You are on page 1of 1

Day : Senin

Date : 6-Apr-20
Hari
Weeks : 70
Daily Report
Tanggal

RÉHABILITATION DU PALAIS PRÉSIDENTIEL DU RÉPUBLIQUE DU NIGER


Minggu Ke
Work Durations number of workers Volume
NO Job Description Working Hours Unit Material / Information Material
(Hours) Ind WorkersLocal Workers Tools Ind WorkersLocal Workers Tools
A. Earthwork 0 0 0 0
a.1 Excavation ### s/d ### 15 0 0 0 0 m3
a.2 Striping area backside SVB ### s/d ### 9 0 0 0 0 m3
a.3 ### s/d ### 0 0 0 0 0
a.4 ### s/d ### 0 0 0 0 0

B. Concrete 4 0 5.2 0
b.1 Casting concrete LC footing PoP ### s/d ### 2 4 0 5.2 0 m3 Continue working for cleaning all area and dis
b.2 ### s/d ### 0 0 0 0 0
b.3 ### s/d ### 0 0 0 0 0
b.4 ### s/d ### 0 0 0 0 0
b.5 ### s/d ### 0 0 0 0 0

C. Formwork 29 0 199.02 0
c.1 Workshop ### s/d ### 10 3 0 0 0 m2 fabrication formwork and others
c.2 Fabrication on site ### s/d ### 10 1 0 0 0 m2
c.3 Install scaffolding and formwork for beam and slab ballroo ### s/d ### 10 3 0 0 0 m2
c.4 Install formwork for column ballroom ToC +9.600 ### s/d ### 10 4 0 59.706 0 m2
c.5 Dishutter formwork for column ballroom ToC +9.600 ### s/d ### 10 8 0 0 0 m2
c.6 Install scaffolding and formwork beam and slab Ballroom To ### s/d ### 10 2 0 0 0 m2
c.7 Install scaffolding dan formwork ring beam and slab HoS To ### s/d ### 10 6 0 0 0 m2
c.8 Install formwork LC footing and column pedestal PoP ### s/d ### 10 2 0 139.314 0 m2

D. Rebar 12 0 23.084 0
d.1 Fabrication Rebar ### s/d ### 10 4 0 0 0 kg
d.2 Install rebar beam and slab ballroom ToC -0.050 ### s/d ### 10 4 0 12.6962 0 kg
d.3 Install rebar beam and slab HoS ToC +6.350 ### s/d ### 10 4 0 10.3878 0
d.4 ### s/d ### 0 0 0 0 0

E. Masonry 2 12 0 0
e.1 Install brick for column corridor HoS ### s/d ### 10 2 0 0 0 m2
e.2 Install brick for pavilon HoS ### s/d ### 10 0 12 0 0 m2
e.3 ### s/d ### 0 0 0 0 0
e.4 ### s/d ### 0 0 0 0 0

F. Plastering 10 0 0 0
f.1 Finishing gutter roof SVB ### s/d ### 10 2 0 0 0 m'
f.2 Finishing wall and window SVB ### s/d ### 10 6 0 0 0 m2
f.3 finishing arc above zanko SVB ### s/d ### 10 2 0 0 0
f.4 ### s/d ### 0 0 0 0 0

G. Anti-Thermite 0 0 0 0
g.1 ### s/d ### 0 0 0 0 0 m2
g.2 ### s/d ### 0 0 0 0 0
g.3 ### s/d ### 0 0 0 0 0
g.4 ### s/d ### 0 0 0 0 0
g.5 ### s/d ### 0 0 0 0 0

H. Waterproofing Sub Structure 0 0 0 0


h.1 ### s/d ### 0 0 0 0 0
h.2 ### s/d ### 0 0 0 0 0
h.3 ### s/d ### 0 0 0 0 0
h.4 ### s/d ### 0 0 0 0 0
h.5 ### s/d ### 0 0 0 0 0

I. Waterproofing Wet Area 0 0 0 0


i.1 ### s/d ### 0 0 0 0 0
i.2 ### s/d ### 0 0 0 0 0
i.3 ### s/d ### 0 0 0 0 0
i.4 ### s/d ### 0 0 0 0 0
i.5 ### s/d ### 0 0 0 0 0

J. Others 23 6 0 0 ls
j.1 Storing ### s/d ### 10 1 0 0 0 ls
j.2 MEP Crew ### s/d ### 10 2 0 0 0 ls
j.3 SHE Crew ### s/d ### 10 4 1 0 0 ls
j.4 Surveyor Crew ### s/d ### 10 2 0 0 0 ls
j.5 Scaffolder ### s/d ### 10 1 0 0 0 ls
j.6 Canteen Crew and office boy ### s/d ### 10 2 0 0 0 ls
j.7 Driver and Operator ### s/d ### 10 4 5 0 0 ls
j.8 Warehouse assistant ### s/d ### 10 1 0 0 0 ls
j.9 Laboratory quality control assistant ### s/d ### 10 1 0 0 0 ls
j.10 Equipment assistant ### s/d ### 10 1 0 0 0 ls
j.11 Foreman ### s/d ### 10 1 0 0 0 ls
j.12 Leave or sick ### s/d ### 8 1 0 0 0 ls
j.13 Fabrication concrete decking ### s/d ### 10 1 0 0 0 ls
j.14 Repair of concrete columns ### s/d ### 10 1 0 0 0 pcs

K Tools
k.1 Excavator ### s/d ### 15 1 0
k.2 Compactor ### s/d ### 10 1 0
k.3 Bob Cat ### s/d ### 9 1 0
k.4 Fiori ### s/d ### 10 2 0
k.5 Rough Terrain Crane ### s/d ### 10 1 0
k.6 Concrete Vibrator ### s/d ### 10 3 0
k.7 Bar Bending ### s/d ### 10 1 0
k.8 Bar Cutter ### s/d ### 10 1 0
k.9 Flat Bed Truck ### s/d ### 10 2 0
k.10 Circle Cutter ### s/d ### 10 4 0
k.11 Welding Machine ### s/d ### 10 4 0
k.12 Stamper ### s/d ### 10 1 0
k.13 Compressor ### s/d ### 10 1 0
k.14 Tile Cutter ### s/d ### 10 2 0
k.15 Seaming Roofing Machine ### s/d ### 10 2 0
k.16 Hand Bor ### s/d ### 10 6 0

Indonesia Local
n
Workers Workers ###
Temperature (Celcius) Amount of Working Hours Overtime (hours) Management Staff TOTAL
80 18
ENG 7 HC / GA 7
44° C 10 - 98 SPV 6 SHE 4
SURVEYOR 4 KOM 6

Notes Maitre Douvrage Entrepreneur Dibuat Oleh,

Chef de Department Technique Chef de De Department D'ingenierie


NIAMEY NYALA PT. WIJAYA KARYA (Persero) Tbk.