PROJECT: MWEP Project

PJ NO.: V3530248

CIVIL WORKS

ITEM DESCRIPTION

GENERAL AND PRELIMINARIES


Allow for insurances for the work, mobilisation, levy, site
0a management staff, security, safety, contractor's temporary buildings,
working shed, plant and machinery, temporary water and power and all necessary

sub total [0a]


TEMPORARY WORKS
0b

sub total [0b]


RESEARCH
0c

0c-1 SURVEY WORK


0c-1-1 TOPOGRAPHICAL SURVEY
0c-2 GEOTECHNICAL SOIL INVESTIGATION
0c-2-1 FIELD INVESTIGATION
0c-2-1-1 IN-LAND (BOREHOLES= 25 NOS) 8 NOS
0c-2-1-1-1 Mobilization / Demobilization
Boring in all types of soil (0~30m depth) including SPT with disturbed samples (30m x 8 Nos
0c-2-1-1-2
= 240m)
0c-2-1-1-3 Undisturbed sampling for cohesive layers - 1 sample from each distinguished cohesive layer
Lateral loading Test
0c-2-1-1-4
(Pressuremeter Test)
0c-2-1-1-5 Permeability test
0c-2-1-1-6 Ground water observation and measurement
0c-2-1-1-7 Rock drilling
0c-2-1-1-8 Core box
0c-3 LABORATORY TEST
0c-3-1 Particle size distribution (24 nos. of Test)
0c-3-2 Atterberg limit tests (24 nos. of Test)
0c-3-3 Moisture content and bulk density determination (24 nos. of Test)
0c-3-4 California Bearing Ration test (CBR) (8 nos. of Test)
0c-3-5 Unconfined Compressive Strength compression test (UCS) (8 nos.of Test)
0c-3-6 Unconsolidated Undrained Triaxial Compression test (UU) (8 nos. of Test)
0c-3-7 Point load test on rock core (8 nos.of Test)
0c-3-8 Triaxial Test CU (24 nos.of Test)
0c-3-9 Chemical analysis of soil and water sample (PH, chloride, sulfate), in-land only
0c-4 ENGINEERING ANALYSIS & REPORT
0c-5 COORDINATION

sub total [0c]


UNIT QTY Unit Price AMOUNT REMARKS

LS

m2 9,804.00

lot

m 240.00

nos

nos

nos
nos
nos
nos

lot
lot
lot
lot
lot
lot
lot
lot
lot
lot
lot

0.00