :1 slope) = 0.50 m
Upstream floor = 3.00 m
Total = 18.10 m

Program by - Sunil K Goyal 4 Checked by - P.P.Pareek


Office of Director Dam
575461512.xls
I.D.R.,Jaipur

(6) Pressure calculations


Let the floor thickness in the u/s be 0.60 m and near the downstream cutoff
be 1.00 m.
(i) Upstream sheet pile
Let the thickness of sheet pile = 0.5 m
d = 246.95 - 244.80
= 2.15 m
b = 18.10 m
1 d 2.15
----- = ------ = -------- = 0.1188
a b 18.10
From Khosla's Pressure curves
l= 4.739
fD = 79%
fC = 70% ; f D - fC = 9%
Correction for floor thickness = 2.60% (+ ve)
Correction for interference due to d/s sheet pile line, C = 19ÖD/b'.(d+D)/b
where,
d = 246.35 - 244.80 = 1.55 m
D = 246.35 - 244.50 = 1.85 m
b' = 17.10
b = 18.10
Then,
C= 1.174% (+ ve)
fC corrected = 70% + 2.60% + 1.174%
= 73.39%
(ii) Downstream sheet pile
d = 246.65 - 244.50
= 2.15 m
b = 18.10 m
1 d 2.15
------ = ------ = --------- = 0.119
a b 18.10
From Khosla's Pressure curves
l= 4.739
fE1 = 30%
fD1 = 21% ; fE1 - fD1 = 9%
Correction for floor thickness = 4.34% (- ve)
Correction for interference due to u/s sheet pile line, C = 19ÖD/b'.(d+D)/b
where,
d = 245.65 - 244.50 = 1.15 m
D = 245.65 - 244.80 = 0.85 m
b' = 17.10
b = 18.10
Then,
C= 0.468% (- ve)
fE1 corrected = 30% - 4.34% - 0.468%

Program by - Sunil K Goyal 5 Checked by - P.P.Pareek


Office of Director Dam
575461512.xls
I.D.R.,Jaipur

= 25.58%

Program by - Sunil K Goyal 6 Checked by - P.P.Pareek


Office of Director Dam
575461512.xls
I.D.R.,Jaipur

(7) Floor thickness


The maximum static head will occur on the floor when there is no flow in the canal but maximum
flood is passing down the barrage.
Thus maximum static head = 250.15 - 246.65
= 3.50 m
The subsoil hydraulic gradient line shall be drawn for the maximum static head only since the floor
thicknesses are governed by this critical condition.
Downstream floor
(i) Upto 4.00 m from d/s end
Unbalanced head = 1.238 m
1.238
Floor thickness required = ---------- = 0.998 m
1.24
Provide floor thickness = 1.00 m in 4.00 m length d/s
(ii) At 4.00 m from d/s end to 7.00 m from d/s end

Unbalanced head = 1.531 m


1.531
Floor thickness required = ---------- = 1.235 m
1.24
Provide floor thickness = 1.30 m

(iii) At 7.00 m from d/s end to 11.00 m from d/s end


( toe of d/s glacis )
Unbalanced head = 1.923 m
1.923
Floor thickness required =
---------- = 1.551 m
1.24
Provide floor thickness = 1.60 m
(8) Protection works beyond impervious floor
(i) u.s. protection : It shall be the same as provided in the upstream on undersluices
( as per IS 6531 : 1994 ) or may be calculated as below
R= 2.60 m
Anticipated scour = 1.5 R = 3.89 m
Upstream scour level = 250.15 - 3.89
= 246.26 m
Min scour depth 'D' below u.s floor = 2.10

(a) Block protection


Provide 6 rows of 0.6 m X 0.6 m X 0.6 m
C.C. blocks over 0.40 m thick gravel apron in a length of 3.6 m.

(b) Launching apron


Loose apron 1.5 D long consisting of either boulders of not less than 40 kg or wire boulder
crates should be provided so as to ensure a minimum thickness of 1 m in launched position
(refer IS 6531 : 1994).
Thickness of launching apron = 1.00 m
Quantity of launching apron required = 2.25 D cu m/m

Program by - Sunil K Goyal 7 Checked by - P.P.Pareek


Office of Director Dam
575461512.xls
I.D.R.,Jaipur

= 4.725

Program by - Sunil K Goyal 8 Checked by - P.P.Pareek


Office of Director Dam
575461512.xls
I.D.R.,Jaipur

4.725
Length required =
1.00
= 4.73 m

Provide launching apron 1.00 m deep in a length of 4.80 m.

(ii) d.s. protection :


R= 2.60 m
Anticipated scour = 2R = 5.19 m
Downstream scour level = 249.85 - 5.19
= 244.66 m
Scour depth 'D' below d.s. floor = 246.65 - 244.66
(min) = 2.10 m

(a) Inverted filter

AS per IS 6531 : 1994, Just at the end of concrete floor on the downstream an inverted filter
1.5 to 2 D long (D being the depth of scour below bed ), consisting of 600 to 900 mm deep concrete
blocks with open gaps ( 100 - 150 mm to be suitably filled with coarse material ) laid over 500 to 800
mm graded filter, should be provided.
The graded inverted filter should conform to the following design criteria :

D 15 of filter D 15 of filter
³ 4 ³
D 15 of foundation D 85 of foundation

Provide 7 rows of 0.6 m X 0.6 m X 0.6 m


C.C. blocks with 10 cm gap filled with 'bajri' over 0.60 m thick graded
filter in a length of 5.00 m.

(b) Launching apron

Downstream of the inverted filter, loose apron 1.5 D long consisting of either boulders of not
less than 40 kg or wire boulder crates should be provided so as to ensure a minimum thickness
of 1 m in launched position (refer IS 6531 : 1994).

Thickness of launching apron = 1.20 m


Quantity of launching apron required = 2.25 D cu m/m
= 4.725

4.725
Length required =
1.20
= 3.94 m

Provide launching apron 1.20 m deep in a length of 4.00 m.

Also provide a 0.6 m thick and 1.20 m deep toe wall between the filter and the
launching apron

************* *************

Program by - Sunil K Goyal 9 Checked by - P.P.Pareek


Office of Director Dam
575461512.xls
I.D.R.,Jaipur

GATE GROOVE
U/S F.S.L. 250.15

D/S F.S.L. 249.85


6 ROWS OF 7 ROWS OF
### X ### X ### C.C. 0.60 X 0.60 X 0.60 LAUNCHING
LAUNCHING BLOCKS OVER ### C.C. BLOCKS WITH 10 APRON
APRON
m THICK APRON CREST LEVEL CM GAP FILLED WITH BAJRI OVER
247.45 M 0.60 m Th. GRADED FILTER D/S BED AT

U/S BED 1 :1 u/s 2 :1 d/s glacis R.L. 246.65


246.95
### m R.L. 246.65
1.00
1.60 1.30 1.00 ###
4.80 3.6
R.L. 244.80 TOE WALL
R.L. 244.50
3.00 0.50 2.00 1.60 4.00 3.00 4.00 5.00 0.60 4.00

18.10 M

Notes -
1 All dimensions in m
2 The drawing is not to the scale
3 The barrels detail is as below
No. of barrels = 2 No.
Width of each barrel = 3.75 m
Clear waterway = 7.50 m

DISTRIBUTORY HEAD REGULATOR

Program by - Sunil K Goyal Checked by -P.P.Pareek


Office of Director Dam
575461512.xls
I.D.R.,Jaipur

Program by - Sunil K Goyal Checked by -P.P.Pareek


Office of Director Dam
575461512.xls
I.D.R.,Jaipur

Program by - Sunil K Goyal Checked by -P.P.Pareek


Determination of conjugate depth
(Refer IS 4997-1968)

HL/DC = 0.231 0.235 0.240 0.244 0.249 0.254 0.259 0.264


D1/DC = 0.6 0.598 0.596 0.594 0.592 0.59 0.588 0.586

HL = 0.30
q = 2.67
DC = 0.90
HL/DC = 0.33
D1/DC = 0.56
D1 = 0.50
D2 = 1.46
Ef1 = 1.93
Ef2 = 1.63

1.63