You are on page 1of 1

Day : Monday

Date : 18-May-20
Hari
Weeks : 76
Daily Report
Tanggal

RÉHABILITATION DU PALAIS PRÉSIDENTIEL DU RÉPUBLIQUE DU NIGER


Minggu Ke
Work Durations number of workers Volume
NO Job Description Working Hours (Hours) Unit Material / Information Material
Ind WorkersLocal Workers Tools Ind WorkersLocal Workers Tools
A. EARTHWORK 0 0 0 0
a.1 Excavation and Shifting ### s/d ### 17 0 0 0 0 m3
a.2 backfill tie beam HoS ### s/d ### 0 0 0 0 0 m3
a.3 ### s/d ### 0 0 0 0 0
a.4 ### s/d ### 0 0 0 0 0

B.1 CONCRETE FOR COLUMN 8 4 346.06 8.94


b.1.1 Casting concrete for column ballroom, HoS, and footing PoP ### s/d ### 14 8 4 20.86 8.94 m3 Start working for preparing for preparing for sta
b.1.2 ### s/d ### 0 0 0 0 0
b.1.3 ### s/d ### 0 0 0 0 0

B.2 CONCRETE FOR BEAM 0 0 195.12 0


b.2.1 ### s/d ### 0 0 0 0 0 m3
b.2.2 ### s/d ### 0 0 0 0 0
b.2.3 ### s/d ### 0 0 0 0 0

B.3 CONCRETE FOR SLAB/FLOOR PLATE 0 0 130.08 0


b.3.1 ### s/d ### 0 0 0 0 0 m3
b.3.2 ### s/d ### 0 0 0 0 0
b.3.3 ### s/d ### 0 0 0 0 0

C.1 FORMWORK FOR COLUMN 27 2 65.04 0


c.1.1 Workshop ### s/d ### 13 3 0 0 0 m2
c.1.2 Fabrication on site ### s/d ### 13 2 0 0 0 m2
c.1.3 Install formwork column ballroom ### s/d ### 13 16 0 65.04 0 m2
c.1.4 Install formwork column pedestal ballroom ### s/d ### 13 0 0 0 0 m2
c.1.5 Install and dishutter formwork footing PoP ### s/d ### 13 2 2 0 0 m2
c.1.6 Install scaffolding for column ballroom ToC +9.600 ### s/d ### 13 4 0 0 0 m2

C.2 FORMWORK FOR BEAM 7 2 32.52 10.84


c.2.1 Install formwork beam HoS Toc +5.250 ### s/d ### 13 7 2 32.52 10.84 m2
c.2.2 ### s/d ### 0 0 0 0 0 m2
c.2.3 ### s/d ### 0 0 0 0 0 m2

C.3 FORMWORK FOR SLAB 5 5 0 0


c.3.1 Dishutter formwork beam and slab HoS ToC -0.050 ### s/d ### 13 0 4 0 0 m2
c.3.2 Dishutter formwork beam and slab Ballroom ToC +9.600 ### s/d ### 13 5 1 0 0 m2
c.3.3 ### s/d ### 0 0 0 0 0 m2

D.1 REBAR FOR COLUMN 5 9 0 12539


d.1.1 Fabrication Rebar ### s/d ### 13 5 0 0 0 kg
d.1.2 Fabrication Rebar for column and lintel beam for architecture ### s/d ### 13 0 2 0 0 kg
d.1.3 Install rebar footing and column PoP ### s/d ### 13 0 7 0 12539 kg
d.1.4 Install stirrup for column Ballroom ### s/d ### 13 0 0 0 0 kg

D.2 REBAR FOR BEAM 8 0 0 0


d.2.1 Prefab rebar column ballroom ### s/d ### 13 8 0 0 0 kg
d.2.2 ### s/d ### 0 0 0 0 0 kg
d.2.3 ### s/d ### 0 0 0 0 0 kg

D.3 REBAR FOR SLAB 0 0 0 0


d.3.1 ### s/d ### 0 0 0 0 0 kg
d.3.2 ### s/d ### 0 0 0 0 0 kg
d.3.3 ### s/d ### 0 0 0 0 0 kg

E. Masonry 2 16 0 0
e.1 Install brick for pavilon HoS ### s/d ### 9 0 10 0 0 m2
e.2 Fabrication brique ### s/d ### 9 0 6 0 0 m2
e.3 Install head of plaster HoS ### s/d ### 13 2 0 0 0 m2
e.4 ### s/d ### 13 0 0 0 0 m'

F. Plastering 0 2 0 43.08
f.1 Plastering column corridor ### s/d ### 13 0 2 0 43.08 m2
f.2 Plastering wall HoS ### s/d ### 13 0 0 0 0 m2
f.3 ### s/d ### 0 0 0 0 0 ls
f.3 ### s/d ### 0 0 0 0 0 m'

G. Anti-Thermite 0 0 0 0
g.1 ### s/d ### 0 0 0 0 0 m2
g.2 ### s/d ### 0 0 0 0 0
g.3 ### s/d ### 0 0 0 0 0
g.4 ### s/d ### 0 0 0 0 0
g.5 ### s/d ### 0 0 0 0 0

H. Waterproofing Sub Structure 0 0 0 0


h.1 ### s/d ### 0 0 0 0 0
h.2 ### s/d ### 0 0 0 0 0
h.3 ### s/d ### 0 0 0 0 0
h.4 ### s/d ### 0 0 0 0 0
h.5 ### s/d ### 0 0 0 0 0

I. Waterproofing Wet Area 0 0 0 0


i.1 ### s/d ### 0 0 0 0 0
i.2 ### s/d ### 0 0 0 0 0
i.3 ### s/d ### 0 0 0 0 0
i.4 ### s/d ### 0 0 0 0 0
i.5 ### s/d ### 0 0 0 0 0

J. Lain-Lain 20 16 0 0 ls
j.1 Storing ### s/d ### 13 1 0 0 0 ls
j.2 MEP Crew ### s/d ### 13 2 0 0 0 ls
j.3 SHE Crew ### s/d ### 13 4 3 0 0 ls
j.4 Surveyor Crew ### s/d ### 13 2 0 0 0 ls
j.5 Scaffolder ### s/d ### 13 1 0 0 0 ls
j.6 Canteen Crew and office boy ### s/d ### 13 2 0 0 0 ls
j.7 Driver and Operator ### s/d ### 13 4 4 0 0 ls
j.8 Warehouse assistant ### s/d ### 13 1 0 0 0 ls
j.9 Laboratory quality control assistant ### s/d ### 13 1 0 0 0 ls
j.10 Equipment assistant ### s/d ### 13 1 0 0 0 ls
j.11 Foreman ### s/d ### 13 1 1 0 0 ls
j.12 Leave or sick ### s/d ### 13 0 0 0 0 ls
j.13 Fabrication concrete decking ### s/d ### 13 0 0 0 0 ls
j.14 Fabrication door and windows SVB ### s/d ### 8 0 2 0 0 set
j.15 Prepare for pedestal column (shifting land) ### s/d ### 13 0 2 0 0 m2
j.16 Shifting Materiel ### s/d ### 13 0 2 0 0 ls
j.17 Cleaning all area ### s/d ### 10 0 2 0 0 ls
j.18 Repair column ballroom ### s/d ### 13 0 0 0 0 ls
0
K Alat
k.1 Excavator ### s/d ### 13 1 0
k.2 Compactor ### s/d ### 13 1 0
k.3 Bob Cat ### s/d ### 13 0 0
k.4 Fiori ### s/d ### 13 2 0
k.5 Rough Terrain Crane ### s/d ### 13 1 0
k.6 Concrete Vibrator ### s/d ### 13 3 0
k.7 Bar Bending ### s/d ### 13 1 0
k.8 Bar Cutter ### s/d ### 13 1 0
k.9 Flat Bed Truck ### s/d ### 13 1 0
k.10 Circle Cutter ### s/d ### 13 4 0
k.11 Welding Machine ### s/d ### 13 4 0
k.12 Stamper ### s/d ### 13 1 0
k.13 Compressor ### s/d ### 13 1 0
k.14 Tile Cutter ### s/d ### 13 2 0
k.15 Seaming Roofing Machine ### s/d ### 13 2 0
k.16 Hand Bor ### s/d ### 13 6 0

Indonesia
Local
n
Workers ###
Temperature (Celcius) Amount of Working Hours Overtime (hours) Workers Management Staff TOTAL
82 56
ENG 7 HC / GA 7
27 - 42° C 10 0 138 SPV 6 SHE 4
SURVEYOR 4 KOM 6

Notes Maitre Douvrage Entrepreneur Dibuat Oleh,

Chef de Department Technique Chef de De Department D'ingenierie


NIAMEY NYALA PT. WIJAYA KARYA (Persero) Tbk.

You might also like