You are on page 1of 305

12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
Guide Wall Concrete for Secant Piles for 12.6 M Shoring &
1 NAVAYUGA BETC P145 IR C MZP 001 Rev 00 BETC/P145/IR/C/MZP/001/Rev 00 9-Oct-14 11-Oct-14 2 B 0 0 0 B
(Pile No. H-123 To S-114) Shoring Works Working Piles
Established Temporary Bench Marks (Done By
Shoring &
2 Concord Surveying Works) Al Shahad Tower NAVAYUGA BETC P145 IR C MZP 002 Rev 00 BETC/P145/IR/C/MZP/002/Rev 00 11-Oct-14 11-Oct-14 0 B 0 0 0 B
Working Piles
Project
Guide Wall Concrete for Secant Piles for 12.6 M Shoring &
3 NAVAYUGA BETC P145 IR C MZP 003 Rev 00 BETC/P145/IR/C/MZP/003/Rev 00 12-Oct-14 13-Oct-14 1 B 0 0 0 B
(Pile No. H-114 To S-105) Shoring Works Working Piles
Guide Wall Concrete for Secant Piles for 12.0 M Shoring &
4 NAVAYUGA BETC P145 IR C MZP 004 Rev 00 BETC/P145/IR/C/MZP/004/Rev 00 14-Oct-14 20-Oct-14 6 B 0 0 0 B
(Pile No.S-105 to S-097) Shoring works Working Piles
Guide Wall Concrete for Secant Piles for 12.0 M Shoring &
5 NAVAYUGA BETC P145 IR C MZP 005 Rev 00 BETC/P145/IR/C/MZP/005/Rev 00 16-Oct-14 20-Oct-14 4 B 0 0 0 B
(Pile No.H-097 to H-089) Shoring works Working Piles
Guide Wall for Secant Pile Shoring for 12.0 Mtr Shoring &
6 NAVAYUGA BETC P145 IR C MZP 006 Rev 00 BETC/P145/IR/C/MZP/006/Rev 00 18-Oct-14 20-Oct-14 2 B 0 0 0 B
from pile no S-88 to S-80 Working Piles
Guide Wall and setting out for Secant Pile (Pile Shoring &
7 NAVAYUGA BETC P145 IR C MZP 007 Rev 00 BETC/P145/IR/C/MZP/007/Rev 00 20-Oct-14 22-Oct-14 2 B 0 0 0 B
no. H-80 to H-72 Working Piles
Setting Out only Secant Pile for 12.0M (Pile No: Shoring &
8 NAVAYUGA BETC P145 IR C MZP 008 Rev 00 BETC/P145/IR/C/MZP/008/Rev 00 21-Oct-14 22-Oct-14 1 B 0 0 0 B
123 To 131 Working Piles
Setting Out only Secant Pile for 12.0M (Pile No: Shoring &
9 NAVAYUGA BETC P145 IR C MZP 009 Rev 00 BETC/P145/IR/C/MZP/009/Rev 00 22-Oct-14 29-Oct-14 7 B 0 0 0 B
H-132 to H-140) Working Piles
Center Point Pile Depth Prior to Cast Soft Pile Shoring &
10 NAVAYUGA BETC P145 IR C MZP 010 Rev 00 BETC/P145/IR/C/MZP/010/Rev 00 23-Oct-14 29-Oct-14 6 B 0 0 0 B
(Pile No S-115, S-116 & S-117 Working Piles
Setting Out only Secant Pile for 12.6M (Pile No Shoring &
11 NAVAYUGA BETC P145 IR C MZP 011 Rev 00 BETC/P145/IR/C/MZP/011/Rev 00 23-Oct-14 29-Oct-14 6 B 0 0 0 B
S-140 To S-149) Working Piles
Pile Setting Out for Secant Piles (Pile: S-118, S- Shoring &
12 NAVAYUGA BETC P145 IR C MZP 012 Rev 00 BETC/P145/IR/C/MZP/012/Rev 00 26-Oct-14 30-Oct-14 4 B 0 0 0 B
119, S-120) Working Piles
Inspection of Reinforcement prior to install in the Shoring &
13 NAVAYUGA BETC P145 IR C MZP 013 Rev 01 BETC/P145/IR/C/MZP/013/Rev 01 26-Oct-14 30-Oct-14 4 C 11-Nov-14 18-Nov-14 7 B 0 0 B
Pile Working Piles
Guide wall & Setting Out only secant Pile for Shoring &
14 NAVAYUGA BETC P145 IR C MZP 014 Rev 00 BETC/P145/IR/C/MZP/014/Rev 00 26-Oct-14 30-Oct-14 4 B 0 0 0 B
12.6M (Pile No S-71 TO S-63) Working Piles
Center Point & Pile Depth for secant pile (Pile Shoring &
15 NAVAYUGA BETC P145 IR C MZP 015 Rev 01 BETC/P145/IR/C/MZP/015/Rev 01 26-Oct-14 30-Oct-14 4 C 24-Dec-14 30-Dec-14 6 B 0 0 B
No. S-121, S-122, S-123) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
16 NAVAYUGA BETC P145 IR C MZP 016 Rev 01 BETC/P145/IR/C/MZP/016/Rev 01 27-Oct-14 3-Nov-14 7 C 5-Nov-14 9-Nov-14 4 B 0 B
No. S-135, S-134, S-1330 Working Piles
Guide Wall & Setting out Secant Pile 12.6m for
Shoring &
17 C-20 grade (Pile no H-60 to H-63 & H-150 to H- NAVAYUGA BETC P145 IR C MZP 017 Rev 01 BETC/P145/IR/C/MZP/017/Rev 01 29-Oct-14 3-Nov-14 5 C 5-Nov-14 9-Nov-14 4 B 0 0 B
Working Piles
153)
Center point & Pile Depth secant Pile (Pile no. H- Shoring &
18 NAVAYUGA BETC P145 IR C MZP 018 Rev 01 BETC/P145/IR/C/MZP/018/Rev 01 29-Oct-14 3-Nov-14 5 C 5-Nov-14 9-Nov-14 4 B 0 B
116, H-117, H-118 Working Piles
Guide wall & Setting Out only secant Pile for Shoring &
19 NAVAYUGA BETC P145 IR C MZP 019 Rev 00 BETC/P145/IR/C/MZP/019/Rev 00 1-Nov-14 5-Nov-14 4 B 0 0 0 B
(Pile No S-059 to S-050) Working Piles
Guide Wall & Setting out only for secant Pile Shoring &
20 NAVAYUGA BETC P145 IR C MZP 020 Rev 00 BETC/P145/IR/C/MZP/020/Rev 00 2-Nov-14 6-Nov-14 4 B 0 0 0 B
(Pile no H-50 to H-042 Working Piles
Center Point & Pile Depth for Secant Piles (Pile Shoring &
21 NAVAYUGA BETC P145 IR C MZP 021 Rev 00 BETC/P145/IR/C/MZP/021/Rev 00 4-Nov-14 6-Nov-14 2 B 0 0 0 B
No S-114,S-113,S-112,S-111 & S-121) Working Piles
Guide Wall Setting out only for Secant Pile (Pile Shoring &
22 NAVAYUGA BETC P145 IR C MZP 022 Rev 00 BETC/P145/IR/C/MZP/022/Rev 00 6-Nov-14 9-Nov-14 3 B 0 0 0 B
no. S-041 to S-033) Working Piles
Center Point and Pile Depth for Secant Pile (Pile Shoring &
23 NAVAYUGA BETC P145 IR C MZP 023 Rev 00 BETC/P145/IR/C/MZP/023/Rev 00 6-Nov-14 9-Nov-14 3 B 0 0 0 B
No. H119, H-120 and S-110) Working Piles
Guide Wall Setting out only for Secant Pile (Pile Shoring &
24 NAVAYUGA BETC P145 IR C MZP 024 Rev 00 BETC/P145/IR/C/MZP/024/Rev 00 9-Nov-14 11-Nov-14 2 B 0 0 0 B
No H33 To H-25) Working Piles
Center Point & Pile Depth for Secant Pile
Shoring &
25 Shoring works (Pile No. S-103,S-102,S-101 & NAVAYUGA BETC P145 IR C MZP 025 Rev 00 BETC/P145/IR/C/MZP/025/Rev 00 9-Nov-14 11-Nov-14 2 B 0 0 0 B
Working Piles
S95, S-94, s-93
Guide Wall Setting out only for secant Pile (Pile Shoring &
26 NAVAYUGA BETC P145 IR C MZP 026 Rev 00 BETC/P145/IR/C/MZP/026/Rev 00 10-Nov-14 17-Nov-14 7 B 0 0 0 B
no S-024 to S-016) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
27 NAVAYUGA BETC P145 IR C MZP 027 Rev 00 BETC/P145/IR/C/MZP/027/Rev 00 10-Nov-14 17-Nov-14 7 B 0 0 0 B
no H-121, H-115, H-112, H-111) Working Piles
Center Point & Pile Depth for Secant Pile (Pile
Shoring &
28 no H-114, H-113 & s-104, S-100, S-98, S-96, S- NAVAYUGA BETC P145 IR C MZP 028 Rev 00 BETC/P145/IR/C/MZP/028/Rev 00 12-Nov-14 17-Nov-14 5 B 0 0 0 B
Working Piles
91)
Center Point & Pile Depth for Secant Pile &
Shoring &
29 Reinforcement for Hard Pile (Pile no: S-109, S- NAVAYUGA BETC P145 IR C MZP 029 Rev 00 BETC/P145/IR/C/MZP/029/Rev 00 13-Nov-14 18-Nov-14 5 B 0 0 0 B
Working Piles
107, S-105 & H-103, H-102)
Center Point & Pile Depth for Secant Pile &
Shoring &
30 Reinforcement for Hard Pile (Pile no: S-99, S-97, NAVAYUGA BETC P145 IR C MZP 030 Rev 00 BETC/P145/IR/C/MZP/030/Rev 00 13-Nov-14 18-Nov-14 5 B 0 0 0 B
Working Piles
S-92 & H-101, H-94)
Guide Wall & Setting out for Secant Pile (Pile no: Shoring &
31 NAVAYUGA BETC P145 IR C MZP 031 Rev 00 BETC/P145/IR/C/MZP/031/Rev 00 13-Nov-14 19-Nov-14 6 B 0 0 0 B
H-16 To H-008) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
32 NAVAYUGA BETC P145 IR C MZP 032 Rev 00 BETC/P145/IR/C/MZP/032/Rev 00 17-Nov-14 19-Nov-14 2 B 0 0 0 B
No: S-90, s-88, S-84, S-78) Working Piles
Center Point & Pile Depth & Reinforcement for Shoring &
33 NAVAYUGA BETC P145 IR C MZP 033 Rev 00 BETC/P145/IR/C/MZP/033/Rev 00 17-Nov-14 19-Nov-14 2 B 0 0 0 B
Secant Pile (Pile No H-96, H-103, H-110) Working Piles
Center Point & Pile Depth and Reinforcement for Shoring &
34 NAVAYUGA BETC P145 IR C MZP 034 Rev 00 BETC/P145/IR/C/MZP/034/Rev 00 18-Nov-14 24-Nov-14 6 B 0 0 0 B
secant Pile (pile No H-098, H-105) Working Piles
Guide Wall & Setting out only for Secant Pile Shoring &
35 NAVAYUGA BETC P145 IR C MZP 035 Rev 00 BETC/P145/IR/C/MZP/035/Rev 00 18-Nov-14 24-Nov-14 6 B 0 0 0 B
(Pile No. S-241 To S-237 Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
36 NAVAYUGA BETC P145 IR C MZP 036 Rev 00 BETC/P145/IR/C/MZP/036/Rev 00 18-Nov-14 24-Nov-14 6 B 0 0 0 B
No S-086, S-081, S-075, S-072, S-069, S-067) Working Piles
Guide Wall & Setting out only for secant pile (Pile Shoring &
37 NAVAYUGA BETC P145 IR C MZP 037 Rev 00 BETC/P145/IR/C/MZP/037/Rev 00 18-Nov-14 24-Nov-14 6 B 0 0 0 B
no. S-007 To H-004) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
38 NAVAYUGA BETC P145 IR C MZP 038 Rev 00 BETC/P145/IR/C/MZP/038/Rev 00 19-Nov-14 24-Nov-14 5 B 0 0 0 B
No. S-89, S-85, S-77, S-70, S-63) Working Piles
Center Point & Pile Depth, Reinforcement for Shoring &
39 NAVAYUGA BETC P145 IR C MZP 039 Rev 00 BETC/P145/IR/C/MZP/039/Rev 00 19-Nov-14 24-Nov-14 5 B 0 0 0 B
Secant Pile (Pile no. H-100, H-092) Working Piles
Guide Wall Setting out Only for Secant Pile (Pile Shoring &
40 NAVAYUGA BETC P145 IR C MZP 040 Rev 01 BETC/P145/IR/C/MZP/040/Rev 01 20-Nov-14 26-Nov-14 6 C 23-Dec-14 30-Dec-14 7 B 0 0 B
No. H-237 TO H-229) Working Piles
Center Point & Pile Depth, Reinforcement for Shoring &
41 NAVAYUGA BETC P145 IR C MZP 041 Rev 00 BETC/P145/IR/C/MZP/041/Rev 00 20-Nov-14 26-Nov-14 6 B 0 0 0 B
secant Pile (Pile no. H-107, H-095) Working Piles
Center Point & Pile Depth for Secant Pile (pile
Shoring &
42 No. S-108, S-79, S-065, S-050, S-047, S-044, S- NAVAYUGA BETC P145 IR C MZP 042 Rev 00 BETC/P145/IR/C/MZP/042/Rev 00 20-Nov-14 26-Nov-14 6 B 0 0 0 B
Working Piles
040)
Center Point & Pile Depth, Reinforcement for Shoring &
43 NAVAYUGA BETC P145 IR C MZP 043 Rev 00 BETC/P145/IR/C/MZP/043/Rev 00 20-Nov-14 26-Nov-14 6 B 0 0 0 B
Secant Pile (Pile No. H-099, H-104) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
44 NAVAYUGA BETC P145 IR C MZP 044 Rev 00 BETC/P145/IR/C/MZP/044/Rev 00 20-Nov-14 26-Nov-14 6 B 0 0 0 B
No. S-076, S-068, S-063, S-056, S-54, S-052) Working Piles

Center Point & Pile Depth for Secant Pile (Pile Shoring &
45 NAVAYUGA BETC P145 IR C MZP 045 Rev 00 BETC/P145/IR/C/MZP/045/Rev 00 23-Nov-14 1-Dec-14 8 B 0 0 0 B
no. S-085, S-074, S-080, S-064) Working Piles
Center Point & Pile Deprth, Reinforcement for Shoring &
46 NAVAYUGA BETC P145 IR C MZP 046 Rev 00 BETC/P145/IR/C/MZP/046/Rev 00 23-Nov-14 26-Nov-14 3 B 0 0 0 B
Secant Pile (pile No H-106, H-97) Working Piles

1/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
Guide wall Setting out only for secant Pile (Pile Shoring &
47 NAVAYUGA BETC P145 IR C MZP 047 Rev 00 BETC/P145/IR/C/MZP/047/Rev 00 23-Nov-14 1-Dec-14 8 B 0 0 0 B
No.S-003 To H-001 & H-60, S-59) Working Piles
Guide Wall Setting out only for Secant Pile (Pile Shoring &
48 NAVAYUGA BETC P145 IR C MZP 048 Rev 01 BETC/P145/IR/C/MZP/048/Rev 01 23-Nov-14 7-Dec-14 14 C 23-Dec-14 30-Dec-14 7 B 0 0 B
no. S-228 To S-220) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
49 NAVAYUGA BETC P145 IR C MZP 049 Rev 00 BETC/P145/IR/C/MZP/049/Rev 00 24-Nov-14 4-Dec-14 10 B 0 0 0 B
No. S-087, S-82, S-71) Working Piles
Center Point & Pile Depth, Reinforcement for Shoring &
50 NAVAYUGA BETC P145 IR C MZP 050 Rev 00 BETC/P145/IR/C/MZP/050/Rev 00 24-Nov-14 1-Dec-14 7 B 0 0 0 B
Secant Pile (Pile No. H-109, H-093) Working Piles
Center Pouint & Pile Depth for Secant Pile (Pile Shoring &
51 NAVAYUGA BETC P145 IR C MZP 051 Rev 00 BETC/P145/IR/C/MZP/051/Rev 00 25-Nov-14 4-Dec-14 9 B 0 0 0 B
No. S-66, S-46) Working Piles
Center Point and Pile Depth, Reinforcement for Shoring &
52 NAVAYUGA BETC P145 IR C MZP 052 Rev 00 BETC/P145/IR/C/MZP/052/Rev 00 25-Nov-14 1-Dec-14 6 B 0 0 0 B
Secant Pile (Pile No. H-79, H-90) Working Piles
Center Point & Pile Depth, Reinforcement for Shoring &
53 NAVAYUGA BETC P145 IR C MZP 053 Rev 00 BETC/P145/IR/C/MZP/053/Rev 00 26-Nov-14 1-Dec-14 5 B 0 0 0 B
Secant Pile (Pile No. H-108, H-88, H-76) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
54 NAVAYUGA BETC P145 IR C MZP 054 Rev 00 BETC/P145/IR/C/MZP/054/Rev 00 26-Nov-14 1-Dec-14 5 B 0 0 0 B
No .S-55, S-49, S-41) Working Piles
Center Point & Pile Depth, reinforcement for
Shoring &
55 Secant Pile (Pile no. H-134, H-91, H-86, H-78, H- NAVAYUGA BETC P145 IR C MZP 055 Rev 00 BETC/P145/IR/C/MZP/055/Rev 00 27-Nov-14 4-Dec-14 7 B 0 0 0 B
Working Piles
70)
Center Point & Pile Depth for Secant Pile (Pile
Shoring &
56 No. S-73, S-62, S-48, S-42, S-123, S-128, S- NAVAYUGA BETC P145 IR C MZP 056 Rev 00 BETC/P145/IR/C/MZP/056/Rev 00 27-Nov-14 7-Dec-14 10 B 0 0 0 B
Working Piles
141)
Guide Wall Setting out only for Secant Pile (Pile Shoring &
57 NAVAYUGA BETC P145 IR C MZP 057 Rev 01 BETC/P145/IR/C/MZP/057/Rev 01 27-Nov-14 7-Dec-14 10 C 23-Dec-14 30-Dec-14 7 B 0 0 B
no. H-220 To H-212) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
58 NAVAYUGA BETC P145 IR C MZP 058 Rev 00 BETC/P145/IR/C/MZP/058/Rev 00 27-Nov-14 4-Dec-14 7 B 0 0 0 B
No. S-83, S-54, S-45, S-39) Working Piles
Center Point & pile Depth, Reinforcement for Shoring &
59 NAVAYUGA BETC P145 IR C MZP 059 Rev 00 BETC/P145/IR/C/MZP/059/Rev 00 27-Nov-14 7-Dec-14 10 B 0 0 0 B
Secant Pile (Pile no. H-89, H-77, H-68) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
60 NAVAYUGA BETC P145 IR C MZP 060 Rev 00 BETC/P145/IR/C/MZP/060/Rev 00 30-Nov-14 11-Dec-14 11 B 0 0 0 B
No.S-131, S-122, S-126) Working Piles
Center Point & Pile Depth, Reinforcement for Shoring &
61 NAVAYUGA BETC P145 IR C MZP 061 Rev 00 BETC/P145/IR/C/MZP/061/Rev 00 30-Nov-14 23-Dec-14 23 B 0 0 0 B
Secant Pile (Pile no.H-133) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
62 NAVAYUGA BETC P145 IR C MZP 062 Rev 00 BETC/P145/IR/C/MZP/062/Rev 00 1-Dec-14 7-Dec-14 6 B 0 0 0 B
no. S-135, S-129, S-124) Working Piles
Center Point & Pile Depth, Reinforcement for Shoring &
63 NAVAYUGA BETC P145 IR C MZP 063 Rev 00 BETC/P145/IR/C/MZP/063/Rev 00 1-Dec-14 7-Dec-14 6 B 0 0 0 B
Secant Pile (Pile no. H-87, H-80, H-72) Working Piles
Center Point & Pile Depth, Reinforcement for Shoring &
64 NAVAYUGA BETC P145 IR C MZP 064 Rev 00 BETC/P145/IR/C/MZP/064/Rev 00 2-Dec-14 11-Dec-14 9 B 0 0 0 B
Secant Pile (Pile No. H-66, H-73, H-85) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
65 NAVAYUGA BETC P145 IR C MZP 065 Rev 00 BETC/P145/IR/C/MZP/065/Rev 00 3-Dec-14 7-Dec-14 4 B 0 0 0 B
No. S-61, S-51, S-43) Working Piles
Center Point & Pile Depth, Reinforcement for Shoring &
66 NAVAYUGA BETC P145 IR C MZP 066 Rev 00 BETC/P145/IR/C/MZP/066/Rev 00 3-Dec-14 7-Dec-14 4 B 0 0 0 B
Secant Pile (Pile no. H-83, H-75) Working Piles
Guide Wall & Setting out Only for Secant Pile Shoring &
67 NAVAYUGA BETC P145 IR C MZP 067 Rev 01 BETC/P145/IR/C/MZP/067/Rev 01 3-Dec-14 11-Dec-14 8 C 23-Dec-14 30-Dec-14 7 B 0 0 B
(Pile No. S-211 To H-208) Working Piles
Center Point & Pile Depth for Secant Pile (pile Shoring &
68 NAVAYUGA BETC P145 IR C MZP 068 Rev 00 BETC/P145/IR/C/MZP/068/Rev 00 4-Dec-14 11-Dec-14 7 B 0 0 0 B
No. S-127, S-125) Working Piles
Center Point & Pile Depth, Reinforcement for Shoring &
69 NAVAYUGA BETC P145 IR C MZP 069 Rev 00 BETC/P145/IR/C/MZP/069/Rev 00 4-Dec-14 11-Dec-14 7 B 0 0 0 B
Secant Pile (Pile No. H-135, H-84, H-74, H-69) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
70 NAVAYUGA BETC P145 IR C MZP 070 Rev 00 BETC/P145/IR/C/MZP/070/Rev 00 4-Dec-14 11-Dec-14 7 B 0 0 0 B
no. S-53, S-60) Working Piles
Center Point & Pile Depth, Reinforcement for Shoring &
71 NAVAYUGA BETC P145 IR C MZP 071 Rev 00 BETC/P145/IR/C/MZP/071/Rev 00 4-Dec-14 21-Dec-14 17 B 0 0 0 B
Secant Pile (Pile No, H-81, H-71, H-42) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
72 NAVAYUGA BETC P145 IR C MZP 072 Rev 00 BETC/P145/IR/C/MZP/072/Rev 00 7-Dec-14 11-Dec-14 4 B 0 0 0 B
No. S-138, S-136, S-130, S-58, S-38, S-36) Working Piles
Center Point & pileDepth for Secant Pile (Pile Shoring &
73 NAVAYUGA BETC P145 IR C MZP 073 Rev 00 BETC/P145/IR/C/MZP/073/Rev 00 8-Dec-14 15-Dec-14 7 B 0 0 0 B
No. S-52, S-34, S-32, S-28, S-26) Working Piles
Center Point & Pile Depth, Reinforcement for Shoring &
74 NAVAYUGA BETC P145 IR C MZP 074 Rev 00 BETC/P145/IR/C/MZP/074/Rev 00 8-Dec-14 15-Dec-14 7 B 0 0 0 B
Secant Pile (Pile No H-82) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
75 NAVAYUGA BETC P145 IR C MZP 075 Rev 00 BETC/P145/IR/C/MZP/075/Rev 00 9-Dec-14 15-Dec-14 6 B 0 0 0 B
No. S-140, S-137, S-59, S-57) Working Piles
Guide Wall & Setting out only for Secant Pile Shoring &
76 NAVAYUGA BETC P145 IR C MZP 076 Rev 01 BETC/P145/IR/C/MZP/076/Rev 01 9-Dec-14 15-Dec-14 6 C 23-Dec-14 30-Dec-14 7 B 0 0 B
(Pile No. H-212 To S-200) Working Piles
Center Point & Pile depth for Secant Pile (Pile
Shoring &
77 No. S-37 (Dewatering Pipe), S-35, S-30, S-24, S- NAVAYUGA BETC P145 IR C MZP 077 Rev 00 BETC/P145/IR/C/MZP/077/Rev 00 10-Dec-14 15-Dec-14 5 B 0 0 0 B
Working Piles
22, S-18)
Center Point & Pile Depth for Secant Pile (Pile Shoring &
78 NAVAYUGA BETC P145 IR C MZP 078 Rev 00 BETC/P145/IR/C/MZP/078/Rev 00 11-Dec-14 21-Dec-14 10 B 0 0 0 B
no. S-33, S-31, S-20, S-20, S-17) Working Piles
Center Point & Pille Depth, Reinforcement for Shoring &
79 NAVAYUGA BETC P145 IR C MZP 079 Rev 00 BETC/P145/IR/C/MZP/079/Rev 00 11-Dec-14 21-Dec-14 10 B 0 0 0 B
Secant Pile (Pile no. H-71, H-67, H-63, H-61) Working Piles
Center Point & Pile Depth for Secant Pile
Shoring &
80 (PileNo. S-141 (Dewatering Pipe), S-139, S-25, NAVAYUGA BETC P145 IR C MZP 080 Rev 00 BETC/P145/IR/C/MZP/080/Rev 00 11-Dec-14 23-Dec-14 12 B 0 0 0 B
Working Piles
S-23)
Center Point & Pille Depth, Reinforcement for
Shoring &
81 Secant Pile (Pile no.H-122, H-124, H-131, H- NAVAYUGA BETC P145 IR C MZP 081 Rev 00 BETC/P145/IR/C/MZP/081/Rev 00 11-Dec-14 21-Dec-14 10 B 0 0 0 B
Working Piles
133)
Guide Wall & Setting out only for Secant Pile Shoring &
82 NAVAYUGA BETC P145 IR C MZP 082 Rev 01 BETC/P145/IR/C/MZP/082/Rev 01 11-Dec-14 21-Dec-14 10 C 24-Dec-14 30-Dec-14 6 B 0 0 B
(Pile No. H-200 To S-185) Working Piles
Center Point & Pile Depth, Reinforcement for Shoring &
83 NAVAYUGA BETC P145 IR C MZP 083 Rev 00 BETC/P145/IR/C/MZP/083/Rev 00 14-Dec-14 23-Dec-14 9 B 0 0 0 B
Secant Pile (Pile no. H-62, H-59, H-50, H-48) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
84 NAVAYUGA BETC P145 IR C MZP 084 Rev 00 BETC/P145/IR/C/MZP/084/Rev 00 14-Dec-14 23-Dec-14 9 B 0 0 0 B
No. S-29, S-21) Working Piles
Surface Prepapration for Capping Beam (Pile Shoring &
85 NAVAYUGA BETC P145 IR C MZP 085 Rev 00 BETC/P145/IR/C/MZP/085/Rev 00 14-Dec-14 30-Dec-14 16 B 0 0 0 B
No. S-118 To S-100) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
86 NAVAYUGA BETC P145 IR C MZP 086 Rev 00 BETC/P145/IR/C/MZP/086/Rev 00 15-Dec-14 23-Dec-14 8 B 0 0 0 B
No. S-143, S-145, S-27) Working Piles
Center Point & Pile Depth,Reinforcement for
Shoring &
87 Secant Pile (Pile no. H-123, H-125, H-132, H- NAVAYUGA BETC P145 IR C MZP 087 Rev 00 BETC/P145/IR/C/MZP/087/Rev 00 15-Dec-14 28-Dec-14 13 B 0 0 0 B
Working Piles
136)
Center Point & Pile Depth, Reinforcement for Shoring &
88 NAVAYUGA BETC P145 IR C MZP 088 Rev 00 BETC/P145/IR/C/MZP/088/Rev 00 16-Dec-14 30-Dec-14 14 B 0 0 0 B
Scant Pile (Pile No. H-52, H-53, H-64, H-65) Working Piles
Center Point & Pile Depth for secant Pile (Pile Shoring &
89 NAVAYUGA BETC P145 IR C MZP 089 Rev 00 BETC/P145/IR/C/MZP/089/Rev 00 16-Dec-14 23-Dec-14 7 B 0 0 0 B
No. S-19, S-16) Working Piles
Center Point & Pile depth for Secant Pile (Pile Shoring &
90 NAVAYUGA BETC P145 IR C MZP 090 Rev 00 BETC/P145/IR/C/MZP/090/Rev 00 17-Dec-14 23-Dec-14 6 B 0 0 0 B
No .S-14) Working Piles
Center Point & Pile Depth, Reinforcement for Shoring &
91 NAVAYUGA BETC P145 IR C MZP 091 Rev 00 BETC/P145/IR/C/MZP/091/Rev 00 17-Dec-14 28-Dec-14 11 B 0 0 0 B
Secant Pile (Pile No. H-60, H-58, H-49, H-43) Working Piles
Guide Wall & Setting out only for Secant Pile Shoring &
92 NAVAYUGA BETC P145 IR C MZP 092 Rev 01 BETC/P145/IR/C/MZP/092/Rev 01 17-Dec-14 5-Jan-15 19 Cancelled 6-Jan-15 12-Jan-15 6 B 0 0 B
(Pile No H-185 To S-179) Working Piles

2/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
Capping Beam Reinforcement & Shuttering for Shoring &
93 NAVAYUGA BETC P145 IR C MZP 093 Rev 00 BETC/P145/IR/C/MZP/093/Rev 00 17-Dec-14 30-Dec-14 13 B 0 0 0 B
Concreting (Pile No. S-118 To S-100) Working Piles
Center Point & Pile Depth , Reinforcement for Shoring &
94 NAVAYUGA BETC P145 IR C MZP 094 Rev 00 BETC/P145/IR/C/MZP/094/Rev 00 17-Dec-14 30-Dec-14 13 B 0 0 0 B
Secant Pile (Pile No. H-51, H-47, H-46) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
95 NAVAYUGA BETC P145 IR C MZP 095 Rev 00 BETC/P145/IR/C/MZP/095/Rev 00 17-Dec-14 28-Dec-14 11 B 0 0 0 B
No. S-142, S-144) Working Piles
Center Point & Pile Depth, Reinforcement for Shoring &
96 NAVAYUGA BETC P145 IR C MZP 096 Rev 00 BETC/P145/IR/C/MZP/096/Rev 00 21-Dec-14 30-Dec-14 9 B 0 0 0 B
Secant Pile (Pile No. H-57, H-44, H-41) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
97 NAVAYUGA BETC P145 IR C MZP 097 Rev 00 BETC/P145/IR/C/MZP/097/Rev 00 21-Dec-14 28-Dec-14 7 B 0 0 0 B
No. S-12, S-04, S-02) Working Piles
Center Point & Pile Depth for Secant Pile (Pile
Shoring &
98 No. S-15, S-08, S-06, S-241 (Dewatering ) S- NAVAYUGA BETC P145 IR C MZP 098 Rev 00 BETC/P145/IR/C/MZP/098/Rev 00 22-Dec-14 30-Dec-14 8 B 0 0 0 B
Working Piles
232, S-230, S-146, S-148)
Center Point & Pile Depth for Secant Pile (Pile
Shoring &
99 No. S-239, S-237, S-228, S-226, S-224, S-224, NAVAYUGA BETC P145 IR C MZP 099 Rev 00 BETC/P145/IR/C/MZP/099/Rev 00 23-Dec-14 5-Jan-15 13 B 0 0 0 B
Working Piles
S-220, S-218)
Center Point & Pile Depth for Secant Pile (Pile
Shoring &
100 No. S-01, S-03, S-236, S-234, S-222, S-234, S- NAVAYUGA BETC P145 IR C MZP 100 Rev 00 BETC/P145/IR/C/MZP/100/Rev 00 24-Dec-14 30-Dec-14 6 B 0 0 0 B
Working Piles
222, S-216, S-214, S-213)
Center Point & Pile Depth, Reinforcement for Shoring &
101 NAVAYUGA BETC P145 IR C MZP 101 Rev 00 BETC/P145/IR/C/MZP/101/Rev 00 24-Dec-14 5-Jan-15 12 B 0 0 0 B
Secant Pile (H-137, H-130, H-128, H-126) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
102 NAVAYUGA BETC P145 IR C MZP 102 Rev 00 BETC/P145/IR/C/MZP/102/Rev 00 24-Dec-14 30-Dec-14 6 B 0 0 0 B
No. S-05, S-07, S-147) Working Piles
Guide Wall & Setting out only for Secant Pile Shoring &
103 NAVAYUGA BETC P145 IR C MZP 103 Rev 00 BETC/P145/IR/C/MZP/103/Rev 00 24-Dec-14 30-Dec-14 6 B 0 0 0 B
(Pile No. H-150 to H-154) Working Piles
Center Point & Pile Depth, Reinforcement for
Shoring &
104 Secant Pile (Pile No. H-56, H-54, H-45, H-39, H- NAVAYUGA BETC P145 IR C MZP 104 Rev 00 BETC/P145/IR/C/MZP/104/Rev 00 24-Dec-14 5-Jan-15 12 B 0 0 0 B
Working Piles
37)
Center Point & Pile Depth for Secant Pile (Pile Shoring &
105 NAVAYUGA BETC P145 IR C MZP 105 Rev 00 BETC/P145/IR/C/MZP/105/Rev 00 24-Dec-14 30-Dec-14 6 B 0 0 0 B
No. S-09, S-11, S-231) Working Piles
Center Point & Pile Depth, reinforcement for Shoring &
106 NAVAYUGA BETC P145 IR C MZP 106 Rev 00 BETC/P145/IR/C/MZP/106/Rev 00 28-Dec-14 5-Jan-15 8 B 0 0 0 B
Secant Pile (Pile No. H-146, H-144, H-139, H-35) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
107 NAVAYUGA BETC P145 IR C MZP 107 Rev 00 BETC/P145/IR/C/MZP/107/Rev 00 28-Dec-14 5-Jan-15 8 B 0 0 0 B
No.S-235, S-233, S-225, S-223) Working Piles
Center Point & Pile Depth, Reinforcement for Shoring &
108 NAVAYUGA BETC P145 IR C MZP 108 Rev 00 BETC/P145/IR/C/MZP/108/Rev 00 29-Dec-14 5-Jan-15 7 B 0 0 0 B
Secant (Pile No. H-127, H-129, H-55, H-29) Working Piles
Center Point & pile Depth for Secant Pile (Pile Shoring &
109 NAVAYUGA BETC P145 IR C MZP 109 Rev 00 BETC/P145/IR/C/MZP/109/Rev 00 29-Dec-14 5-Jan-15 7 B 0 0 0 B
No. S-229, S-227, S-217, S-215) Working Piles
Capping Beam Reinforcement and Shuttering for Shoring &
110 NAVAYUGA BETC P145 IR C MZP 110 Rev 00 BETC/P145/IR/C/MZP/110/Rev 00 29-Dec-14 5-Jan-15 7 B 0 0 0 B
Concreting (Pile no. H-100 to S-81) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
111 NAVAYUGA BETC P145 IR C MZP 111 Rev 00 BETC/P145/IR/C/MZP/111/Rev 00 30-Dec-14 5-Jan-15 6 B 0 0 0 B
No. S-221, S-219 (Dewatering ), S-213, S-211) Working Piles

Center Point & Pile Depth, Reinforcement for


Shoring &
112 Secant Pile(Pile No. h-147, H-141, H-138, H-33, NAVAYUGA BETC P145 IR C MZP 112 Rev 00 BETC/P145/IR/C/MZP/112/Rev 00 30-Dec-14 5-Jan-15 6 B 0 0 0 B
Working Piles
H-31)
Center Point & Pile Depth, Reinforcement for
Shoring &
113 Secant Pile (Pile No. H-40, H-38, H-25, H-23, H- NAVAYUGA BETC P145 IR C MZP 113 Rev 00 BETC/P145/IR/C/MZP/113/Rev 00 31-Dec-14 6-Jan-15 6 B 0 0 0 B
Working Piles
15, H-13)
Center Point & Pile Depth for Secant Pile (Pile Shoring &
114 NAVAYUGA BETC P145 IR C MZP 114 Rev 00 BETC/P145/IR/C/MZP/114/Rev 00 31-Dec-14 6-Jan-15 6 B 0 0 0 B
No. S-209, S-207) Working Piles
Center Point & Pile Depth, Reinforcement for
Shoring &
115 Secant Pile (Pile No. H-148, H-143, H140, H-36, NAVAYUGA BETC P145 IR C MZP 115 Rev 00 BETC/P145/IR/C/MZP/115/Rev 00 31-Dec-14 5-Jan-15 5 B 0 0 0 B
Working Piles
H-34, H-27, H-17)
Capping Beam Reinforcement and shuttering for Shoring &
116 NAVAYUGA BETC P145 IR C MZP 116 Rev 00 BETC/P145/IR/C/MZP/116/Rev 00 31-Dec-14 12-Jan-15 12 B 0 0 0 B
Concreting (Pile No. H-841 To S-58 Working Piles
Center Point & Pile Depth, Reinforcement for
Shoring &
117 Secant Pile (Pile No. H-32, H-30, H-21, H-19, H- NAVAYUGA BETC P145 IR C MZP 117 Rev 00 BETC/P145/IR/C/MZP/117/Rev 00 31-Dec-14 12-Jan-15 12 B 0 0 0 B
Working Piles
14, H-11, H-4, H-2)
Cente rPoint & Pile Depth for Secant Pile (Pile Shoring &
118 NAVAYUGA BETC P145 IR C MZP 118 Rev 00 BETC/P145/IR/C/MZP/118/Rev 00 4-Jan-15 12-Jan-15 8 B 0 0 0 B
No. S-205, S-203, S-197, S-195) Working Piles
Center Point & Pile Depth, Reinforcement for
Shoring &
119 Secant Pile (Pile No. H-236, H-234, H-228, H- NAVAYUGA BETC P145 IR C MZP 119 Rev 00 BETC/P145/IR/C/MZP/119/Rev 00 4-Jan-15 12-Jan-15 8 B 0 0 0 B
Working Piles
226, H-145, H-142)
Center Point & Pile Depth, Reinforcement for Shoring &
120 NAVAYUGA BETC P145 IR C MZP 120 Rev 00 BETC/P145/IR/C/MZP/120/Rev 00 5-Jan-15 12-Jan-15 7 B 0 0 0 B
Secant Pile (Pile No. H-28, H-26, H-18, H-16) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
121 NAVAYUGA BETC P145 IR C MZP 121 Rev 00 BETC/P145/IR/C/MZP/121/Rev 00 5-Jan-15 12-Jan-15 7 B 0 0 0 B
No. S-187, S-189, S-210, S-212) Working Piles
Center Point & Pile Depth, Reinforcement for Shoring &
122 NAVAYUGA BETC P145 IR C MZP 122 Rev 00 BETC/P145/IR/C/MZP/122/Rev 00 6-Jan-15 12-Jan-15 6 B 0 0 0 B
Secant Pile (Pile No. H-07, H-09, H-20) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
123 NAVAYUGA BETC P145 IR C MZP 123 Rev 00 BETC/P145/IR/C/MZP/123/Rev 00 6-Jan-15 12-Jan-15 6 B 0 0 0 B
No. S-208, S-201, S-199) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
124 NAVAYUGA BETC P145 IR C MZP 124 Rev 00 BETC/P145/IR/C/MZP/124/Rev 00 7-Jan-15 12-Jan-15 5 B 0 0 0 B
No. S-151, S-153, S-206) - Working Piles
Center Point & pile Depth for Secant Pile (Pile Shoring &
125 NAVAYUGA BETC P145 IR C MZP 125 Rev 00 BETC/P145/IR/C/MZP/125/Rev 00 7-Jan-15 12-Jan-15 5 B 0 0 0 B
No. H-230, H-218, H-216) Working Piles
Center Poibnt & Pile Depth, reinforcement for Shoring &
126 NAVAYUGA BETC P145 IR C MZP 126 Rev 00 BETC/P145/IR/C/MZP/126/Rev 00 8-Jan-15 19-Jan-15 11 B 0 0 0 B
Secant Pile (Pile No. H-03, H-05, H-22, H-24) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
127 NAVAYUGA BETC P145 IR C MZP 127 Rev 00 BETC/P145/IR/C/MZP/127/Rev 00 8-Jan-15 12-Jan-15 4 B 0 0 0 B
No. S-149, S-191, S-193, S-204) Working Piles
Guide Wall & Setting out only for Secant Pile Shoring &
128 NAVAYUGA BETC P145 IR C MZP 128 Rev 00 BETC/P145/IR/C/MZP/128/Rev 00 8-Jan-15 19-Jan-15 11 B 0 0 0 B
(Pile No. S-177 to S-168) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
129 NAVAYUGA BETC P145 IR C MZP 129 Rev 00 BETC/P145/IR/C/MZP/129/Rev 00 8-Jan-15 19-Jan-15 11 B 0 0 0 B
No. S-150, S-152, S-202) Working Piles
Center Point & Pile Depth, Reinfocement for
Shoring &
130 Secant Pile (Pile No. H-12, H-10, H-229, H-224) NAVAYUGA BETC P145 IR C MZP 130 Rev 00 BETC/P145/IR/C/MZP/130/Rev 00 8-Jan-15 19-Jan-15 11 B 0 0 0 B
Working Piles
-
Cente rpoint & Pile Depth for Secant Pile (Pile Shoring &
131 NAVAYUGA BETC P145 IR C MZP 131 Rev 00 BETC/P145/IR/C/MZP/131/Rev 00 11-Jan-15 20-Jan-15 9 B 0 0 0 B
no. S-200, S-198 (Dewatering(, S-190) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
132 NAVAYUGA BETC P145 IR C MZP 132 Rev 00 BETC/P145/IR/C/MZP/132/Rev 00 12-Jan-15 20-Jan-15 8 B 0 0 0 B
No. S-187, S-194, S-196) Working Piles
Center Point & Pile Depth, Reinforcement for
Shoring &
133 Secant Pile (Pile No.H-06, H-08, H-18, H-149, H- NAVAYUGA BETC P145 IR C MZP 133 Rev 00 BETC/P145/IR/C/MZP/133/Rev 00 12-Jan-15 20-Jan-15 8 B 0 0 0 B
Working Piles
151, H-153, H-220, H-222, H-226)
Center Point & Pile Depth, Reinforcement for Shoring &
134 NAVAYUGA BETC P145 IR C MZP 134 Rev 00 BETC/P145/IR/C/MZP/134/Rev 00 13-Jan-15 20-Jan-15 7 B 0 0 0 B
Secant Pile (Pile No. H-233, H-214) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
135 NAVAYUGA BETC P145 IR C MZP 135 Rev 00 BETC/P145/IR/C/MZP/135/Rev 00 13-Jan-15 26-Jan-15 13 B 0 0 0 B
No. S-192, S-185) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
136 NAVAYUGA BETC P145 IR C MZP 136 Pending BETC/P145/IR/C/MZP/136/Pending 14-Jan-15 -42018 Cancelled 0 0 0 Cancelled
No. S-183, S-181) Working Piles

3/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
Center Point & Pile Depth, Reinforcement for
Shoring &
137 Secant Pile (Pile No. H-227, H-225, H-212, H- NAVAYUGA BETC P145 IR C MZP 137 Rev 00 BETC/P145/IR/C/MZP/137/Rev 00 14-Jan-15 26-Jan-15 12 B 0 0 0 B
Working Piles
210, H-202, H-200, H-152, H-150)

Center Point & Pile Depth for Secant Pile (Pile Shoring &
138 NAVAYUGA BETC P145 IR C MZP 138 Rev 00 BETC/P145/IR/C/MZP/138/Rev 00 14-Jan-15 21-Jan-15 7 B 0 0 0 B
No. S-241, S-239) Working Piles

Center Point & Pile Depth, Reinfocement for


Shoring &
139 Secant Pile (Pile No. H-206, H-208, H-217, H- NAVAYUGA BETC P145 IR C MZP 139 Rev 00 BETC/P145/IR/C/MZP/139/Rev 00 14-Jan-15 21-Jan-15 7 B 0 0 0 B
Working Piles
219)

Capping Beam, Reinforcement and Shuttering Shoring &


140 NAVAYUGA BETC P145 IR C MZP 140 Rev 00 BETC/P145/IR/C/MZP/140/Rev 00 14-Jan-15 25-Jun-15 162 B 0 0 0 B
for Concreting (Pile no. H-59 to S-36) Working Piles
Guide Wall & Setting out only for Secant Pile Shoring &
141 NAVAYUGA BETC P145 IR C MZP 141 Rev 00 BETC/P145/IR/C/MZP/141/Rev 00 14-Jan-15 20-Jan-15 6 B 0 0 0 B
(Pile No. H-168 To S-165) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
142 NAVAYUGA BETC P145 IR C MZP 142 Rev 00 BETC/P145/IR/C/MZP/142/Rev 00 14-Jan-15 21-Jan-15 7 B 0 0 0 B
No. S-177 (Dewatering), S-179 Working Piles
Center Point & Pile Depth, Reinforcement for
Shoring &
143 Secant Pile (Pile No. H-235, H-232, H-223, H- NAVAYUGA BETC P145 IR C MZP 143 Rev 00 BETC/P145/IR/C/MZP/143/Rev 00 14-Jan-15 26-Jan-15 12 B 0 0 0 B
Working Piles
221, H-198, H-196)
Center Point & Pile Depth, Reinforcement for Shoring &
144 NAVAYUGA BETC P145 IR C MZP 144 Rev 00 BETC/P145/IR/C/MZP/144/Rev 00 18-Jan-15 26-Jan-15 8 B 0 0 0 B
secant Pile (H-215, H-213, H-205, H-203) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
145 NAVAYUGA BETC P145 IR C MZP 145 Rev 00 BETC/P145/IR/C/MZP/145/Rev 00 18-Jan-15 29-Jan-15 11 B 0 0 0 B
No. S-188, S-186, S-170, S-168) Working Piles
Center point & Pile Depth for Secant Pile (Pile Shoring &
146 NAVAYUGA BETC P145 IR C MZP 146 Rev 00 BETC/P145/IR/C/MZP/146/Rev 00 19-Jan-15 29-Jan-15 10 B 0 0 0 B
No. S-169, S-167) Working Piles
Center point & Pile Depth, Reinforcement for
Shoring &
147 Secant pile (Pile No. H-207, H-211, H-194, H- NAVAYUGA BETC P145 IR C MZP 147 Rev 00 BETC/P145/IR/C/MZP/147/Rev 00 19-Jan-15 29-Jan-15 10 B 0 0 0 B
Working Piles
192)
Center Point & Pile Depth, Reinforcement for
Shoring &
148 Secant Pile (Pile No. H-201, H-199, H-209, H- NAVAYUGA BETC P145 IR C MZP 148 Rev 00 BETC/P145/IR/C/MZP/148/Rev 00 20-Jan-15 29-Jan-15 9 B 0 0 0 B
Working Piles
190)
Center Point & Pile Depth for Secant Pile (Pile Shoring &
149 NAVAYUGA BETC P145 IR C MZP 149 Rev 00 BETC/P145/IR/C/MZP/149/Rev 00 21-Jan-15 29-Jan-15 8 B 0 0 0 B
No. S-240, s-238, S-237) Working Piles
Cente rPoint & Pile Depth, Reinforcement for
Shoring &
150 Secant Pile (Pile No. H-001, H-186, H-195, H- NAVAYUGA BETC P145 IR C MZP 150 Rev 00 BETC/P145/IR/C/MZP/150/Rev 00 22-Jan-15 3-Feb-15 12 B 0 0 0 B
Working Piles
197, H-204)
Center Point & Pile Depth for Secant pile (Pile Shoring &
151 NAVAYUGA BETC P145 IR C MZP 151 Rev 00 BETC/P145/IR/C/MZP/151/Rev 00 22-Jan-15 29-Jan-15 7 B 0 0 0 B
No. S-176, S-174) Working Piles
Center Point & Pile Depth, Reinforcement for
Shoring &
152 Secant Pile (Pile No. h-237, H-239, H-193, H- NAVAYUGA BETC P145 IR C MZP 152 Rev 00 BETC/P145/IR/C/MZP/152/Rev 00 22-Jan-15 3-Feb-15 12 B 0 0 0 B
Working Piles
189)
Center Point & Pile Depth for Secant Pile (Pile Shoring &
153 NAVAYUGA BETC P145 IR C MZP 153 Rev 00 BETC/P145/IR/C/MZP/153/Rev 00 22-Jan-15 3-Feb-15 12 B 0 0 0 B
No. S-183, S-181) - Working Piles
Shoring &
154 Center Point & Pile Depth for Pile Head Chipping NAVAYUGA BETC P145 IR C MZP 154 Rev 00 BETC/P145/IR/C/MZP/154/Rev 00 22-Jan-15 25-Jun-15 154 B 0 0 0 B
Working Piles
Work (Pile No. S-153 To H-117) - 22-1-15
Center Point & Pile Depth, Reinforcement for
Shoring &
155 Secant Pile (Pile No. H-238, H-240, H-191, H- NAVAYUGA BETC P145 IR C MZP 155 Rev 00 BETC/P145/IR/C/MZP/155/Rev 00 25-Jan-15 3-Feb-15 9 B 0 0 0 B
Working Piles
188)
Center Point & Pile Depth for Secant Pile (Pile Shoring &
156 NAVAYUGA BETC P145 IR C MZP 156 Rev 00 BETC/P145/IR/C/MZP/156/Rev 00 25-Jan-15 3-Feb-15 9 B 0 0 0 B
No. S-175, S-172, S-184, S-182) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
157 NAVAYUGA BETC P145 IR C MZP 157 Rev 00 BETC/P145/IR/C/MZP/157/Rev 00 26-Jan-15 25-Jun-15 150 B 0 0 0 B
No. S-178, S-171, S-173) Working Piles
Center Point & Pile Depth, Reinforcement for
Shoring &
158 Secant Pile (Pile No. H-170, H-187, H-169, H- NAVAYUGA BETC P145 IR C MZP 158 Rev 00 BETC/P145/IR/C/MZP/158/Rev 00 26-Jan-15 3-Feb-15 8 B 0 0 0 B
Working Piles
241)
Center Point & Pile Depth for Steel Preparation Shoring &
159 NAVAYUGA BETC P145 IR C MZP 159 Rev 00 BETC/P145/IR/C/MZP/159/Rev 00 26-Jan-15 25-Jun-15 150 B 0 0 0 B
(Pile No. S-153 To H-117) Working Piles
Center Point & Pile Depth, Reinforcement for Shoring &
160 NAVAYUGA BETC P145 IR C MZP 160 Rev 00 BETC/P145/IR/C/MZP/160/Rev 00 27-Jan-15 25-Jun-15 149 B 0 0 0 B
Secant Pile (Pile No.H-185, H-184) - Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
161 NAVAYUGA BETC P145 IR C MZP 161 Rev 00 BETC/P145/IR/C/MZP/161/Rev 00 27-Jan-15 25-Jun-15 149 B 0 0 0 B
No. S-167, S-166, S-180) Working Piles
Prefabricated Anchors & Grouting (Anchor No. A- Shoring &
162 NAVAYUGA BETC P145 IR C MZP 162 Rev 00 BETC/P145/IR/C/MZP/162/Rev 00 28-Jan-15 24-Jun-15 147 B 0 0 0 B
97, A-95, A-94, A-93) Working Piles
Prefabricated Anchors & Grouting (Anchor no. Shoring &
163 NAVAYUGA BETC P145 IR C MZP 163 Rev 00 BETC/P145/IR/C/MZP/163/Rev 00 28-Jan-15 24-Jun-15 147 B 0 0 0 B
A-99 & A-100) Working Piles
Prefabricated Anchors &Grouting (Anchor No. A- Shoring &
164 NAVAYUGA BETC P145 IR C MZP 164 Rev 00 BETC/P145/IR/C/MZP/164/Rev 00 29-Jan-15 25-Jun-15 147 B 0 0 0 B
112, A-98, A-89, A-86, A-82, A-80) Working Piles
Capping Beam Reinforcement and Shuttering for Shoring &
165 NAVAYUGA BETC P145 IR C MZP 165 Rev 00 BETC/P145/IR/C/MZP/165/Rev 00 29-Jan-15 25-Jun-15 147 B 0 0 0 B
Concreting (Pile No. S-153 To S-136) Working Piles
Center Point & Pile Depth Reinforcement for Shoring &
166 NAVAYUGA BETC P145 IR C MZP 166 Rev 00 BETC/P145/IR/C/MZP/166/Rev 00 29-Jan-15 25-Jun-15 147 B 0 0 0 B
Secant Pile (Pile no. H-186, H-183, H-182) Working Piles
Prefabricated Anchors & Grouting - (Anchor A- Shoring &
167 NAVAYUGA BETC P145 IR C MZP 167 Rev 00 BETC/P145/IR/C/MZP/167/Rev 00 29-Jan-15 24-Jun-15 146 B 0 0 0 B
79, A-78, A-71, A-69) Working Piles
Center Point & Pile Depth, Reinforcement for
Shoring &
168 Secant Pile (pile No. H-177, H-176, H-174, H- NAVAYUGA BETC P145 IR C MZP 168 Rev 00 BETC/P145/IR/C/MZP/168/Rev 00 29-Jan-15 25-Jun-15 147 B 0 0 0 B
Working Piles
171, H-168) -
Prefabricated Anchors & Grouting (Anchor No. A- Shoring &
169 NAVAYUGA BETC P145 IR C MZP 169 Rev 00 BETC/P145/IR/C/MZP/169/Rev 00 1-Feb-15 24-Jun-15 143 B 0 0 0 B
87, A-88, A-90, A-110, A-114) Working Piles
Center Point & Pile Depth, Reinforcement for Shoring &
170 NAVAYUGA BETC P145 IR C MZP 170 Rev 00 BETC/P145/IR/C/MZP/170/Rev 00 3-Feb-15 25-Jun-15 142 B 0 0 0 B
Secant Pile (Pile No. H-175, H-173, H-172) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
171 NAVAYUGA BETC P145 IR C MZP 171 Rev 00 BETC/P145/IR/C/MZP/171/Rev 00 3-Feb-15 25-Jun-15 142 B 0 0 0 B
No. S-180, S-178) - 03-2-15 Working Piles
Prefabricated Anchors & Grouting (Anchor No. A- Shoring &
172 NAVAYUGA BETC P145 IR C MZP 172 Rev 00 BETC/P145/IR/C/MZP/172/Rev 00 3-Feb-15 24-Jun-15 141 B 0 0 0 B
84, A-85, A-96) Working Piles
Reinforcement and shuttering for Capping Beam Shoring &
173 NAVAYUGA BETC P145 IR C MZP 173 Rev 00 BETC/P145/IR/C/MZP/173/Rev 00 3-Feb-15 25-Jun-15 142 B 0 0 0 B
(Pile No. S-137 To H-117) Working Piles
Prefabricated Anchors & Grouting (Anchor No. A- Shoring &
174 NAVAYUGA BETC P145 IR C MZP 174 Rev 00 BETC/P145/IR/C/MZP/174/Rev 00 3-Feb-15 24-Jun-15 141 B 0 0 0 B
91, A-93, A-85, A-84, A-83) Working Piles
Guide Wall & Setting out only for Secant Pile Shoring &
175 NAVAYUGA BETC P145 IR C MZP 175 Rev 00 BETC/P145/IR/C/MZP/175/Rev 00 4-Feb-15 17-Feb-15 13 B 0 0 0 B
(Pile No. H-167 to H-154) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
176 NAVAYUGA BETC P145 IR C MZP 176 Rev 00 BETC/P145/IR/C/MZP/176/Rev 00 8-Feb-15 17-Feb-15 9 B 0 0 0 B
No. H-181, H-179) Working Piles
Reinforcement and Shuttering for Capping Beam Shoring &
177 NAVAYUGA BETC P145 IR C MZP 177 Rev 00 BETC/P145/IR/C/MZP/177/Rev 00 8-Feb-15 18-Feb-15 10 B 0 0 0 B
(pile No. S-44 To S-22) - 08-2-15 Working Piles
Center point & Pile Depth for Secant pile (pile Shoring &
178 NAVAYUGA BETC P145 IR C MZP 178 Rev 00 BETC/P145/IR/C/MZP/178/Rev 00 8-Feb-15 17-Feb-15 9 B 0 0 0 B
No. S-166, S-164, S-158, S-156) Working Piles
Center Point & Pile Depth for Secant Pile (pile Shoring &
179 NAVAYUGA BETC P145 IR C MZP 179 Rev 00 BETC/P145/IR/C/MZP/179/Rev 00 8-Feb-15 17-Feb-15 9 B 0 0 0 B
No. S-165, S-163, S-157) Working Piles

4/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
Center Point & Pile Depth, Reinforcement for Shoring &
180 NAVAYUGA BETC P145 IR C MZP 180 Rev 00 BETC/P145/IR/C/MZP/180/Rev 00 8-Feb-15 17-Feb-15 9 B 0 0 0 B
Secant Pile (Pile No. H-180, H-178) - Working Piles
Reinforcement & Shuttering for Capping Beam Shoring &
181 NAVAYUGA BETC P145 IR C MZP 181 Rev 00 BETC/P145/IR/C/MZP/181/Rev 00 11-Feb-15 18-Feb-15 7 B 0 0 0 B
(Pile No. H-022 To S-001) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
182 NAVAYUGA BETC P145 IR C MZP 182 Rev 00 BETC/P145/IR/C/MZP/182/Rev 00 11-Feb-15 18-Feb-15 7 B 0 0 0 B
No. S-161, S-159) Working Piles
Reinforcement and shuttering for Capping Beam Shoring &
183 NAVAYUGA BETC P145 IR C MZP 183 Rev 00 BETC/P145/IR/C/MZP/183/Rev 00 11-Feb-15 18-Feb-15 7 B 0 0 0 B
(Pile No. H-001 To H-220) Working Piles
Center Point & Pile Depth for Secant Pile (Pile Shoring &
184 NAVAYUGA BETC P145 IR C MZP 184 Rev 00 BETC/P145/IR/C/MZP/184/Rev 00 11-Feb-15 18-Feb-15 7 B 0 0 0 B
no. S-162, S-154, S-155) Working Piles
Reinforcement and Shuttering for Capping Beam Shoring &
185 NAVAYUGA BETC P145 IR C MZP 185 Rev 00 BETC/P145/IR/C/MZP/185/Rev 00 12-Feb-15 16-Mar-15 32 B 0 0 0 B
(Pile No. H-220 To H-197) Working Piles
Center Point & Pile Depth, Reinforcement for
Shoring &
186 Secant Pile (Pile No. H-167, H-165, H-158, H- NAVAYUGA BETC P145 IR C MZP 186 Rev 00 BETC/P145/IR/C/MZP/186/Rev 00 12-Feb-15 18-Feb-15 6 B 0 0 0 B
Working Piles
156)
Center Point & Pile Depth for Secant Pile (Pile Shoring &
187 NAVAYUGA BETC P145 IR C MZP 187 Rev 00 BETC/P145/IR/C/MZP/187/Rev 00 12-Feb-15 16-Mar-15 32 B 0 0 0 B
No. S-160) Working Piles
Center Point & Pile Depth, Reinforcement for
Shoring &
188 Secant Pile (Pile No. H-166, H-164, H-157, H- NAVAYUGA BETC P145 IR C MZP 188 Rev 00 BETC/P145/IR/C/MZP/188/Rev 00 12-Feb-15 16-Mar-15 32 B 0 0 0 B
Working Piles
155)
Center Point & Pile Depth, Reinforcement for
Shoring &
189 Secant Pile (Pile No. H-163, H-162, H-154, H- NAVAYUGA BETC P145 IR C MZP 189 Rev 00 BETC/P145/IR/C/MZP/189/Rev 00 16-Feb-15 23-Jun-15 127 B 0 0 0 B
Working Piles
159)
Center Point & Pile Depth, Reinforcement for Shoring &
190 NAVAYUGA BETC P145 IR C MZP 190 Rev 00 BETC/P145/IR/C/MZP/190/Rev 00 18-Feb-15 2-Mar-15 12 B 0 0 0 B
Secant Pile (Pile No. H-161, H-160) Working Piles
Reinforcement and Shutering for Capping Beam Shoring &
191 NAVAYUGA BETC P145 IR C MZP 191 Rev 00 BETC/P145/IR/C/MZP/191/Rev 00 18-Feb-15 2-Mar-15 12 B 0 0 0 B
(Pile No. S-196 To H-178) Working Piles
Reinforcement and Shuttering for Capping Beam Shoring &
192 NAVAYUGA BETC P145 IR C MZP 192 Rev 00 BETC/P145/IR/C/MZP/192/Rev 00 19-Feb-15 4-Mar-15 13 B 0 0 0 B
(Pile No. S-177 To S-153) Working Piles
Center Point & Pile depth & Reinforcement PTP- Shoring &
193 NAVAYUGA BETC P145 IR C MZP 193 Rev 00 BETC/P145/IR/C/MZP/193/Rev 00 3-Mar-15 11-Mar-15 8 B 0 0 0 B
01 (Test Pile) 1200mm DIA Working Piles
Center Point & Pile depth & Reinforcement PTP- Shoring &
194 NAVAYUGA BETC P145 IR C MZP 194 Rev 00 BETC/P145/IR/C/MZP/194/Rev 00 12-Mar-15 17-Mar-15 5 B 0 0 0 B
02 (Test Pile) 900mm DIA Working Piles
Preliminary Pile Load Test for Compression Shoring &
195 NAVAYUGA BETC P145 IR C MZP 195 Rev 00 BETC/P145/IR/C/MZP/195/Rev 00 16-Mar-15 18-Mar-15 2 B 0 0 0 B
(PTP-01 (Compression Test Pile) 1200 dia) Working Piles
Center Point, Depth & Reinforcement (P3-125, Shoring &
196 NAVAYUGA BETC P145 IR C MZP 196 Rev 00 BETC/P145/IR/C/MZP/196/Rev 00 17-Mar-15 23-Mar-15 6 B 0 0 0 B
P3-138, P3-154, P3-155) Working Piles
Shoring &
197 Center Point, Pile Depth & Reinforcement (P3- NAVAYUGA BETC P145 IR C MZP 197 Rev 00 BETC/P145/IR/C/MZP/197/Rev 00 18-Mar-15 30-Mar-15 12 B 0 0 0 B
Working Piles
130, P3-131, P3-152, P3-153 & P4-47, P4-48)
Center Point, Pile Depth & Reinforcement (P3-
Shoring &
198 124, P3-137, P3-150, P3-151 & P4-44, P4-45, NAVAYUGA BETC P145 IR C MZP 198 Rev 00 BETC/P145/IR/C/MZP/198/Rev 00 19-Mar-15 26-Mar-15 7 B 0 0 0 B
Working Piles
P4-46, P4-49)
Center Point, Pile Depth & Reinforcement (P3-
Shoring &
199 148, P3-149, P3-143, P3-144 & P4-41, P4-42, NAVAYUGA BETC P145 IR C MZP 199 Rev 00 BETC/P145/IR/C/MZP/199/Rev 00 19-Mar-15 26-Mar-15 7 B 0 0 0 B
Working Piles
P4-43)
Center Point, pile Depth & Reinforcement (P3-
Shoring &
200 134, P3-135, P3-136, P3-129, P3-150 & P4-39, NAVAYUGA BETC P145 IR C MZP 200 Rev 00 BETC/P145/IR/C/MZP/200/Rev 00 22-Mar-15 26-Mar-15 4 B 0 0 0 B
Working Piles
P4-40)
Center Point, Pile Depth & Reinforcement (P3-
Shoring &
201 136, P3-129, P3A-4 & P3A-4 & P4-37, P4-38, NAVAYUGA BETC P145 IR C MZP 201 Rev 00 BETC/P145/IR/C/MZP/201/Rev 00 23-Mar-15 26-Mar-15 3 B 0 0 0 B
Working Piles
P4-39)
Center Point, Pile Depth & Reinforcement (P3-
Shoring &
202 125, P3-146, P3A-3, P3A-2 & P4-32, P4-34, P4- NAVAYUGA BETC P145 IR C MZP 202 Rev 00 BETC/P145/IR/C/MZP/202/Rev 00 24-Mar-15 29-Mar-15 5 B 0 0 0 B
Working Piles
36)
Center Point, Pile Depth & Reinforcement (P3- Shoring &
203 NAVAYUGA BETC P145 IR C MZP 203 Rev 00 BETC/P145/IR/C/MZP/203/Rev 00 25-Mar-15 29-Mar-15 4 B 0 0 0 B
145, P3-147, P3-142 & P4-33, P4-35, P4-36) Working Piles
Preliminary Pile Load Test for Compression Shoring &
204 NAVAYUGA BETC P145 IR C MZP 204 Rev 00 BETC/P145/IR/C/MZP/204/Rev 00 26-Mar-15 29-Mar-15 3 B 0 0 0 B
(PTP-02 (Compression Test Pile) 900 dia) Working Piles
Center Point, Pile Depth & Reinforcement (P3-
Shoring &
205 148, P3-147, P3-132, P3-133 & P4-29, P4-30, NAVAYUGA BETC P145 IR C MZP 205 Rev 00 BETC/P145/IR/C/MZP/205/Rev 00 26-Mar-15 30-Mar-15 4 B 0 0 0 B
Working Piles
P4-27)
Center Point, Pile Depth & Reinforcement (P3-
Shoring &
206 139, P3-140, P3-133 & P4-25, P4-26, P4-27, P4- NAVAYUGA BETC P145 IR C MZP 206 Rev 00 BETC/P145/IR/C/MZP/206/Rev 00 29-Mar-15 1-Apr-15 3 B 0 0 0 B
Working Piles
28)
Center Point, Pile Depth & Reinforcement (P3-
Shoring &
207 120, P3-121, P3-122, P3-123, P3-141, P3-148 & NAVAYUGA BETC P145 IR C MZP 207 Rev 00 BETC/P145/IR/C/MZP/207/Rev 00 30-Mar-15 1-Apr-15 2 B 0 0 0 B
Working Piles
P4-23, P4-28)
Center Point , Pile Depth & Reinforcement (P3-
Shoring &
208 115, P3-116, P3-117, P3-118, P3-119, P3-127 & NAVAYUGA BETC P145 IR C MZP 208 Rev 00 BETC/P145/IR/C/MZP/208/Rev 00 1-Apr-15 2-Apr-15 1 B 0 0 0 B
Working Piles
P4-24)
Center point, Pile Depth & Reinforcement (P3-
Shoring &
209 58, P3-70, P3-84, P3-96, P3-106,P3-126 & P4- NAVAYUGA BETC P145 IR C MZP 209 Rev 00 BETC/P145/IR/C/MZP/209/Rev 00 2-Apr-15 3-Apr-15 1 B 0 0 0 B
Working Piles
19)
Center Point, Pile Depth & Reinforcement (P3-
Shoring &
210 50, P3-64, P3-76, P3-90, P3-112, P3-51 & P4- NAVAYUGA BETC P145 IR C MZP 210 Rev 00 BETC/P145/IR/C/MZP/210/Rev 00 2-Apr-15 5-Apr-15 3 B 0 0 0 B
Working Piles
15, P4-20)
Center Point, Pile Depth & Reinforcement (P3-
Shoring &
211 59, P3-65, P3-77, P3-91, P3-107, P3-111 & P4- NAVAYUGA BETC P145 IR C MZP 211 Rev 00 BETC/P145/IR/C/MZP/211/Rev 00 2-Apr-15 6-Apr-15 4 B 0 0 0 B
Working Piles
16)
Pile Center point, depth & Reinforcement (P3- Shoring &
212 NAVAYUGA BETC P145 IR C MZP 212 Rev 00 BETC/P145/IR/C/MZP/212/Rev 00 6-Apr-15 6-Apr-15 0 B 0 0 0 B
45,44,71,97 & P1-72,73,74) Working Piles
Pile Center point, depth & Reinforcement (P3- Shoring &
213 NAVAYUGA BETC P145 IR C MZP 213 Rev 00 BETC/P145/IR/C/MZP/213/Rev 00 7-Apr-15 9-Apr-15 2 B 0 0 0 B
78,85,102 & P3A-1 & P1-72,73,74,75) Working Piles
Pile Center point, depth & Reinforcement (P3- Shoring &
214 NAVAYUGA BETC P145 IR C MZP 214 Rev 00 BETC/P145/IR/C/MZP/214/Rev 00 8-Apr-15 9-Apr-15 1 B 0 0 0 B
52,53,36,79,85,102,103 & P1-97) Working Piles
Pile Center Point , depth & Reinforcement (P3- Shoring &
215 NAVAYUGA BETC P145 IR C MZP 215 Rev 00 BETC/P145/IR/C/MZP/215/Rev 00 11-Apr-15 24-May-15 43 B 0 0 0 B
36,37,66,102,92 & P1-98,99) Working Piles
Pile Center Point, depth & reinforcement (P3- Shoring &
216 NAVAYUGA BETC P145 IR C MZP 216 Rev 00 BETC/P145/IR/C/MZP/216/Rev 00 11-Apr-15 12-Apr-15 1 B 0 0 0 B
27,46,60,72,86,98 & P1-71, 96) Working Piles
Center Point, Pile Depth & Reinforcement (P3- Shoring &
217 NAVAYUGA BETC P145 IR C MZP 217 Rev 00 BETC/P145/IR/C/MZP/217/Rev 00 12-Apr-15 13-Apr-15 1 B 0 0 0 B
1,P3-2, P3-25,P3-26, P3-92 & P1-86, P1-88) Working Piles
Shoring &
218 Center Point, Pile Depth & Reinforcement (P3-8, NAVAYUGA BETC P145 IR C MZP 218 Rev 00 BETC/P145/IR/C/MZP/218/Rev 00 12-Apr-15 13-Apr-15 1 B 0 0 0 B
Working Piles
P3-9, P3-38, P3-39, P3-92 & P1-89, P1-91)
Center Point, Pile Depth & Reinforcement (P3-3, Shoring &
219 NAVAYUGA BETC P145 IR C MZP 219 Rev 00 BETC/P145/IR/C/MZP/219/Rev 00 13-Apr-15 14-Apr-15 1 B 0 0 0 B
P3-4, P3-38, P4-1, P4-2 & P1-93, P1-95) Working Piles
Center Point, Pile Depth & Reinforcement (P3- Shoring &
220 NAVAYUGA BETC P145 IR C MZP 220 Rev 00 BETC/P145/IR/C/MZP/220/Rev 00 14-Apr-15 16-Apr-15 2 B 0 0 0 B
18, P3-24, P4-2, P4-3, P4-4 & P1-87, P1-90) Working Piles

5/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

Shoring &
221 Center Point, Pile Depth & Reinforcement (P3- NAVAYUGA BETC P145 IR C MZP 221 Rev 00 BETC/P145/IR/C/MZP/221/Rev 00 15-Apr-15 17-Apr-15 2 B 0 0 0 B
Working Piles
10, P3-11, P3-28, P1-90, P1-92, P1-94, P1-77)
Center Point, Pile Depth & Reinforcement (P3-
Shoring &
222 100, P3-101, P3-110, P100, P1-94, P1-82, P1- NAVAYUGA BETC P145 IR C MZP 222 Rev 00 BETC/P145/IR/C/MZP/222/Rev 00 16-Apr-15 19-Apr-15 3 B 0 0 0 B
Working Piles
80, P1-78 )

Shoring &
223 Center Point, Pile Depth & Reinforcement (P1- NAVAYUGA BETC P145 IR C MZP 223 Rev 00 BETC/P145/IR/C/MZP/223/Rev 00 19-Apr-15 20-Apr-15 1 B 0 0 0 B
Working Piles
70, P1-79. P1-81, P1-82, P1-83, P1-84, P1-85 )
Center Point, Pile Depth & Reinforcement (P1- Shoring &
224 NAVAYUGA BETC P145 IR C MZP 224 Rev 00 BETC/P145/IR/C/MZP/224/Rev 00 19-Apr-15 21-Apr-15 2 B 0 0 0 B
81, P1-70, P1-62, P1-54, P3-89, P3-88 ) Working Piles
Center Point, Pile Depth & Reinforcement (P1- Shoring &
225 NAVAYUGA BETC P145 IR C MZP 225 Rev 00 BETC/P145/IR/C/MZP/225/Rev 00 20-Apr-15 23-Apr-15 3 B 0 0 0 B
57, P1-58, P1-62, P1-65, P3-109, P3-113 ) Working Piles
Center Point, Pile Depth & Reinforcement (P4- Shoring &
226 NAVAYUGA BETC P145 IR C MZP 226 Rev 00 BETC/P145/IR/C/MZP/226/Rev 00 21-Apr-15 23-Apr-15 2 B 0 0 0 B
17, P4-18, P4-21, P4-22 & P3-108, P3-114 ) Working Piles

Shoring &
227 Stressing of Anchor (Sencond Layer Anchor: A- NAVAYUGA BETC P145 IR C MZP 227 Rev 00 BETC/P145/IR/C/MZP/227/Rev 00 21-Apr-15 25-Jun-15 65 B 0 0 0 B
Working Piles
135,134,133,132,131,130,129,128,127,126,125,
124,123,122,121,120,119,118,117,116,115
Center Point, Pile Depth & Reinforcement (P4- Shoring &
228 NAVAYUGA BETC P145 IR C MZP 228 Rev 00 BETC/P145/IR/C/MZP/228/Rev 00 22-Apr-15 25-Apr-15 3 B 0 0 0 B
17, P4-18, P3-99,P3-105, P3-108 ) Working Piles
Center Point, Pile Depth & Reinforcement (P1-
Shoring &
229 19, P1-28, P1-53, P1-61, P1-66, P1-69 & P3-87, NAVAYUGA BETC P145 IR C MZP 229 Rev 00 BETC/P145/IR/C/MZP/229/Rev 00 23-Apr-15 26-Apr-15 3 B 0 0 0 B
Working Piles
P3-99, P3-108)

Shoring &
230 Center Point, Pile Depth & Reinforcement (P1- NAVAYUGA BETC P145 IR C MZP 230 Rev 00 BETC/P145/IR/C/MZP/230/Rev 00 25-04-15 27-Apr-15 2 B 0 0 0 B
Working Piles
22, P1-27, P1-28, P1-45, P1-48, P3-87, P3-93)
Center Point, Pile Depth & Reinforcement (P1-9, Shoring &
231 NAVAYUGA BETC P145 IR C MZP 231 Rev 00 BETC/P145/IR/C/MZP/231/Rev 00 26-Apr-15 28-Apr-15 2 B 0 0 0 B
P1-10, P1-11, P1-12, P1-27, P1-37) Working Piles
Center Point, Pile Depth & Reinforcement (P1-9, Shoring &
232 NAVAYUGA BETC P145 IR C MZP 232 Rev 00 BETC/P145/IR/C/MZP/232/Rev 00 27-Apr-15 29-Apr-15 2 B 0 0 0 B
P1-10, P1-11, P1-12, P1-23,P1-30, P1-37) Working Piles
Center Point, Pile Depth & Reinforcement (P1- Shoring &
233 NAVAYUGA BETC P145 IR C MZP 233 Rev 00 BETC/P145/IR/C/MZP/233/Rev 00 28-Apr-15 30-Apr-15 2 B 0 0 0 B
10, P1-20,P1-24, P1-29, P1-42, P1-50) Working Piles
Center Point, Pile Depth & Reinforcement (P3- Shoring &
234 NAVAYUGA BETC P145 IR C MZP 234 Rev 00 BETC/P145/IR/C/MZP/234/Rev 00 29-Apr-15 13-Jun-15 45 B 0 0 0 B
63, P3-75, P3-82, P3-83 & P1-20, P1-21) Working Piles
Center Point, Pile Depth & Reinforcement (P1-
Shoring &
235 24, P1-38, P1-49, P2-16, P3-61, P3-62, P3-73, NAVAYUGA BETC P145 IR C MZP 235 Rev 00 BETC/P145/IR/C/MZP/235/Rev 00 30-Apr-15 13-Jun-15 44 B 0 0 0 B
Working Piles
P3-74, P1-21)
Center Point, Depth & Reinforcement (P1-38,
Shoring &
236 P2-14, P3-68, P3-69, P3-80, P3-81, P1-49, P3- NAVAYUGA BETC P145 IR C MZP 236 Rev 00 BETC/P145/IR/C/MZP/236/Rev 00 2-May-15 13-Jun-15 42 B 0 0 0 B
Working Piles
73)

Shoring &
237 Center Point, Pile Depth & Reinforcement (P1- NAVAYUGA BETC P145 IR C MZP 237 Rev 00 BETC/P145/IR/C/MZP/237/Rev 00 3-May-15 13-Jun-15 41 B 0 0 0 B
Working Piles
50, P1-33, P2-17, P3-67, P3-68, P3-69, P1-38)

Shoring &
238 Center Point, Pile Depth & Reinforcement (P1- NAVAYUGA BETC P145 IR C MZP 238 Rev 00 BETC/P145/IR/C/MZP/238/Rev 00 4-May-15 13-Jun-15 40 B 0 0 0 B
Working Piles
33, P1-36, P1-44, P2-15, P3-67, P3-68, P1-50)
Center Point, Pile Depth & Reinforcement (P1- Shoring &
239 NAVAYUGA BETC P145 IR C MZP 239 Rev 00 BETC/P145/IR/C/MZP/239/Rev 00 5-May-15 13-Jun-15 39 B 0 0 0 B
533, P1-36, P1-44, P2-11, P3-55, P1-76) Working Piles
Center Point, Pile Depth & Reinforcement (P1- Shoring &
240 NAVAYUGA BETC P145 IR C MZP 240 Rev 00 BETC/P145/IR/C/MZP/240/Rev 00 6-May-15 24-May-15 18 B 0 0 0 B
32, P1-44, P1-67, P2-8, P3-18) Working Piles
Center Point, Pile Depth & Reinforcement (P1-
Shoring &
241 40, P1-47, P1-63,P1-64, P2-8, P2-10, P2-20, P2- NAVAYUGA BETC P145 IR C MZP 241 Rev 00 BETC/P145/IR/C/MZP/241/Rev 00 7-May-15 24-May-15 17 B 0 0 0 B
Working Piles
22)
Center Point, Depth & Reinforcement (P1-47, Shoring &
242 NAVAYUGA BETC P145 IR C MZP 242 Rev 00 BETC/P145/IR/C/MZP/242/Rev 00 9-May-15 24-May-15 15 B 0 0 0 B
P2-20, P3-5, P3-6, P4-5, P4-6) Working Piles
Center Point, Depth & Reinforcement (P1-47, Shoring &
243 NAVAYUGA BETC P145 IR C MZP 243 Rev 00 BETC/P145/IR/C/MZP/243/Rev 00 10-May-15 24-May-15 14 B 0 0 0 B
P2-9, P3-12, P3-29, P3-30, P4-9) Working Piles
Center Point, Depth & Reinforcement (P1-7, P1- Shoring &
244 NAVAYUGA BETC P145 IR C MZP 244 Rev 00 BETC/P145/IR/C/MZP/244/Rev 00 11-May-15 24-May-15 13 B 0 0 0 B
35, P2-20, P4-7, P4-8) Working Piles
Center Point, Depth & Reinforcement (P1-2, P1- Shoring &
245 NAVAYUGA BETC P145 IR C MZP 245 Rev 00 BETC/P145/IR/C/MZP/245/Rev 00 12-May-15 24-May-15 12 B 0 0 0 B
3, P2-9, P2-2, P4-8) Working Piles
Center Point, Depth & Reinforcement (P1-1, P1- Shoring &
246 NAVAYUGA BETC P145 IR C MZP 246 Rev 00 BETC/P145/IR/C/MZP/246/Rev 00 13-May-15 24-May-15 11 B 0 0 0 B
2, P1-3, P1-4, P2-1, P3-14) Working Piles
Shoring &
247 Center Point, Depth & Reinforcement (P1-1, P1- NAVAYUGA BETC P145 IR C MZP 247 Rev 00 BETC/P145/IR/C/MZP/247/Rev 00 14-May-15 24-May-15 10 B 0 0 0 B
Working Piles
4, P1-43, P1-51, P2-2, P2-4, P3-15, P3-32)
Center Point, Depth & Reinforcement (P1-1, P1- Shoring &
248 NAVAYUGA BETC P145 IR C MZP 248 Rev 00 BETC/P145/IR/C/MZP/248/Rev 00 16-May-15 25-Jun-15 40 B 0 0 0 B
4, P1-17, P2-4, P2-13, P4-11) Working Piles
Center Point, Depth & Reinforcement (P1-14, P- Shoring &
249 NAVAYUGA BETC P145 IR C MZP 249 Rev 00 BETC/P145/IR/C/MZP/249/Rev 00 17-May-15 25-Jun-15 39 B 0 0 0 B
15, P1-17, P2-12, P3-33, P4-13) Working Piles
Center Point, Depth & Reinforcement (P1-8, P2- Shoring &
250 NAVAYUGA BETC P145 IR C MZP 250 Rev 00 BETC/P145/IR/C/MZP/250/Rev 00 18-May-15 25-Jun-15 38 B 0 0 0 B
1, P3-19, P3-23, P4-12, P4-13) Working Piles
Center Point, Depth & Reinforcement (P1-13, Shoring &
251 NAVAYUGA BETC P145 IR C MZP 251 Rev 00 BETC/P145/IR/C/MZP/251/Rev 00 20-May-15 25-Jun-15 36 B 0 0 0 B
P1-26, P2-19, P3-40, P3-41, P4-14 ) Working Piles
Center Point, Depth & Reinforcement (P1-5, P1- Shoring &
252 NAVAYUGA BETC P145 IR C MZP 252 Rev 00 BETC/P145/IR/C/MZP/252/Rev 00 20-May-15 25-Jun-15 36 B 0 0 0 B
18, P2-5, P3-17, P3-34, P4-14) Working Piles
Center point, Pile Depth & Reinforcement (P1-
Shoring &
253 25, P1-68, P2-32, P3-20, P3-32, P3-35, P3-54, NAVAYUGA BETC P145 IR C MZP 253 Rev 00 BETC/P145/IR/C/MZP/253/Rev 00 21-May-15 13-Jun-15 23 B 0 0 0 B
Working Piles
P3-57, P2-24, P3-49)
Center point, Pile Depth & Reinforcement (P1-5,
Shoring &
254 P1-52, P1-60, P1-68, P2-7, P2-27, P2-33, P2-29, NAVAYUGA BETC P145 IR C MZP 254 Rev 00 BETC/P145/IR/C/MZP/254/Rev 00 23-May-15 25-Jun-15 33 B 0 0 0 B
Working Piles
P2-35)

Shoring &
255 Center point, Pile Depth & Reinforcement (P1- NAVAYUGA BETC P145 IR C MZP 255 Rev 00 BETC/P145/IR/C/MZP/255/Rev 00 24-May-15 25-Jun-15 32 B 0 0 0 B
Working Piles
25, P2-3, P2-34, P2-20, P3-22, P3-42, P3-56)
Center Point, Pile Depth & Reinforcement (P1- Shoring &
256 NAVAYUGA BETC P145 IR C MZP 256 Rev 00 BETC/P145/IR/C/MZP/256/Rev 00 25-May-15 25-Jun-15 31 B 0 0 0 B
56, P1-64, P2-26, P2-34, P3-42, P4-14) Working Piles
Center Point, Pile Depth & Reinforcement (P2- Shoring &
257 NAVAYUGA BETC P145 IR C MZP 257 Rev 00 BETC/P145/IR/C/MZP/257/Rev 00 26-May-15 25-Jun-15 30 B 0 0 0 B
26, P2-31, P2-36, P3-48, P4-10) Working Piles
Center Point, Pile Depth & Reinforcement (P2- Shoring &
258 NAVAYUGA BETC P145 IR C MZP 258 Pending BETC/P145/IR/C/MZP/258/Pending 26-May-15 13-Jun-15 18 D 0 0 0 D
36, P2-35, P2-28, P2-33) Working Piles
Well center Point & Depth (DW-1, DW-2, DW-4, Shoring &
259 NAVAYUGA BETC P145 IR C MZP 259 Pending BETC/P145/IR/C/MZP/259/Pending 28-May-15 25-Jun-15 28 C 0 0 0 C
DW-5, DW-6) Working Piles
Center Point, Pile Depth & Reinforcement (P1- Shoring &
260 NAVAYUGA BETC P145 IR C MZP 260 Rev 00 BETC/P145/IR/C/MZP/260/Rev 00 28-May-15 25-Jun-15 28 B 0 0 0 B
56, P2-28, P2-33, P2-35, P2-36) Working Piles
Center Point, Pile Depth & Reinforcement (P3- Shoring &
261 NAVAYUGA BETC P145 IR C MZP 261 Rev 00 BETC/P145/IR/C/MZP/261/Rev 00 26-May-15 25-Jun-15 30 B 0 0 0 B
48, P4-10) Working Piles
Shoring &
262 Well center Point & Depth (DW-3, DW-7, DW-8) NAVAYUGA BETC P145 IR C MZP 262 Rev 01 BETC/P145/IR/C/MZP/262/Rev 01 30-May-15 25-Jun-15 26 D 31-May-15 25-Jun-15 25 B 0 0 B
Working Piles

6/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
Center Point, Pile Depth & Reinforcement (P1- Shoring &
263 NAVAYUGA BETC P145 IR C MZP 263 Rev 00 BETC/P145/IR/C/MZP/263/Rev 00 9-Jun-15 25-Jun-15 16 B 0 0 0 B
58, P2-25) Working Piles
Working Pile Load Test for Compression (P1-58 Shoring &
264 NAVAYUGA BETC P145 IR C MZP 264 Rev 00 BETC/P145/IR/C/MZP/264/Rev 00 2-Jul-15 5-Jul-15 3 B 0 0 0 B
(Compression test Pile) 1200mm dia) Working Piles
Working Pile Load Test for Compression (P2-25 Shoring &
265 NAVAYUGA BETC P145 IR C MZP 265 Rev 00 BETC/P145/IR/C/MZP/265/Rev 00 4-Jul-15 9-Jul-15 5 B 0 0 0 B
(Compression test Pile) 1200mm dia) Working Piles
Water Leakage arresting by wooden piece from
Shoring &
266 anchor Hole (A-222, A-223, A-224, A-225, A- NAVAYUGA BETC P145 IR C MZP 266 Rev 00 BETC/P145/IR/C/MZP/266/Rev 00 2-Sep-15 5-Sep-15 3 B 0 0 0 B
Working Piles
226)
Inspection request for minor leakage arresting by Shoring &
267 NAVAYUGA BETC P145 IR C MZP 267 Rev 00 BETC/P145/IR/C/MZP/267/Rev 00 2-Sep-15 5-Sep-15 3 B 0 0 0 B
injection Method Working Piles
Working Pile Load Test for Tension (P3-48 Shoring &
268 NAVAYUGA BETC P145 IR C MZP 268 Rev 00 BETC/P145/IR/C/MZP/268/Rev 00 10-Sep-15 13-Sep-15 3 B 0 0 0 B
(Tension Test Pile) 900mm dia Working Piles
Working Pile Load Test for Tension (P4-10 Shoring &
269 NAVAYUGA BETC P145 IR C MZP 269 Rev 00 BETC/P145/IR/C/MZP/269/Rev 00 15-Sep-15 17-Sep-15 2 B 0 0 0 B
(Tension Test Pile) 1200mm dia Working Piles
Tower crane pit, sumppit & PC Raft formwork
270 Raft ABE BETC P145 IR C MZP 270 Rev 00 BETC/P145/IR/C/MZP/270/Rev 00 31-Oct-15 2-Nov-15 2 B 0 0 0 B
(J:M/2:9)
Tower crane pit, sumppit & PC Raft concrete
271 Raft ABE BETC P145 IR C MZP 271 Rev 00 BETC/P145/IR/C/MZP/271/Rev 00 31-Oct-15 3-Nov-15 3 B 0 0 0 B
(J:M/2:9)
272 Lift Pit formwork (F:H/4:7) Raft ABE BETC P145 IR C MZP 272 Rev 00 BETC/P145/IR/C/MZP/272/Rev 00 9-Nov-15 11-Nov-15 2 B 0 0 0 B
273 Lift Pit concrete (F:H/4:7) Raft ABE BETC P145 IR C MZP 273 Rev 00 BETC/P145/IR/C/MZP/273/Rev 00 9-Nov-15 12-Nov-15 3 B 0 0 0 B
Pile Integrity Test (27 Piles)
P3-99, 93, 87, 109, 105, 104, 100, 94, 95, 88, 89, Shoring &
274 NAVAYUGA BETC P145 IR C MZP 274 Pending BETC/P145/IR/C/MZP/274/Pending 10-Nov-15 10-Nov-15 0 O 0 0 0 O O - Others
82, 83, 75, 63, 69, 68, 62, 57, 56, 55, 54, 47, 41, Working Piles
33 & P4-17, 18
Formwork & setting out of PC foundation Zone C
275 Raft ABE BETC P145 IR C MZP 275 Rev 00 BETC/P145/IR/C/MZP/275/Rev 00 10-Nov-15 12-Nov-15 2 B 0 0 0 B
(H-I/3-5)(I-G/3-4)
Casting concrete for PC foundation Zone C (H-
276 Raft ABE BETC P145 IR C MZP 276 Pending BETC/P145/IR/C/MZP/276/Pending 10-Nov-15 14-Nov-15 4 C 0 0 0 C
I/3-5)(I-G/3-4)
Formwork & setting out of PC foundation Raft &
277 Raft ABE BETC P145 IR C MZP 277 Rev 00 BETC/P145/IR/C/MZP/277/Rev 00 14-Nov-15 14-Nov-15 0 B 0 0 0 B
Sumpit (H:L/5:7)
Concrete casting for PC foundation Raft &
278 Raft ABE BETC P145 IR C MZP 278 Rev 00 BETC/P145/IR/C/MZP/278/Rev 00 14-Nov-15 15-Nov-15 1 B 0 0 0 B
Sumpit (E:L/2:7)
Block work & setting out for tower crane pit
279 Raft ABE BETC P145 IR C MZP 279 Rev 00 BETC/P145/IR/C/MZP/279/Rev 00 14-Nov-15 14-Nov-15 0 B 0 0 0 B
(J:L/6:7)
280 Block work & setting out for lift pit (F:H/4:7) Raft ABE BETC P145 IR C MZP 280 Rev 01 BETC/P145/IR/C/MZP/280/Rev 01 14-Nov-15 16-Nov-15 2 C 18-Nov-15 22-Nov-15 4 B 0 0 B
First coarse block work & setting out for sumpit
281 Raft ABE BETC P145 IR C MZP 281 Rev 00 BETC/P145/IR/C/MZP/281/Rev 00 16-Nov-15 18-Nov-15 2 B 0 0 0 B
and wall (J:L/2:6)
Masonry block works for sumpit and wall
282 Raft ABE BETC P145 IR C MZP 282 Rev 00 BETC/P145/IR/C/MZP/282/Rev 00 16-Nov-15 18-Nov-15 2 B 0 0 0 B
(J:L/2:6)
Formwork and setting out for PC Foundation
283 Raft ABE BETC P145 IR C MZP 283 Rev 00 BETC/P145/IR/C/MZP/283/Rev 00 16-Nov-15 18-Nov-15 2 B 0 0 0 B
(D:G/2:6)

284 Concrete casting for PC foundation (C:F/2:6) Raft ABE BETC P145 IR C MZP 284 Rev 01 BETC/P145/IR/C/MZP/284/Rev 01 16-Nov-15 21-Nov-15 5 C 22-Nov-15 24-Nov-15 2 B 0 0 B

Proofex engage waterproofing HDPE membrane


285 Raft Tadmur BETC P145 IR C MZP 285 Pending BETC/P145/IR/C/MZP/285/Pending 18-Nov-15 21-Nov-15 3 C 0 0 0 C
for tower crane (1) pit (Floor & Walls) (J:L/6:7)

Formwork and setting out for PC foundation


286 Raft ABE BETC P145 IR C MZP 286 Rev 00 BETC/P145/IR/C/MZP/286/Rev 00 18-Nov-15 21-Nov-15 3 B 0 0 0 B
(K:M/1:5)
287 Concrete casting for PC foundation (K:M/1:5) Raft ABE BETC P145 IR C MZP 287 Rev 00 BETC/P145/IR/C/MZP/287/Rev 00 18-Nov-15 21-Nov-15 3 B 0 0 0 B
First coarse block work & setting out for lift pit
288 Raft ABE BETC P145 IR C MZP 288 Rev 00 BETC/P145/IR/C/MZP/288/Rev 00 18-Nov-15 21-Nov-15 3 B 0 0 0 B
(F:H/4:7)
Bottom steel RFT for Tower Crane 1 footing
289 Raft ABE BETC P145 IR C MZP 289 Rev 00 BETC/P145/IR/C/MZP/289/Rev 00 21-Nov-15 21-Nov-15 0 B 0 0 0 B
(J:L/6:7)
Pile Integrity Test (36 Piles)
P2-1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, Shoring &
290 NAVAYUGA BETC P145 IR C MZP 290 Rev 00 BETC/P145/IR/C/MZP/290/Rev 00 21-Nov-15 22-Nov-15 1 B 0 0 0 B
16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, Working Piles
29, 30, 31, 32, 33, 34, 35, 36
Formwork & setting out for tower crane 1 footing
291 Raft ABE BETC P145 IR C MZP 291 Rev 00 BETC/P145/IR/C/MZP/291/Rev 00 23-Nov-15 24-Nov-15 1 B 0 0 0 B
(J:L/6:7)
Top steel RFT & crane section for Tower Crane 1
292 Raft ABE BETC P145 IR C MZP 292 Rev 00 BETC/P145/IR/C/MZP/292/Rev 00 23-Nov-15 24-Nov-15 1 B 0 0 0 B
footing (J:L/6:7)
Concrete casting RC for Tower Crane 1 footing
293 Raft ABE BETC P145 IR C MZP 293 Rev 00 BETC/P145/IR/C/MZP/293/Rev 00 23-Nov-15 24-Nov-15 1 B 0 0 0 B
(J:L/6:7)
Concrete casting PC for Tower Crane 3 footing
294 Raft ABE BETC P145 IR C MZP 294 Rev 00 BETC/P145/IR/C/MZP/294/Rev 00 25-Nov-15 26-Nov-15 1 B 0 0 0 B
(G:H/1:2)

Pile Integrity Test (36 Piles)


P1-3, 3, 4, 5, 10, 11, 12, 13, 14, 15, 20, 21, 22,
295 Raft NAVAYUGA BETC P145 IR C MZP 295 Rev 00 BETC/P145/IR/C/MZP/295/Rev 00 25-Nov-15 29-Nov-15 4 B 0 0 0 B
23, 24, 25, 28, 29, 30, 37, 38, 41, 42, 45, 46, 49,
50, 53, 54, 57, 58, 61, 62, 65, 66, 69, 70

Setting out for tower crane 3 footing PC after


296 Raft ABE BETC P145 IR C MZP 296 Rev 00 BETC/P145/IR/C/MZP/296/Rev 00 26-Nov-15 26-Nov-15 0 B 0 0 0 B
concrete casting (G:H/1:2)
Concrete casting for PC foundation (K:H &
297 Raft ABE BETC P145 IR C MZP 297 Rev 00 BETC/P145/IR/C/MZP/297/Rev 00 28-Nov-15 29-Nov-15 1 B 0 0 0 B
G:E/1:2)
Setting out for PC foundation formation level
298 Raft ABE BETC P145 IR C MZP 298 Rev 00 BETC/P145/IR/C/MZP/298/Rev 00 28-Nov-15 29-Nov-15 1 B 0 0 0 B
under PCC (K:H & G:E/1:2)
Pile Integrity Test (50 Piles)
P1-2,2, 8, 9, 18, 19, 27, 1, 6, 7, 16, 17, 26, 3, 32,
Shoring &
299 35, 36, 39, 40, 43, 44, 47, 48, 51, 52, 55, 56, P3- NAVAYUGA BETC P145 IR C MZP 299 Rev 00 BETC/P145/IR/C/MZP/299/Rev 00 29-Nov-15 30-Nov-15 1 B 0 0 0 B
Working Piles
86, 92, 8, 61, 67, 73, 74, 80, 81, 16, 17, 19, 20,
21, 22, 23, , 35, 42, 43, 48, 49
First coarse block work & setting out for TC2,
300 Raft ABE BETC P145 IR C MZP 300 Rev 00 BETC/P145/IR/C/MZP/300/Rev 00 30-Nov-15 30-Nov-15 0 B 0 0 0 B
TC3, Sumpits & Walls (B:I/1:7)
Masonry block works for TC2, RC3, sumpit and
301 Raft ABE BETC P145 IR C MZP 301 Rev 00 BETC/P145/IR/C/MZP/301/Rev 00 30-Nov-15 1-Dec-15 1 B 0 0 0 B
wall (B:I/1:7)
Formwork and setting out for PC foundation
302 Raft ABE BETC P145 IR C MZP 302 Rev 00 BETC/P145/IR/C/MZP/302/Rev 00 30-Nov-15 30-Nov-15 0 B 0 0 0 B
(A:H/1:6)

303 Concrete Casting for PC foundation (A:H/1:6) Raft ABE BETC P145 IR C MZP 303 Rev 00 BETC/P145/IR/C/MZP/303/Rev 00 30-Nov-15 1-Dec-15 1 B 0 0 0 B

Steel mesh installation & level points (prior to


304 Shoring Piles ABE BETC P145 IR C MZP 304 Rev 00 BETC/P145/IR/C/MZP/304/Rev 00 1-Dec-15 2-Dec-15 1 B 0 0 0 B
start of shotcrete) Excavation walls
305 Shotcrete Application (first layer) (M/1:5) Shoring Piles ABE BETC P145 IR C MZP 305 Pending BETC/P145/IR/C/MZP/305/Pending 1-Dec-15 2-Dec-15 1 D 0 0 0 D
Formwork and setting out for PC foundation
306 Raft ABE BETC P145 IR C MZP 306 Rev 00 BETC/P145/IR/C/MZP/306/Rev 00 1-Dec-15 1-Dec-15 0 B 0 0 0 B
(E:I/6:8)

307 Concrete casting for PC foundation (E:I/6:8) Raft ABE BETC P145 IR C MZP 307 Rev 00 BETC/P145/IR/C/MZP/307/Rev 00 1-Dec-15 3-Dec-15 2 B 0 0 0 B

308 Casting PC foundation (6:8/M:J) Raft ABE ABE P145 IR C MZP 308 Rev 00 ABE/P145/IR/C/MZP/308/Rev 00 5-Dec-15 5-Dec-15 0 B 0 0 0 B

7/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
309 Waterproofing for TC2 footing (1:2/G:H) Raft Tadmur ABE P145 IR C MZP 309 Rev 00 ABE/P145/IR/C/MZP/309/Rev 00 5-Dec-15 6-Dec-15 1 B 0 0 0 B
310 Waterproofing for TC3 footing (6:7/B:C) Raft Tadmur ABE P145 IR C MZP 310 Rev 00 ABE/P145/IR/C/MZP/310/Rev 00 5-Dec-15 6-Dec-15 1 B 0 0 0 B
311 Waterproofing for Pit Area (7:4/F:H) Raft Tadmur ABE P145 IR C MZP 311 Rev 00 ABE/P145/IR/C/MZP/311/Rev 00 5-Dec-15 8-Dec-15 3 B 0 0 0 B
Setting out for PCC formation level under PCC
312 Raft ABE ABE P145 IR C MZP 312 Rev 00 ABE/P145/IR/C/MZP/312/Rev 00 5-Dec-15 7-Dec-15 2 B 0 0 0 B
(A:B/2:7)
Concrete casting for PCC formation level under
313 Raft ABE ABE P145 IR C MZP 313 Rev 00 ABE/P145/IR/C/MZP/313/Rev 00 5-Dec-15 7-Dec-15 2 B 0 0 0 B
PCC (A:B/2:7)
Setting out for PC foundation formation level
314 Raft ABE ABE P145 IR C MZP 314 Rev 00 ABE/P145/IR/C/MZP/314/Rev 00 5-Dec-15 5-Dec-15 0 B 0 0 0 B
under PCC (6:8/M:J)
Bottom layer of stell reinforcement for TC2
315 Raft ABE ABE P145 IR C MZP 315 Rev 00 ABE/P145/IR/C/MZP/315/Rev 00 5-Dec-15 6-Dec-15 1 B 0 0 0 B
(7:6/B:C)
Bottom layer of stell reinforcement for TC3
316 Raft ABE ABE P145 IR C MZP 316 Rev 00 ABE/P145/IR/C/MZP/316/Rev 00 5-Dec-15 6-Dec-15 1 B 0 0 0 B
(7:6/B:C)
Setting out for piles level & centralization for piles
317 Raft ABE ABE P145 IR C MZP 317 Rev 00 ABE/P145/IR/C/MZP/317/Rev 00 5-Dec-15 9-Dec-15 4 A 0 0 0 A
(1:8/M:A)
Setting out formation level under PCC
318 Raft ABE ABE P145 IR C MZP 318 Rev 00 ABE/P145/IR/C/MZP/318/Rev 00 5-Dec-15 7-Dec-15 2 B 0 0 0 B
(E:F/1:2)

319 Casting concrete for PCC (E:F/1:2 & G:H/1:2) Raft ABE ABE P145 IR C MZP 319 Rev 00 ABE/P145/IR/C/MZP/319/Rev 00 5-Dec-15 7-Dec-15 2 B 0 0 0 B

Pile integrity test (38 piles)


P4-1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14 P3- Shoring &
320 NAVAYUGA ABE P145 IR C MZP 320 Rev 00 ABE/P145/IR/C/MZP/320/Rev 00 7-Dec-15 8-Dec-15 1 B 0 0 0 B
18, 24, 26, 27, 28, 29, 30, 31, 32, 36, 37, 38, 39, Working Piles
45, 51, 52, 53, 59, 60, 65, 66, 71, 72
Top steel RFT for tower crane connections TC3
321 Raft ABE ABE P145 IR C MZP 321 Rev 00 ABE/P145/IR/C/MZP/321/Rev 00 7-Dec-15 8-Dec-15 1 B 0 0 0 B
(A:M/1:8)
322 Bottom steel reinforcement for pit area (F:H/4:7) Raft ABE ABE P145 IR C MZP 322 Rev 00 ABE/P145/IR/C/MZP/322/Rev 00 9-Dec-15 9-Dec-15 0 B 0 0 0 B

323 Top steel reinf. & starter bar for pit area (f:h/4-7) Raft ABE ABE P145 IR C MZP 323 Rev 00 ABE/P145/IR/C/MZP/323/Rev 00 9-Dec-15 14-Dec-15 5 B 0 0 0 B
324 Setting out formation level for PCC (6:11/A:B) Raft ABE ABE P145 IR C MZP 324 Rev 00 ABE/P145/IR/C/MZP/324/Rev 00 9-Dec-15 12-Dec-15 3 B 0 0 0 B

Pile integrity test (24 piles)


Shoring &
325 P3-44, 50, 58, 64, 70, 76, 77, 78, 79, 84, 85, 90, NAVAYUGA ABE P145 IR C MZP 325 Rev 00 ABE/P145/IR/C/MZP/325/Rev 00 13-Dec-15 15-Dec-15 2 B 0 0 0 B
Working Piles
91, 96, 97, 102, 103, 106, 107, P4-15, 16, 19, 20

326 Setting out for PCC (D:K/7:9) Raft ABE ABE P145 IR C MZP 326 Rev 00 ABE/P145/IR/C/MZP/326/Rev 00 13-Dec-15 14-Dec-15 1 B 0 0 0 B
327 Waterproofing for area 2 (K:H/2:7) Raft ABE ABE P145 IR C MZP 327 Rev 00 ABE/P145/IR/C/MZP/327/Rev 00 15-Dec-15 19-Dec-15 4 B 0 0 0 B
328 Setting out for PCC (H:K/7:9) Raft ABE ABE P145 IR C MZP 328 Rev 00 ABE/P145/IR/C/MZP/328/Rev 00 15-Dec-15 15-Dec-15 0 B 0 0 0 B
329 Setting out for PCC (B:D/7:9) (A:G/9:11) Raft ABE ABE P145 IR C MZP 329 Rev 00 ABE/P145/IR/C/MZP/329/Rev 00 19-Dec-15 19-Dec-15 0 B 0 0 0 B

Pile integrity test (36 piles)


P-59, 60, 63, 64, 67, 68, 71, 72, 73, 74, 75, 76, Shoring &
330 NAVAYUGA ABE P145 IR C MZP 330 Rev 00 ABE/P145/IR/C/MZP/330/Rev 00 21-Dec-15 23-Dec-15 2 B 0 0 0 B
77, 78, 79, 80, 81, 82, 83, 84, 85, 86, 87, 88, 89, Working Piles
90, 91, 92, 93, 94, 95, 96, 97, 98, 99, 100

Top steel RFT & crane section for Tower Crane 2


331 Raft ABE ABE P145 IR C MZP 331 Rev 00 ABE/P145/IR/C/MZP/331/Rev 00 22-Dec-15 23-Dec-15 1 B 0 0 0 B
footing (B:D/6:7)
Formwork & setting out for tower crane 2 footing
332 Raft ABE ABE P145 IR C MZP 332 Rev 00 ABE/P145/IR/C/MZP/332/Rev 00 22-Dec-15 23-Dec-15 1 B 0 0 0 B
(B:D/6:7)
Concrete casting RC for Tower Crane 2 footing
333 Raft ABE ABE P145 IR C MZP 333 Rev 00 ABE/P145/IR/C/MZP/333/Rev 00 22-Dec-15 23-Dec-15 1 B 0 0 0 B
(B:D/6:7)
334 Formwork and setting out for PC (E:H/9:11) Raft ABE ABE P145 IR C MZP 334 Pending ABE/P145/IR/C/MZP/334/Pending 23-Dec-15 23-Dec-15 0 C 0 0 0 C
335 Concrete blinding (E:H/9:11) Raft ABE ABE P145 IR C MZP 335 Pending ABE/P145/IR/C/MZP/335/Pending 23-Dec-15 23-Dec-15 0 D 0 0 0 D
Steel Rft for core wall (internal walls) lift pit (F-
336 Raft ABE ABE P145 IR C MZP 336 Rev 00 ABE/P145/IR/C/MZP/336/Rev 00 27-Dec-15 27-Dec-15 0 B 0 0 0 B
H/4-7)
337 Waterproofing area 2 (C:H/2:4) Raft ABE ABE P145 IR C MZP 337 Rev 00 ABE/P145/IR/C/MZP/337/Rev 00 29-Dec-15 29-Dec-15 0 B 0 0 0 B
338 Concrete blinding (E:H/9:11) sumppit 7 Raft ABE ABE P145 IR C MZP 338 Rev 00 ABE/P145/IR/C/MZP/338/Rev 00 29-Dec-15 29-Dec-15 0 B 0 0 0 B
339 Waterproofing area 2 (C:F/4:7) Raft ABE ABE P145 IR C MZP 339 Rev 00 ABE/P145/IR/C/MZP/339/Rev 00 30-Dec-15 30-Dec-15 0 B 0 0 0 B
340 Concrete blinding (9:10/H:M)(10:11/H:K) Raft ABE ABE P145 IR C MZP 340 Rev 00 ABE/P145/IR/C/MZP/340/Rev 00 2-Jan-16 3-Jan-16 1 B 0 0 0 B
Pile Integrity Test (61 Piles)
P3-1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15,
111, 112, 115, 116, 117, 118, 119, 120, 126,
Shoring &
341 127, 132, 133, 134, 139, 140, 141, 142, 145, NAVAYUGA ABE P145 IR C MZP 341 Rev 00 ABE/P145/IR/C/MZP/341/Rev 00 2-Jan-16 4-Jan-16 2 B 0 0 0 B
Working Piles
146, 147, 148, 149, 150, P3A-1, 2, 3, 4, 5, P4-23,
24, 25, 26, 27, 28, 29, 30, 31, 32, 37, 38, 39, 40,
41, 42, 43, 44
Raft sum pits (1, 4, 5) reinforcement (5:6/J:L)
342 Raft ABE ABE P145 IR C MZP 342 Rev 00 ABE/P145/IR/C/MZP/342/Rev 00 3-Jan-16 5-Jan-16 2 B 0 0 0 B
(1:2/H:I) (2:3/C:E)
Raft bottom steel + additional for raft foundation
343 Raft ABE ABE P145 IR C MZP 343 Rev 00 ABE/P145/IR/C/MZP/343/Rev 00 4-Jan-16 5-Jan-16 1 B 0 0 0 B
(2:4/C:K) (4:9/C:F)
Waterproofing (proofex engage) raft foundation
344 Raft ABE ABE P145 IR C MZP 344 Rev 00 ABE/P145/IR/C/MZP/344/Rev 00 5-Jan-16 5-Jan-16 0 B 0 0 0 B
area 2 (C:K/7:9)
Bottom & additional steel RFT for raft foundation
345 Raft ABE ABE P145 IR C MZP 345 Rev 00 ABE/P145/IR/C/MZP/345/Rev 00 7-Jan-16 7-Jan-16 0 B 0 0 0 B
(area 2) (H:J/4:7 & F:J/7:9)
Formwork and setting out for core wall internal
346 Liftpit ABE ABE P145 IR C MZP 346 Rev 00 ABE/P145/IR/C/MZP/346/Rev 00 9-Jan-16 10-Jan-16 1 B 0 0 0 B
walls (G-H/4-7)
Formwork and setting out for sum pits (1, 4, 5)
347 Raft ABE ABE P145 IR C MZP 347 Rev 00 ABE/P145/IR/C/MZP/347/Rev 00 9-Jan-16 10-Jan-16 1 B 0 0 0 B
(K-L/5-6, C-E/2-3, H-I/2-3)
Concrete blingind PC for raft foundation (K-M/10-
348 Raft ABE ABE P145 IR C MZP 348 Rev 00 ABE/P145/IR/C/MZP/348/Rev 00 7-Jan-16 7-Jan-16 0 B 0 0 0 B
11)
Waterproofing (proofex engage) raft foundation
349 Raft ABE ABE P145 IR C MZP 349 Rev 00 ABE/P145/IR/C/MZP/349/Rev 00 12-Jan-16 12-Jan-16 0 B 0 0 0 B
sumpit 7 (K:M/2:3)
Formwork and setting out for core wall internal
350 Raft ABE ABE P145 IR C MZP 350 Rev 00 ABE/P145/IR/C/MZP/350/Rev 00 12-Jan-16 13-Jan-16 1 B 0 0 0 B
walls (F-G/4-7)
351 Waterproofing proofex engage (H:M/1:2) Raft ABE ABE P145 IR C MZP 351 Rev 00 ABE/P145/IR/C/MZP/351/Rev 00 16-Jan-16 16-Jan-16 0 B 0 0 0 B
352 Raft top reinforcement area 2 (C:G/2:9) Raft ABE ABE P145 IR C MZP 352 Rev 00 ABE/P145/IR/C/MZP/352/Rev 00 16-Jan-16 16-Jan-16 0 B 0 0 0 B
353 B5 starter bar 10 columns area 2 (C:G/2:9) Raft ABE ABE P145 IR C MZP 353 Rev 00 ABE/P145/IR/C/MZP/353/Rev 00 16-Jan-16 17-Jan-16 1 B 0 0 0 B
Water bars for lift pit to close NCR-STR-004
354 NCR-STR-004 ABE ABE P145 IR C MZP 354 Rev 01 ABE/P145/IR/C/MZP/354/Rev 01 16-Jan-16 17-Jan-16 1 D 17-Jan-16 17-Jan-16 0 B 0 0 B
(F:H/4:7)
355 Waterproofing proofex engage (B:H/1:2) Raft ABE ABE P145 IR C MZP 355 Rev 00 ABE/P145/IR/C/MZP/355/Rev 00 20-Jan-16 20-Jan-16 0 B 0 0 0 B
Pile integrity test P3-101, 108, 110, 113, 114,
121, 122, 123, 124, 125, 128, 129, 130, 131,
Shoring &
356 135, 136, 137, 138, 143, 144, 151, 152, 153, NAVAYUGA ABE P145 IR C MZP 356 Rev 00 ABE/P145/IR/C/MZP/356/Rev 00 20-Jan-16 23-Jan-16 3 B 0 0 0 B
Working Piles
154, 155, 25, P4-21, 22, 33, 34, 35, 36, 45, 46,
47, 48, 49
357 Waterproofing proofex engage (B:D/2:6) Raft ABE ABE P145 IR C MZP 357 Rev 00 ABE/P145/IR/C/MZP/357/Rev 00 20-Jan-16 20-Jan-16 0 B 0 0 0 B
Raft sum pits (2,7) reinforcement (B:D/5:6)
358 Raft ABE ABE P145 IR C MZP 358 Rev 00 ABE/P145/IR/C/MZP/358/Rev 00 21-Jan-16 21-Jan-16 0 B 0 0 0 B
(K:M/2:3)
Bottom steel + additional for raft foundation
359 Raft ABE ABE P145 IR C MZP 359 Rev 00 ABE/P145/IR/C/MZP/359/Rev 00 21-Jan-16 21-Jan-16 0 B 0 0 0 B
(A:M/1:2)

8/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

360 Formwork and setting out for sum pit 2 (B:D/5:6) Raft ABE ABE P145 IR C MZP 360 Rev 02 ABE/P145/IR/C/MZP/360/Rev 02 21-Jan-16 24-Jan-16 3 C 27-Jan-16 27-Jan-16 0 C 28-Jan-16 28-Jan-16 0 B 0 B
361 Waterproofing proofex engage (A:B/1:6) Raft ABE ABE P145 IR C MZP 361 Rev 00 ABE/P145/IR/C/MZP/361/Rev 00 23-Jan-16 23-Jan-16 0 B 0 0 0 B
362 Dewatering system to closed SOR no.01 SOR-01 ABE ABE P145 IR C MZP 362 Rev 00 ABE/P145/IR/C/MZP/362/Rev 00 23-Jan-16 25-Jan-16 2 B 0 0 0 B
Stoppage of flow of underground water to closed
363 SOR-STR-03 ABE ABE P145 IR C MZP 363 Rev 00 ABE/P145/IR/C/MZP/363/Rev 00 23-Jan-16 26-Jan-16 3 B 0 0 0 B
SOR-STR-03 & 03 R1
364 Enabling works (Anchoring nails) SOR-STR-04 ABE ABE P145 IR C MZP 364 Rev 00 ABE/P145/IR/C/MZP/364/Rev 00 23-Jan-16 25-Jan-16 2 B 0 0 0 B
Stoppage of water leakage on secant piles
365 SOR-STR-05 ABE ABE P145 IR C MZP 365 Rev 00 ABE/P145/IR/C/MZP/365/Rev 00 23-Jan-16 25-Jan-16 2 B 0 0 0 B
anchors to closed SOR-STR-005 & R1
Repair and/or replace dewatering hoses to close
366 SOR-STR-06 ABE ABE P145 IR C MZP 366 Rev 00 ABE/P145/IR/C/MZP/366/Rev 00 23-Jan-16 25-Jan-16 2 B 0 0 0 B
SOR-STR-006
Preparation for tower crane foundation layout to
367 SOR-STR-07 ABE ABE P145 IR C MZP 367 Rev 00 ABE/P145/IR/C/MZP/367/Rev 00 23-Jan-16 25-Jan-16 2 B 0 0 0 B
close SOR-STR-007
Extension of pile reinforcement to closed SOR-
368 SOR-STR-08 ABE ABE P145 IR C MZP 368 Rev 00 ABE/P145/IR/C/MZP/368/Rev 00 23-Jan-16 26-Jan-16 3 B 0 0 0 B
STR-008
Stoppage of underground water ponding/leak @
369 SOR-STR-09 ABE ABE P145 IR C MZP 369 Rev 00 ABE/P145/IR/C/MZP/369/Rev 00 23-Jan-16 26-Jan-16 3 B 0 0 0 B
(sumppit area) to closed SOR-STR-009
370 Preparation of pile head to closed SOR-STR-010 SOR-STR-010 ABE ABE P145 IR C MZP 370 Rev 00 ABE/P145/IR/C/MZP/370/Rev 00 23-Jan-16 26-Jan-16 3 B 0 0 0 B
Protection for perforated drainage pipe for
371 SOR-STR-011 ABE ABE P145 IR C MZP 371 Rev 00 ABE/P145/IR/C/MZP/371/Rev 00 23-Jan-16 26-Jan-16 3 B 0 0 0 B
trenches to closed SOR-STR-11 & 11 R1
Bottom steel + additional for raft foundation
372 Raft ABE ABE P145 IR C MZP 372 Rev 00 ABE/P145/IR/C/MZP/372/Rev 00 24-Jan-16 24-Jan-16 0 B 0 0 0 B
(A:D/2:6)
373 Waterproofing proofex engage (J:M/2:9) Raft ABE ABE P145 IR C MZP 373 Rev 00 ABE/P145/IR/C/MZP/373/Rev 00 25-Jan-16 25-Jan-16 0 B 0 0 0 B
Steel Rft for core wall (external walls) lift pit (F-
374 Raft ABE ABE P145 IR C MZP 374 Rev 01 ABE/P145/IR/C/MZP/374/Rev 01 27-Jan-16 27-Jan-16 0 C 2-Feb-16 4-Feb-16 2 B 0 0 B
H/4-7)
Bottom steel + additional for raft foundation
375 Raft ABE ABE P145 IR C MZP 375 Rev 00 ABE/P145/IR/C/MZP/375/Rev 00 30-Jan-16 30-Jan-16 0 B 0 0 0 B
(J:M/2:9 & A:B/1:2)
376 Waterproofing proofex engage (E:M/9:11) Raft ABE ABE P145 IR C MZP 376 Rev 00 ABE/P145/IR/C/MZP/376/Rev 00 30-Jan-16 30-Jan-16 0 B 0 0 0 B
Raft sum pits (3, 6, 10) reinforcement
377 Raft ABE ABE P145 IR C MZP 377 Rev 00 ABE/P145/IR/C/MZP/377/Rev 00 30-Jan-16 31-Jan-16 1 B 0 0 0 B
(L:M/10:11, H:I/10:11 & F:G/10:11)
378 Waterproofing proofex engage (A:B/2:6) Raft ABE ABE P145 IR C MZP 378 Rev 00 ABE/P145/IR/C/MZP/378/Rev 00 30-Jan-16 30-Jan-16 0 B 0 0 0 B
Bottom steel + additional for raft foundation
379 Raft ABE ABE P145 IR C MZP 379 Rev 00 ABE/P145/IR/C/MZP/379/Rev 00 30-Jan-16 30-Jan-16 0 B 0 0 0 B
(F:M/9:11)
380 Raft top reinforcement (A:M/1:2 & J:M/2:9) Raft ABE ABE P145 IR C MZP 380 Rev 00 ABE/P145/IR/C/MZP/380/Rev 00 31-Jan-16 1-Feb-16 1 B 0 0 0 B
Waterproofing proofex engage (A:B/6:11 &
381 Raft ABE ABE P145 IR C MZP 381 Rev 00 ABE/P145/IR/C/MZP/381/Rev 00 1-Feb-16 3-Feb-16 2 B 0 0 0 B
A:F/9:11))
Waterstop installation for raft sum pits (3,6,10)
382 Raft ABE ABE P145 IR C MZP 382 Rev 00 ABE/P145/IR/C/MZP/382/Rev 00 1-Feb-16 1-Feb-16 0 B 0 0 0 B
(L:M/10:11, H:I/10:11 & F:G/10:11)
Waterproofing for raft around pile (P3-91) to
383 close SOR-STR-013 & NCR-STR-006 (A:B/06- Raft ABE ABE P145 IR C MZP 383 Rev 01 ABE/P145/IR/C/MZP/383/Rev 01 1-Feb-16 2-Feb-16 1 D 4-Feb-16 6-Feb-16 2 B 0 0 B
07)
Bottom steel + additional for raft foundation
384 Raft ABE ABE P145 IR C MZP 384 Rev 00 ABE/P145/IR/C/MZP/384/Rev 00 2-Feb-16 3-Feb-16 1 B 0 0 0 B
(A:D/6:11 & A:F/9:11)
Formwork for core wall (external walls) lift pit
385 Raft ABE ABE P145 IR C MZP 385 Rev 00 ABE/P145/IR/C/MZP/385/Rev 00 3-Feb-16 4-Feb-16 1 B 0 0 0 B
(F:H/4:7)
Raft top & add reinforcement (A:D/2:9, G:J/2:9 &
386 Raft ABE ABE P145 IR C MZP 386 Rev 00 ABE/P145/IR/C/MZP/386/Rev 00 2-Feb-16 4-Feb-16 2 B 0 0 0 B
A:M/9:11)
387 Raft starter bars for columns (B:L/2;10) Raft ABE ABE P145 IR C MZP 387 Rev 00 ABE/P145/IR/C/MZP/387/Rev 00 3-Feb-16 4-Feb-16 1 B 0 0 0 B
Raft starter bars for retaining wall and tanks
388 Raft ABE ABE P145 IR C MZP 388 Rev 00 ABE/P145/IR/C/MZP/388/Rev 00 3-Feb-16 4-Feb-16 1 B 0 0 0 B
(A:M/1:11)
389 Raft formwork (A:M/1:11) Raft ABE ABE P145 IR C MZP 389 Rev 00 ABE/P145/IR/C/MZP/389/Rev 00 3-Feb-16 4-Feb-16 1 B 0 0 0 B
390 Formwork for sump pits 1, 2, 3, 4, 5, 6, 7, 10 Raft ABE ABE P145 IR C MZP 390 Rev 00 ABE/P145/IR/C/MZP/390/Rev 00 3-Feb-16 4-Feb-16 1 B 0 0 0 B
Tower crane 1 & 3 waterproofing to close SOR-
391 Raft ABE ABE P145 IR C MZP 391 Rev 00 ABE/P145/IR/C/MZP/391/Rev 00 3-Feb-16 4-Feb-16 1 B 0 0 0 B
STR-012
Columns coordinates/setting out B5 to B4
392 B5 ABE ABE P145 IR C MZP 392 Rev 00 ABE/P145/IR/C/MZP/392/Rev 00 7-Feb-16 7-Feb-16 0 B 0 0 0 B
(B:K/1:5)
Columns coordinates/setting out B5 to B4
393 B5 ABE ABE P145 IR C MZP 393 Rev 00 ABE/P145/IR/C/MZP/393/Rev 00 8-Feb-16 11-Feb-16 3 B 0 0 0 B
(A:L/1:10)
394 Column reinforcement (C1,2,3, C1A, C3A, C3B) B5 ABE ABE P145 IR C MZP 394 Rev 00 ABE/P145/IR/C/MZP/394/Rev 00 8-Feb-16 8-Feb-16 0 B 0 0 0 B
Repair works for core wall to close NCR-STR-
395 B5 ABE ABE P145 IR C MZP 395 Rev 00 ABE/P145/IR/C/MZP/395/Rev 00 10-Feb-16 13-Feb-16 3 B 0 0 0 B
009 (G:H/4 & F/4:7)
Formworm and setting out for columns B5 to B4
396 B5 ABE ABE P145 IR C MZP 396 Rev 00 ABE/P145/IR/C/MZP/396/Rev 00 10-Feb-16 13-Feb-16 3 B 0 0 0 B
to close SOR-STR-014 C2,C3,C3A,C3B
Column reinforcement (C1,2,3,4,6,7,9,10)
397 B5 ABE ABE P145 IR C MZP 397 Rev 00 ABE/P145/IR/C/MZP/397/Rev 00 13-Feb-16 13-Feb-16 0 B 0 0 0 B
(A:I/8:10)(K:M/2:10)
Column formwork (C1,2,3,4,6,7,9,10)
398 B5 ABE ABE P145 IR C MZP 398 Rev 00 ABE/P145/IR/C/MZP/398/Rev 00 13-Feb-16 15-Feb-16 2 B 0 0 0 B
(A:I/8:10)(K:M/2:10)
Concrete for columns (after casting) to close
399 NCR-STR-010 ABE ABE P145 IR C MZP 399 Rev 00 ABE/P145/IR/C/MZP/399/Rev 00 13-Feb-16 14-Feb-16 1 B 0 0 0 B
NCR-STR-010 C2,C3,C3A,C3B
400 Column formwork (C1A, C2) (B:C/1) B5 ABE ABE P145 IR C MZP 400 Rev 00 ABE/P145/IR/C/MZP/400/Rev 00 13-Feb-16 14-Feb-16 1 B 0 0 0 B
Ramp 1 wall steel reinforcement B5 to B4
401 B5 ABE ABE P145 IR C MZP 401 Rev 00 ABE/P145/IR/C/MZP/401/Rev 00 13-Feb-16 13-Feb-16 0 B 0 0 0 B
(A:B/2:7)
Ramp 1 & 2 coordinates and setting out
402 B5 ABE ABE P145 IR C MZP 402 Rev 00 ABE/P145/IR/C/MZP/402/Rev 00 13-Feb-16 15-Feb-16 2 B 0 0 0 B
(A:B/2:7 & M:L/2:6)
Tank 1 & 7 coordinates and setting out
403 B5 ABE ABE P145 IR C MZP 403 Rev 00 ABE/P145/IR/C/MZP/403/Rev 00 13-Feb-16 17-Feb-16 4 B 0 0 0 B
(G:I/10:11 & L:M/3:10)
Retaining wall coordinates and setting out
404 B5 ABE ABE P145 IR C MZP 404 Rev 00 ABE/P145/IR/C/MZP/404/Rev 00 13-Feb-16 16-Feb-16 3 B 0 0 0 B
(A:M/1:11)
Waterproofing (proofex engage) B5 to B4 walls
405 B5 ABE ABE P145 IR C MZP 405 Rev 01 ABE/P145/IR/C/MZP/405/Rev 01 14-Feb-16 15-Feb-16 1 D 15-Feb-16 16-Feb-16 1 B 0 0 B
(A/1)
406 Ramp 1 wall formwork B5 to B4 (A:B/2:7) B5 ABE ABE P145 IR C MZP 406 Rev 00 ABE/P145/IR/C/MZP/406/Rev 00 14-Feb-16 17-Feb-16 3 B 0 0 0 B
Steel reinforcement for retaining wall B5 to B4
407 B5 ABE ABE P145 IR C MZP 407 Rev 00 ABE/P145/IR/C/MZP/407/Rev 00 15-Feb-16 15-Feb-16 0 B 0 0 0 B
(A/1-5)
408 Columns reinforcement (C5) B5 to B4 (C-F/10) B5 ABE ABE P145 IR C MZP 408 Rev 00 ABE/P145/IR/C/MZP/408/Rev 00 16-Feb-16 16-Feb-16 0 B 0 0 0 B
Columns formwork after casting (C1, C2, C3, C4,
409 C6, C7, C9, C10) B5 to B4 (A-1/8-10 & K-M/2- B5 ABE ABE P145 IR C MZP 409 Rev 00 ABE/P145/IR/C/MZP/409/Rev 00 16-Feb-16 17-Feb-16 1 B 0 0 0 B
10)
Steel reinforcement for retaining wall B5 to B4
410 B5 ABE ABE P145 IR C MZP 410 Rev 01 ABE/P145/IR/C/MZP/410/Rev 01 16-Feb-16 17-Feb-16 1 D 17-Feb-16 17-Feb-16 0 B 0 0 D
(AI/1)
Repair works for columns to close SOR-STR-018
411 SOR-STR-018 ABE ABE P145 IR C MZP 411 Rev 00 ABE/P145/IR/C/MZP/411/Rev 00 17-Feb-16 17-Feb-16 0 B 0 0 0 B
(K/6)
Columns reinforcement (TC1-TC2) B5 to B4 (E-
412 B5 ABE ABE P145 IR C MZP 412 Rev 00 ABE/P145/IR/C/MZP/412/Rev 00 18-Feb-16 20-Feb-16 2 B 0 0 0 B
I/3)
Stair 6 walls and columns coordinates and
413 B5 ABE ABE P145 IR C MZP 413 Rev 00 ABE/P145/IR/C/MZP/413/Rev 00 18-Feb-16 20-Feb-16 2 B 0 0 0 B
setting out (B-C/8)
Columns formwork after casting (C5) B5 to B4
414 B5 ABE ABE P145 IR C MZP 414 Rev 00 ABE/P145/IR/C/MZP/414/Rev 00 18-Feb-16 20-Feb-16 2 B 0 0 0 B
(C-F/10)

9/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
Columns reinforcement (C1,3,5,7) B5 to B4 (B-
415 B5 ABE ABE P145 IR C MZP 415 Rev 00 ABE/P145/IR/C/MZP/415/Rev 00 20-Feb-16 21-Feb-16 1 B 0 0 0 B
C/8), (G/10), (K/9), (L/6) & (L/10)
Steel reinforcement for retaining wall B5 to B4
416 B5 ABE ABE P145 IR C MZP 416 Rev 00 ABE/P145/IR/C/MZP/416/Rev 00 20-Feb-16 22-Feb-16 2 B 0 0 0 B
(5-11/A & A-B/11)
Columns reinforcement (ITC1-ITC24TC3) B5 to
417 B5 ABE ABE P145 IR C MZP 417 Rev 00 ABE/P145/IR/C/MZP/417/Rev 00 21-Feb-16 21-Feb-16 0 B 0 0 0 B
B4 (4-8/E & 8/F)
Corewall 1 coordinates and setting out to close
418 NCR-STR-011 ABE ABE P145 IR C MZP 418 Rev 00 ABE/P145/IR/C/MZP/418/Rev 00 21-Feb-16 22-Feb-16 1 B 0 0 0 B
NCR-STR-011 (F-H/4-7)
419 Corewall - 1 reinforcement B5 to B4 (F-H/4-7) B5 ABE ABE P145 IR C MZP 419 Rev 01 ABE/P145/IR/C/MZP/419/Rev 01 21-Feb-16 28-Feb-16 7 C 28-Feb-16 29-Feb-16 1 B 0 0 B
Steel reinforcement for water tank-7 B5 to B4 (G-
420 B5 ABE ABE P145 IR C MZP 420 Rev 00 ABE/P145/IR/C/MZP/420/Rev 00 21-Feb-16 22-Feb-16 1 B 0 0 0 B
I/11)
Steel reinforcement for retaining wall B5 to B4
421 B5 ABE ABE P145 IR C MZP 421 Rev 00 ABE/P145/IR/C/MZP/421/Rev 00 21-Feb-16 22-Feb-16 1 B 0 0 0 B
(B-I/11)
Cleaning and replacing defected couplers for
422 corewall B5 to B4 to close NCR-STR-012 NCR-STR-012 ABE ABE P145 IR C MZP 422 Rev 00 ABE/P145/IR/C/MZP/422/Rev 00 22-Feb-16 23-Feb-16 1 B 0 0 0 B
(F:H/4:7)
Columns reinforcement (1TC1-2TC2) B5 to B4
423 B5 ABE ABE P145 IR C MZP 423 Rev 00 ABE/P145/IR/C/MZP/423/Rev 00 22-Feb-16 23-Feb-16 1 B 0 0 0 B
(G-I/8)
Improper storage of material, to closed SOR-
424 SOR-STR-019 ABE ABE P145 IR C MZP 424 Rev 00 ABE/P145/IR/C/MZP/424/Rev 00 22-Feb-16 24-Feb-16 2 B 0 0 0 B
STR-019
425 Columns reinforcement (4TC3) B5 to B4 (4-7/I) B5 ABE ABE P145 IR C MZP 425 Rev 00 ABE/P145/IR/C/MZP/425/Rev 00 23-Feb-16 25-Feb-16 2 B 0 0 0 B
Chemical anchoring for stair 6 corewall additional
426 B5 ABE ABE P145 IR C MZP 426 Pending ABE/P145/IR/C/MZP/426/Pending 23-Feb-16 24-Feb-16 1 D 25-Feb-16 -42425 0 0 D
reinforcement B5 to B4 (B-C/8)
427 Formwork for columns (after casting) B5 ABE ABE P145 IR C MZP 427 Rev 00 ABE/P145/IR/C/MZP/427/Rev 00 23-Feb-16 25-Feb-16 2 B 0 0 0 B
428 Formwork for RW (after casting) B5 ABE ABE P145 IR C MZP 428 Pending ABE/P145/IR/C/MZP/428/Pending 23-Feb-16 25-Feb-16 2 D 0 0 0 0
429 Stair 6 corewall reinforcement B5 to B4 (B-C/8) B5 ABE ABE P145 IR C MZP 429 Rev 00 ABE/P145/IR/C/MZP/429/Rev 00 24-Feb-16 25-Feb-16 1 B 0 0 0 B
430 Water stop repair to close SOR-STR-022 SOR-STR-022 ABE ABE P145 IR C MZP 430 Rev 00 ABE/P145/IR/C/MZP/430/Rev 00 24-Feb-16 25-Feb-16 1 B 0 0 0 B
Stair 6 shear Wall Vertical Reinforcement B5 to
431 SOR -STR-025 ABE ABE P145 IR C MZP 431 Rev 00 ABE/P145/IR/C/MZP/431/Rev 00 25-Feb-16 25-Feb-16 0 B 0 0 0 B
B4 to close SOR -STR-025
Starter bars for internal corewall (I) connection
432 B5 ABE ABE P145 IR C MZP 432 Rev 00 ABE/P145/IR/C/MZP/432/Rev 00 25-Feb-16 28-Feb-16 3 B 0 0 0 B
with beams and stairs

Steel Reinforcement on couplers B5 to B4 to


433 SOR-STR-015 ABE ABE P145 IR C MZP 433 Rev 00 ABE/P145/IR/C/MZP/433/Rev 00 25-Feb-16 28-Feb-16 3 B 0 0 0 B
closer SOR-STR-015

434 Water proofing (Proofex Engage) B5 to B4 ABE ABE P145 IR C MZP 434 Rev 00 ABE/P145/IR/C/MZP/434/Rev 00 25-Feb-16 1-Mar-16 5 B 0 0 0 B

435 Using AK forwok for corewall shuttering B5 ABE ABE P145 IR C MZP 435 Rev 00 ABE/P145/IR/C/MZP/435/Rev 00 28-Feb-16 29-Feb-16 1 B 0 0 0 B
436 Corewall to closeout NCR-STR-011 NCR-STR-011 ABE ABE P145 IR C MZP 436 Rev 00 ABE/P145/IR/C/MZP/436/Rev 00 28-Feb-16 29-Feb-16 1 B 0 0 0 B
437 Corewall-2 Reinforcement B5 to B4 B5 ABE ABE P145 IR C MZP 437 Rev 00 ABE/P145/IR/C/MZP/437/Rev 00 29-Feb-16 3-Mar-16 3 B 0 0 0 B
438 Corewall-2 Starter bars B5 to B4 B5 ABE ABE P145 IR C MZP 438 Rev 00 ABE/P145/IR/C/MZP/438/Rev 00 29-Feb-16 2-Mar-16 2 B 0 0 0 B
439 Steel Reinforcement for retaining wall B5 to B4 B5 ABE ABE P145 IR C MZP 439 Rev 01 ABE/P145/IR/C/MZP/439/Rev 01 29-Feb-16 1-Mar-16 1 D 2-Mar-16 2-Mar-16 0 B 0 0 B
440 Rectification of Steel RFT to close NCR-STR- NCR-STR-018 ABE ABE P145 IR C MZP 440 Rev 00 ABE/P145/IR/C/MZP/440/Rev 00 1-Mar-16 1-Mar-16 0 B 0 0 0 B
441 Steel Reinforcement for retaining wall b5 to B4 B5 ABE ABE P145 IR C MZP 441 Rev 00 ABE/P145/IR/C/MZP/441/Rev 00 3-Mar-16 3-Mar-16 0 B 0 0 0 B
442 Setting out & Survey Report for Core wall (2) B5 B5 ABE ABE P145 IR C MZP 442 Rev 00 ABE/P145/IR/C/MZP/442/Rev 00 3-Mar-16 14-Mar-16 11 B 0 0 0 B
Form work for core wall (I) (Surface Quality &
443 B5 ABE ABE P145 IR C MZP 443 Rev 00 ABE/P145/IR/C/MZP/443/Rev 00 3-Mar-16 6-Mar-16 3 B 14-Mar-16 19-Mar-16 5 B 0 0 B
Verticality) (after concrete Casting)
4th Basement Slab bottom + Additional Bottom
444 B5 ABE ABE P145 IR C MZP 444 Rev 02 ABE/P145/IR/C/MZP/444/Rev 02 5-Mar-16 6-Mar-16 1 C 7-Mar-16 8-Mar-16 1 D 12-Mar-16 12-Mar-16 0 B 0 B
Reinforcement
4th Basement Slab bottom + Additional Bottom
445 B5 ABE ABE P145 IR C MZP 445 Rev 02 ABE/P145/IR/C/MZP/445/Rev 02 5-Mar-16 6-Mar-16 1 C 7-Mar-16 8-Mar-16 1 D 12-Mar-16 12-Mar-16 0 B 0 B
Reinforcement
4th Basement Slab bottom + Additional Bottom
446 B5 ABE ABE P145 IR C MZP 446 Rev 02 ABE/P145/IR/C/MZP/446/Rev 02 5-Mar-16 6-Mar-16 1 C 7-Mar-16 8-Mar-16 1 D 12-Mar-16 12-Mar-16 0 B 0 B
Reinforcement
Repair Work for Columns at B5 to close NCR-
447 B5 ABE ABE P145 IR C MZP 447 Rev 00 ABE/P145/IR/C/MZP/447/Rev 00 5-Mar-16 9-Mar-16 4 B 0 0 0 B
STR-014
448 Cleaning of Rebars of Retaining Walls to Close B5 ABE ABE P145 IR C MZP 448 Rev 00 ABE/P145/IR/C/MZP/448/Rev 00 5-Mar-16 9-Mar-16 4 B 0 0 0 B
449 Celaning of Rebars of columns to Close SOR-ST B5 ABE ABE P145 IR C MZP 449 Rev 00 ABE/P145/IR/C/MZP/449/Rev 00 5-Mar-16 9-Mar-16 4 B 0 0 0 B
450 4th Basement slab formwork B4 ABE ABE P145 IR C MZP 450 Rev 00 ABE/P145/IR/C/MZP/450/Rev 00 6-Mar-16 8-Mar-16 2 B 0 0 0 B
451 4th Basement Beams Reinforcement B4 ABE ABE P145 IR C MZP 451 Rev 02 ABE/P145/IR/C/MZP/451/Rev 02 6-Mar-16 6-Mar-16 0 C 8-Mar-16 8-Mar-16 0 D 12-Mar-16 12-Mar-16 0 B 0 B

452 Steel reinforcement for retaining wall B5 to B4 B5 ABE ABE P145 IR C MZP 452 Rev 01 ABE/P145/IR/C/MZP/452/Rev 01 6-Mar-16 6-Mar-16 0 D 7-Mar-16 9-Mar-16 2 B 0 0 B

453 Formwork for columns (after casting) B5 ABE ABE P145 IR C MZP 453 Rev 00 ABE/P145/IR/C/MZP/453/Rev 00 6-Mar-16 19-Mar-16 13 B 27-Apr-16 28-Apr-16 1 B 0 0 B

Repair Works for Columns at B5 to Close SOR-


454 Close SOR-STR-028 ABE ABE P145 IR C MZP 454 Rev 00 ABE/P145/IR/C/MZP/454/Rev 00 6-Mar-16 9-Mar-16 3 B 0 0 0 B
STR-028

455 Setting out for Columns at B4 B4 ABE ABE P145 IR C MZP 455 Rev 00 ABE/P145/IR/C/MZP/455/Rev 00 8-Mar-16 12-Mar-16 4 B 0 0 0 B

456 Steel reinforcement for Columns at B4 B4 ABE ABE P145 IR C MZP 456 Rev 00 ABE/P145/IR/C/MZP/456/Rev 00 8-Mar-16 10-Mar-16 2 B 0 0 0 B

457 Steel Reinforcement for Tank Wall (I) at B5 B5 ABE ABE P145 IR C MZP 457 Rev 00 ABE/P145/IR/C/MZP/457/Rev 00 8-Mar-16 10-Mar-16 2 B 0 0 0 B

458 Setting out for Core2 at B4-B3 B4 ABE ABE P145 IR C MZP 458 Rev 00 ABE/P145/IR/C/MZP/458/Rev 00 10-Mar-16 14-Mar-16 4 B 0 0 0 B
459 Steel Reinforcement for Tank Wall (I) at B5 B5 ABE ABE P145 IR C MZP 459 Rev 00 ABE/P145/IR/C/MZP/459/Rev 00 10-Mar-16 14-Mar-16 4 B 0 0 0 B
460 Steel Reinforcement for Columns at B4 B5 ABE ABE P145 IR C MZP 460 Rev 00 ABE/P145/IR/C/MZP/460/Rev 00 10-Mar-16 12-Mar-16 2 B 0 0 0 B
461 Setting out for Podium Columnsa at B4 B4 ABE ABE P145 IR C MZP 461 Rev 00 ABE/P145/IR/C/MZP/461/Rev 00 12-Mar-16 13-Mar-16 1 B 0 0 0 B
462 Steel Reinforcement for Podium Columns at B4 B4 ABE ABE P145 IR C MZP 462 Rev 00 ABE/P145/IR/C/MZP/462/Rev 00 12-Mar-16 13-Mar-16 1 B 0 0 0 B
463 Setting out for Retaining Wall at B4 B4 ABE ABE P145 IR C MZP 463 Rev 00 ABE/P145/IR/C/MZP/463/Rev 00 13-Mar-16 15-Mar-16 2 B 0 0 0 B
464 Steel Reinforcement for stair-6 Wall at B4 B4 ABE ABE P145 IR C MZP 464 Pending ABE/P145/IR/C/MZP/464/Pending 13-Mar-16 14-Mar-16 1 C 0 0 0 0
465 Corewall- I Reinforcement B4 to B3 B4 ABE ABE P145 IR C MZP 465 Rev 00 ABE/P145/IR/C/MZP/465/Rev 00 13-Mar-16 16-Mar-16 3 B 0 0 0 B
466 Steel Reinforcement for Ramp Wall (2) at B5 B4 ABE ABE P145 IR C MZP 466 Rev 00 ABE/P145/IR/C/MZP/466/Rev 00 13-Mar-16 15-Mar-16 2 B 0 0 0 B
467 Setting out for Stair 6 wall and Ramp I wall at B4 B4 ABE ABE P145 IR C MZP 467 Rev 00 ABE/P145/IR/C/MZP/467/Rev 00 13-Mar-16 14-Mar-16 1 B 0 0 0 B
Close NCRSTR-
468 Repair for Retaining wall ABE ABE P145 IR C MZP 468 Rev 00 ABE/P145/IR/C/MZP/468/Rev 00 15-Mar-16 17-Mar-16 2 B 0 0 0 B
015
469 Steel Reinforcement for Ramp wall- I at B4 B4 ABE ABE P145 IR C MZP 469 Rev 00 ABE/P145/IR/C/MZP/469/Rev 00 15-Mar-16 16-Mar-16 1 B 0 0 0 B
Close out- NCR-
470 Steel Reinforcement (Shear Rebars / Connectors / STR-019 & ABE ABE P145 IR C MZP 470 Rev 00 ABE/P145/IR/C/MZP/470/Rev 00 15-Mar-16 17-Mar-16 2 B 0 0 0 B
SOR-STR-030
471 Corewall-2 Reinforcement B4 to B3 B4 ABE ABE P145 IR C MZP 471 Rev 00 ABE/P145/IR/C/MZP/471/Rev 00 16-Mar-16 22-Mar-16 6 B 0 0 0 B
472 Steel Reinforcement for Tank Wall (I) at B5 B5 ABE ABE P145 IR C MZP 472 Rev 01 ABE/P145/IR/C/MZP/472/Rev 01 16-Mar-16 16-Mar-16 0 C 19-Mar-16 20-Mar-16 1 B 0 0 B
473 Steel reinforcement for tower Columns at B4 B4 ABE ABE P145 IR C MZP 473 Rev 00 ABE/P145/IR/C/MZP/473/Rev 00 16-Mar-16 24-Mar-16 8 B 0 0 0 B
474 ////// 0 0 0 0 0
475 Repair for Columns To close SOR-STR-032 SOR-STR-032 ABE ABE P145 IR C MZP 475 Rev 00 ABE/P145/IR/C/MZP/475/Rev 00 16-Mar-16 19-Mar-16 3 B 0 0 0 B

10/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
476 Vertical Waterproofing (Proofec Engage) B4 to B3 ABE ABE P145 IR C MZP 476 Rev 00 ABE/P145/IR/C/MZP/476/Rev 00 19-Mar-16 21-Mar-16 2 B 0 0 0 B
477 Steel Reinforcement for retaining wall B4 to B3 B4 ABE ABE P145 IR C MZP 477 Rev 00 ABE/P145/IR/C/MZP/477/Rev 00 19-Mar-16 21-Mar-16 2 B 0 0 0 B
4th Basement Slab bottom + Additional Bottom
478 B4 ABE ABE P145 IR C MZP 478 Rev 00 ABE/P145/IR/C/MZP/478/Rev 00 19-Mar-16 21-Mar-16 2 B 0 0 0 B
Reinforcement
479 Fixation of beam coupler & Steel Rft B4 ABE ABE P145 IR C MZP 479 Rev 00 ABE/P145/IR/C/MZP/479/Rev 00 19-Mar-16 21-Mar-16 2 B 0 0 0 B
Anchor (A-001 to
480 Removing Anchors - third Layer A121, A-178 to ABE ABE P145 IR C MZP 480 Rev 00 ABE/P145/IR/C/MZP/480/Rev 00 19-Mar-16 21-Mar-16 2 B 0 0 0 B
A-241)
To Close SOR-
481 Concrete Spacers at B4 ABE ABE P145 IR C MZP 481 Rev 00 ABE/P145/IR/C/MZP/481/Rev 00 20-Mar-16 21-Mar-16 1 B 0 0 0 B
STR-030
482 Steel Reinforcement for retaining wall B4 to B3 B4 ABE ABE P145 IR C MZP 482 Rev 00 ABE/P145/IR/C/MZP/482/Rev 00 21-Mar-16 24-Mar-16 3 B 0 0 0 B
4th Basement Slab bottom + Additional Bottom
483 B4 ABE ABE P145 IR C MZP 483 Rev 00 ABE/P145/IR/C/MZP/483/Rev 00 21-Mar-16 22-Mar-16 1 B 0 0 0 B
Reinforcement
4th Basement Slab Top + Additional Top
484 B4 ABE ABE P145 IR C MZP 484 Rev 00 ABE/P145/IR/C/MZP/484/Rev 00 21-Mar-16 22-Mar-16 1 B 0 0 0 B
Reinforcement
485 4th Basement Slab Forwork B4 ABE ABE P145 IR C MZP 485 Rev 00 ABE/P145/IR/C/MZP/485/Rev 00 21-Mar-16 22-Mar-16 1 B 0 0 0 B
486 Vertical Waterproofing (Proofec Engage) B4 to B3 ABE ABE P145 IR C MZP 486 Rev 00 ABE/P145/IR/C/MZP/486/Rev 00 23-Mar-16 24-Mar-16 1 B 0 0 0 B
487 Setting out for Podium Columnsa at B4 B4 ABE ABE P145 IR C MZP 487 Rev 00 ABE/P145/IR/C/MZP/487/Rev 00 23-Mar-16 24-Mar-16 1 B 0 0 0 B
488 Steel Reinforcement for Podium Columns at B4 B4 ABE ABE P145 IR C MZP 488 Rev 00 ABE/P145/IR/C/MZP/488/Rev 00 23-Mar-16 24-Mar-16 1 B 0 0 0 B
489 Steel Reinforcement B4 ABE ABE P145 IR C MZP 489 Rev 00 ABE/P145/IR/C/MZP/489/Rev 00 24-Mar-16 26-Mar-16 2 B 0 0 0 B
490 Vertical Waterproofing (Proofec Engage) B4 to B3 ABE ABE P145 IR C MZP 490 Rev 00 ABE/P145/IR/C/MZP/490/Rev 00 26-Mar-16 26-Mar-16 0 B 0 0 0 B
491 Removing Anchors - third Layer (Bottom Layer)Anchor (A-122 to A-177) NAVAYUGA ABE P145 IR C MZP 491 Rev 00 ABE/P145/IR/C/MZP/491/Rev 00 26-Mar-16 7-Apr-16 12 B 0 0 0 B
492 Setting out for Retaining walls and Ramp 2 wall a B4 ABE ABE P145 IR C MZP 492 Rev 00 ABE/P145/IR/C/MZP/492/Rev 00 26-Mar-16 28-Mar-16 2 B 0 0 0 B
493 Anchor Removal and water proofin Installation t Close SOR-STR-034 ABE ABE P145 IR C MZP 493 Rev 00 ABE/P145/IR/C/MZP/493/Rev 00 26-Mar-16 28-Mar-16 2 B 0 0 0 B
494 Covering of Anchors removed from Shoring WallClose SOR-STR-037 ABE ABE P145 IR C MZP 494 Rev 01 ABE/P145/IR/C/MZP/494/Rev 01 26-Mar-16 28-Mar-16 2 C 2-Apr-16 7-Apr-16 5 B 0 0 B
495 Formwork for Retaining Wall, Ramp wall and tanks B5 ABE ABE P145 IR C MZP 495 Rev 00 ABE/P145/IR/C/MZP/495/Rev 00 27-Apr-16 28-Apr-16 1 B 0 0 0 B
496 Steel reinforcement for ramp wall (2) at B4 B4 ABE ABE P145 IR C MZP 496 Rev 01 ABE/P145/IR/C/MZP/496/Rev 01 28-Mar-16 29-Mar-16 1 C 30-Mar-16 30-Mar-16 0 B 0 0 B
3rd basement slab bottom + additional bottom
497 B3 ABE ABE P145 IR C MZP 497 Rev 00 ABE/P145/IR/C/MZP/497/Rev 00 28-Mar-16 30-Mar-16 2 B 0 0 0 B
reinforcement
Steel Reinforcement for retaining wall B4 to B3
498 B4 ABE ABE P145 IR C MZP 498 Rev 00 ABE/P145/IR/C/MZP/498/Rev 00 28-Mar-16 30-Mar-16 2 B 0 0 0 B
(I/H-M)
499 Steel reinforcement for wall (B4 to B3) B4 ABE ABE P145 IR C MZP 499 Rev 00 ABE/P145/IR/C/MZP/499/Rev 00 30-Mar-16 30-Mar-16 0 B 0 0 0 B
Steel reinforcement for retaining wall (B4 to B3)
500 B4 ABE ABE P145 IR C MZP 500 Rev 00 ABE/P145/IR/C/MZP/500/Rev 00 30-Mar-16 31-Mar-16 1 B 0 0 0 B
(F-J/11)
Vertical Waterproofing (Proofec Engage) (11/I-M,
501 B4 ABE ABE P145 IR C MZP 501 Rev 00 ABE/P145/IR/C/MZP/501/Rev 00 30-Mar-16 2-Apr-16 3 B 0 0 0 B
M/1-11, 1/I-M)
3rd basement slab bottom + additional bottom
502 B3 ABE ABE P145 IR C MZP 502 Rev 00 ABE/P145/IR/C/MZP/502/Rev 00 2-Apr-16 4-Apr-16 2 B 0 0 0 B
reinforcement (A-J/1-11)
3rd basement slab top + additional top
503 B3 ABE ABE P145 IR C MZP 503 Rev 00 ABE/P145/IR/C/MZP/503/Rev 00 3-Apr-16 4-Apr-16 1 B 0 0 0 B
reinforcement (A-J/1-11)
504 3rd basement slab reinforcement (A-C/6-10) B3 ABE ABE P145 IR C MZP 504 Rev 00 ABE/P145/IR/C/MZP/504/Rev 00 3-Apr-16 4-Apr-16 1 B 0 0 0 B
505 3rd basement slab formworks (A-J/1-11) B3 ABE ABE P145 IR C MZP 505 Rev 00 ABE/P145/IR/C/MZP/505/Rev 00 3-Apr-16 4-Apr-16 1 B 0 0 0 B

11/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
Steel reinforcement for retaining wall (B4 to B3)
506 B4 ABE ABE P145 IR C MZP 506 Rev 00 ABE/P145/IR/C/MZP/506/Rev 00 4-Apr-16 4-Apr-16 0 B 0 0 0 B
(J-M/11 & 6-11/M)
507 Setting out for columns at B3 B3 ABE ABE P145 IR C MZP 507 Rev 00 ABE/P145/IR/C/MZP/507/Rev 00 4-Apr-16 7-Apr-16 3 B 0 0 0 B
Steel reinforcement for retaining wall (B4 to B3)
508 B4 ABE ABE P145 IR C MZP 508 Rev 00 ABE/P145/IR/C/MZP/508/Rev 00 5-Apr-16 6-Apr-16 1 B 0 0 0 B
(M/1-6)
Vertical waterproofing (proofex engage) retaining
509 B4 to B3 ABE ABE P145 IR C MZP 509 Rev 00 ABE/P145/IR/C/MZP/509/Rev 00 5-Apr-16 6-Apr-16 1 B 0 0 0 B
walls (M/2-6) B4 to B3
Steel reinforcement for podium Columns at B3
510 B3 ABE ABE P145 IR C MZP 510 Rev 00 ABE/P145/IR/C/MZP/510/Rev 00 5-Apr-16 6-Apr-16 1 B 0 0 0 B
(A-I/1-2)
Steel reinforcement for podium Columns at B3
511 B3 ABE ABE P145 IR C MZP 511 Rev 00 ABE/P145/IR/C/MZP/511/Rev 00 5-Apr-16 7-Apr-16 2 B 0 0 0 B
(B-C/3-9) (E-I/9)
Steel reinforcement for tower columns at B3 (E-
512 B3 ABE ABE P145 IR C MZP 512 Rev 00 ABE/P145/IR/C/MZP/512/Rev 00 7-Apr-16 10-Apr-16 3 B 0 0 0 B
H/3)
Setting out for retaining walls, stair 6 walls and
513 B3 ABE ABE P145 IR C MZP 513 Rev 00 ABE/P145/IR/C/MZP/513/Rev 00 9-Apr-16 11-Apr-16 2 B 0 0 0 B
ramp 1 wall at B3
Steel reinforcement for podium columns at B3
514 B3 ABE ABE P145 IR C MZP 514 Rev 00 ABE/P145/IR/C/MZP/514/Rev 00 9-Apr-16 10-Apr-16 1 B 0 0 0 B
(E-I/9-10)
515 Corewall-1 reinforcement B3 to B2 (F-H/4-7) B3 ABE ABE P145 IR C MZP 515 Rev 01 ABE/P145/IR/C/MZP/515/Rev 01 9-Apr-16 10-Apr-16 1 C 11-Apr-16 13-Apr-16 2 B 0 0 B
Removing anchors - second layer at level (-7.55
516 Removing anchors ABE ABE P145 IR C MZP 516 Rev 00 ABE/P145/IR/C/MZP/516/Rev 00 9-Apr-16 17-Apr-16 8 B 0 0 0 B
QND) A-103 to A-196
Steel reinforcement for columns and stair 6 wall
517 B3 ABE ABE P145 IR C MZP 517 Rev 00 ABE/P145/IR/C/MZP/517/Rev 00 10-Apr-16 11-Apr-16 1 B 0 0 0 B
at B3 (B-I/8 & I/3)
Steel reinforcement for ramp wall 01 & 02 at B3
518 B3 ABE ABE P145 IR C MZP 518 Rev 01 ABE/P145/IR/C/MZP/518/Rev 01 10-Apr-16 11-Apr-16 1 C 16-Apr-16 19-Apr-16 3 B 0 0 B
(2-6/A-B & 2-6/L-M)
Roughening preperation of construction joint to
519 SOR-STR-040 ABE ABE P145 IR C MZP 519 Rev 00 ABE/P145/IR/C/MZP/519/Rev 00 11-Apr-16 16-Apr-16 5 B 0 0 0 B
close SOR-STR-040 @ B3
Steel anchoring of bottom RFT to close NCR-
520 NCR-STR-024 ABE ABE P145 IR C MZP 520 Rev 01 ABE/P145/IR/C/MZP/520/Rev 01 11-Apr-16 11-Apr-16 0 D 11-Apr-16 12-Apr-16 1 B 0 0 B
STR-024 @ B3
3rd basement slab bottom + additional bottom
521 B3 ABE ABE P145 IR C MZP 521 Rev 01 ABE/P145/IR/C/MZP/521/Rev 01 11-Apr-16 12-Apr-16 1 D 12-Apr-16 13-Apr-16 1 B 0 0 B
reinforcement (L-M/1-11)
3rd basement slab top + additional top
522 B3 ABE ABE P145 IR C MZP 522 Rev 01 ABE/P145/IR/C/MZP/522/Rev 01 11-Apr-16 12-Apr-16 1 D 12-Apr-16 13-Apr-16 1 B 0 0 B
reinforcement (I-M/1-11)
3rd basement beams reinforcement (B2, B6) (L-
523 B3 ABE ABE P145 IR C MZP 523 Rev 01 ABE/P145/IR/C/MZP/523/Rev 01 11-Apr-16 12-Apr-16 1 D 12-Apr-16 13-Apr-16 1 B 0 0 B
M/1 & 8-9/M)
524 3rd basement slab formworks (I-M/1-11) B3 ABE ABE P145 IR C MZP 524 Rev 00 ABE/P145/IR/C/MZP/524/Rev 00 11-Apr-16 13-Apr-16 2 B 0 0 0 B
Steel reinforcement for tower columns at B3
525 B3 ABE ABE P145 IR C MZP 525 Rev 00 ABE/P145/IR/C/MZP/525/Rev 00 12-Apr-16 13-Apr-16 1 B 0 0 0 B
(E/4-7)
To close NCR-STR-025 nails fixing with the
526 NCR-STR-025 ABE ABE P145 IR C MZP 526 Rev 00 ABE/P145/IR/C/MZP/526/Rev 00 12-Apr-16 13-Apr-16 1 B 0 0 0 B
waterproofing membrane (A-B/1)
Vertical waterproofing (proofex engage) retaining
527 B3 ABE ABE P145 IR C MZP 527 Rev 00 ABE/P145/IR/C/MZP/527/Rev 00 12-Apr-16 13-Apr-16 1 B 0 0 0 B
walls (A/1-2)(1/A-J)
Steel reinforcement for tower columns at B3 (I/4-
528 B3 ABE ABE P145 IR C MZP 528 Rev 00 ABE/P145/IR/C/MZP/528/Rev 00 13-Apr-16 16-Apr-16 3 B 0 0 0 B
7)
Steel reinforcement for retaining wall (B4 to B3)
529 B4 to B3 ABE ABE P145 IR C MZP 529 Rev 00 ABE/P145/IR/C/MZP/529/Rev 00 13-Apr-16 16-Apr-16 3 B 0 0 0 B
(A/2-6)
530 Setting out for columns at B3 (I/4-7 & K-M/2-10) B3 ABE ABE P145 IR C MZP 530 Rev 00 ABE/P145/IR/C/MZP/530/Rev 00 13-Apr-16 17-Apr-16 4 B 0 0 0 B
Roughening preperation of construction joint to
531 B3 ABE ABE P145 IR C MZP 531 Rev 00 ABE/P145/IR/C/MZP/531/Rev 00 16-Apr-16 16-Apr-16 0 B 0 0 0 B
close SOR-STR-041 @ B3 (1:11/I:M)
Setting out for ramp wall and retaining wall at B3
532 B3 ABE ABE P145 IR C MZP 532 Rev 00 ABE/P145/IR/C/MZP/532/Rev 00 14-Apr-16 17-Apr-16 3 B 0 0 0 B
part 2 (I-M/1-11)
533 Reinforcement for columns at B3 (K-L/2-10) B3 ABE ABE P145 IR C MZP 533 Rev 00 ABE/P145/IR/C/MZP/533/Rev 00 14-Apr-16 16-Apr-16 2 B 0 0 0 B
Reinforcement for retaining wall at B3 (1-2/A &
534 B3 ABE ABE P145 IR C MZP 534 Rev 00 ABE/P145/IR/C/MZP/534/Rev 00 16-Apr-16 16-Apr-16 0 B 0 0 0 B
A-H/1)
535 Reinforcement for tower column (I/6) B3 ABE ABE P145 IR C MZP 535 Rev 00 ABE/P145/IR/C/MZP/535/Rev 00 16-Apr-16 16-Apr-16 0 B 0 0 0 B
Reinforcement for retaining wall at B3 (A-G/11 &
536 SOR-STR-042 ABE ABE P145 IR C MZP 536 Rev 02 ABE/P145/IR/C/MZP/536/Rev 02 17-Apr-16 19-Apr-16 2 C 20-Apr-16 20-Apr-16 0 C 21-Apr-16 24-Apr-16 3 B 0 B
6-11/A)
537 Corewall-2 reinforcement B3 to B2 (F-H/4-7) B3 ABE ABE P145 IR C MZP 537 Rev 00 ABE/P145/IR/C/MZP/537/Rev 00 17-Apr-16 19-Apr-16 2 B 0 0 0 B
Vertical waterproofing (proofex engage) (A/6-11
538 B3 to B2 ABE ABE P145 IR C MZP 538 Rev 00 ABE/P145/IR/C/MZP/538/Rev 00 17-Apr-16 19-Apr-16 2 B 0 0 0 B
& 11/A-H)
539 Reinforcement for retaining wall at B3 (H-J/1) B3 ABE ABE P145 IR C MZP 539 Rev 00 ABE/P145/IR/C/MZP/539/Rev 00 19-Apr-16 20-Apr-16 1 B 0 0 0 B
540 Reinforcement for retaining wall at B3 (G-J/11) B3 ABE ABE P145 IR C MZP 540 Rev 00 ABE/P145/IR/C/MZP/540/Rev 00 19-Apr-16 20-Apr-16 1 B 0 0 0 B
Removing anchors - second layer at level (-7.55
541 Removing anchors ABE ABE P145 IR C MZP 541 Rev 00 ABE/P145/IR/C/MZP/541/Rev 00 20-Apr-16 23-Apr-16 3 B 0 0 0 B
QND) A-103 to A-195
542 Setting out for corewall-1 & corewall-2 (4-7/F-H) B3 ABE ABE P145 IR C MZP 542 Rev 00 ABE/P145/IR/C/MZP/542/Rev 00 20-Apr-16 24-Apr-16 4 B 0 0 0 B
Vertical waterproofing proofex engage (H-M/I &
543 B3 ABE ABE P145 IR C MZP 543 Rev 00 ABE/P145/IR/C/MZP/543/Rev 00 20-Apr-16 21-Apr-16 1 B 0 0 0 B
H-M/11 & 6-11/M)
Reinforcement for retaining wall at B3 (I/J-M &
544 B3 ABE ABE P145 IR C MZP 544 Rev 00 ABE/P145/IR/C/MZP/544/Rev 00 20-Apr-16 21-Apr-16 1 B 0 0 0 B
M/1-2)
To close SOR-STR-042 cleaning of construction
545 B3 ABE ABE P145 IR C MZP 545 Rev 00 ABE/P145/IR/C/MZP/545/Rev 00 21-Apr-16 23-Apr-16 2 B 0 0 0 B
joint of retaining wall at (A/7-11 & A-G/11)
Reinforcement for retaining wall at B3 (1I/J-M &
546 B3 ABE ABE P145 IR C MZP 546 Rev 01 ABE/P145/IR/C/MZP/546/Rev 01 23-Apr-16 24-Apr-16 1 C 25-Apr-16 26-Apr-16 1 B 0 0 B
M/6-11)
Anchor holes for rebars of staircase - 06 (B-C/8-
547 B4 to B5 ABE ABE P145 IR C MZP 547 Rev 00 ABE/P145/IR/C/MZP/547/Rev 00 25-Apr-16 26-Apr-16 1 B 0 0 0 B
9)
2nd basement slab bottom + additional bottom
548 B2 ABE ABE P145 IR C MZP 548 Rev 00 ABE/P145/IR/C/MZP/548/Rev 00 27-Apr-16 2-May-16 5 B 0 0 0 B
reinforcement (A:J/1:11)
Vertical bitumen waterproofing rampwall/tank-01
549 B5 ABE ABE P145 IR C MZP 549 Rev 00 ABE/P145/IR/C/MZP/549/Rev 00 27-Apr-16 28-Apr-16 1 B 0 0 0 B
wall
Steel reinforcement for ramp wall 02 at B3 (2-
550 B3 ABE ABE P145 IR C MZP 550 Rev 00 ABE/P145/IR/C/MZP/550/Rev 00 27-Apr-16 2-May-16 5 B 0 0 0 B
6/L-M)
Backfilling, leveling & setting out below ramp-2
551 B5 ABE ABE P145 IR C MZP 551 Rev 00 ABE/P145/IR/C/MZP/551/Rev 00 27-Apr-16 28-Apr-16 1 B 0 0 0 B
slab (L-M/2-4)
2nd basement slab top + additional top reinf. (A-
552 B2 ABE ABE P145 IR C MZP 552 Rev 00 ABE/P145/IR/C/MZP/552/Rev 00 30-Apr-16 2-May-16 2 B 0 0 0 B
J/1-11)
553 2nd basement slab beams reinf. (A-J/1-11) B2 ABE ABE P145 IR C MZP 553 Rev 00 ABE/P145/IR/C/MZP/553/Rev 00 30-Apr-16 2-May-16 2 B 0 0 0 B
554 2nd basement planted walls reinf. (B-C/1) B2 ABE ABE P145 IR C MZP 554 Rev 00 ABE/P145/IR/C/MZP/554/Rev 00 30-Apr-16 2-May-16 2 B 0 0 0 B
555 3rd basement slab formworks (A-J/1-11) B3 ABE ABE P145 IR C MZP 555 Rev 00 ABE/P145/IR/C/MZP/555/Rev 00 30-Apr-16 2-May-16 2 B 0 0 0 B
556 Setting out for columns at B2 (A-J/1-11) B2 ABE ABE P145 IR C MZP 556 Rev 00 ABE/P145/IR/C/MZP/556/Rev 00 1-May-16 4-May-16 3 B 0 0 0 B
557 Setting out for core walls at B2 B2 ABE ABE P145 IR C MZP 557 Rev 00 ABE/P145/IR/C/MZP/557/Rev 00 1-May-16 4-May-16 3 B 0 0 0 B
Setting out for retaining walls, stair 6 walls, tank-
558 B2 ABE ABE P145 IR C MZP 558 Rev 00 ABE/P145/IR/C/MZP/558/Rev 00 1-May-16 4-May-16 3 B 0 0 0 B
02 walls and ramp-01 wall at B2
Steel reinforcement for ramp-02 slab at B5 (2-
559 B5 ABE ABE P145 IR C MZP 559 Rev 00 ABE/P145/IR/C/MZP/559/Rev 00 1-May-16 3-May-16 2 B 0 0 0 B
6/L-M)
Steel reinforcement for podium columns at B2
560 B3 ABE ABE P145 IR C MZP 560 Rev 00 ABE/P145/IR/C/MZP/560/Rev 00 2-May-16 3-May-16 1 B 0 0 0 B
(B-I/1-3, B/9-10 & H-I/10)
561 Staircase-06 reinforcement at B5 (B-C/8-9) B5 to B4 ABE ABE P145 IR C MZP 561 Rev 00 ABE/P145/IR/C/MZP/561/Rev 00 3-May-16 4-May-16 1 B 0 0 0 B

12/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
Steel reinforcement for podium columns at B2
562 B2 ABE ABE P145 IR C MZP 562 Rev 00 ABE/P145/IR/C/MZP/562/Rev 00 3-May-16 5-May-16 2 B 0 0 0 B
(B-C/3-9 & C-G/8-10)
563 Reinforcement for retaining wall (A-E/1 & 1-2/A) B3 ABE ABE P145 IR C MZP 563 Rev 00 ABE/P145/IR/C/MZP/563/Rev 00 4-May-16 5-May-16 1 B 0 0 0 B
Vertical waterproofing (proofex engage) retaining
564 B2 to B1 ABE ABE P145 IR C MZP 564 Rev 00 ABE/P145/IR/C/MZP/564/Rev 00 4-May-16 5-May-16 1 B 0 0 0 B
wall (A/1-3 & 1/A-H)
565 Reinforcement for tower columns (E/3-8 & I/3-8) B2 ABE ABE P145 IR C MZP 565 Rev 00 ABE/P145/IR/C/MZP/565/Rev 00 4-May-16 5-May-16 1 B 0 0 0 B
566 Steel reinforcement for wall (B3 to B2) M/8-9 B3 ABE ABE P145 IR C MZP 566 Rev 00 ABE/P145/IR/C/MZP/566/Rev 00 5-May-16 7-May-16 2 B 0 0 0 B
567 Steel reinforcement for ramp wall 01 at B2 2-6/B B2 ABE ABE P145 IR C MZP 567 Rev 00 ABE/P145/IR/C/MZP/567/Rev 00 5-May-16 7-May-16 2 B 0 0 0 B
Reinforcement for retaining wall and tank-02 at
568 B2 ABE ABE P145 IR C MZP 568 Rev 01 ABE/P145/IR/C/MZP/568/Rev 01 5-May-16 7-May-16 2 C 7-May-16 9-May-16 2 B 0 0 B
B2 (E-G/I & E-F/1)
569 Refinforcement for retaining wall (G-J/1) B2 ABE ABE P145 IR C MZP 569 Rev 00 ABE/P145/IR/C/MZP/569/Rev 00 7-May-16 9-May-16 2 B 0 0 0 B
Vertical waterproofing (proofex engage) retaining
570 B2 to B1 ABE ABE P145 IR C MZP 570 Rev 00 ABE/P145/IR/C/MZP/570/Rev 00 7-May-16 9-May-16 2 B 0 0 0 B
wall (H-J/1 & A/6-11)
Rectification of PVC water stop kickers to close
571 NCR-STR-030 ABE ABE P145 IR C MZP 571 Rev 00 ABE/P145/IR/C/MZP/571/Rev 00 7-May-16 9-May-16 2 B 0 0 0 B
NCR-STR-030
572 Stair 6 shear wall reinforcement B2 to B1 (B-C/8) B2 ABE ABE P145 IR C MZP 572 Rev 00 ABE/P145/IR/C/MZP/572/Rev 00 7-May-16 9-May-16 2 B 0 0 0 B

573 Reinforcement for retaining wall at B2 (A/6-11) B2 ABE ABE P145 IR C MZP 573 Rev 00 ABE/P145/IR/C/MZP/573/Rev 00 9-May-16 10-May-16 1 B 0 0 0 B
Anchorage holes for rebars of staircase-06 (B-
574 B4 to B3 ABE ABE P145 IR C MZP 574 Rev 00 ABE/P145/IR/C/MZP/574/Rev 00 9-May-16 11-May-16 2 B 0 0 0 B
C/8-9)
575 Vertical waterproofing (Proofex Engage) (11/A-J) B2 to B1 ABE ABE P145 IR C MZP 575 Rev 00 ABE/P145/IR/C/MZP/575/Rev 00 10-May-16 11-May-16 1 B 0 0 0 B

13/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
576 Reinforcement for retaining wall (11/A-J) B2 ABE ABE P145 IR C MZP 576 Rev 00 ABE/P145/IR/C/MZP/576/Rev 00 11-May-16 14-May-16 3 B 0 0 0 B
2nd basement slab bottom + additional bottom
577 B2 ABE ABE P145 IR C MZP 577 Rev 00 ABE/P145/IR/C/MZP/577/Rev 00 14-May-16 16-May-16 2 B 0 0 0 B
reinforcement (J:M/1:11)
2nd basement slab top + additional top
578 B2 ABE ABE P145 IR C MZP 578 Rev 00 ABE/P145/IR/C/MZP/578/Rev 00 15-May-16 16-May-16 1 B 0 0 0 B
reinforcement (J:M/1:11)
579 2nd basement slab beams reinf. (J-M/1-11) B2 ABE ABE P145 IR C MZP 579 Rev 00 ABE/P145/IR/C/MZP/579/Rev 00 15-May-16 16-May-16 1 B 0 0 0 B
580 2nd basement slab formworks (J-M/1-11) B2 ABE ABE P145 IR C MZP 580 Rev 00 ABE/P145/IR/C/MZP/580/Rev 00 15-May-16 16-May-16 1 B 0 0 0 B
Fixation of pull out starter at staircase-06 at B4 to
581 SOR-STR-033 ABE ABE P145 IR C MZP 581 Rev 00 ABE/P145/IR/C/MZP/581/Rev 00 15-May-16 16-May-16 1 B 0 0 0 B
close SOR-STR-033
582 Staircase-06 reinforcement at B4 (B-C/8-9) B4 to B3 ABE ABE P145 IR C MZP 582 Rev 00 ABE/P145/IR/C/MZP/582/Rev 00 15-May-16 16-May-16 1 B 0 0 0 B
583 Staircase-06 formwork B4 to B3 B4 to B3 ABE ABE P145 IR C MZP 583 Rev 00 ABE/P145/IR/C/MZP/583/Rev 00 15-May-16 16-May-16 1 B 0 0 0 B
Setting out for podium Columnsa at B2 (K-L/1-
584 B2 ABE ABE P145 IR C MZP 584 Rev 00 ABE/P145/IR/C/MZP/584/Rev 00 16-May-16 18-May-16 2 B 0 0 0 B
11)
Setting out for ramp wall-02 & retaining wall (J-
585 B2 ABE ABE P145 IR C MZP 585 Rev 00 ABE/P145/IR/C/MZP/585/Rev 00 16-May-16 18-May-16 2 B 0 0 0 B
M/1-11)
Steel reinforcement for podium columns at B2
586 B2 ABE ABE P145 IR C MZP 586 Rev 00 ABE/P145/IR/C/MZP/586/Rev 00 16-May-16 18-May-16 2 B 0 0 0 B
(K-L/1-11)
587 Corewall-1 reinforcement B2 to B1 (F-G/4-7) B2 ABE ABE P145 IR C MZP 587 Rev 00 ABE/P145/IR/C/MZP/587/Rev 00 16-May-16 19-May-16 3 B 0 0 0 B
Vertical waterproofing (proofex engage) retaining
588 B2 to B1 ABE ABE P145 IR C MZP 588 Rev 00 ABE/P145/IR/C/MZP/588/Rev 00 16-May-16 18-May-16 2 B 0 0 0 B
wall (J-M/11 & M/6-11)
589 Reinforcement for tower columns at B2 (F-G/3) B2 ABE ABE P145 IR C MZP 589 Rev 00 ABE/P145/IR/C/MZP/589/Rev 00 18-May-16 19-May-16 1 B 0 0 0 B

590 Steel reinforcement for wall (B2 to B1) (A/8:10) B2 ABE ABE P145 IR C MZP 590 Rev 00 ABE/P145/IR/C/MZP/590/Rev 00 18-May-16 21-May-16 3 B 0 0 0 B
Steel reinforcement for retaining wall at B2 (11/J-
591 B2 ABE ABE P145 IR C MZP 591 Rev 00 ABE/P145/IR/C/MZP/591/Rev 00 18-May-16 21-May-16 3 B 0 0 0 B
M & M/9-11)
Chipping and surface preparation of defective
592 NCR-STR-017 ABE ABE P145 IR C MZP 592 Rev 00 ABE/P145/IR/C/MZP/592/Rev 00 18-May-16 21-May-16 3 B 0 0 0 B
R.C to closed NCT-STR-017
Removal of stored materials to closed SOR-STR-
593 SOR-STR-039 ABE ABE P145 IR C MZP 593 Rev 00 ABE/P145/IR/C/MZP/593/Rev 00 18-May-16 21-May-16 3 B 0 0 0 B
039
Steel reinforcement for ramp-02 slab at B4 (2-
594 B4 ABE ABE P145 IR C MZP 594 Rev 00 ABE/P145/IR/C/MZP/594/Rev 00 19-May-16 21-May-16 2 B 0 0 0 B
6/L-M)
Reinforcement for tower columns at B2 (H/3, E/4
595 B2 ABE ABE P145 IR C MZP 595 Rev 00 ABE/P145/IR/C/MZP/595/Rev 00 19-May-16 21-May-16 2 B 0 0 0 B
& F-G/8))
Steel reinforcement for walls (2,3) (B2 to B1) (B-
596 B2 ABE ABE P145 IR C MZP 596 Rev 00 ABE/P145/IR/C/MZP/596/Rev 00 19-May-16 23-May-16 4 B 0 0 0 B
C/1)
Reinforcement for tower columns at B2 (E/5-7 &
597 B2 ABE ABE P145 IR C MZP 597 Rev 00 ABE/P145/IR/C/MZP/597/Rev 00 21-May-16 23-May-16 2 B 0 0 0 B
H/8)
598 Corewall-2 reinforcement B2 to B1 (G-H/4-7) B2 ABE ABE P145 IR C MZP 598 Rev 00 ABE/P145/IR/C/MZP/598/Rev 00 21-May-16 24-May-16 3 B 0 0 0 B
599 Reinforcement for retaining wall at B2 (M/6-9) B2 ABE ABE P145 IR C MZP 599 Rev 00 ABE/P145/IR/C/MZP/599/Rev 00 21-May-16 24-May-16 3 B 0 0 0 B

600 Reinforcement for tower columns at B2 (I/4-7) B2 ABE ABE P145 IR C MZP 600 Rev 00 ABE/P145/IR/C/MZP/600/Rev 00 22-May-16 24-May-16 2 B 0 0 0 B

Formwork for core wall (1,2) (surface quality &


601 B4 ABE ABE P145 IR C MZP 601 Pending ABE/P145/IR/C/MZP/601/Pending 22-May-16 26-May-16 4 C 0 0 0 C
verticality) (after concrete casting)
Formwork for retaining wall, ramp (1,2) wall and
602 stair-06 wall (surface quality & verticality) (after B4 ABE ABE P145 IR C MZP 602 Pending ABE/P145/IR/C/MZP/602/Pending 22-May-16 26-May-16 4 C 0 0 0 C
concrete casting)
Formwork for tower and podium columns
603 (surface quality & verticality) after concrete B4 ABE ABE P145 IR C MZP 603 Pending ABE/P145/IR/C/MZP/603/Pending 22-May-16 26-May-16 4 C 0 0 0 C
casting
Removal of stored materials to closed SOR-STR-
604 SOR-STR-043 ABE ABE P145 IR C MZP 604 Rev 00 ABE/P145/IR/C/MZP/604/Rev 00 22-May-16 24-May-16 2 B 0 0 0 B
043
605 Staircase-06 reinforcement at B3 (B-C/8-9) B3 to B2 ABE ABE P145 IR C MZP 605 Rev 00 ABE/P145/IR/C/MZP/605/Rev 00 23-May-16 26-May-16 3 B 0 0 0 B
606 Staircase-06 formwork at B3 (B-C/8-9) B3 to B2 ABE ABE P145 IR C MZP 606 Rev 00 ABE/P145/IR/C/MZP/606/Rev 00 24-May-16 25-May-16 1 B 0 0 0 B
607 Vertical waterproofing (proofex engage) (1/J-M) B2 to B1 ABE ABE P145 IR C MZP 607 Rev 00 ABE/P145/IR/C/MZP/607/Rev 00 26-May-16 29-May-16 3 B 0 0 0 B
608 Reinforcement for retaining wall (I/J-L) B2 ABE ABE P145 IR C MZP 608 Rev 00 ABE/P145/IR/C/MZP/608/Rev 00 26-May-16 29-May-16 3 B 0 0 0 B
609 Vertical waterproofing (proofex engage) (M/1-3) B2 to B1 ABE ABE P145 IR C MZP 609 Rev 00 ABE/P145/IR/C/MZP/609/Rev 00 28-May-16 30-May-16 2 B 0 0 0 B

610 Vertical waterproofing (proofex engage) (M/3-6) B3 to B2 ABE ABE P145 IR C MZP 610 Rev 00 ABE/P145/IR/C/MZP/610/Rev 00 28-May-16 30-May-16 2 B 0 0 0 B
1st basement slab bottom + additional bottom
611 B1 ABE ABE P145 IR C MZP 611 Rev 01 ABE/P145/IR/C/MZP/611/Rev 01 28-May-16 30-May-16 2 D 6-Jun-16 8-Jun-16 2 B 0 0 B
reinforcement (J-M/1-11)
1st basement slab beams reinforcement (J-M/1-
612 B1 ABE ABE P145 IR C MZP 612 Rev 01 ABE/P145/IR/C/MZP/612/Rev 01 28-May-16 30-May-16 2 D 6-Jun-16 8-Jun-16 2 B 0 0 B
11)
613 1st basement slab formworks (J-M/1-11) B1 ABE ABE P145 IR C MZP 613 Rev 01 ABE/P145/IR/C/MZP/613/Rev 01 28-May-16 30-May-16 2 D 6-Jun-16 8-Jun-16 2 A 0 0 A
Anchorage holes for rebars of sumpits slab
614 SOR-STR-045 ABE ABE P145 IR C MZP 614 Rev 00 ABE/P145/IR/C/MZP/614/Rev 00 29-May-16 5-Jun-16 7 B 0 0 0 B
(1,2,3,4,5,6,7,10) to close SOR-STR-045
1st basement slab top + additional top
615 B1 ABE ABE P145 IR C MZP 615 Rev 01 ABE/P145/IR/C/MZP/615/Rev 01 29-May-16 30-May-16 1 D 6-Jun-16 8-Jun-16 2 B 0 0 B
reinforcement (A-J/1-11)
616 Staircase-06 reinforcement (B-C/8-9) B2 to B1 ABE ABE P145 IR C MZP 616 Rev 01 ABE/P145/IR/C/MZP/616/Rev 01 30-May-16 31-May-16 1 D 31-May-16 4-Jun-16 4 B 0 0 B
617 Staircase-06 formwork (B-C/8-9) B2 to B1 ABE ABE P145 IR C MZP 617 Rev 01 ABE/P145/IR/C/MZP/617/Rev 01 30-May-16 31-May-16 1 D 31-May-16 4-Jun-16 4 B 0 0 B
618 Reinforcement for tower column (E/3-8 & F-G/8) B1 ABE ABE P145 IR C MZP 618 Rev 00 ABE/P145/IR/C/MZP/618/Rev 00 30-May-16 31-May-16 1 B 0 0 0 B
619 Setting out for core walls at B1 B1 ABE ABE P145 IR C MZP 619 Pending ABE/P145/IR/C/MZP/619/Pending 31-May-16 5-Jun-16 5 C 23-Jun-16 25-Jun-16 2 D 0 0 D
Setting out for retaining walls, stair 6 walls,
620 B1 ABE ABE P145 IR C MZP 620 Rev 00 ABE/P145/IR/C/MZP/620/Rev 00 31-May-16 19-Jun-16 19 B 0 0 0 B
tanks-2,4,5 walls and ramp-01 wall at B1
Setting out for tower and podium columns at B1
621 B1 ABE ABE P145 IR C MZP 621 Rev 00 ABE/P145/IR/C/MZP/621/Rev 00 31-May-16 8-Jun-16 8 B 0 0 0 B
(A-J/1-11)
622 Reinforcement for retaining wall at B3 (M/3-6) B3 ABE ABE P145 IR C MZP 622 Rev 01 ABE/P145/IR/C/MZP/622/Rev 01 31-May-16 31-May-16 0 C 2-Jun-16 4-Jun-16 2 B 0 0 B
Reinforcement for retaining wall at B2 (1/L-M)
623 B2 ABE ABE P145 IR C MZP 623 Rev 00 ABE/P145/IR/C/MZP/623/Rev 00 2-Jun-16 4-Jun-16 2 B 0 0 0 B
(M/1-3)
624 Corewall-1 reinforcement B1 to GF (F/G/4:7) B1 ABE ABE P145 IR C MZP 624 Rev 01 ABE/P145/IR/C/MZP/624/Rev 01 4-Jun-16 5-Jun-16 1 C 7-Jun-16 8-Jun-16 1 B 0 0 B
625 Reinforcement for tower column at B1 (F-I/3)(I/4) B1 ABE ABE P145 IR C MZP 625 Rev 00 ABE/P145/IR/C/MZP/625/Rev 00 4-Jun-16 5-Jun-16 1 B 0 0 0 B
Reinforcement for columns and beams for
626 B1 ABE ABE P145 IR C MZP 626 Rev 00 ABE/P145/IR/C/MZP/626/Rev 00 4-Jun-16 5-Jun-16 1 B 0 0 0 B
diaphragm block wall at B1 (A/1-3)(I/A-J)
Sumpits slab reinforcement (1,2,3,4,5,6,7,10) (A-
627 B5 ABE ABE P145 IR C MZP 627 Rev 00 ABE/P145/IR/C/MZP/627/Rev 00 4-Jun-16 8-Jun-16 4 B 0 0 0 B
M/1-11)
Reinforcement for tower columns at B1 (I/5-8)
628 B1 ABE ABE P145 IR C MZP 628 Rev 00 ABE/P145/IR/C/MZP/628/Rev 00 5-Jun-16 6-Jun-16 1 B 0 0 0 B
(G-H/8)
Steel reinforcement for podium columns at B1
629 B1 ABE ABE P145 IR C MZP 629 Rev 00 ABE/P145/IR/C/MZP/629/Rev 00 5-Jun-16 6-Jun-16 1 B 0 0 0 B
(C-G/10)
Reinforcement for columns and beams for
630 B1 ABE ABE P145 IR C MZP 630 Rev 00 ABE/P145/IR/C/MZP/630/Rev 00 5-Jun-16 6-Jun-16 1 B 0 0 0 B
diaphragm block wall at B1 (A/6-11)(11/A-J)
631 Corewall-2 reinforcement B1 to GF (G-H/4-7) B1 ABE ABE P145 IR C MZP 631 Rev 01 ABE/P145/IR/C/MZP/631/Rev 01 5-Jun-16 6-Jun-16 1 C 26-Jun-16 29-Jun-16 3 B 0 0 B

14/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
Steel reinforcement for podium columns at B1
631 B1 ABE ABE P145 IR C MZP 632 Rev 00 ABE/P145/IR/C/MZP/632/Rev 00 6-Jun-16 8-Jun-16 2 B 0 0 0 B
(B-I/1-2)(B-C/3-4)
633 Steel reinforcement for wall (W,W5) (M/7-9) B2 to B1 ABE ABE P145 IR C MZP 633 Rev 00 ABE/P145/IR/C/MZP/633/Rev 00 6-Jun-16 8-Jun-16 2 B 0 0 0 B
Steel reinforcement for podium columns at B1
634 B1 ABE ABE P145 IR C MZP 634 Rev 00 ABE/P145/IR/C/MZP/634/Rev 00 7-Jun-16 11-Jun-16 4 B 0 0 0 B
(B-C/4-10)(E-H/9-10)
Steel reinforcement for ramp-02 wall at B2 (2-
635 B2 ABE ABE P145 IR C MZP 635 Rev 00 ABE/P145/IR/C/MZP/635/Rev 00 8-Jun-16 12-Jun-16 4 B 0 0 0 B
6/L-M)
Vertical waterproofing (proofex engage) B1 to
636 B1 to G.F ABE ABE P145 IR C MZP 636 Rev 00 ABE/P145/IR/C/MZP/636/Rev 00 9-Jun-16 12-Jun-16 3 B 0 0 0 B
G.F (A/I-3)(I/A-E)
Reinforcement for retaining wall at B1 (1/A-B &
637 B1 ABE ABE P145 IR C MZP 637 Rev 00 ABE/P145/IR/C/MZP/637/Rev 00 9-Jun-16 12-Jun-16 3 B 0 0 0 B
A/1-3)
Steel reinforcement for ramp-02 slab at B3 (2-
638 B3 ABE ABE P145 IR C MZP 638 Rev 00 ABE/P145/IR/C/MZP/638/Rev 00 11-Jun-16 12-Jun-16 1 B 0 0 0 B
6/L-M)
639 Formwork for ramp-02 slab at B3 to B2 (2-6/L-M) B3 to B2 ABE ABE P145 IR C MZP 639 Rev 00 ABE/P145/IR/C/MZP/639/Rev 00 11-Jun-16 12-Jun-16 1 B 0 0 0 B
Steel reinforcement for wall (W1, W4)(B2 to B1)
640 B2 ABE ABE P145 IR C MZP 640 Rev 00 ABE/P145/IR/C/MZP/640/Rev 00 11-Jun-16 12-Jun-16 1 B 0 0 0 B
(1/L-M)
Removing anchors 3rd layer at level (-0.25 QND)
641 B1 ABE ABE P145 IR C MZP 641 Rev 01 ABE/P145/IR/C/MZP/641/Rev 01 12-Jun-16 14-Jun-16 2 D 14-Jun-16 19-Jun-16 5 B 0 0 B
retaining walls
642 Reinforcement for retaining wall at B1 (A/6-11) B1 ABE ABE P145 IR C MZP 642 Rev 00 ABE/P145/IR/C/MZP/642/Rev 00 12-Jun-16 14-Jun-16 2 B 0 0 0 B
Vertical waterproofing (proofex engage) retaining
643 B1 to G.F ABE ABE P145 IR C MZP 643 Rev 00 ABE/P145/IR/C/MZP/643/Rev 00 12-Jun-16 14-Jun-16 2 B 0 0 0 B
wall (A/6-11)
644 Stair 6 shear wall reinforcement B1 to GF (B-C/8) B1 ABE ABE P145 IR C MZP 644 Rev 01 ABE/P145/IR/C/MZP/644/Rev 01 12-Jun-16 14-Jun-16 2 C 14-Jun-16 15-Jun-16 1 B 0 0 B
645 Reinforcement for retaining wall at B1 (11/A-F) B1 ABE ABE P145 IR C MZP 645 Rev 00 ABE/P145/IR/C/MZP/645/Rev 00 13-Jun-16 14-Jun-16 1 B 0 0 0 B
Steel reinforcement for podium columns at B1
646 B1 ABE ABE P145 IR C MZP 646 Rev 00 ABE/P145/IR/C/MZP/646/Rev 00 13-Jun-16 14-Jun-16 1 B 0 0 0 B
(I/9-10)
Vertical waterproofing (proofex engage) retaining
647 B1 to G.F ABE ABE P145 IR C MZP 647 Rev 00 ABE/P145/IR/C/MZP/647/Rev 00 13-Jun-16 14-Jun-16 1 B 0 0 0 B
wall (A/F-11)
Reinforcement for retaining wall and tank-02
648 B1 ABE ABE P145 IR C MZP 648 Rev 01 ABE/P145/IR/C/MZP/648/Rev 01 15-Jun-16 16-Jun-16 1 C 19-Jun-16 25-Jun-16 6 B 0 0 B
walls at B1
B1 slab bottom + additional bottom reinforcement
649 B1 ABE ABE P145 IR C MZP 649 Rev 00 ABE/P145/IR/C/MZP/649/Rev 00 16-Jun-16 19-Jun-16 3 B 0 0 0 B
(J-M/1-11)
650 B1 slab beams reinforcement (J-M/1-11) B1 ABE ABE P145 IR C MZP 650 Rev 01 ABE/P145/IR/C/MZP/650/Rev 01 16-Jun-16 19-Jun-16 3 D 19-Jun-16 22-Jun-16 3 B 0 0 B
651 B1 slab formworks (J-M/1-11) B1 ABE ABE P145 IR C MZP 651 Rev 01 ABE/P145/IR/C/MZP/651/Rev 01 16-Jun-16 19-Jun-16 3 D 19-Jun-16 25-Jun-16 6 B 0 0 B
B1 slab top + additional top reinforcement (J-
652 B1 ABE ABE P145 IR C MZP 652 Rev 01 ABE/P145/IR/C/MZP/652/Rev 01 16-Jun-16 19-Jun-16 3 D 19-Jun-16 22-Jun-16 3 B 0 0 B
M/1-11)
Setting out for podium columns at B1 (part-02)
653 B1 ABE ABE P145 IR C MZP 653 Rev 00 ABE/P145/IR/C/MZP/653/Rev 00 20-Jun-16 22-Jun-16 2 B 0 0 0 B
(J-M/1-11)
Formwork for core wall-01 (surface quality &
654 verticality) (after concrete casting) to close NCR- NCR-STR-033 ABE ABE P145 IR C MZP 654 Pending ABE/P145/IR/C/MZP/654/Pending 19-Jun-16 22-Jun-16 3 C 23-Jun-16 26-Jun-16 3 D 0 0 D
STR-033
655 Reinforcement for retaining wall at B1 (11/F-J) B1 ABE ABE P145 IR C MZP 655 Rev 00 ABE/P145/IR/C/MZP/655/Rev 00 20-Jun-16 21-Jun-16 1 B 0 0 0 B
Steel reinforcement for podium columns at B1
656 B1 ABE ABE P145 IR C MZP 656 Rev 00 ABE/P145/IR/C/MZP/656/Rev 00 20-Jun-16 21-Jun-16 1 B 0 0 0 B
(K-L/6-10)
Vertical waterproofing (Proofex engage) to close
657 B1 to G.F ABE ABE P145 IR C MZP 657 Rev 00 ABE/P145/IR/C/MZP/657/Rev 00 20-Jun-16 25-Jun-16 5 B 0 0 0 B
NCR-STR-034 (11/F-J)
Vertical waterproofing (proofex engage) (M/3-6)
658 B2 to B1 ABE ABE P145 IR C MZP 658 Rev 00 ABE/P145/IR/C/MZP/658/Rev 00 22-Jun-16 25-Jun-16 3 B 0 0 0 B
retaining walls
659 Reinforcement for retaining wall at B2 (M/3-6) B2 ABE ABE P145 IR C MZP 659 Rev 00 ABE/P145/IR/C/MZP/659/Rev 00 22-Jun-16 25-Jun-16 3 B 0 0 0 B
660 Reinforcement for tank-05 walls at B1 (E-G/3-4) B1 ABE ABE P145 IR C MZP 660 Rev 00 ABE/P145/IR/C/MZP/660/Rev 00 22-Jun-16 25-Jun-16 3 B 0 0 0 B
Reinforcement for tank-04 walls and ramp-01
661 B1 ABE ABE P145 IR C MZP 661 Rev 00 ABE/P145/IR/C/MZP/661/Rev 00 22-Jun-16 25-Jun-16 3 B 0 0 0 B
wall
662 Steel reinforcement for wall (W,W1) (A/8-11) B1 ABE ABE P145 IR C MZP 662 Rev 00 ABE/P145/IR/C/MZP/662/Rev 00 22-Jun-16 25-Jun-16 3 B 0 0 0 B
Steel reinforcement for podium columns at B1
663 B1 ABE ABE P145 IR C MZP 663 Rev 00 ABE/P145/IR/C/MZP/663/Rev 00 23-Jun-16 25-Jun-16 2 B 0 0 0 B
(K-L/2-5)
Vertical waterproofing (proofex engage) (1/F-J)
664 B1 to G.F ABE ABE P145 IR C MZP 664 Rev 02 ABE/P145/IR/C/MZP/664/Rev 02 23-Jun-16 25-Jun-16 2 B 29-Jun-16 30-Jun-16 1 C 4-Sep-16 5-Sep-16 1 B 0 B
retaining wall
665 Reinforcement for retaining wall at B1 (1/F-J) B1 ABE ABE P145 IR C MZP 665 Rev 00 ABE/P145/IR/C/MZP/665/Rev 00 23-Jun-16 26-Jun-16 3 B 0 0 0 B
666 Steel reinforcement for wall (W3) (11/B-D) B1 ABE ABE P145 IR C MZP 666 Rev 00 ABE/P145/IR/C/MZP/666/Rev 00 25-Jun-16 26-Jun-16 1 B 0 0 0 B
Reinforcement for columns and beams for
667 B1 ABE ABE P145 IR C MZP 667 Rev 00 ABE/P145/IR/C/MZP/667/Rev 00 25-Jun-16 26-Jun-16 1 B 0 0 0 B
diaphragm block wall at B1 (11/J-M & M/6-11)

Reinforcement for columns and beams for


668 B1 ABE ABE P145 IR C MZP 668 Rev 00 ABE/P145/IR/C/MZP/668/Rev 00 27-Jun-16 28-Jun-16 1 B 0 0 0 B
diaphragm block wall at B1 (I/J-M & M/1-6)
Removing anchors - 3rd layer at level (-0.25
669 B1 ABE ABE P145 IR C MZP 669 Rev 00 ABE/P145/IR/C/MZP/669/Rev 00 27-Jun-16 10-Jul-16 13 B 0 0 0 B
QND)
670 Staircase-06 reinforcement at B1 (B-C/8-9) B1 to G.F ABE ABE P145 IR C MZP 670 Rev 00 ABE/P145/IR/C/MZP/670/Rev 00 28-Jun-16 3-Jul-16 5 B 0 0 0 B
671 Staircase-06 formwork at B1 (B-C/8-9) B1 to G.F ABE ABE P145 IR C MZP 671 Rev 00 ABE/P145/IR/C/MZP/671/Rev 00 28-Jun-16 30-Jun-16 2 B 0 0 0 B
672 Steel reinforcement for wall (W2) (1/B-C) B1 ABE ABE P145 IR C MZP 672 Rev 00 ABE/P145/IR/C/MZP/672/Rev 00 29-Jun-16 4-Jul-16 5 B 0 0 0 B
673 Corewall-1 reinforcement B1 to GF (F:G/4:7) B1 ABE ABE P145 IR C MZP 673 Rev 00 ABE/P145/IR/C/MZP/673/Rev 00 29-Jun-16 4-Jul-16 5 B 0 0 0 B
674 Water tank 03 walls reinforcement @ B1 (L/3-6) B1 ABE ABE P145 IR C MZP 674 Rev 00 ABE/P145/IR/C/MZP/674/Rev 00 30-Jun-16 12-Jul-16 12 B 0 0 0 B

675 Reinforcement for retaining wall at B1 (11/J-M) B1 ABE ABE P145 IR C MZP 675 Rev 00 ABE/P145/IR/C/MZP/675/Rev 00 30-Jun-16 4-Jul-16 4 B 0 0 0 B
Steel reinforcement for planted columns at B1 (L-
676 B1 ABE ABE P145 IR C MZP 676 Rev 00 ABE/P145/IR/C/MZP/676/Rev 00 30-Jun-16 3-Jul-16 3 B 0 0 0 B
M/2-3)
677 Vertical waterproofing (Proofex Engage) (11/J-M) B1 to G.F ABE ABE P145 IR C MZP 677 Rev 00 ABE/P145/IR/C/MZP/677/Rev 00 30-Jun-16 3-Jul-16 3 B 0 0 0 B
Setting out for podium column at 1/9, 1st
678 SOR-STR-048 ABE ABE P145 IR C MZP 678 Rev 00 ABE/P145/IR/C/MZP/678/Rev 00 3-Jul-16 12-Jul-16 9 B 0 0 0 B
basement level to close SOR-STR-048
Formwork for column located at staircase-06
679 (surface quality & verticality) (after concrete NCR-STR-017 ABE ABE P145 IR C MZP 679 Rev 00 ABE/P145/IR/C/MZP/679/Rev 00 3-Jul-16 10-Jul-16 7 B 0 0 0 B
casting) to closed NCR-STR-017
Alignment for beam at grid (L-M/9) to close SOR-
680 SOR-STR-038 ABE ABE P145 IR C MZP 680 Rev 00 ABE/P145/IR/C/MZP/680/Rev 00 3-Jul-16 10-Jul-16 7 B 0 0 0 B
STR-038
Corewall-1 reinforcement G.F to 1st Floor (F-
681 GF ABE ABE P145 IR C MZP 681 Rev 02 ABE/P145/IR/C/MZP/681/Rev 02 4-Jul-16 10-Jul-16 6 C 17-Jul-16 18-Jul-16 1 D 20-Jul-16 20-Jul-16 0 B 0 B
G/4-7)
Vertical waterproofing (Proofex Engage) (M/6-
682 B1 to G.F ABE ABE P145 IR C MZP 682 Rev 00 ABE/P145/IR/C/MZP/682/Rev 00 4-Jul-16 11-Jul-16 7 B 0 0 0 B
11)
683 Reinforcement for retaining wall at B1 (M/6-11) B1 ABE ABE P145 IR C MZP 683 Rev 00 ABE/P145/IR/C/MZP/683/Rev 00 4-Jul-16 10-Jul-16 6 B 0 0 0 B
Installation of swellable bars for tank-03 to close
684 B1 ABE ABE P145 IR C MZP 684 Rev 00 ABE/P145/IR/C/MZP/684/Rev 00 5-Jul-16 17-Jul-16 12 B 0 0 0 B
NCR-STR-035
685 Corewall-2 reinforcement B1 to GF (G-H/4-7) B1 ABE ABE P145 IR C MZP 685 Rev 00 ABE/P145/IR/C/MZP/685/Rev 00 10-Jul-16 12-Jul-16 2 B 0 0 0 B
Reinforcement for retaining wall at B1 (J-K/1 &
686 B1 ABE ABE P145 IR C MZP 686 Rev 00 ABE/P145/IR/C/MZP/686/Rev 00 14-Jul-16 17-Jul-16 3 B 0 0 0 B
M/1-2)

15/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
Vertical waterproofing (proofex engage) (J-K/1 &
687 B1 to G.F ABE ABE P145 IR C MZP 687 Rev 00 ABE/P145/IR/C/MZP/687/Rev 00 14-Jul-16 17-Jul-16 3 B 0 0 0 B
M/1-2)
Form work for ramp-02 slab at B2 to B1 (2-6/L-
688 B2 to B1 ABE ABE P145 IR C MZP 688 Rev 00 ABE/P145/IR/C/MZP/688/Rev 00 14-Jul-16 17-Jul-16 3 B 0 0 0 B
M)
Steel reinforcement for ramp-02 slab at B2 to B1
689 B2 to B1 ABE ABE P145 IR C MZP 689 Rev 00 ABE/P145/IR/C/MZP/689/Rev 00 14-Jul-16 17-Jul-16 3 B 0 0 0 B
(2-6/L-M)
Corewall-2 reinforcement G.F to 1st floor (G-H/4-
690 GF to 1F ABE ABE P145 IR C MZP 690 Rev 00 ABE/P145/IR/C/MZP/690/Rev 00 20-Jul-16 24-Jul-16 4 B 0 0 0 B
7)
691 Vertical waterproofing (proofex engage) (M/2-6) B1 to G.F ABE ABE P145 IR C MZP 691 Rev 00 ABE/P145/IR/C/MZP/691/Rev 00 23-Jul-16 24-Jul-16 1 B 0 0 0 B

692 Reinforcement for retaining wall at B1 (M/2-6) B1 ABE ABE P145 IR C MZP 692 Rev 00 ABE/P145/IR/C/MZP/692/Rev 00 23-Jul-16 24-Jul-16 1 B 0 0 0 B

Formwork for retaining wall, ramp (1,2) wall and


693 stair-06 wall (surface quality & verticality) (after B3 ABE ABE P145 IR C MZP 693 Pending ABE/P145/IR/C/MZP/693/Pending 25-Jul-16 27-Jul-16 2 C 0 0 0 C
concrete casting)
Formwork for tower and podium columns
694 (surface quality & verticality) after concrete B3 ABE ABE P145 IR C MZP 694 Pending ABE/P145/IR/C/MZP/694/Pending 25-Jul-16 27-Jul-16 2 C 0 0 0 C
casting
Formwork for core wall (1,2) (surface quality &
695 B3 ABE ABE P145 IR C MZP 695 Pending ABE/P145/IR/C/MZP/695/Pending 25-Jul-16 27-Jul-16 2 C 0 0 0 C
verticality) (after concrete casting)
696 Steel reinforcement for wall (W,W1) B1 to G.F ABE ABE P145 IR C MZP 696 Rev 00 ABE/P145/IR/C/MZP/696/Rev 00 26-Jul-16 27-Jul-16 1 B 0 0 0 B
Vertical waterproofing in sleeve area (proofex
697 B1 to G.F ABE ABE P145 IR C MZP 697 Rev 00 ABE/P145/IR/C/MZP/697/Rev 00 30-Jul-16 30-Jul-16 0 B 0 0 0 B
engage) (M/10-11)
Formwork for retaining wall located at G.L (A-
698 B/1) (surface quality & verticality) (after concrete NCR-STR-013 ABE ABE P145 IR C MZP 698 Rev 00 ABE/P145/IR/C/MZP/698/Rev 00 30-Jul-16 14-Aug-16 15 B 0 0 0 B
casting)
Ground floor slab beams reinforcement (A:M/1-
699 GF ABE ABE P145 IR C MZP 699 Rev 00 ABE/P145/IR/C/MZP/699/Rev 00 30-Jul-16 2-Aug-16 3 B 0 0 0 B
11)
700 Manholes reinforcement (1/F-H) GF ABE ABE P145 IR C MZP 700 Rev 00 ABE/P145/IR/C/MZP/700/Rev 00 2-Aug-16 4-Aug-16 2 B 0 0 0 B
Ground floor slab bottom + additional bottom
701 GF ABE ABE P145 IR C MZP 701 Rev 01 ABE/P145/IR/C/MZP/701/Rev 01 2-Aug-16 4-Aug-16 2 C 7-Aug-16 11-Aug-16 4 B 0 0 B
reinforcemtn (B-L/2-10)
Ground floor slab top + additional top
702 GF ABE ABE P145 IR C MZP 702 Rev 01 ABE/P145/IR/C/MZP/702/Rev 01 2-Aug-16 4-Aug-16 2 C 2-Aug-16 11-Aug-16 9 B 0 0 B
reinforcemtn (B-L/2-10)
Ground floor slab bottom + additional bottom
703 reinforcemtn (A-M/1-2, A-M/10-11, A-B/2-10, L- GF ABE ABE P145 IR C MZP 703 Rev 01 ABE/P145/IR/C/MZP/703/Rev 01 4-Aug-16 4-Aug-16 0 C 7-Aug-16 11-Aug-16 4 B 0 0 B
M/2-10)
Ground floor slab top + additional top
704 reinforcemtn (A-M/1-2, A-M/10-11, A-B/2-10, L- GF ABE ABE P145 IR C MZP 704 Rev 01 ABE/P145/IR/C/MZP/704/Rev 01 4-Aug-16 4-Aug-16 0 C 7-Aug-16 11-Aug-16 4 B 0 0 B
M/2-10)
705 Ground floor slab form works (A-M/1-11) GF ABE ABE P145 IR C MZP 705 Rev 01 ABE/P145/IR/C/MZP/705/Rev 01 4-Aug-16 4-Aug-16 0 C 7-Aug-16 11-Aug-16 4 B 0 0 B
Setting out for columns, stairs and planted walls
706 GF ABE ABE P145 IR C MZP 706 Rev 00 ABE/P145/IR/C/MZP/706/Rev 00 4-Aug-16 9-Aug-16 5 B 0 0 0 B
starter bars (A-M/1-11)
707 Vertical waterproofing (proofex engage) (M/2-8) NCR-STR-038 ABE ABE P145 IR C MZP 707 Rev 00 ABE/P145/IR/C/MZP/707/Rev 00 4-Aug-16 7-Aug-16 3 B 0 0 0 B
708 Staircase-06 reinforcement at G.F (B:C/8:9) GF ABE ABE P145 IR C MZP 708 Rev 00 ABE/P145/IR/C/MZP/708/Rev 00 6-Aug-16 7-Aug-16 1 B 0 0 0 B
Reinforcement for tower columns at GF (E-F/3 &
709 GF ABE ABE P145 IR C MZP 709 Rev 00 ABE/P145/IR/C/MZP/709/Rev 00 9-Aug-16 11-Aug-16 2 B 0 0 0 B
E-I/8)
Steel reinforcement for podim columns at GF (C-
710 GF ABE ABE P145 IR C MZP 710 Rev 00 ABE/P145/IR/C/MZP/710/Rev 00 9-Aug-16 11-Aug-16 2 B 0 0 0 B
G/10 & 8/C)
711 Manholes reinforcement (M/7) GF ABE ABE P145 IR C MZP 711 Rev 00 ABE/P145/IR/C/MZP/711/Rev 00 10-Aug-16 11-Aug-16 1 B 0 0 0 B
Steel reinforcement for podium columns at (B-
712 GF ABE ABE P145 IR C MZP 712 Rev 00 ABE/P145/IR/C/MZP/712/Rev 00 10-Aug-16 11-Aug-16 1 B 0 0 0 B
G/9, B/10 & H-I/1-10)
Removal of unnecessary concrete piled on the
713 SOR-STR-050 ABE ABE P145 IR C MZP 713 Rev 00 ABE/P145/IR/C/MZP/713/Rev 00 2-Oct-16 2-Oct-16 0 B 0 0 0 B
slab (J-K/5-7)
Corewall-1 reinforcement 1st floor to 2nd floor
714 1F ABE ABE P145 IR C MZP 714 Rev 00 ABE/P145/IR/C/MZP/714/Rev 00 11-Aug-16 17-Aug-16 6 B 0 0 0 B
(F-G/4-7)
715 Reinforcement for tower columns at GF (D-E/4-7) GF ABE ABE P145 IR C MZP 715 Rev 00 ABE/P145/IR/C/MZP/715/Rev 00 11-Aug-16 14-Aug-16 3 B 0 0 0 B
Steel reinforcement for podium columns at GF
716 GF ABE ABE P145 IR C MZP 716 Rev 00 ABE/P145/IR/C/MZP/716/Rev 00 11-Aug-16 13-Aug-16 2 B 0 0 0 B
(B/2-8)
Steel reinforcement for podium columns at GF
717 GF ABE ABE P145 IR C MZP 717 Rev 00 ABE/P145/IR/C/MZP/717/Rev 00 13-Aug-16 14-Aug-16 1 B 0 0 0 B
(L/2-8 & C/6-7)
718 Reinforcement for tower columns at GF (I-J/4-7) GF ABE ABE P145 IR C MZP 718 Rev 00 ABE/P145/IR/C/MZP/718/Rev 00 14-Aug-16 16-Aug-16 2 B 0 0 0 B
Steel reinforcement for podium columns at GF
719 GF ABE ABE P145 IR C MZP 719 Rev 00 ABE/P145/IR/C/MZP/719/Rev 00 14-Aug-16 16-Aug-16 2 B 0 0 0 B
(K/2-8)
720 Setting out for core-01 walls at 1F (F-G/4-7) 1F ABE ABE P145 IR C MZP 720 Rev 00 ABE/P145/IR/C/MZP/720/Rev 00 15-Aug-16 17-Aug-16 2 B 0 0 0 B
Steel reinforcement for podium columns at GF
721 GF ABE ABE P145 IR C MZP 721 Rev 00 ABE/P145/IR/C/MZP/721/Rev 00 15-Aug-16 16-Aug-16 1 B 0 0 0 B
(H-L/9-10)
Trail mix for non-shrink grout for post-tensioned
722 1F ABE ABE P145 IR C MZP 722 Rev 00 ABE/P145/IR/C/MZP/722/Rev 00 15-Aug-16 16-Aug-16 1 B 0 0 0 B
abcles 1. flo-add C, 2. flo-add 1
723 Corewall-2 reinforcement 1F to 2F (G-H/4-7) 1F ABE ABE P145 IR C MZP 723 Rev 00 ABE/P145/IR/C/MZP/723/Rev 00 16-Aug-16 20-Aug-16 4 B 0 0 0 B
Steel reinforcement for podium columns at GF
724 GF ABE ABE P145 IR C MZP 724 Rev 00 ABE/P145/IR/C/MZP/724/Rev 00 17-Aug-16 20-Aug-16 3 B 0 0 0 B
(C/4-5)
Reinforcement for tower columns and planted
725 GF ABE ABE P145 IR C MZP 725 Rev 00 ABE/P145/IR/C/MZP/725/Rev 00 17-Aug-16 20-Aug-16 3 B 0 0 0 B
walls at GF (G-I/3, I/3-4, I/7-8)
Proper storage and protectin of P.T accessories
726 SOR-STR-053 ABE ABE P145 IR C MZP 726 Rev 00 ABE/P145/IR/C/MZP/726/Rev 00 17-Aug-16 20-Aug-16 3 B 0 0 0 B
at GF to close SOR-STR-053
727 Setting out for core-02 walls (G-H/4-7) 1F ABE ABE P145 IR C MZP 727 Rev 01 ABE/P145/IR/C/MZP/727/Rev 01 17-Aug-16 20-Aug-16 3 C 28-Aug-16 1-Sep-16 4 B 0 0 B
Steel reinforcement for podium columns at GF
728 GF ABE ABE P145 IR C MZP 728 Rev 00 ABE/P145/IR/C/MZP/728/Rev 00 20-Aug-16 20-Aug-16 0 B 0 0 0 B
(C-I/2-3)
729 1F slab beams reinforcement (B/7-10, 10/B-H) 1F ABE ABE P145 IR C MZP 729 Rev 00 ABE/P145/IR/C/MZP/729/Rev 00 23-Aug-16 25-Aug-16 2 B 0 0 0 B
1F slab beams reinforcement (B/5-7, B-D/5-6,
730 1F ABE ABE P145 IR C MZP 730 Rev 00 ABE/P145/IR/C/MZP/730/Rev 00 28-Aug-16 29-Aug-16 1 B 0 0 0 B
D/4-6, I-J/7-8, H/8-10)
731 1F slab beams reinforcement (I-L/2-10) 1F ABE ABE P145 IR C MZP 731 Rev 00 ABE/P145/IR/C/MZP/731/Rev 00 29-Aug-16 1-Sep-16 3 B 0 0 0 B
732 1F slab bottom reinforcement (B-L/2-10) 1F ABE ABE P145 IR C MZP 732 Pending ABE/P145/IR/C/MZP/732/Pending 4-Sep-16 5-Sep-16 1 D 7-Sep-16 10-Sep-16 3 D 0 0 D
733 1F slab formwork (B-L/2-10) 1F ABE ABE P145 IR C MZP 733 Rev 00 ABE/P145/IR/C/MZP/733/Rev 00 4-Sep-16 10-Sep-16 6 B 0 0 0 B
Vertical waterproofing (proofex engage) (A/8-10)
734 SOR-STR-049 ABE ABE P145 IR C MZP 734 Rev 00 ABE/P145/IR/C/MZP/734/Rev 00 5-Sep-16 6-Sep-16 1 B 0 0 0 B
GF
Removal of concrete debris and loose particles
735 on the construction joint of core wall (1) (F-G/4-7) SOR-STR-051 ABE ABE P145 IR C MZP 735 Rev 00 ABE/P145/IR/C/MZP/735/Rev 00 5-Sep-16 6-Sep-16 1 B 0 0 0 B
GF
Concrete cover, dimensions and alignment of the
736 SOR-STR-054 ABE ABE P145 IR C MZP 736 Pending ABE/P145/IR/C/MZP/736/Pending 5-Sep-16 11-Sep-16 6 D 0 0 0 D
core wall (1) at 1F
737 Ground water level in the dewatering well B5 SOR-STR-056 ABE ABE P145 IR C MZP 737 Rev 00 ABE/P145/IR/C/MZP/737/Rev 00 5-Sep-16 10-Sep-16 5 B 0 0 0 B
738 Staircase-01 reinforcement at (3-6/C-E) GF ABE ABE P145 IR C MZP 738 Rev 00 ABE/P145/IR/C/MZP/738/Rev 00 7-Sep-16 10-Sep-16 3 B 0 0 0 B
739 Staircase-01 form work (C-E/3-6) GF ABE ABE P145 IR C MZP 739 Rev 00 ABE/P145/IR/C/MZP/739/Rev 00 7-Sep-16 10-Sep-16 3 B 0 0 0 B
740 Top additional reinforcement (2-10/B-L) 1F ABE ABE P145 IR C MZP 740 Pending ABE/P145/IR/C/MZP/740/Pending 7-Sep-16 10-Sep-16 3 D 0 0 0 D
741 Post tension (2-10/B-L) 1F ABE ABE P145 IR C MZP 741 Pending ABE/P145/IR/C/MZP/741/Pending 7-Sep-16 10-Sep-16 3 D 0 0 0 D
742 Corewall-1 reinforcement 2F to 3F (F-G/4-7) 2F to 3F ABE ABE P145 IR C MZP 742 Rev 00 ABE/P145/IR/C/MZP/742/Rev 00 8-Sep-16 11-Sep-16 3 B 0 0 0 B

16/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
Setting out for tower & podium columns (2-10/B-
743 1F ABE ABE P145 IR C MZP 743 Rev 00 ABE/P145/IR/C/MZP/743/Rev 00 10-Sep-16 21-Sep-16 11 B 0 0 0 B
L)
Formwork for core-01 walls at 1F (surface quality
744 & verticality) after concrete casting to close NCR- NCR-STR-040 ABE ABE P145 IR C MZP 744 Pending ABE/P145/IR/C/MZP/744/Pending 10-Sep-16 17-Sep-16 7 C 0 0 0 C
STR-040
Formwork for reaining wall, ramp (1,2) wall and
745 stair-06 wall (surface quality & verticality) after B2 ABE ABE P145 IR C MZP 745 Pending ABE/P145/IR/C/MZP/745/Pending 10-Sep-16 17-Sep-16 7 C 0 0 0 C
concrete casting
Formwork for tower and podium columns
746 (surface quality & verticality) after concrete B2 ABE ABE P145 IR C MZP 746 Pending ABE/P145/IR/C/MZP/746/Pending 10-Sep-16 17-Sep-16 7 C 0 0 0 C
casting
Formwork for core wall (1,2) (surface quality &
747 B2 ABE ABE P145 IR C MZP 747 Pending ABE/P145/IR/C/MZP/747/Pending 10-Sep-16 17-Sep-16 7 C 0 0 0 C
verticality) (after concrete casting)
Steel reinforcment for podium columns at 1F (K-
748 1F ABE ABE P145 IR C MZP 748 Rev 00 ABE/P145/IR/C/MZP/748/Rev 00 11-Sep-16 18-Sep-16 7 B 0 0 0 B
L/2-5, H-I/9-10)
Reinforcement for tower columns at 1F (E-G/8,
749 1F ABE ABE P145 IR C MZP 749 Rev 00 ABE/P145/IR/C/MZP/749/Rev 00 11-Sep-16 18-Sep-16 7 B 0 0 0 B
E/6-7)
750 Formwork for core-01 walls at 2F 2F ABE ABE P145 IR C MZP 750 Rev 00 ABE/P145/IR/C/MZP/750/Rev 00 17-Sep-16 18-Sep-16 1 B 0 0 0 B
751 Setting out for core-01 walls (F-G/4-7) 2F ABE ABE P145 IR C MZP 751 Rev 00 ABE/P145/IR/C/MZP/751/Rev 00 17-Sep-16 18-Sep-16 1 B 0 0 0 B
752 Final stressing for strands for 1F slab (2-10/B-L) 1F ABE ABE P145 IR C MZP 752 Rev 01 ABE/P145/IR/C/MZP/752/Rev 01 17-Sep-16 18-Sep-16 1 C 19-Sep-16 19-Sep-16 0 B 0 0 B

753 Reinforcement for tower columns (H-I/8, I-J/6-7) 1F ABE ABE P145 IR C MZP 753 Rev 00 ABE/P145/IR/C/MZP/753/Rev 00 17-Sep-16 18-Sep-16 1 B 0 0 0 B
754 Corewall-2 reinforcement (F-G/4-7) 2F ABE ABE P145 IR C MZP 754 Rev 01 ABE/P145/IR/C/MZP/754/Rev 01 17-Sep-16 18-Sep-16 1 C 21-Sep-16 21-Sep-16 0 B 0 0 B
Steel reinforcement for podium columns at (K-
755 1F ABE ABE P145 IR C MZP 755 Rev 00 ABE/P145/IR/C/MZP/755/Rev 00 18-Sep-16 19-Sep-16 1 B 0 0 0 B
L/6-10)
756 Reinforcement for tower columns at (E-H/3) 1F ABE ABE P145 IR C MZP 756 Rev 00 ABE/P145/IR/C/MZP/756/Rev 00 18-Sep-16 19-Sep-16 1 B 0 0 0 B
Reinforcement for tower columns at (I-J/3-5, D-
757 1F ABE ABE P145 IR C MZP 757 Rev 00 ABE/P145/IR/C/MZP/757/Rev 00 19-Sep-16 20-Sep-16 1 B 0 0 0 B
E/4-5)
758 Setting out for core-01 walls at (G-H/4-7) 2F ABE ABE P145 IR C MZP 758 Rev 00 ABE/P145/IR/C/MZP/758/Rev 00 20-Sep-16 22-Sep-16 2 B 0 0 0 B
759 Formwork for core-02 walls (G-H/4-7) 2F ABE ABE P145 IR C MZP 759 Rev 00 ABE/P145/IR/C/MZP/759/Rev 00 20-Sep-16 22-Sep-16 2 B 0 0 0 B
760 Formwork for podium columns (K/6-9) 1F ABE ABE P145 IR C MZP 760 Rev 00 ABE/P145/IR/C/MZP/760/Rev 00 20-Sep-16 21-Sep-16 1 B 0 0 0 B
761 Formwork for tower columns (E-H/3) 1F ABE ABE P145 IR C MZP 761 Rev 00 ABE/P145/IR/C/MZP/761/Rev 00 20-Sep-16 21-Sep-16 1 B 0 0 0 B
762 1F slab beams reinforcement (B-I/2, 2-6/B) 1F ABE ABE P145 IR C MZP 762 Rev 00 ABE/P145/IR/C/MZP/762/Rev 00 20-Sep-16 22-Sep-16 2 B 0 0 0 B
763 Formwork for podium columns (K/2-5, I/2) 1F ABE ABE P145 IR C MZP 763 Rev 00 ABE/P145/IR/C/MZP/763/Rev 00 20-Sep-16 21-Sep-16 1 B 0 0 0 B
Steel reinforcement for podium columns (B-C/6-
764 1F ABE ABE P145 IR C MZP 764 Rev 00 ABE/P145/IR/C/MZP/764/Rev 00 20-Sep-16 22-Sep-16 2 B 0 0 0 B
10, I/2)
765 Steel reinforcement for planted walls (I-J/3-4/7-8) 1F ABE ABE P145 IR C MZP 765 Rev 00 ABE/P145/IR/C/MZP/765/Rev 00 22-Sep-16 24-Sep-16 2 B 0 0 0 B
Formwork for podium columns & planted wall
766 1F ABE ABE P145 IR C MZP 766 Rev 00 ABE/P145/IR/C/MZP/766/Rev 00 22-Sep-16 24-Sep-16 2 B 0 0 0 B
(L/2-5, K-L/9-10, I-J/3-4)
767 Formwork for tower columns (I-J/2-5) 1F ABE ABE P145 IR C MZP 767 Rev 00 ABE/P145/IR/C/MZP/767/Rev 00 22-Sep-16 24-Sep-16 2 B 0 0 0 B
768 Steel framing details for canopy (F-G/2) 1F ABE ABE P145 IR C MZP 768 Rev 00 ABE/P145/IR/C/MZP/768/Rev 00 22-Sep-16 24-Sep-16 2 B 0 0 0 B
769 Formwork for podium columns (B:C/6:8) 1F ABE ABE P145 IR C MZP 769 Rev 00 ABE/P145/IR/C/MZP/769/Rev 00 24-Sep-16 25-Sep-16 1 B 0 0 0 B
770 Formwork for tower columns (D:E/4:5) 1F ABE ABE P145 IR C MZP 770 Rev 00 ABE/P145/IR/C/MZP/770/Rev 00 24-Sep-16 25-Sep-16 1 B 0 0 0 B
771 Grouting for post tension (2-10/B-L) 1F ABE ABE P145 IR C MZP 771 Rev 00 ABE/P145/IR/C/MZP/771/Rev 00 25-Sep-16 26-Sep-16 1 B 0 0 0 B
B4 inner slab bottom + top reinforcement at core-
772 B4 ABE ABE P145 IR C MZP 772 Rev 00 ABE/P145/IR/C/MZP/772/Rev 00 25-Sep-16 26-Sep-16 1 B 0 0 0 B
02 (G-H/4-7)
773 B4 inner slab beams reinf. at core-02 (G-H/4-7) B4 ABE ABE P145 IR C MZP 773 Rev 00 ABE/P145/IR/C/MZP/773/Rev 00 25-Sep-16 26-Sep-16 1 B 0 0 0 B
774 B4 slab formworks (G-H/4-7) B4 ABE ABE P145 IR C MZP 774 Rev 00 ABE/P145/IR/C/MZP/774/Rev 00 25-Sep-16 26-Sep-16 1 B 0 0 0 B
775 Staircase-01 reinforcement (4-7/G-H) B4 ABE ABE P145 IR C MZP 775 Rev 00 ABE/P145/IR/C/MZP/775/Rev 00 25-Sep-16 27-Sep-16 2 B 0 0 0 B
776 Setting out for core-01 walls (F-G/4-7) 2F ABE ABE P145 IR C MZP 776 Rev 00 ABE/P145/IR/C/MZP/776/Rev 00 25-Sep-16 26-Sep-16 1 B 0 0 0 B
777 Formwork for core-01 wall (F-G/4-7) 2F ABE ABE P145 IR C MZP 777 Rev 00 ABE/P145/IR/C/MZP/777/Rev 00 25-Sep-16 26-Sep-16 1 B 0 0 0 B
Steel reinforcement for podium columns (B-H/2,
778 1F ABE ABE P145 IR C MZP 778 Rev 00 ABE/P145/IR/C/MZP/778/Rev 00 26-Sep-16 27-Sep-16 1 B 0 0 0 B
B-C/3-5)
779 Setting out for core-02 walls (G-H/4-7) 2F ABE ABE P145 IR C MZP 779 Rev 00 ABE/P145/IR/C/MZP/779/Rev 00 28-Sep-16 29-Sep-16 1 B 0 0 0 B
780 Formwork for core-02 walls (G-H/4-7) 2F ABE ABE P145 IR C MZP 780 Rev 00 ABE/P145/IR/C/MZP/780/Rev 00 28-Sep-16 29-Sep-16 1 B 0 0 0 B
2F slab beams reinforcement (B-H/8, 8-10/H, H-
781 2F ABE ABE P145 IR C MZP 781 Rev 00 ABE/P145/IR/C/MZP/781/Rev 00 29-Sep-16 4-Oct-16 5 B 0 0 0 B
L/10, 2-10/L)
782 2F slab beams reinforcement (B-L/2, B/2-8) 2F ABE ABE P145 IR C MZP 782 Rev 00 ABE/P145/IR/C/MZP/782/Rev 00 2-Oct-16 4-Oct-16 2 B 0 0 0 B
783 2F slab bottom reinforcement (B-L/2-10) 2F ABE ABE P145 IR C MZP 783 Rev 01 ABE/P145/IR/C/MZP/783/Rev 01 3-Oct-16 4-Oct-16 1 D 16-Oct-16 19-Oct-16 3 B 0 0 B
784 Top additional reinforcement (2-10/B-L) 2F ABE ABE P145 IR C MZP 784 Rev 01 ABE/P145/IR/C/MZP/784/Rev 01 4-Oct-16 5-Oct-16 1 D 16-Oct-16 19-Oct-16 3 B 0 0 B
785 2F slab formworks (B-L/2-10) 2F ABE ABE P145 IR C MZP 785 Rev 01 ABE/P145/IR/C/MZP/785/Rev 01 4-Oct-16 5-Oct-16 1 D 16-Oct-16 19-Oct-16 3 B 0 0 B
786 Post tension (2-10/B-L) 2F ABE ABE P145 IR C MZP 786 Rev 01 ABE/P145/IR/C/MZP/786/Rev 01 4-Oct-16 5-Oct-16 1 D 16-Oct-16 19-Oct-16 3 B 0 0 B
Steel reinforecement for podium columns (C-
787 1F ABE ABE P145 IR C MZP 787 Rev 00 ABE/P145/IR/C/MZP/787/Rev 00 6-Oct-16 8-Oct-16 2 B 0 0 0 B
G/10)
Setting out for tower & podium columns (2-10/B-
788 2F ABE ABE P145 IR C MZP 788 Rev 00 ABE/P145/IR/C/MZP/788/Rev 00 6-Oct-16 9-Oct-16 3 B 0 0 0 B
L)
Steel reinforcement for podium columns (E-L/2)
789 2F ABE ABE P145 IR C MZP 789 Rev 00 ABE/P145/IR/C/MZP/789/Rev 00 9-Oct-16 10-Oct-16 1 B 0 0 0 B
(2-8/L)
790 Reinforcement for tower columns (E-I/3) 2F ABE ABE P145 IR C MZP 790 Rev 00 ABE/P145/IR/C/MZP/790/Rev 00 9-Oct-16 9-Oct-16 0 B 0 0 0 B
791 Corewall-2 reinforcement (G-H/4-7) 3F ABE ABE P145 IR C MZP 791 Rev 00 ABE/P145/IR/C/MZP/791/Rev 00 9-Oct-16 10-Oct-16 1 B 0 0 0 B
792 Formwork for podium columns (E-L/2) (L/2-8) 2F ABE ABE P145 IR C MZP 792 Rev 00 ABE/P145/IR/C/MZP/792/Rev 00 9-Oct-16 10-Oct-16 1 B 0 0 0 B
793 Formwork for tower columns (E-I/3) 2F ABE ABE P145 IR C MZP 793 Rev 00 ABE/P145/IR/C/MZP/793/Rev 00 9-Oct-16 10-Oct-16 1 B 0 0 0 B
794 Final stressing for strands for 2F slab (2-10/B-L) 2F ABE ABE P145 IR C MZP 794 Rev 00 ABE/P145/IR/C/MZP/794/Rev 00 27-Oct-16 29-Oct-16 2 B 0 0 0 B
795 Setting out for core-02 walls (G-H/4-7) 3F ABE ABE P145 IR C MZP 795 Rev 00 ABE/P145/IR/C/MZP/795/Rev 00 9-Oct-16 10-Oct-16 1 B 0 0 0 B
796 Formwork for core-02 walls (G-H/4-7) 3F ABE ABE P145 IR C MZP 796 Rev 00 ABE/P145/IR/C/MZP/796/Rev 00 9-Oct-16 10-Oct-16 1 B 0 0 0 B
Reinforcement for tower columns and planted
797 2F ABE ABE P145 IR C MZP 797 Rev 00 ABE/P145/IR/C/MZP/797/Rev 00 9-Oct-16 11-Oct-16 2 B 0 0 0 B
walls (D:J/4-7)
Steel reinforcement for podium columns (K/3-10)
798 2F ABE ABE P145 IR C MZP 798 Rev 00 ABE/P145/IR/C/MZP/798/Rev 00 9-Oct-16 11-Oct-16 2 B 0 0 0 B
(H-I/9-10)
799 Corewall-1 reinforcement 3F to 4F (F-G/4-7) 3F ABE ABE P145 IR C MZP 799 Rev 00 ABE/P145/IR/C/MZP/799/Rev 00 10-Oct-16 16-Oct-16 6 B 0 0 0 B
800 Reinforcement for tower columns at (E-I/8) 2F ABE ABE P145 IR C MZP 800 Rev 00 ABE/P145/IR/C/MZP/800/Rev 00 12-Oct-16 16-Oct-16 4 B 0 0 0 B
801 Formwork for core-01 wall (F-G/4-7) 3F ABE ABE P145 IR C MZP 801 Rev 00 ABE/P145/IR/C/MZP/801/Rev 00 12-Oct-16 16-Oct-16 4 B 0 0 0 B
802 Setting out for core-01 walls (F-G/4-7) 3F ABE ABE P145 IR C MZP 802 Rev 00 ABE/P145/IR/C/MZP/802/Rev 00 13-Oct-16 16-Oct-16 3 B 0 0 0 B
Reinforcement for lintel beams (D-L/2, L/2-10, H-
803 2F ABE ABE P145 IR C MZP 803 Rev 00 ABE/P145/IR/C/MZP/803/Rev 00 13-Oct-16 16-Oct-16 3 B 0 0 0 B
L/10)

804 2F slab beam reinforcement (B-H/10, B/8-10) 2F ABE ABE P145 IR C MZP 804 Rev 00 ABE/P145/IR/C/MZP/804/Rev 00 13-Oct-16 16-Oct-16 3 B 0 0 0 B

805 Staircase-4 & 4A reinforcement (I-J/3-4/7-8) GF ABE ABE P145 IR C MZP 805 Rev 00 ABE/P145/IR/C/MZP/805/Rev 00 13-Oct-16 16-Oct-16 3 B 0 0 0 B
B3 Inner slab bottom + top reinf. at core-02
806 B3 ABE ABE P145 IR C MZP 806 Rev 00 ABE/P145/IR/C/MZP/806/Rev 00 15-Oct-16 16-Oct-16 1 B 0 0 0 B
(G:H/4:7)
807 B3 Inner slab beams reinf. at core-02 (G:H/4:7) B3 ABE ABE P145 IR C MZP 807 Rev 00 ABE/P145/IR/C/MZP/807/Rev 00 15-Oct-16 16-Oct-16 1 B 0 0 0 B

17/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
808 B3 slab form works (G:H/4:7) B3 ABE ABE P145 IR C MZP 808 Rev 00 ABE/P145/IR/C/MZP/808/Rev 00 15-Oct-16 16-Oct-16 1 B 0 0 0 B
809 Grouting for post tension (2-10/B-L) 2F ABE ABE P145 IR C MZP 809 Rev 00 ABE/P145/IR/C/MZP/809/Rev 00 16-Oct-16 18-Oct-16 2 B 0 0 0 B
810 Steel reinforcement for ramp-01 slab (2-6/A-B) B5 ABE ABE P145 IR C MZP 810 Rev 00 ABE/P145/IR/C/MZP/810/Rev 00 17-Oct-16 18-Oct-16 1 B 0 0 0 B

811 Form work for ramp-01 slab (2-6/A-B) B5 to B4 B5 to B4 ABE ABE P145 IR C MZP 811 Rev 00 ABE/P145/IR/C/MZP/811/Rev 00 17-Oct-16 18-Oct-16 1 B 0 0 0 B

812 Core wall 2 reinforcement 4F to 5F (G-H/4-7) 4F ABE ABE P145 IR C MZP 812 Rev 00 ABE/P145/IR/C/MZP/812/Rev 00 18-Oct-16 24-Oct-16 6 B 0 0 0 B

813 To close SOR-STR-063 Post tension (2-10/B-L) SOR-STR-063 ABE ABE P145 IR C MZP 813 Rev 00 ABE/P145/IR/C/MZP/813/Rev 00 18-Oct-16 19-Oct-16 1 B 0 0 0 B
Steel reinforcement for podium columns (C-G/10
814 2F ABE ABE P145 IR C MZP 814 Rev 00 ABE/P145/IR/C/MZP/814/Rev 00 18-Oct-16 22-Oct-16 4 B 0 0 0 B
& C/8)
815 Lift lobby slab reinforcement (G/4-7) 3F ABE ABE P145 IR C MZP 815 Rev 00 ABE/P145/IR/C/MZP/815/Rev 00 18-Oct-16 20-Oct-16 2 B 0 0 0 B
816 Lift lobby slab formwork (G/4-7) 3F ABE ABE P145 IR C MZP 816 Rev 00 ABE/P145/IR/C/MZP/816/Rev 00 19-Oct-16 20-Oct-16 1 B 0 0 0 B
3F slab beams reinforcement (D-L/2-3, D-J-L/2-
817 3F ABE ABE P145 IR C MZP 817 Rev 00 ABE/P145/IR/C/MZP/817/Rev 00 20-Oct-16 22-Oct-16 2 B 0 0 0 B
10)
818 Formwork for core-02 wall (G-H/4-7) 4F ABE ABE P145 IR C MZP 818 Rev 00 ABE/P145/IR/C/MZP/818/Rev 00 23-Oct-16 24-Oct-16 1 B 0 0 0 B
819 Setting out for core-02 walls (G-H/4-7) 4F ABE ABE P145 IR C MZP 819 Rev 00 ABE/P145/IR/C/MZP/819/Rev 00 23-Oct-16 24-Oct-16 1 B 0 0 0 B
3F slab beams reinforcement (E-J/8, E-G/8-10,
820 3F ABE ABE P145 IR C MZP 820 Rev 00 ABE/P145/IR/C/MZP/820/Rev 00 23-Oct-16 26-Oct-16 3 B 0 0 0 B
E-G/10)
3F slab bottom + additional bottom reinforcement
821 3F ABE ABE P145 IR C MZP 821 Rev 00 ABE/P145/IR/C/MZP/821/Rev 00 23-Oct-16 26-Oct-16 3 B 0 0 0 B
(D-L/2-10)
3F slab top + additional top reinforcement (D-L/2-
822 3F ABE ABE P145 IR C MZP 822 Rev 00 ABE/P145/IR/C/MZP/822/Rev 00 24-Oct-16 26-Oct-16 2 B 0 0 0 B
10)
823 3F slab form work (D-L/2-10) 3F ABE ABE P145 IR C MZP 823 Rev 01 ABE/P145/IR/C/MZP/823/Rev 01 24-Oct-16 26-Oct-16 2 D 26-Oct-16 29-Oct-16 3 B 0 0 B
824 Setting out for tower columns (D-J/3-8) 3F ABE ABE P145 IR C MZP 824 Rev 00 ABE/P145/IR/C/MZP/824/Rev 00 26-Oct-16 29-Oct-16 3 B 0 0 0 B
Concrete of columns to close NCR-STR-039 (K-
825 NCR-STR-039 ABE ABE P145 IR C MZP 825 Rev 00 ABE/P145/IR/C/MZP/825/Rev 00 26-Oct-16 29-Oct-16 3 B 0 0 0 B
L/9-10)
Concrete beam & slab soffit after concrete
826 NCR-STR-043 ABE ABE P145 IR C MZP 826 Rev 00 ABE/P145/IR/C/MZP/826/Rev 00 26-Oct-16 2-Nov-16 7 B 0 0 0 B
casting to close NCR-STR-043
Concete of core-2 walls to close NCR-STR-045
827 NCR-STR-045 ABE ABE P145 IR C MZP 827 Rev 00 ABE/P145/IR/C/MZP/827/Rev 00 26-Oct-16 29-Oct-16 3 B 0 0 0 B
(G-H/4-7)
Reinforcement for tower columns (E-I/2 & D-E/4-
828 3F ABE ABE P145 IR C MZP 828 Rev 00 ABE/P145/IR/C/MZP/828/Rev 00 27-Oct-16 2-Nov-16 6 B 0 0 0 B
5)
829 Corewall-1 reinforcement (F-G/4-7) 4F ABE ABE P145 IR C MZP 829 Rev 00 ABE/P145/IR/C/MZP/829/Rev 00 29-Oct-16 29-Oct-16 0 B 0 0 0 B
830 Formwork for tower columns (E-I/2 & D-E/4-5) 3F ABE ABE P145 IR C MZP 830 Rev 00 ABE/P145/IR/C/MZP/830/Rev 00 29-Oct-16 2-Nov-16 4 B 0 0 0 B
831 Setting out for core-01 walls (F-G/4-7) 4F ABE ABE P145 IR C MZP 831 Rev 00 ABE/P145/IR/C/MZP/831/Rev 00 30-Oct-16 1-Nov-16 2 B 0 0 0 B
832 Formwork for core-01 wall (F-G/4-7) 4F ABE ABE P145 IR C MZP 832 Rev 00 ABE/P145/IR/C/MZP/832/Rev 00 30-Oct-16 3-Nov-16 4 B 0 0 0 B
833 Corewall-2 reinforcement (G-H/4-7) 5F ABE ABE P145 IR C MZP 833 Rev 01 ABE/P145/IR/C/MZP/833/Rev 01 31-Oct-16 1-Nov-16 1 D 3-Nov-16 5-Nov-16 2 B 0 0 B
Staircase 4 & 4A reinforcement GF to 1F (I-J/3-
834 GF to 1F ABE ABE P145 IR C MZP 834 Rev 00 ABE/P145/IR/C/MZP/834/Rev 00 31-Oct-16 1-Nov-16 1 B 0 0 0 B
4/7-8)
835 Reinforcement for tower columns (E-I/2 & I-J/3-8) 3F ABE ABE P145 IR C MZP 835 Rev 00 ABE/P145/IR/C/MZP/835/Rev 00 1-Nov-16 2-Nov-16 1 B 0 0 0 B
836 Formwork for tower columns (E-I/2 & I-J/3-8) 3F ABE ABE P145 IR C MZP 836 Rev 01 ABE/P145/IR/C/MZP/836/Rev 01 1-Nov-16 2-Nov-16 1 D 6-Nov-16 8-Nov-16 2 B 0 0 B
Steel reinforcement for podium columns (B-C/2-
837 2F ABE ABE P145 IR C MZP 837 Rev 00 ABE/P145/IR/C/MZP/837/Rev 00 2-Nov-16 6-Nov-16 4 B 0 0 0 B
10)
838 Staircase 4 & 4A formwork GF to 1F (I-J/3-4/7-8) GF to 1F ABE ABE P145 IR C MZP 838 Rev 00 ABE/P145/IR/C/MZP/838/Rev 00 3-Nov-16 3-Nov-16 0 B 0 0 0 B
839 Lift lobby slab formwork (G/4-7) 4F ABE ABE P145 IR C MZP 839 Rev 00 ABE/P145/IR/C/MZP/839/Rev 00 3-Nov-16 5-Nov-16 2 B 0 0 0 B
840 Lift lobby slab reinforcement (G/4-7) 4F ABE ABE P145 IR C MZP 840 Rev 00 ABE/P145/IR/C/MZP/840/Rev 00 3-Nov-16 5-Nov-16 2 B 0 0 0 B
841 Setting out for core-02 walls (G-H/4-7) 5F ABE ABE P145 IR C MZP 841 Rev 00 ABE/P145/IR/C/MZP/841/Rev 00 3-Nov-16 5-Nov-16 2 B 0 0 0 B
842 Formwork for core-02 walls (G-H/4-7) 5F ABE ABE P145 IR C MZP 842 Rev 00 ABE/P145/IR/C/MZP/842/Rev 00 3-Nov-16 5-Nov-16 2 B 0 0 0 B
843 Steel reinforcement for ramp-01 (2-6/A-B) B4 to B3 ABE ABE P145 IR C MZP 843 Rev 00 ABE/P145/IR/C/MZP/843/Rev 00 5-Nov-16 6-Nov-16 1 B 0 0 0 B
844 Formwork for ramp-01 (2-6/A-B) B4 to B3 ABE ABE P145 IR C MZP 844 Rev 01 ABE/P145/IR/C/MZP/844/Rev 01 5-Nov-16 6-Nov-16 1 C 7-Nov-16 9-Nov-16 2 B 0 0 B
845 Corewall-1 reinforcement (F-H/4-7) 5F ABE ABE P145 IR C MZP 845 Rev 00 ABE/P145/IR/C/MZP/845/Rev 00 5-Nov-16 6-Nov-16 1 B 0 0 0 B
846 Formwork for podium columns (B:C/2-10) 2F ABE ABE P145 IR C MZP 846 Rev 00 ABE/P145/IR/C/MZP/846/Rev 00 5-Nov-16 12-Nov-16 7 B 0 0 0 B
Reinforcement for tower columns (E-H/8 & D-
847 3F ABE ABE P145 IR C MZP 847 Rev 00 ABE/P145/IR/C/MZP/847/Rev 00 5-Nov-16 6-Nov-16 1 B 0 0 0 B
E/6-7)
Formwork for tower columns after concrete
848 casting (surface quality & verticality) (D-I/3, I-J/4- NCR-STR-050 ABE ABE P145 IR C MZP 848 Rev 00 ABE/P145/IR/C/MZP/848/Rev 00 6-Nov-16 7-Nov-16 1 B 0 0 0 B
8)
849 Setting out for core-01 walls at (F-G/4-7) 5F ABE ABE P145 IR C MZP 849 Rev 00 ABE/P145/IR/C/MZP/849/Rev 00 7-Nov-16 9-Nov-16 2 B 0 0 0 B
850 Formwork for core-01 walls at (F-G/4-7) 5F ABE ABE P145 IR C MZP 850 Rev 00 ABE/P145/IR/C/MZP/850/Rev 00 7-Nov-16 9-Nov-16 2 B 0 0 0 B
B2 inner slab botoom + top reinforcement at
851 B2 ABE ABE P145 IR C MZP 851 Rev 00 ABE/P145/IR/C/MZP/851/Rev 00 7-Nov-16 9-Nov-16 2 B 0 0 0 B
core-2 (G-H/4-7)
B2 inner slab beam reinforcement at core-2 (G-
852 B2 ABE ABE P145 IR C MZP 852 Rev 00 ABE/P145/IR/C/MZP/852/Rev 00 7-Nov-16 9-Nov-16 2 B 0 0 0 B
H/4-7)
853 B2 slab formworks (G-H/4-7) B2 ABE ABE P145 IR C MZP 853 Rev 00 ABE/P145/IR/C/MZP/853/Rev 00 7-Nov-16 9-Nov-16 2 B 0 0 0 B
854 Staircase-02 reinforcement (G-H/4-7) B3 ABE ABE P145 IR C MZP 854 Rev 00 ABE/P145/IR/C/MZP/854/Rev 00 7-Nov-16 9-Nov-16 2 B 0 0 0 B
855 Formwork for tower column at (D-E/6) 3F ABE ABE P145 IR C MZP 855 Rev 00 ABE/P145/IR/C/MZP/855/Rev 00 7-Nov-16 9-Nov-16 2 B 0 0 0 B
856 4F slab beams reinforcement (D-J/2-9) 4F ABE ABE P145 IR C MZP 856 Rev 01 ABE/P145/IR/C/MZP/856/Rev 01 9-Nov-16 10-Nov-16 1 D 10-Nov-16 12-Nov-16 2 B 0 0 B
857 4F slab bottom reinforcement (D-J/2-9) 4F ABE ABE P145 IR C MZP 857 Rev 01 ABE/P145/IR/C/MZP/857/Rev 01 9-Nov-16 10-Nov-16 1 D 10-Nov-16 12-Nov-16 2 B 0 0 B
858 4F slab Top & additional reinforcement (D-J/2-9) 4F ABE ABE P145 IR C MZP 858 Rev 01 ABE/P145/IR/C/MZP/858/Rev 01 9-Nov-16 10-Nov-16 1 D 10-Nov-16 12-Nov-16 2 B 0 0 B
859 4F slab formwork (D-J/2-9) 4F ABE ABE P145 IR C MZP 859 Rev 01 ABE/P145/IR/C/MZP/859/Rev 01 9-Nov-16 10-Nov-16 1 D 10-Nov-16 12-Nov-16 2 B 0 0 B
860 Post tension (2-09/D-J) 4F ABE ABE P145 IR C MZP 860 Rev 01 ABE/P145/IR/C/MZP/860/Rev 01 9-Nov-16 10-Nov-16 1 D 10-Nov-16 12-Nov-16 2 B 0 0 B
861 Closing of dewateing well no. 05 (E-F/2-3) B5 ABE ABE P145 IR C MZP 861 Rev 00 ABE/P145/IR/C/MZP/861/Rev 00 9-Nov-16 19-Nov-16 10 B 0 0 0 B
862 Setting our for tower columns (D-J/2-9) 4F ABE ABE P145 IR C MZP 862 Rev 01 ABE/P145/IR/C/MZP/862/Rev 01 9-Nov-16 10-Nov-16 1 D 10-Nov-16 15-Nov-16 5 B 0 0 B
863 Corewall-2 reinforcement (G-H/4-7) 6F ABE ABE P145 IR C MZP 863 Pending ABE/P145/IR/C/MZP/863/Pending 12-Nov-16 12-Nov-16 0 D 0 0 0 D
864 Planted beam reinforcement at (K-M/9-11) GF ABE ABE P145 IR C MZP 864 Rev 00 ABE/P145/IR/C/MZP/864/Rev 00 12-Nov-16 15-Nov-16 3 B 0 0 0 B
865 Setting out for core-02 walls (G-H/4-7) 6F ABE ABE P145 IR C MZP 865 Rev 00 ABE/P145/IR/C/MZP/865/Rev 00 13-Nov-16 14-Nov-16 1 B 0 0 0 B
866 Formwork for core-02 walls (G-H/4-7) 6F ABE ABE P145 IR C MZP 866 Rev 00 ABE/P145/IR/C/MZP/866/Rev 00 13-Nov-16 14-Nov-16 1 B 0 0 0 B
867 core wall 1 reinforcement (F-G/4:7) 6F to 7F ABE ABE P145 IR C MZP 867 Rev 00 ABE/P145/IR/C/MZP/867/Rev 00 14-Nov-16 15-Nov-16 1 B 0 0 0 B
Reinforcement for tower columns (G-I/3, I-J/4-7,
868 4F ABE ABE P145 IR C MZP 868 Rev 00 ABE/P145/IR/C/MZP/868/Rev 00 14-Nov-16 15-Nov-16 1 B 0 0 0 B
H-I/8)
Formwork for tower columns (G-I/3, I-J/4-7, H-
869 4F ABE ABE P145 IR C MZP 869 Rev 00 ABE/P145/IR/C/MZP/869/Rev 00 14-Nov-16 15-Nov-16 1 B 0 0 0 B
I/8)
870 Setting out for core-01 walls (F-G/4-7) 6F ABE ABE P145 IR C MZP 870 Rev 00 ABE/P145/IR/C/MZP/870/Rev 00 16-Nov-16 17-Nov-16 1 B 0 0 0 B
871 Formwork for core-01 walls (F-G/4-7) 6F ABE ABE P145 IR C MZP 871 Rev 00 ABE/P145/IR/C/MZP/871/Rev 00 16-Nov-16 17-Nov-16 1 B 0 0 0 B
872 Lift lobby slab reinforcement (G/4-7) 5F ABE ABE P145 IR C MZP 872 Rev 00 ABE/P145/IR/C/MZP/872/Rev 00 16-Nov-16 17-Nov-16 1 B 0 0 0 B
873 Lift lobby slab formwork (G/4-7) 5F ABE ABE P145 IR C MZP 873 Rev 00 ABE/P145/IR/C/MZP/873/Rev 00 16-Nov-16 17-Nov-16 1 B 0 0 0 B
Reinforcement for tower columns (E-F/3, D-E/4-
874 4F ABE ABE P145 IR C MZP 874 Rev 00 ABE/P145/IR/C/MZP/874/Rev 00 16-Nov-16 17-Nov-16 1 B 0 0 0 B
7, E-G/8)
Inner slab bottom + top reinforcement at core-02
875 B1 ABE ABE P145 IR C MZP 875 Rev 00 ABE/P145/IR/C/MZP/875/Rev 00 16-Nov-16 17-Nov-16 1 B 0 0 0 B
(G-H/4-7)
Inner slab beams reinforcement at core-02 (G-
876 B1 ABE ABE P145 IR C MZP 876 Pending ABE/P145/IR/C/MZP/876/Pending 16-Nov-16 17-Nov-16 1 D 0 0 0 D
H/4-7)
877 Slab form works (G-H/4-7) B1 ABE ABE P145 IR C MZP 877 Rev 00 ABE/P145/IR/C/MZP/877/Rev 00 16-Nov-16 17-Nov-16 1 B 0 0 0 B

18/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
878 Staircase-02 reinforcement (G-H/4-7) B2 ABE ABE P145 IR C MZP 878 Rev 00 ABE/P145/IR/C/MZP/878/Rev 00 16-Nov-16 17-Nov-16 1 B 0 0 0 B
Formwork for tower column (E-F/3, D-E/4-7, E-
879 4F ABE ABE P145 IR C MZP 879 Rev 00 ABE/P145/IR/C/MZP/879/Rev 00 16-Nov-16 17-Nov-16 1 B 0 0 0 B
G/8)
880 Staircase-4 & 4A reinforcement (I-J/3-4/7-8) 1F to 2F ABE ABE P145 IR C MZP 880 Rev 00 ABE/P145/IR/C/MZP/880/Rev 00 19-Nov-16 19-Nov-16 0 B 0 0 0 B
881 Staircase-4 & 4A formwork (I-J/3-4/7-8) 1F to 2F ABE ABE P145 IR C MZP 881 Rev 00 ABE/P145/IR/C/MZP/881/Rev 00 19-Nov-16 19-Nov-16 0 B 0 0 0 B
882 Slab beam reinforcement (2-9/D-J) 5F ABE ABE P145 IR C MZP 882 Rev 00 ABE/P145/IR/C/MZP/882/Rev 00 22-Nov-16 26-Nov-16 4 B 0 0 0 B
883 Slab bottom reinforcement (D-J/2-9) 5F ABE ABE P145 IR C MZP 883 Rev 00 ABE/P145/IR/C/MZP/883/Rev 00 22-Nov-16 26-Nov-16 4 B 0 0 0 B
884 Slab formwork (D-J/2-9) 5F ABE ABE P145 IR C MZP 884 Rev 00 ABE/P145/IR/C/MZP/884/Rev 00 22-Nov-16 26-Nov-16 4 B 0 0 0 B
Upstand preparation for casting (G-H/8-10) (K/2-
885 1F ABE ABE P145 IR C MZP 885 Pending ABE/P145/IR/C/MZP/885/Pending 22-Nov-16 -42696 0 0 0 U/R
10)
Waterproofing (proofex engage) B3 to B2 walls
886 B3-B2 ABE ABE P145 IR C MZP 886 Rev 00 ABE/P145/IR/C/MZP/886/Rev 00 22-Nov-16 26-Nov-16 4 B 0 0 0 B
(A/2-7)
887 Top additional reinforcement (D-J/2-9) 5F ABE ABE P145 IR C MZP 887 Rev 00 ABE/P145/IR/C/MZP/887/Rev 00 23-Nov-16 26-Nov-16 3 B 0 0 0 B
888 Post tension (D-J/2-9) 5F ABE ABE P145 IR C MZP 888 Rev 00 ABE/P145/IR/C/MZP/888/Rev 00 23-Nov-16 26-Nov-16 3 B 0 0 0 B
889 Corewall-2 reinforcement (G-H/4-7) 7F ABE ABE P145 IR C MZP 889 Rev 00 ABE/P145/IR/C/MZP/889/Rev 00 24-Nov-16 28-Nov-16 4 B 0 0 0 B
890 Setting out core-02 walls (G-H/4-7) 7F ABE ABE P145 IR C MZP 890 Rev 00 ABE/P145/IR/C/MZP/890/Rev 00 26-Nov-16 28-Nov-16 2 B 0 0 0 B
891 Formwork for core-02 walls (G-H/4-7) 7F ABE ABE P145 IR C MZP 891 Rev 00 ABE/P145/IR/C/MZP/891/Rev 00 26-Nov-16 28-Nov-16 2 B 0 0 0 B
892 Lift lobby slab reinforcement (G/4-7) 6F ABE ABE P145 IR C MZP 892 Rev 00 ABE/P145/IR/C/MZP/892/Rev 00 26-Nov-16 28-Nov-16 2 B 0 0 0 B
893 Lift lobby slab formwork (G/4-7) 6F ABE ABE P145 IR C MZP 893 Rev 00 ABE/P145/IR/C/MZP/893/Rev 00 26-Nov-16 28-Nov-16 2 B 0 0 0 B
894 Setting out for tower columns (D-J/2-9) 5F ABE ABE P145 IR C MZP 894 Rev 00 ABE/P145/IR/C/MZP/894/Rev 00 26-Nov-16 28-Nov-16 2 B 0 0 0 B
895 Reinforcement for tower columns (3/E-I) 5F ABE ABE P145 IR C MZP 895 Rev 00 ABE/P145/IR/C/MZP/895/Rev 00 26-Nov-16 28-Nov-16 2 B 0 0 0 B
896 Formwork for tower column (E-I/3) (E-I/8) 5F ABE ABE P145 IR C MZP 896 Rev 00 ABE/P145/IR/C/MZP/896/Rev 00 27-Nov-16 28-Nov-16 1 B 0 0 0 B
897 Reinforcement for tower column (E-I/8) 5F ABE ABE P145 IR C MZP 897 Rev 00 ABE/P145/IR/C/MZP/897/Rev 00 27-Nov-16 28-Nov-16 1 B 0 0 0 B
898 Corewall-1 reinforcement (F-G/4-7) 7F ABE ABE P145 IR C MZP 898 Rev 00 ABE/P145/IR/C/MZP/898/Rev 00 27-Nov-16 30-Nov-16 3 B 0 0 0 B
899 Reinforcement for tower columns (I-E/4-7) 5F ABE ABE P145 IR C MZP 899 Pending ABE/P145/IR/C/MZP/899/Pending 1-Nov-16 -42675 0 0 0 U/R
900 Formwork for tower columns (I-E/4-7) 5F ABE ABE P145 IR C MZP 900 Pending ABE/P145/IR/C/MZP/900/Pending 1-Nov-16 -42675 0 0 0 U/R
901 Inner slab core-01 formworks (F-G/4-7) B4 ABE ABE P145 IR C MZP 901 Pending ABE/P145/IR/C/MZP/901/Pending 1-Nov-16 -42675 0 0 0 U/R
Inner slab bottom + top reinforcement at core-01
902 B4 ABE ABE P145 IR C MZP 902 Pending ABE/P145/IR/C/MZP/902/Pending 1-Nov-16 -42675 0 0 0 U/R
(F-G/4-7)
903 Staircase 4 & 4A formwork (I-J/3-4/7-8) 1F to 2F ABE ABE P145 IR C MZP 903 Pending ABE/P145/IR/C/MZP/903/Pending 1-Nov-16 -42675 0 0 0 U/R
904 Staircase 4 & 4A reinforcement (I-J/3-4/7-8) 1F to 2F ABE ABE P145 IR C MZP 904 Pending ABE/P145/IR/C/MZP/904/Pending 1-Nov-16 -42675 0 0 0 U/R
905 Final stressing for strands (2-8/D-J) 5F ABE ABE P145 IR C MZP 905 Pending ABE/P145/IR/C/MZP/905/Pending 1-Nov-16 -42675 0 0 0 U/R
906 Setting out for core-01 walls (F-G/4-7) 7F ABE ABE P145 IR C MZP 906 Pending ABE/P145/IR/C/MZP/906/Pending 1-Nov-16 -42675 0 0 0 U/R
907 Formwork for core-01 walls (F-G/4-7) 7F ABE ABE P145 IR C MZP 907 Pending ABE/P145/IR/C/MZP/907/Pending 1-Nov-16 -42675 0 0 0 U/R
Reinforcement for lintel beams (B/2-10, 2/B-C,
908 3F ABE ABE P145 IR C MZP 908 Pending ABE/P145/IR/C/MZP/908/Pending 1-Nov-16 -42675 0 0 0 U/R
10/B-C)
909 Pending //////Pending 0 0 0 0 0
910 Pending //////Pending 0 0 0 0 0
911 Pending //////Pending 0 0 0 0 0
912 Pending //////Pending 0 0 0 0 0
913 Pending //////Pending 0 0 0 0 0
914 Pending //////Pending 0 0 0 0 0
915 Pending //////Pending 0 0 0 0 0
916 Pending //////Pending 0 0 0 0 0
917 Pending //////Pending 0 0 0 0 0
918 Pending //////Pending 0 0 0 0 0
919 Pending //////Pending 0 0 0 0 0
920 Pending //////Pending 0 0 0 0 0
921 Pending //////Pending 0 0 0 0 0
922 Pending //////Pending 0 0 0 0 0
923 Pending //////Pending 0 0 0 0 0
924 Pending //////Pending 0 0 0 0 0
925 Pending //////Pending 0 0 0 0 0
926 Pending //////Pending 0 0 0 0 0
927 Pending //////Pending 0 0 0 0 0

928 Pending //////Pending 0 0 0 0 0

929 Pending //////Pending 0 0 0 0 0

930 Pending //////Pending 0 0 0 0 0

931 Pending //////Pending 0 0 0 0 0

932 Pending //////Pending 0 0 0 0 0

933 Pending //////Pending 0 0 0 0 0


934 Pending //////Pending 0 0 0 0 0
935 Pending //////Pending 0 0 0 0 0
936 Pending //////Pending 0 0 0 0 0
937 Pending //////Pending 0 0 0 0 0
938 Pending //////Pending 0 0 0 0 0
939 Pending //////Pending 0 0 0 0 0
940 Pending //////Pending 0 0 0 0 0

941 Pending //////Pending 0 0 0 0 0

942 Pending //////Pending 0 0 0 0 0

943 Pending //////Pending 0 0 0 0 0


944 Pending //////Pending 0 0 0 0 0
945 Pending //////Pending 0 0 0 0 0
946 Pending //////Pending 0 0 0 0 0
947 Pending //////Pending 0 0 0 0 0
948 Pending //////Pending 0 0 0 0 0
949 Pending //////Pending 0 0 0 0 0
950 Pending //////Pending 0 0 0 0 0
951 Pending //////Pending 0 0 0 0 0
952 Pending //////Pending 0 0 0 0 0
953 Pending //////Pending 0 0 0 0 0

954 Pending //////Pending 0 0 0 0 0

955 Pending //////Pending 0 0 0 0 0

19/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

956 Pending //////Pending 0 0 0 0 0


957 Pending //////Pending 0 0 0 0 0
958 Pending //////Pending 0 0 0 0 0
959 Pending //////Pending 0 0 0 0 0
960 Pending //////Pending 0 0 0 0 0
961 Pending //////Pending 0 0 0 0 0
962 Pending //////Pending 0 0 0 0 0
963 Pending //////Pending 0 0 0 0 0
964 Pending //////Pending 0 0 0 0 0
965 Pending //////Pending 0 0 0 0 0
966 Pending //////Pending 0 0 0 0 0

967 Pending //////Pending 0 0 0 0 0

968 Pending //////Pending 0 0 0 0 0

969 Pending //////Pending 0 0 0 0 0

970 Pending //////Pending 0 0 0 0 0

971 Pending //////Pending 0 0 0 0 0

972 Pending //////Pending 0 0 0 0 0

973 Pending //////Pending 0 0 0 0 0


974 Pending //////Pending 0 0 0 0 0
975 Pending //////Pending 0 0 0 0 0
976 Pending //////Pending 0 0 0 0 0
977 Pending //////Pending 0 0 0 0 0
978 Pending //////Pending 0 0 0 0 0
979 Pending //////Pending 0 0 0 0 0
980 Pending //////Pending 0 0 0 0 0
981 Pending //////Pending 0 0 0 0 0
982 Pending //////Pending 0 0 0 0 0
983 Pending //////Pending 0 0 0 0 0
984 Pending //////Pending 0 0 0 0 0
985 Pending //////Pending 0 0 0 0 0
986 Pending //////Pending 0 0 0 0 0
987 Pending //////Pending 0 0 0 0 0
988 Pending //////Pending 0 0 0 0 0
989 Pending //////Pending 0 0 0 0 0
990 Pending //////Pending 0 0 0 0 0
991 Pending //////Pending 0 0 0 0 0
992 Pending //////Pending 0 0 0 0 0
993 Pending //////Pending 0 0 0 0 0
994 Pending //////Pending 0 0 0 0 0
995 Pending //////Pending 0 0 0 0 0
996 Pending //////Pending 0 0 0 0 0
997 Pending //////Pending 0 0 0 0 0

998 Pending //////Pending 0 0 0 0 0

999 Pending //////Pending 0 0 0 0 0

1000 Pending //////Pending 0 0 0 0 0

20/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

21/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

22/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

23/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

24/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

25/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

26/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

27/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

28/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

29/305
12

STRUCTURAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
Submittal Submittal Submittal Submittal Legends
6
PROJECT No : P145 A 1 A 1 A 0 A 0 A = Approved
4 B 787 B 72 B 8 B 0 B = Approved As Noted
06 October 2020 C 60 C 3 C 0 C 0 C = Revised And Resubmit
2 D 45 D 8 D 0 D 0 D= Rejected

0
For BE use only
Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

30/305
12

PLUMBING WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 14 A 0 A 0 A 0 A = Approved
B 22 B 1 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 0 C 0 C 0 C 0 C = Revised And Resubmit
D 1 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

1 Installation of high pressure pipes & fittings Raft Electrowatt ABE P145 IR PLUMB MZP 001 Pending ABE/P145/IR/PLUMB/MZP/001/Pending 13-Dec-15 14-Dec-15 1 D 0 0 0 D

Installation of UPVC drainage pipes & fittings


2 Raft Electrowatt ABE P145 IR PLUMB MZP 002 Rev 00 ABE/P145/IR/PLUMB/MZP/002/Rev 00 27-Jan-16 30-Jan-16 3 B 0 0 0 B
(C:K/2:8)
UPVC Drainage pipes & fitings, high pressure &
3 Raft Electrowatt ABE P145 IR PLUMB MZP 003 Rev 00 ABE/P145/IR/PLUMB/MZP/003/Rev 00 2-Feb-16 6-Feb-16 4 B 0 0 0 B
leak test (Sump pit area) (C:K/2:8)
Installation of UPVC drainage pipes & fittings
4 Raft Electrowatt ABE P145 IR PLUMB MZP 004 Rev 00 ABE/P145/IR/PLUMB/MZP/004/Rev 00 2-Feb-16 3-Feb-16 1 B 0 0 0 B
(C:K/2:8)
UPVC Drainage pipes & fittings gravity leak test
5 Raft Electrowatt ABE P145 IR PLUMB MZP 005 Rev 00 ABE/P145/IR/PLUMB/MZP/005/Rev 00 2-Feb-16 3-Feb-16 1 B 0 0 0 B
(C:K/2:8)

6 Pending //////Pending 0 0 0 0 0

7 Installation of water tank sleeves (H:I/10:11) B5 Electrowatt ABE P145 IR PLUMB MZP 007 Rev 00 ABE/P145/IR/PLUMB/MZP/007/Rev 00 24-Feb-16 24-Feb-16 0 B 0 0 0 B

8 Installation of water tank sleeves (H:I/10:11) B5 Electrowatt ABE P145 IR PLUMB MZP 008 Rev 00 ABE/P145/IR/PLUMB/MZP/008/Rev 00 9-Mar-16 10-Mar-16 1 B 20-Mar-16 20-Mar-16 0 B 0 0 B

Installation of sleeves for storm water tank and


9 B1 Electrowatt ABE P145 IR PLUMB MZP 009 Rev 00 ABE/P145/IR/PLUMB/MZP/009/Rev 00 22-Jun-16 25-Jun-16 3 B 0 0 0 B
ramp wall (A/B-3/7)
Installation of sleeves for septic tanks (SMH,
10 B1 Electrowatt ABE P145 IR PLUMB MZP 010 Rev 00 ABE/P145/IR/PLUMB/MZP/010/Rev 00 18-Jul-16 19-Jul-16 1 B 0 0 0 B
PRM & FMH) (Main manholes) (F:H/1:2)
Installation of UPVC drainage pipes & fittings
11 B5 Electrowatt ABE P145 IR PLUMB MZP 011 Rev 00 ABE/P145/IR/PLUMB/MZP/011/Rev 00 20-Aug-16 24-Aug-16 4 A 0 0 0 A
(A:M/1:11)
Gravity test for UPVC drainage pipes & fittings
12 B5 Electrowatt ABE P145 IR PLUMB MZP 012 Rev 00 ABE/P145/IR/PLUMB/MZP/012/Rev 00 20-Aug-16 24-Aug-16 4 A 0 0 0 A
(A:M/6:11)
Gravity test for UPVC drainage pipes & fittings
13 B5 Electrowatt ABE P145 IR PLUMB MZP 013 Rev 00 ABE/P145/IR/PLUMB/MZP/013/Rev 00 22-Aug-16 29-Aug-16 7 A 0 0 0 A
(A:M/6:1)
Installation of UPVC drainage pipes & fittings
14 B4 Electrowatt ABE P145 IR PLUMB MZP 014 Rev 00 ABE/P145/IR/PLUMB/MZP/014/Rev 00 3-Sep-16 5-Sep-16 2 A 0 0 0 A
(parking drain) (A/M-8/11)
Gravity and leak test for UPVC drainage pipes &
15 B4 Electrowatt ABE P145 IR PLUMB MZP 015 Rev 00 ABE/P145/IR/PLUMB/MZP/015/Rev 00 3-Sep-16 5-Sep-16 2 A 0 0 0 A
fitting (parking drain) (A/M-8/11)
Installation of PPR pipes and fittings in
16 B5 Electrowatt ABE P145 IR PLUMB MZP 016 Rev 00 ABE/P145/IR/PLUMB/MZP/016/Rev 00 22-Sep-16 25-Sep-16 3 B 0 0 0 B
(A:M/1:11)
Installation of PPR pipes and fittings in
17 B4 Electrowatt ABE P145 IR PLUMB MZP 017 Rev 00 ABE/P145/IR/PLUMB/MZP/017/Rev 00 22-Sep-16 25-Sep-16 3 B 0 0 0 B
(A:M/1:11)
Installation of UPVC pipes and fittings for vent
18 B5 Electrowatt ABE P145 IR PLUMB MZP 018 Rev 00 ABE/P145/IR/PLUMB/MZP/018/Rev 00 24-Sep-16 26-Sep-16 2 B 0 0 0 B
lines (A:M/1:11)
Installation of UPVC drainage pipes & fittings
19 B4 Electrowatt ABE P145 IR PLUMB MZP 019 Rev 00 ABE/P145/IR/PLUMB/MZP/019/Rev 00 24-Sep-16 26-Sep-16 2 B 0 0 0 B
(parking drain) (A/M-8/11)
Gravity and leak test for UPVC drainage pipes &
20 B4 Electrowatt ABE P145 IR PLUMB MZP 020 Rev 00 ABE/P145/IR/PLUMB/MZP/020/Rev 00 24-Sep-16 26-Sep-16 2 B 0 0 0 B
fitting (parking drain) (A/M-8/11)
Installation of UPVC drainage pipes & fittings
21 B3 Electrowatt ABE P145 IR PLUMB MZP 021 Rev 00 ABE/P145/IR/PLUMB/MZP/021/Rev 00 1-Oct-16 4-Oct-16 3 B 0 0 0 B
(parking drain) (A/G-1/11)
Gravity and leak test for UPVC drainage pipes &
22 B3 Electrowatt ABE P145 IR PLUMB MZP 022 Rev 00 ABE/P145/IR/PLUMB/MZP/022/Rev 00 1-Oct-16 4-Oct-16 3 B 0 0 0 B
fitting (parking drain) (A/G-1/11)
Installation of PPR pipes and fittings in
23 B3 Electrowatt ABE P145 IR PLUMB MZP 023 Rev 00 ABE/P145/IR/PLUMB/MZP/023/Rev 00 15-Oct-16 16-Oct-16 1 B 0 0 0 B
(A:M/1:11)
Installation of PPR pipes and fittings in
24 B2 Electrowatt ABE P145 IR PLUMB MZP 024 Rev 00 ABE/P145/IR/PLUMB/MZP/024/Rev 00 15-Oct-16 16-Oct-16 1 B 0 0 0 B
(A:M/1:11)
Installation of PEX pipes and conduit terminal
25 B5 Electrowatt ABE P145 IR PLUMB MZP 025 Rev 00 ABE/P145/IR/PLUMB/MZP/025/Rev 00 18-Oct-16 19-Oct-16 1 B 0 0 0 B
box (E:I/2:4)
Installation of PVC pipes and fittings for wash
26 B5 Electrowatt ABE P145 IR PLUMB MZP 026 Rev 00 ABE/P145/IR/PLUMB/MZP/026/Rev 00 19-Oct-16 8-Nov-16 20 B 0 0 0 B
basin and urinal (E:I/2:4)
Installation of UPVC pipes and fitting for toilets in
27 B1 Electrowatt ABE P145 IR PLUMB MZP 027 Rev 00 ABE/P145/IR/PLUMB/MZP/027/Rev 00 7-Nov-16 9-Nov-16 2 A 0 0 0 A
basement (1) high level (C:K/3:9)
28 Installation of PPR pipes and fittings in (D:J/2:7) B2 Electrowatt ABE P145 IR PLUMB MZP 028 Rev 00 ABE/P145/IR/PLUMB/MZP/028/Rev 00 12-Nov-16 14-Nov-16 2 B 0 0 0 B
Installation of H.P and fittings for (FCU's &
29 B5 Electrowatt ABE P145 IR PLUMB MZP 029 Rev 00 ABE/P145/IR/PLUMB/MZP/029/Rev 00 16-Nov-16 20-Nov-16 4 B 0 0 0 B
AHU's) condensate drain (CDP) (A:M/1:11)
1st fix of drain sleeve slab of core wall 1
30 B4 Electrowatt ABE P145 IR PLUMB MZP 030 Rev 00 ABE/P145/IR/PLUMB/MZP/030/Rev 00 16-Nov-16 20-Nov-16 4 B 0 0 0 B
(F:G/4:6)
Installation of UPVC pipes and fitting (parking
31 B3 Electrowatt ABE P145 IR PLUMB MZP 031 Rev 00 ABE/P145/IR/PLUMB/MZP/031/Rev 00 21-Nov-16 23-Nov-16 2 A 0 0 0 A
drain) (G:M/1:11)
Gravity and leak test for UPVC drainage pipes &
32 B3 Electrowatt ABE P145 IR PLUMB MZP 032 Rev 00 ABE/P145/IR/PLUMB/MZP/032/Rev 00 21-Nov-16 23-Nov-16 2 A 0 0 0 A
fittings. (parking drain)
Installation of H.P and fittings for (FCU's &
33 B4 Electrowatt ABE P145 IR PLUMB MZP 033 Rev 00 ABE/P145/IR/PLUMB/MZP/033/Rev 00 22-Nov-16 27-Nov-16 5 A 0 0 0 A
AHU's) condensate drain (CDP) (A:M/1:11)
Installation of UPVC pipes and fitting (parking
34 B2 Electrowatt ABE P145 IR PLUMB MZP 034 Rev 00 ABE/P145/IR/PLUMB/MZP/034/Rev 00 23-Nov-16 27-Nov-16 4 A 0 0 0 A
drain) (A:M/1:11)
Gravity and leak test for UPVC drainage pipes &
35 B2 Electrowatt ABE P145 IR PLUMB MZP 035 Rev 00 ABE/P145/IR/PLUMB/MZP/035/Rev 00 23-Nov-16 27-Nov-16 4 A 0 0 0 A
fittings. (parking drain) (A:M/1:11)
Installation of UPVC drainage pipes and fitting
36 GF to 3F Electrowatt ABE P145 IR PLUMB MZP 036 Rev 00 ABE/P145/IR/PLUMB/MZP/036/Rev 00 27-Nov-16 29-Nov-16 2 A 0 0 0 A
(red). (rain water stack) (B:L/2:10)
Gravity and leak test for UPVC drainage pipes
37 GF to 3F Electrowatt ABE P145 IR PLUMB MZP 037 Rev 00 ABE/P145/IR/PLUMB/MZP/037/Rev 00 27-Nov-16 29-Nov-16 2 A 0 0 0 A
and fitting (red). (rain water stack) (B:L/2:10)
Installation of H.P and fittings for (FCU's &
38 B3 Electrowatt ABE P145 IR PLUMB MZP 038 Rev 00 ABE/P145/IR/PLUMB/MZP/038/Rev 00 27-Nov-16 29-Nov-16 2 A 0 0 0 A
AHU's) condensate drain (CDP) (A:M/1:11)
39 Pending //////Pending 0 0 0 0 0
40 Pending //////Pending 0 0 0 0 0
41 Pending //////Pending 0 0 0 0 0
42 Pending //////Pending 0 0 0 0 0
43 Pending //////Pending 0 0 0 0 0
44 Pending //////Pending 0 0 0 0 0
45 Pending //////Pending 0 0 0 0 0
46 Pending //////Pending 0 0 0 0 0
47 Pending //////Pending 0 0 0 0 0
48 Pending //////Pending 0 0 0 0 0
49 Pending //////Pending 0 0 0 0 0
50 Pending //////Pending 0 0 0 0 0
51 Pending //////Pending 0 0 0 0 0
52 Pending //////Pending 0 0 0 0 0
53 Pending //////Pending 0 0 0 0 0
54 Pending //////Pending 0 0 0 0 0
55 Pending //////Pending 0 0 0 0 0
56 Pending //////Pending 0 0 0 0 0
57 Pending //////Pending 0 0 0 0 0

31/305
12

PLUMBING WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 14 A 0 A 0 A 0 A = Approved
B 22 B 1 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 0 C 0 C 0 C 0 C = Revised And Resubmit
D 1 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
58 Pending //////Pending 0 0 0 0 0
59 Pending //////Pending 0 0 0 0 0
60 Pending //////Pending 0 0 0 0 0
61 Pending //////Pending 0 0 0 0 0
62 Pending //////Pending 0 0 0 0 0
63 Pending //////Pending 0 0 0 0 0
64 Pending //////Pending 0 0 0 0 0
65 Pending //////Pending 0 0 0 0 0
66 Pending //////Pending 0 0 0 0 0
67 Pending //////Pending 0 0 0 0 0
68 Pending //////Pending 0 0 0 0 0
69 Pending //////Pending 0 0 0 0 0
70 Pending //////Pending 0 0 0 0 0
71 Pending //////Pending 0 0 0 0 0
72 Pending //////Pending 0 0 0 0 0
73 Pending //////Pending 0 0 0 0 0
74 Pending //////Pending 0 0 0 0 0
75 Pending //////Pending 0 0 0 0 0
76 Pending //////Pending 0 0 0 0 0
77 Pending //////Pending 0 0 0 0 0
78 Pending //////Pending 0 0 0 0 0
79 Pending //////Pending 0 0 0 0 0
80 Pending //////Pending 0 0 0 0 0
81 Pending //////Pending 0 0 0 0 0
82 Pending //////Pending 0 0 0 0 0
83 Pending //////Pending 0 0 0 0 0
84 Pending //////Pending 0 0 0 0 0
85 Pending //////Pending 0 0 0 0 0
86 Pending //////Pending 0 0 0 0 0
87 Pending //////Pending 0 0 0 0 0
88 Pending //////Pending 0 0 0 0 0
89 Pending //////Pending 0 0 0 0 0
90 Pending //////Pending 0 0 0 0 0
91 Pending //////Pending 0 0 0 0 0
92 Pending //////Pending 0 0 0 0 0
93 Pending //////Pending 0 0 0 0 0
94 Pending //////Pending 0 0 0 0 0
95 Pending //////Pending 0 0 0 0 0
96 Pending //////Pending 0 0 0 0 0
97 Pending //////Pending 0 0 0 0 0
98 Pending //////Pending 0 0 0 0 0
99 Pending //////Pending 0 0 0 0 0
100 Pending //////Pending 0 0 0 0 0
101 Pending //////Pending 0 0 0 0 0
102 Pending //////Pending 0 0 0 0 0
103 Pending //////Pending 0 0 0 0 0
104 Pending //////Pending 0 0 0 0 0
105 Pending //////Pending 0 0 0 0 0
106 Pending //////Pending 0 0 0 0 0
107 Pending //////Pending 0 0 0 0 0
108 Pending //////Pending 0 0 0 0 0
109 Pending //////Pending 0 0 0 0 0
110 Pending //////Pending 0 0 0 0 0
111 Pending //////Pending 0 0 0 0 0
112 Pending //////Pending 0 0 0 0 0
113 Pending //////Pending 0 0 0 0 0
114 Pending //////Pending 0 0 0 0 0
115 Pending //////Pending 0 0 0 0 0
116 Pending //////Pending 0 0 0 0 0
117 Pending //////Pending 0 0 0 0 0
118 Pending //////Pending 0 0 0 0 0
119 Pending //////Pending 0 0 0 0 0
120 Pending //////Pending 0 0 0 0 0
121 Pending //////Pending 0 0 0 0 0
122 Pending //////Pending 0 0 0 0 0
123 Pending //////Pending 0 0 0 0 0
124 Pending //////Pending 0 0 0 0 0
125 Pending //////Pending 0 0 0 0 0
126 Pending //////Pending 0 0 0 0 0
127 Pending //////Pending 0 0 0 0 0
128 Pending //////Pending 0 0 0 0 0
129 Pending //////Pending 0 0 0 0 0
130 Pending //////Pending 0 0 0 0 0
131 Pending //////Pending 0 0 0 0
132 Pending //////Pending 0 0 0 0
133 Pending //////Pending 0 0 0 0
134 Pending //////Pending 0 0 0 0 0
135 Pending //////Pending 0 0 0 0 0
136 Pending //////Pending 0 0 0 0 0
137 Pending //////Pending 0 0 0 0 0
138 Pending //////Pending 0 0 0 0 0
139 Pending //////Pending 0 0 0 0 0

140 Pending //////Pending 0 0 0 0 0

141 Pending //////Pending 0 0 0 0 0

142 Pending //////Pending 0 0 0 0

143 Pending //////Pending 0 0 0 0 0


144 Pending //////Pending 0 0 0 0 0
145 Pending //////Pending 0 0 0 0 0

146 Pending //////Pending 0 0 0 0 0


147 Pending //////Pending 0 0 0 0 0
148 Pending //////Pending 0 0 0 0 0

32/305
12

PLUMBING WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 14 A 0 A 0 A 0 A = Approved
B 22 B 1 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 0 C 0 C 0 C 0 C = Revised And Resubmit
D 1 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

149 Pending //////Pending 0 0 0 0 0

150 Pending //////Pending 0 0 0 0 0

151 Pending //////Pending 0 0 0 0 0


152 Pending //////Pending 0 0 0 0 0
153 Pending //////Pending 0 0 0 0 0
154 Pending //////Pending 0 0 0 0 0
155 Pending //////Pending 0 0 0 0 0
156 Pending //////Pending 0 0 0 0 0
157 Pending //////Pending 0 0 0 0 0
158 Pending //////Pending 0 0 0 0 0
159 Pending //////Pending 0 0 0 0 0
160 Pending //////Pending 0 0 0 0 0

161 Pending //////Pending 0 0 0 0 0

162 Pending //////Pending 0 0 0 0 0

163 Pending //////Pending 0 0 0 0 0

164 Pending //////Pending 0 0 0 0 0

165 Pending //////Pending 0 0 0 0 0

166 Pending //////Pending 0 0 0 0 0

167 Pending //////Pending 0 0 0 0 0

168 Pending //////Pending 0 0 0 0 0


169 Pending //////Pending 0 0 0 0 0
170 Pending //////Pending 0 0 0 0 0
171 Pending //////Pending 0 0 0 0 0
172 Pending //////Pending 0 0 0 0 0
173 Pending //////Pending 0 0 0 0 0
174 Pending //////Pending 0 0 0 0 0
175 Pending //////Pending 0 0 0 0 0
176 Pending //////Pending 0 0 0 0 0
177 Pending //////Pending 0 0 0 0 0
178 Pending //////Pending 0 0 0 0 0
179 Pending //////Pending 0 0 0 0 0
180 Pending //////Pending 0 0 0 0 0
181 Pending //////Pending 0 0 0 0 0
182 Pending //////Pending 0 0 0 0 0
183 Pending //////Pending 0 0 0 0 0
184 Pending //////Pending 0 0 0 0 0
185 Pending //////Pending 0 0 0 0 0
186 Pending //////Pending 0 0 0 0 0
187 Pending //////Pending 0 0 0 0 0
188 Pending //////Pending 0 0 0 0 0
189 Pending //////Pending 0 0 0 0 0
190 Pending //////Pending 0 0 0 0 0
191 Pending //////Pending 0 0 0 0 0
192 Pending //////Pending 0 0 0 0 0
193 Pending //////Pending 0 0 0 0 0
194 Pending //////Pending 0 0 0 0 0
195 Pending //////Pending 0 0 0 0 0
196 Pending //////Pending 0 0 0 0 0
197 Pending //////Pending 0 0 0 0 0
198 Pending //////Pending 0 0 0 0 0
199 Pending //////Pending 0 0 0 0 0
200 Pending //////Pending 0 0 0 0 0
201 Pending //////Pending 0 0 0 0 0
202 Pending //////Pending 0 0 0 0 0
203 Pending //////Pending 0 0 0 0 0
204 Pending //////Pending 0 0 0 0 0
205 Pending //////Pending 0 0 0 0 0
206 Pending //////Pending 0 0 0 0 0
207 Pending //////Pending 0 0 0 0 0
208 Pending //////Pending 0 0 0 0 0
209 Pending //////Pending 0 0 0 0 0
210 Pending //////Pending 0 0 0 0 0
211 Pending //////Pending 0 0 0 0 0
212 Pending //////Pending 0 0 0 0 0
213 Pending //////Pending 0 0 0 0 0
214 Pending //////Pending 0 0 0 0 0
215 Pending //////Pending 0 0 0 0 0
216 Pending //////Pending 0 0 0 0 0
217 Pending //////Pending 0 0 0 0 0

33/305
12

PLUMBING WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 14 A 0 A 0 A 0 A = Approved
B 22 B 1 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 0 C 0 C 0 C 0 C = Revised And Resubmit
D 1 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
218 Pending //////Pending 0 0 0 0 0
219 Pending //////Pending 0 0 0 0 0
220 Pending //////Pending 0 0 0 0 0
221 Pending //////Pending 0 0 0 0 0
222 Pending //////Pending 0 0 0 0 0
223 Pending //////Pending 0 0 0 0 0
224 Pending //////Pending 0 0 0 0 0
225 Pending //////Pending 0 0 0 0 0
226 Pending //////Pending 0 0 0 0 0
227 Pending //////Pending 0 0 0 0 0
228 Pending //////Pending 0 0 0 0 0
229 Pending //////Pending 0 0 0 0 0
230 Pending //////Pending 0 0 0 0 0
231 Pending //////Pending 0 0 0 0 0
232 Pending //////Pending 0 0 0 0 0
233 Pending //////Pending 0 0 0 0 0
234 Pending //////Pending 0 0 0 0 0
235 Pending //////Pending 0 0 0 0 0
236 Pending //////Pending 0 0 0 0 0
237 Pending //////Pending 0 0 0 0 0
238 Pending //////Pending 0 0 0 0 0
239 Pending //////Pending 0 0 0 0 0
240 Pending //////Pending 0 0 0 0 0
241 Pending //////Pending 0 0 0 0 0
242 Pending //////Pending 0 0 0 0 0
243 Pending //////Pending 0 0 0 0 0
244 Pending //////Pending 0 0 0 0 0
245 Pending //////Pending 0 0 0 0 0
246 Pending //////Pending 0 0 0 0 0
247 Pending //////Pending 0 0 0 0 0
248 Pending //////Pending 0 0 0 0 0
249 Pending //////Pending 0 0 0 0 0
250 Pending //////Pending 0 0 0 0 0
251 Pending //////Pending 0 0 0 0 0
252 Pending //////Pending 0 0 0 0 0
253 Pending //////Pending 0 0 0 0 0
254 Pending //////Pending 0 0 0 0 0
255 Pending //////Pending 0 0 0 0 0
256 Pending //////Pending 0 0 0 0
257 Pending //////Pending 0 0 0 0 0
258 Pending //////Pending 0 0 0 0 0
259 Pending //////Pending 0 0 0 0 0
260 Pending //////Pending 0 0 0 0 0
261 Pending //////Pending 0 0 0 0 0
262 Pending //////Pending 0 0 0 0 0
263 Pending //////Pending 0 0 0 0 0
264 Pending //////Pending 0 0 0 0 0
265 Pending //////Pending 0 0 0 0 0
266 Pending //////Pending 0 0 0 0 0
267 Pending //////Pending 0 0 0 0 0
268 Pending //////Pending 0 0 0 0 0
269 Pending //////Pending 0 0 0 0 0
270 Pending //////Pending 0 0 0 0 0
271 Pending //////Pending 0 0 0 0 0
272 Pending //////Pending 0 0 0 0 0
273 Pending //////Pending 0 0 0 0 0
274 Pending //////Pending 0 0 0 0 0
275 Pending //////Pending 0 0 0 0 0
276 Pending //////Pending 0 0 0 0 0
277 Pending //////Pending 0 0 0 0 0
278 Pending //////Pending 0 0 0 0 0
279 Pending //////Pending 0 0 0 0 0
280 Pending //////Pending 0 0 0 0 0
281 Pending //////Pending 0 0 0 0 0
282 Pending //////Pending 0 0 0 0 0
283 Pending //////Pending 0 0 0 0 0
284 Pending //////Pending 0 0 0 0 0
285 Pending //////Pending 0 0 0 0 0
286 Pending //////Pending 0 0 0 0 0
287 Pending //////Pending 0 0 0 0 0
288 Pending //////Pending 0 0 0 0 0
289 Pending //////Pending 0 0 0 0 0
290 Pending //////Pending 0 0 0 0 0
291 Pending //////Pending 0 0 0 0 0
292 Pending //////Pending 0 0 0 0 0
293 Pending //////Pending 0 0 0 0 0
294 Pending //////Pending 0 0 0 0 0
295 Pending //////Pending 0 0 0 0 0
296 Pending //////Pending 0 0 0 0 0
297 Pending //////Pending 0 0 0 0 0
298 Pending //////Pending 0 0 0 0 0
299 Pending //////Pending 0 0 0 0 0
300 Pending //////Pending 0 0 0 0 0
301 Pending //////Pending 0 0 0 0 0
302 Pending //////Pending 0 0 0 0 0
303 Pending //////Pending 0 0 0 0 0
304 Pending //////Pending 0 0 0 0 0
305 Pending //////Pending 0 0 0 0 0
306 Pending //////Pending 0 0 0 0 0
307 Pending //////Pending 0 0 0 0 0
308 Pending //////Pending 0 0 0 0 0
309 Pending //////Pending 0 0 0 0 0
310 Pending //////Pending 0 0 0 0 0
311 Pending //////Pending 0 0 0 0 0
312 Pending //////Pending 0 0 0 0 0
313 Pending //////Pending 0 0 0 0 0

34/305
12

PLUMBING WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 14 A 0 A 0 A 0 A = Approved
B 22 B 1 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 0 C 0 C 0 C 0 C = Revised And Resubmit
D 1 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
314 Pending //////Pending 0 0 0 0 0
315 Pending //////Pending 0 0 0 0 0
316 Pending //////Pending 0 0 0 0 0
317 Pending //////Pending 0 0 0 0 0
318 Pending //////Pending 0 0 0 0 0
319 Pending //////Pending 0 0 0 0 0
320 Pending //////Pending 0 0 0 0 0
321 Pending //////Pending 0 0 0 0 0
322 Pending //////Pending 0 0 0 0 0
323 Pending //////Pending 0 0 0 0 0
324 Pending //////Pending 0 0 0 0 0
325 Pending //////Pending 0 0 0 0 0
326 Pending //////Pending 0 0 0 0 0
327 Pending //////Pending 0 0 0 0 0
328 Pending //////Pending 0 0 0 0 0
329 Pending //////Pending 0 0 0 0 0
330 Pending //////Pending 0 0 0 0 0
331 Pending //////Pending 0 0 0 0 0
332 Pending //////Pending 0 0 0 0 0
333 Pending //////Pending 0 0 0 0 0
334 Pending //////Pending 0 0 0 0 0
335 Pending //////Pending 0 0 0 0 0
336 Pending //////Pending 0 0 0 0 0
337 Pending //////Pending 0 0 0 0 0
338 Pending //////Pending 0 0 0 0 0
339 Pending //////Pending 0 0 0 0 0
340 Pending //////Pending 0 0 0 0 0
341 Pending //////Pending 0 0 0 0 0
342 Pending //////Pending 0 0 0 0 0
343 Pending //////Pending 0 0 0 0 0
344 Pending //////Pending 0 0 0 0 0
345 Pending //////Pending 0 0 0 0 0
346 Pending //////Pending 0 0 0 0 0
347 Pending //////Pending 0 0 0 0 0

348 Pending //////Pending 0 0 0 0 0

349 Pending //////Pending 0 0 0 0 0


350 Pending //////Pending 0 0 0 0 0
351 Pending //////Pending 0 0 0 0 0
352 Pending //////Pending 0 0 0 0 0
353 Pending //////Pending 0 0 0 0 0
354 Pending //////Pending 0 0 0 0 0
355 Pending //////Pending 0 0 0 0 0
356 Pending //////Pending 0 0 0 0 0
357 Pending //////Pending 0 0 0 0 0
358 Pending //////Pending 0 0 0 0 0
359 Pending //////Pending 0 0 0 0 0
360 Pending //////Pending 0 0 0 0 0
361 Pending //////Pending 0 0 0 0 0
362 Pending //////Pending 0 0 0 0 0
363 Pending //////Pending 0 0 0 0 0
364 Pending //////Pending 0 0 0 0 0
365 Pending //////Pending 0 0 0 0 0
366 Pending //////Pending 0 0 0 0 0
367 Pending //////Pending 0 0 0 0 0
368 Pending //////Pending 0 0 0 0 0
369 Pending //////Pending 0 0 0 0 0
370 Pending //////Pending 0 0 0 0 0
371 Pending //////Pending 0 0 0 0 0
372 Pending //////Pending 0 0 0 0 0
373 Pending //////Pending 0 0 0 0 0
374 Pending //////Pending 0 0 0 0 0
375 Pending //////Pending 0 0 0 0 0
376 Pending //////Pending 0 0 0 0 0
377 Pending //////Pending 0 0 0 0 0
378 Pending //////Pending 0 0 0 0 0
379 Pending //////Pending 0 0 0 0 0
380 Pending //////Pending 0 0 0 0 0
381 Pending //////Pending 0 0 0 0 0
382 Pending //////Pending 0 0 0 0 0
383 Pending //////Pending 0 0 0 0 0
384 Pending //////Pending 0 0 0 0 0
385 Pending //////Pending 0 0 0 0 0
386 Pending //////Pending 0 0 0 0 0
387 Pending //////Pending 0 0 0 0 0
388 Pending //////Pending 0 0 0 0 0
389 Pending //////Pending 0 0 0 0 0
390 Pending //////Pending 0 0 0 0 0
391 Pending //////Pending 0 0 0 0 0
392 Pending //////Pending 0 0 0 0 0
393 Pending //////Pending 0 0 0 0 0
394 Pending //////Pending 0 0 0 0 0
395 Pending //////Pending 0 0 0 0 0
396 Pending //////Pending 0 0 0 0 0
397 Pending //////Pending 0 0 0 0 0
398 Pending //////Pending 0 0 0 0 0
399 Pending //////Pending 0 0 0 0 0
400 Pending //////Pending 0 0 0 0 0
401 Pending //////Pending 0 0 0 0 0
402 Pending //////Pending 0 0 0 0 0
403 Pending //////Pending 0 0 0 0 0
404 Pending //////Pending 0 0 0 0 0
405 Pending //////Pending 0 0 0 0 0
406 Pending //////Pending 0 0 0 0 0
407 Pending //////Pending 0 0 0 0 0

35/305
12

PLUMBING WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 14 A 0 A 0 A 0 A = Approved
B 22 B 1 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 0 C 0 C 0 C 0 C = Revised And Resubmit
D 1 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
408 Pending //////Pending 0 0 0 0 0
409 Pending //////Pending 0 0 0 0 0
410 Pending //////Pending 0 0 0 0 0
411 Pending //////Pending 0 0 0 0 0
412 Pending //////Pending 0 0 0 0 0
413 Pending //////Pending 0 0 0 0 0
414 Pending //////Pending 0 0 0 0 0
415 Pending //////Pending 0 0 0 0 0
416 Pending //////Pending 0 0 0 0 0
417 Pending //////Pending 0 0 0 0 0
418 Pending //////Pending 0 0 0 0 0
419 Pending //////Pending 0 0 0 0 0
420 Pending //////Pending 0 0 0 0 0
421 Pending //////Pending 0 0 0 0 0
422 Pending //////Pending 0 0 0 0 0
423 Pending //////Pending 0 0 0 0 0
424 Pending //////Pending 0 0 0 0 0
425 Pending //////Pending 0 0 0 0 0
426 Pending //////Pending 0 0 0 0 0
427 Pending //////Pending 0 0 0 0 0
428 Pending //////Pending 0 0 0 0 0
429 Pending //////Pending 0 0 0 0 0
430 Pending //////Pending 0 0 0 0 0
431 Pending //////Pending 0 0 0 0 0
432 Pending //////Pending 0 0 0 0 0
433 Pending //////Pending 0 0 0 0 0
434 Pending //////Pending 0 0 0 0 0
435 Pending //////Pending 0 0 0 0 0
436 Pending //////Pending 0 0 0 0 0
437 Pending //////Pending 0 0 0 0 0
438 Pending //////Pending 0 0 0 0 0
439 Pending //////Pending 0 0 0 0 0
440 Pending //////Pending 0 0 0 0 0
441 Pending //////Pending 0 0 0 0 0
442 Pending //////Pending 0 0 0 0 0
443 Pending //////Pending 0 0 0 0 0
444 Pending //////Pending 0 0 0 0 0
445 Pending //////Pending 0 0 0 0 0

36/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
PVC pipe 50mm for sump pit under the raft
1 Raft Electrowatt ABE P145 IR ELEC MZP 001 Pending ABE/P145/IR/ELEC/MZP/001/Pending 12-Dec-15 14-Dec-15 2 D 0 0 0 D
running to control panel

2 Earthing & lightining protection points (E:I/2:5) Raft Electrowatt ABE P145 IR ELEC MZP 002 Rev 01 ABE/P145/IR/ELEC/MZP/002/Rev 01 2-Jan-16 4-Jan-16 2 C 5-Jan-16 6-Jan-16 1 B 0 0 B

3 Conduits 50mm for two sump pit (D:I/2:3) Raft Electrowatt ABE P145 IR ELEC MZP 003 Rev 00 ABE/P145/IR/ELEC/MZP/003/Rev 00 16-Jan-16 18-Jan-16 2 B 0 0 0 B
Conduits 50mm for two sump pit runnint until CP
4 Raft Electrowatt ABE P145 IR ELEC MZP 004 Rev 00 ABE/P145/IR/ELEC/MZP/004/Rev 00 30-Jan-16 1-Feb-16 2 B 0 0 0 B
(K:L/2:6)
Looping between lightning protection point and
5 connection the cable 95mm from piles to test link Raft Electrowatt ABE P145 IR ELEC MZP 005 Rev 00 ABE/P145/IR/ELEC/MZP/005/Rev 00 30-Jan-16 1-Feb-16 2 B 0 0 0 B
(B:K/2:9)
Earthing & lightining protection points Ohm
6 Raft Electrowatt ABE P145 IR ELEC MZP 006 Rev 00 ABE/P145/IR/ELEC/MZP/006/Rev 00 30-Jan-16 1-Feb-16 2 B 0 0 0 B
testing remining points (A:M/1:11)
Conduits 50mm for SEX sump pit running until
7 Raft Electrowatt ABE P145 IR ELEC MZP 007 Rev 00 ABE/P145/IR/ELEC/MZP/007/Rev 00 2-Feb-16 3-Feb-16 1 B 0 0 0 B
CP (B:M/2:11)
Earthing & lightning protection all point location
8 Raft Electrowatt ABE P145 IR ELEC MZP 008 Rev 00 ABE/P145/IR/ELEC/MZP/008/Rev 00 2-Feb-16 3-Feb-16 1 B 0 0 0 B
running to 50*50*50 boxes (A:M/1:11)
Earthing sleeve & power sockets & public
9 address & fire alarm system imbedded in B5 Electrowatt ABE P145 IR ELEC MZP 009 Rev 00 ABE/P145/IR/ELEC/MZP/009/Rev 00 8-Feb-16 11-Feb-16 3 B 0 0 0 B
columns (B:K/1:10)
Power sockets & CCTV, public address & fire
10 alarm system & data imbedded in columns B5 Electrowatt ABE P145 IR ELEC MZP 010 Rev 00 ABE/P145/IR/ELEC/MZP/010/Rev 00 13-Feb-16 14-Feb-16 1 B 0 0 0 B
(A:C/3:6 & I:K/4:10)
Lighting, CCTV, Access control, data imbedded
11 B5 Electrowatt ABE P145 IR ELEC MZP 011 Rev 00 ABE/P145/IR/ELEC/MZP/011/Rev 00 16-Feb-16 17-Feb-16 1 B 0 0 0 B
in columns (B:L/1:5)
Lighting, CCTV, Access control, data imbedded
12 B5 Electrowatt ABE P145 IR ELEC MZP 012 Rev 00 ABE/P145/IR/ELEC/MZP/012/Rev 00 16-Feb-16 17-Feb-16 1 B 0 0 0 B
in columns (B:L/8:11)
Power sockets & CCTV imbedded in retaining
13 B5 Electrowatt ABE P145 IR ELEC MZP 013 Rev 00 ABE/P145/IR/ELEC/MZP/013/Rev 00 14-Feb-16 15-Feb-16 1 B 0 0 0 B
wall (A:B/1:2) (F:J/0:1)
Pubmic address & fire alarm imbedded in
14 B5 Electrowatt ABE P145 IR ELEC MZP 014 Rev 00 ABE/P145/IR/ELEC/MZP/014/Rev 00 15-Feb-16 15-Feb-16 0 B 0 0 0 B
columns (D:H/2:3/9:10)
Power sockets, lights, lightening protection test
15 B5 Electrowatt ABE P145 IR ELEC MZP 015 Rev 00 ABE/P145/IR/ELEC/MZP/015/Rev 00 16-Feb-16 17-Feb-16 1 B 0 0 0 B
link imbedded in columns (D:H/2:3)
CCTV, lightening protection test link imbedded in
16 B5 Electrowatt ABE P145 IR ELEC MZP 016 Rev 00 ABE/P145/IR/ELEC/MZP/016/Rev 00 16-Feb-16 20-Feb-16 4 B 0 0 0 B
columns (D:H/2:3)
Power sockets imbedded in retaining wall
17 B5 Electrowatt ABE P145 IR ELEC MZP 017 Rev 00 ABE/P145/IR/ELEC/MZP/017/Rev 00 16-Feb-16 17-Feb-16 1 B 0 0 0 B
(A:F/0:1)
18 Power sockets imbedded in core wall (F:H/7:4) B5 Electrowatt ABE P145 IR ELEC MZP 018 Pending ABE/P145/IR/ELEC/MZP/018/Pending 17-Feb-16 20-Feb-16 3 D 0 0 0 D
Power sockets, CCTV & lightining protection
19 B5 Electrowatt ABE P145 IR ELEC MZP 019 Rev 01 ABE/P145/IR/ELEC/MZP/019/Rev 01 17-Feb-16 20-Feb-16 3 D 24-Feb-16 25-Feb-16 1 B 0 0 D
imbedded in column (A:I/2:11)
Power sockets & lightining protection imbedded
20 B5 Electrowatt ABE P145 IR ELEC MZP 020 Rev 00 ABE/P145/IR/ELEC/MZP/020/Rev 00 20-Feb-16 21-Feb-16 1 B 0 0 0 B
incolumbs (D:E/4:7)
Power sockets & lightining protection & speakers
21 B5 Electrowatt ABE P145 IR ELEC MZP 021 Rev 00 ABE/P145/IR/ELEC/MZP/021/Rev 00 21-Feb-16 22-Feb-16 1 B 0 0 0 B
& Co system imbedded in column
Power sockets & lighting & builders work
22 B5 Electrowatt ABE P145 IR ELEC MZP 022 Rev 00 ABE/P145/IR/ELEC/MZP/022/Rev 00 22-Feb-16 23-Feb-16 1 B 0 0 B
imbedded in core-1 (F:G/4:7)
Power sockets work imbedded in retaining wall
23 B5 Electrowatt ABE P145 IR ELEC MZP 023 Rev 00 ABE/P145/IR/ELEC/MZP/023/Rev 00 22-Feb-16 23-Feb-16 1 B 0 0 0 B
(H:K/10:11)
Lightining protection & power work imbedded in
24 B5 Electrowatt ABE P145 IR ELEC MZP 024 Rev 00 ABE/P145/IR/ELEC/MZP/024/Rev 00 23-Feb-16 24-Feb-16 1 B 0 0 0 B
column (H:M/4:11)
Power & CCTV & Lighting & public address
25 B5 Electrowatt ABE P145 IR ELEC MZP 025 Rev 00 ABE/P145/IR/ELEC/MZP/025/Rev 00 25-Feb-16 25-Feb-16 0 B 0 0 0 B
opening work imbedded in core 2
26 Power & Lighting work in the slab B5 Electrowatt ABE P145 IR ELEC MZP 026 Rev 02 ABE/P145/IR/ELEC/MZP/026/Rev 02 5-Mar-16 6-Mar-16 1 D 8-Mar-16 8-Mar-16 0 B 23-Mar-16 24-Mar-16 1 A 0 A
27 Power & Lighting system work in Column B5 Electrowatt ABE P145 IR ELEC MZP 027 Rev 00 ABE/P145/IR/ELEC/MZP/027/Rev 00 9-Mar-16 9-Mar-16 0 B 0 0 0 B
28 Power system work in the Column B4 Electrowatt ABE P145 IR ELEC MZP 028 Rev 00 ABE/P145/IR/ELEC/MZP/028/Rev 00 9-Mar-16 10-Mar-16 1 B 0 0 0 B
29 Power system work in the Column B4 Electrowatt ABE P145 IR ELEC MZP 029 Rev 00 ABE/P145/IR/ELEC/MZP/029/Rev 00 12-Mar-16 13-Mar-16 1 B 0 0 0 B
Power & Lighting System work in the core -1 &
30 B4 Electrowatt ABE P145 IR ELEC MZP 030 Rev 00 ABE/P145/IR/ELEC/MZP/030/Rev 00 14-Mar-16 15-Mar-16 1 B 0 0 0 B
Ramp & Column
31 Power & Lighting System work in the Core 2 B4 Electrowatt ABE P145 IR ELEC MZP 031 Rev 00 ABE/P145/IR/ELEC/MZP/031/Rev 00 19-Mar-16 21-Mar-16 2 B 0 0 0 B
32 Power System work in the Retaining wall B4 Electrowatt ABE P145 IR ELEC MZP 032 Rev 00 ABE/P145/IR/ELEC/MZP/032/Rev 00 19-Mar-16 21-Mar-16 2 B 0 0 0 B
33 Power & Lighting System work in the slap B5 Electrowatt ABE P145 IR ELEC MZP 033 Rev 00 ABE/P145/IR/ELEC/MZP/033/Rev 00 19-Mar-16 21-Mar-16 2 B 0 0 0 B
34 Power System work in the column B4 Electrowatt ABE P145 IR ELEC MZP 034 Rev 00 ABE/P145/IR/ELEC/MZP/034/Rev 00 23-Mar-16 24-Mar-16 1 B 0 0 0 B
35 Power System work in the Retaining wall B4 Electrowatt ABE P145 IR ELEC MZP 035 Rev 01 ABE/P145/IR/ELEC/MZP/035/Rev 01 23-Mar-16 24-Mar-16 1 C 24-Mar-16 24-Mar-16 0 B 0 0 B
Power System work in the Retaining wall &
36 B4 Electrowatt ABE P145 IR ELEC MZP 036 Rev 00 ABE/P145/IR/ELEC/MZP/036/Rev 00 28-Mar-16 29-Mar-16 1 B 0 0 0 B
Ramp Wall
Power system work in the retaining wall
37 B4 Electrowatt ABE P145 IR ELEC MZP 037 Rev 00 ABE/P145/IR/ELEC/MZP/037/Rev 00 30-Mar-16 31-Mar-16 1 B 0 0 0 B
(J:M/10:11)
Power & lighting system work in the slab
38 B4 Electrowatt ABE P145 IR ELEC MZP 038 Rev 00 ABE/P145/IR/ELEC/MZP/038/Rev 00 2-Apr-16 4-Apr-16 2 B 0 0 0 B
(A:J/1:11)
Power system work in the retaining wall
39 B4 Electrowatt ABE P145 IR ELEC MZP 039 Rev 00 ABE/P145/IR/ELEC/MZP/039/Rev 00 2-Apr-16 3-Apr-16 1 B 0 0 0 B
(J:M/7:10)
40 Power system work in the column (B:H/1:2) B3 Electrowatt ABE P145 IR ELEC MZP 040 Rev 00 ABE/P145/IR/ELEC/MZP/040/Rev 00 5-Apr-16 6-Apr-16 1 B 0 0 0 B
41 Power system work in the column (B:F/9:10) B3 Electrowatt ABE P145 IR ELEC MZP 041 Rev 00 ABE/P145/IR/ELEC/MZP/041/Rev 00 6-Apr-16 9-Apr-16 3 B 0 0 0 B
Power & lighting protection system work in the
42 B3 Electrowatt ABE P145 IR ELEC MZP 042 Rev 00 ABE/P145/IR/ELEC/MZP/042/Rev 00 7-Apr-16 9-Apr-16 2 B 0 0 0 B
column (D:H/2:9)
Power & lighting protection system work in the
43 B3 Electrowatt ABE P145 IR ELEC MZP 043 Rev 00 ABE/P145/IR/ELEC/MZP/043/Rev 00 9-Apr-16 10-Apr-16 1 B 0 0 0 B
column, ramp-1 & core-1 (A:F/1:7)
Power, lightining protection & lighting system
44 B3 Electrowatt ABE P145 IR ELEC MZP 044 Rev 00 ABE/P145/IR/ELEC/MZP/044/Rev 00 10-Apr-16 10-Apr-16 0 B 0 0 0 B
work in column (A:J/7:9)
Power, lightining protection & lighting system
45 B3 Electrowatt ABE P145 IR ELEC MZP 045 Rev 00 ABE/P145/IR/ELEC/MZP/045/Rev 00 10-Apr-16 12-Apr-16 2 B 0 0 0 B
work in column & ramp-2 (I:M/2:6)
Power & lighting system work in the slab
46 B3 Electrowatt ABE P145 IR ELEC MZP 046 Rev 00 ABE/P145/IR/ELEC/MZP/046/Rev 00 11-Apr-16 12-Apr-16 1 B 0 0 0 B
(I:M/1:11)
Power, lightining protection system work in
47 B3 Electrowatt ABE P145 IR ELEC MZP 047 Rev 00 ABE/P145/IR/ELEC/MZP/047/Rev 00 11-Apr-16 12-Apr-16 1 B 0 0 0 B
column (C:E/3:7)
Power & lightining protection system work in the
48 B3 Electrowatt ABE P145 IR ELEC MZP 048 Rev 00 ABE/P145/IR/ELEC/MZP/048/Rev 00 13-Apr-16 14-Apr-16 1 B 0 0 0 B
column & retaining wall (A:L/1:9)
Power & lighting system work in the core-2 &
49 B3 Electrowatt ABE P145 IR ELEC MZP 049 Rev 00 ABE/P145/IR/ELEC/MZP/049/Rev 00 14-Apr-16 16-Apr-16 2 B 0 0 0 B
retaining wall (G:I/1:7)
Power system work in the retaining wall
50 B3 Electrowatt ABE P145 IR ELEC MZP 050 Rev 00 ABE/P145/IR/ELEC/MZP/050/Rev 00 16-Apr-16 17-Apr-16 1 B 0 0 0 B
(A:D/7:11)
Power system work in the retaining wall
51 B3 Electrowatt ABE P145 IR ELEC MZP 051 Rev 00 ABE/P145/IR/ELEC/MZP/051/Rev 00 19-Apr-16 19-Apr-16 0 B 0 0 0 B
(A:I/7:11)
Power system work in the retaining wall
52 B3 Electrowatt ABE P145 IR ELEC MZP 052 Rev 00 ABE/P145/IR/ELEC/MZP/052/Rev 00 20-Apr-16 23-Apr-16 3 B 0 0 0 B
(G:M/1:11)
Power system work in the retaining wall
53 B3 Electrowatt ABE P145 IR ELEC MZP 053 Rev 00 ABE/P145/IR/ELEC/MZP/053/Rev 00 23-Apr-16 24-Apr-16 1 B 0 0 0 B
(L:M/07:10)

37/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
Power & lighting system work in the slab
54 B3 Electrowatt ABE P145 IR ELEC MZP 054 Rev 00 ABE/P145/IR/ELEC/MZP/054/Rev 00 27-Apr-16 28-Apr-16 1 B 0 0 0 B
(A:B/1:11)
Power & lighting system work in the column
55 B2 Electrowatt ABE P145 IR ELEC MZP 055 Rev 00 ABE/P145/IR/ELEC/MZP/055/Rev 00 2-May-16 3-May-16 1 B 0 0 0 B
(A:I/1:2)
Power & lighting system work in the column &
56 B2 Electrowatt ABE P145 IR ELEC MZP 056 Rev 01 ABE/P145/IR/ELEC/MZP/056/Rev 01 2-May-16 3-May-16 1 C 3-May-16 4-May-16 1 B 0 0 B
stair case - 6 (A:I/8:10)
Power & lightining protection system work in the
57 B2 Electrowatt ABE P145 IR ELEC MZP 057 Rev 00 ABE/P145/IR/ELEC/MZP/057/Rev 00 3-May-16 5-May-16 2 B 0 0 0 B
column (B:I/3:8)
Power & system work in the retaining wall
58 B2 Electrowatt ABE P145 IR ELEC MZP 058 Rev 00 ABE/P145/IR/ELEC/MZP/058/Rev 00 4-May-16 5-May-16 1 B 0 0 0 B
(A:B/01:02)

59 Power system work in the ramp-1 (A:B/02:07) B2 Electrowatt ABE P145 IR ELEC MZP 059 Rev 00 ABE/P145/IR/ELEC/MZP/059/Rev 00 4-May-16 5-May-16 1 B 0 0 0 B

Power system work in the retaining wall & stair-6


60 B2 Electrowatt ABE P145 IR ELEC MZP 060 Rev 00 ABE/P145/IR/ELEC/MZP/060/Rev 00 5-May-16 8-May-16 3 B 0 0 0 B
(A:I/1:9)
61 Power system work in the retaining wall (A:B/7:9) B2 Electrowatt ABE P145 IR ELEC MZP 061 Rev 00 ABE/P145/IR/ELEC/MZP/061/Rev 00 7-May-16 10-May-16 3 B 0 0 0 B
62 Power system work in columns (L:B/8:9) B2 Electrowatt ABE P145 IR ELEC MZP 062 Rev 00 ABE/P145/IR/ELEC/MZP/062/Rev 00 7-May-16 9-May-16 2 B 0 0 0 B
Power system work in the retaining wall
63 B2 Electrowatt ABE P145 IR ELEC MZP 063 Rev 00 ABE/P145/IR/ELEC/MZP/063/Rev 00 10-May-16 11-May-16 1 B 0 0 0 B
(A:I/10:11)
64 Power system work in columns (K:L/2:6) B2 Electrowatt ABE P145 IR ELEC MZP 064 Rev 00 ABE/P145/IR/ELEC/MZP/064/Rev 00 11-May-16 11-May-16 0 B 0 0 0 B
Power & lighting system work in the slab
65 B3 Electrowatt ABE P145 IR ELEC MZP 065 Rev 00 ABE/P145/IR/ELEC/MZP/065/Rev 00 14-May-16 15-May-16 1 B 0 0 0 B
(I:M/1:11)
66 Lighting system work in the stair-6 (B:C/07:11) B4 & B3 Electrowatt ABE P145 IR ELEC MZP 066 Rev 00 ABE/P145/IR/ELEC/MZP/066/Rev 00 14-May-16 15-May-16 1 B 0 0 0 B
Power & lighting system work in the core-1
67 B2 Electrowatt ABE P145 IR ELEC MZP 067 Rev 00 ABE/P145/IR/ELEC/MZP/067/Rev 00 16-May-16 16-May-16 0 B 0 0 0 B
(F:G/04:07)
Power & lightining protection system work in the
68 B2 Electrowatt ABE P145 IR ELEC MZP 068 Rev 00 ABE/P145/IR/ELEC/MZP/068/Rev 00 17-May-16 21-May-16 4 B 0 0 0 B
colun (F:H/02:04)
Power & lighting protection system work in core-
69 B2 Electrowatt ABE P145 IR ELEC MZP 069 Rev 00 ABE/P145/IR/ELEC/MZP/069/Rev 00 18-May-16 21-May-16 3 B 0 0 0 B
2 & retaining wall (G:M/04:11)
Power & lightining protection system work in the
70 B2 Electrowatt ABE P145 IR ELEC MZP 070 Rev 00 ABE/P145/IR/ELEC/MZP/070/Rev 00 18-May-16 21-May-16 3 B 0 0 0 B
column & ramp 2 (D:H/04:08)
Power & lightining protection system work in the
71 B2 Electrowatt ABE P145 IR ELEC MZP 071 Rev 00 ABE/P145/IR/ELEC/MZP/071/Rev 00 19-May-16 21-May-16 2 B 0 0 0 B
column (D:H/04:08)
Power & lightining protection system work in the
72 B2 Electrowatt ABE P145 IR ELEC MZP 072 Rev 00 ABE/P145/IR/ELEC/MZP/072/Rev 00 21-May-16 23-May-16 2 B 0 0 0 B
column (I:J/04:07)
73 Lighting system work in the stair-6 (B:C/08:09) B3 to B2 Electrowatt ABE P145 IR ELEC MZP 073 Rev 00 ABE/P145/IR/ELEC/MZP/073/Rev 00 21-May-16 25-May-16 4 B 0 0 0 B
Power, lighting, earthing & lightening protection
74 system work in the slab, stair-06 & column B2 to B1 Electrowatt ABE P145 IR ELEC MZP 074 Rev 00 ABE/P145/IR/ELEC/MZP/074/Rev 00 28-May-16 30-May-16 2 B 0 0 0 B
(A:J/01:11)
Power system work in the retaining wall
75 B2 Electrowatt ABE P145 IR ELEC MZP 075 Rev 00 ABE/P145/IR/ELEC/MZP/075/Rev 00 28-May-16 29-May-16 1 B 0 0 0 B
(J:K/01:02)
76 Lighting system in stair 6 (B:C/8:9) B2 Electrowatt ABE P145 IR ELEC MZP 076 Rev 00 ABE/P145/IR/ELEC/MZP/076/Rev 00 30-May-16 31-May-16 1 B 0 0 0 B
Power & lightening protection system work in the
77 B1 Electrowatt ABE P145 IR ELEC MZP 077 Rev 01 ABE/P145/IR/ELEC/MZP/077/Rev 01 30-May-16 31-May-16 1 C 1-Jun-16 5-Jun-16 4 B 0 0 B
column (A:J/01:11)
78 Power system work in the ramp-2 (K-M/01-07) B2 Electrowatt ABE P145 IR ELEC MZP 078 Rev 00 ABE/P145/IR/ELEC/MZP/078/Rev 00 1-Jun-16 6-Jun-16 5 B 0 0 0 B
Power & lighting system work in the core-1
79 B1 Electrowatt ABE P145 IR ELEC MZP 079 Rev 00 ABE/P145/IR/ELEC/MZP/079/Rev 00 1-Jun-16 4-Jun-16 3 B 0 0 0 B
(F:G/04:07)
Power & lighting system work in the core-2
80 B1 Electrowatt ABE P145 IR ELEC MZP 080 Rev 00 ABE/P145/IR/ELEC/MZP/080/Rev 00 5-Jun-16 6-Jun-16 1 B 0 0 0 B
(G:H/04:07)
81 Power system work in the column (B:I/01:02) B1 Electrowatt ABE P145 IR ELEC MZP 081 Rev 00 ABE/P145/IR/ELEC/MZP/081/Rev 00 6-Jun-16 7-Jun-16 1 B 0 0 0 B
82 Power system work in the column (B:I/01:10) B1 Electrowatt ABE P145 IR ELEC MZP 082 Rev 00 ABE/P145/IR/ELEC/MZP/082/Rev 00 6-Jun-16 11-Jun-16 5 B 0 0 0 B
83 Retaining wall & stair case (6) power (A:C/01:09) B1 Electrowatt ABE P145 IR ELEC MZP 083 Rev 00 ABE/P145/IR/ELEC/MZP/083/Rev 00 9-Jun-16 12-Jun-16 3 B 0 0 0 B
84 Lighting system in the ramp 2 (L:M/02:06) B2 Electrowatt ABE P145 IR ELEC MZP 084 Rev 00 ABE/P145/IR/ELEC/MZP/084/Rev 00 11-Jun-16 12-Jun-16 1 B 0 0 0 B
85 Power system in the retaining wall (A:B/07:08) B1 Electrowatt ABE P145 IR ELEC MZP 085 Rev 00 ABE/P145/IR/ELEC/MZP/085/Rev 00 11-Jun-16 13-Jun-16 2 B 0 0 0 B
Power & lighting system in the retaining wall &
86 B1 Electrowatt ABE P145 IR ELEC MZP 086 Rev 00 ABE/P145/IR/ELEC/MZP/086/Rev 00 12-Jun-16 14-Jun-16 2 B 0 0 0 B
ramp-1 (A:F/03:11)
Power system in the fire water tank-2
87 B1 Electrowatt ABE P145 IR ELEC MZP 087 Pending ABE/P145/IR/ELEC/MZP/087/Pending 16-Jun-16 18-Jun-16 2 C 0 0 0 C
(E:G/02:04)
Power, lighting system work in the slab
88 B1 Electrowatt ABE P145 IR ELEC MZP 088 Rev 00 ABE/P145/IR/ELEC/MZP/088/Rev 00 16-Jun-16 19-Jun-16 3 B 0 0 0 B
(J:M/01:11)
89 Power system work in the column (K:L/02:10) B1 Electrowatt ABE P145 IR ELEC MZP 089 Rev 00 ABE/P145/IR/ELEC/MZP/089/Rev 00 19-Jun-16 25-Jun-16 6 B 0 0 0 B
90 Power system work in the column (K:L/02:03) B1 Electrowatt ABE P145 IR ELEC MZP 090 Rev 00 ABE/P145/IR/ELEC/MZP/090/Rev 00 23-Jun-16 26-Jun-16 3 B 0 0 0 B
91 Lighting system work in the stair-6 (B:C/08:09) B1 Electrowatt ABE P145 IR ELEC MZP 091 Rev 00 ABE/P145/IR/ELEC/MZP/091/Rev 00 28-Jun-16 30-Jun-16 2 B 0 0 0 B
92 Power system work in the core-1 (F:G/04:07) GF Electrowatt ABE P145 IR ELEC MZP 092 Rev 00 ABE/P145/IR/ELEC/MZP/092/Rev 00 3-Jul-16 10-Jul-16 7 B 0 0 0 B
Power system work in the retaining wall
93 B1 Electrowatt ABE P145 IR ELEC MZP 093 Rev 00 ABE/P145/IR/ELEC/MZP/093/Rev 00 4-Jul-16 10-Jul-16 6 B 0 0 0 B
(L:M/10:11)
Power & lighting system work in the ramp-02 &
94 B1 Electrowatt ABE P145 IR ELEC MZP 094 Rev 00 ABE/P145/IR/ELEC/MZP/094/Rev 00 16-Jul-16 16-Jul-16 0 B 0 0 0 B
retaining wall (K:M/01:08)
Power system work in the retaining wall
95 B1 Electrowatt ABE P145 IR ELEC MZP 095 Rev 00 ABE/P145/IR/ELEC/MZP/095/Rev 00 17-Jul-16 17-Jul-16 0 B 0 0 0 B
(L:M/06:07)
Power & lighting system work in the core-02
96 GF Electrowatt ABE P145 IR ELEC MZP 096 Rev 00 ABE/P145/IR/ELEC/MZP/096/Rev 00 18-Jul-16 20-Jul-16 2 B 0 0 0 B
(F:H/04:07)
Power, lighting system work in the slab
97 B1 Electrowatt ABE P145 IR ELEC MZP 097 Rev 00 ABE/P145/IR/ELEC/MZP/097/Rev 00 1-Aug-16 4-Aug-16 3 B 0 0 0 B
(A:M/01:11)
98 Power system work in the column (C:F/3:8) GF Electrowatt ABE P145 IR ELEC MZP 098 Rev 00 ABE/P145/IR/ELEC/MZP/098/Rev 00 11-Aug-16 13-Aug-16 2 B 0 0 0 B
Lightning protection system work in the column
99 GF Electrowatt ABE P145 IR ELEC MZP 099 Rev 00 ABE/P145/IR/ELEC/MZP/099/Rev 00 11-Aug-16 13-Aug-16 2 B 0 0 0 B
(C:F/3:8)
Lightning protection system work in the column
100 GF Electrowatt ABE P145 IR ELEC MZP 100 Rev 00 ABE/P145/IR/ELEC/MZP/100/Rev 00 13-Aug-16 14-Aug-16 1 B 0 0 0 B
(I:J/4:7)
101 1F Electrowatt ABE P145 IR ELEC MZP 101 Rev 00 ABE/P145/IR/ELEC/MZP/101/Rev 00 13-Aug-16 14-Aug-16 1 B 0 0 0 B
Lighting system work in the core wall 1 (F:G/4:7)
102 1F Electrowatt ABE P145 IR ELEC MZP 102 Rev 00 ABE/P145/IR/ELEC/MZP/102/Rev 00 13-Aug-16 14-Aug-16 1 B 0 0 0 B
Power system work in the core wall 1 (F:G/4:7)
Lightning protection system work in the column
103 GF Electrowatt ABE P145 IR ELEC MZP 103 Rev 00 ABE/P145/IR/ELEC/MZP/103/Rev 00 17-Aug-16 20-Aug-16 3 B 0 0 0 B
(G:I/2:4)
104 1F Electrowatt ABE P145 IR ELEC MZP 104 Rev 00 ABE/P145/IR/ELEC/MZP/104/Rev 00 17-Aug-16 20-Aug-16 3 B 0 0 0 B
Power system work in the core wall 2 (G:H/4:7)
105 1F Electrowatt ABE P145 IR ELEC MZP 105 Rev 00 ABE/P145/IR/ELEC/MZP/105/Rev 00 17-Aug-16 20-Aug-16 3 B 0 0 0 B
Lighting system work in the core wall 2 (G:H/4:7)
106 Lighting system work in the slab (A:L/1:10) GF Electrowatt ABE P145 IR ELEC MZP 106 Rev 00 ABE/P145/IR/ELEC/MZP/106/Rev 00 1-Sep-16 8-Sep-16 7 B 0 0 0 B
107 Power system work in the slab (A:L/1:10) GF Electrowatt ABE P145 IR ELEC MZP 107 Rev 00 ABE/P145/IR/ELEC/MZP/107/Rev 00 1-Sep-16 8-Sep-16 7 B 0 0 0 B
108 2F Electrowatt ABE P145 IR ELEC MZP 108 Rev 00 ABE/P145/IR/ELEC/MZP/108/Rev 00 8-Sep-16 11-Sep-16 3 B 0 0 0 B
Power system work in the core wall 1 (F:G/4:8)
109 2F Electrowatt ABE P145 IR ELEC MZP 109 Rev 00 ABE/P145/IR/ELEC/MZP/109/Rev 00 8-Sep-16 11-Sep-16 3 B 0 0 0 B
Lighting system work in the core wall 1 (F:G/4:8)

38/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
Lightning protection system work in the columns
110 1F Electrowatt ABE P145 IR ELEC MZP 110 Rev 00 ABE/P145/IR/ELEC/MZP/110/Rev 00 11-Sep-16 28-Sep-16 17 B 0 0 0 B
(D:G/6:9)
111 2F Electrowatt ABE P145 IR ELEC MZP 111 Rev 00 ABE/P145/IR/ELEC/MZP/111/Rev 00 17-Sep-16 18-Sep-16 1 B 0 0 0 B
Power system work in the core wall 2 (G:H/4:7)
112 2F Electrowatt ABE P145 IR ELEC MZP 112 Rev 00 ABE/P145/IR/ELEC/MZP/112/Rev 00 17-Sep-16 18-Sep-16 1 B 0 0 0 B
Lighting system work in the core wall 2 (G:H/4:7)
Lightning protection system work in the columns
113 1F Electrowatt ABE P145 IR ELEC MZP 113 Rev 00 ABE/P145/IR/ELEC/MZP/113/Rev 00 17-Sep-16 19-Sep-16 2 B 0 0 0 B
(H:J/6:9) (E:F/2:3)
Lightning protection system work in the columns
114 1F Electrowatt ABE P145 IR ELEC MZP 114 Rev 00 ABE/P145/IR/ELEC/MZP/114/Rev 00 18-Sep-16 21-Sep-16 3 B 0 0 0 B
(I:J/4:5)
Power & lighting system work, 1st fix on block
115 B5 Electrowatt ABE P145 IR ELEC MZP 115 Rev 00 ABE/P145/IR/ELEC/MZP/115/Rev 00 18-Sep-16 24-Sep-16 6 B 0 0 0 B
work (A:M/1:11)
116 Lightning protection work in columns (D:I/3:4) 1F Electrowatt ABE P145 IR ELEC MZP 116 Rev 00 ABE/P145/IR/ELEC/MZP/116/Rev 00 19-Sep-16 21-Sep-16 2 B 0 0 0 B

117 Power & lighting system work in slab (G:H/4:7) B5 Electrowatt ABE P145 IR ELEC MZP 117 Rev 00 ABE/P145/IR/ELEC/MZP/117/Rev 00 25-Sep-16 27-Sep-16 2 B 0 0 0 B
Power & lighting system work in second slab
118 1F Electrowatt ABE P145 IR ELEC MZP 118 Rev 00 ABE/P145/IR/ELEC/MZP/118/Rev 00 4-Oct-16 5-Oct-16 1 B 0 0 0 B
(G:H/4:7)
Lightning protection system work in the columns
119 2F Electrowatt ABE P145 IR ELEC MZP 119 Rev 00 ABE/P145/IR/ELEC/MZP/119/Rev 00 6-Oct-16 9-Oct-16 3 B 0 0 0 B
(D:J/2:4)
Lightning protection system work in the columns
120 2F Electrowatt ABE P145 IR ELEC MZP 120 Rev 00 ABE/P145/IR/ELEC/MZP/120/Rev 00 9-Oct-16 10-Oct-16 1 B 0 0 0 B
(G:J/4:8)
Lighting & power system works in the core wall 2
121 3F Electrowatt ABE P145 IR ELEC MZP 121 Rev 00 ABE/P145/IR/ELEC/MZP/121/Rev 00 9-Oct-16 10-Oct-16 1 B 0 0 0 B
(G:H/4:7)
Lighting & power system works in the core wall 2
122 2F Electrowatt ABE P145 IR ELEC MZP 122 Rev 00 ABE/P145/IR/ELEC/MZP/122/Rev 00 9-Oct-16 11-Oct-16 2 B 0 0 0 B
(D:F/6:7) (G:J/8:9)
Lighting & power system works in the slab
123 B3 Electrowatt ABE P145 IR ELEC MZP 123 Rev 00 ABE/P145/IR/ELEC/MZP/123/Rev 00 9-Oct-16 16-Oct-16 7 B 0 0 0 B
(G:H/4:7)
Power & lighting system works in the core wall 1
124 3F Electrowatt ABE P145 IR ELEC MZP 124 Rev 00 ABE/P145/IR/ELEC/MZP/124/Rev 00 11-Oct-16 15-Oct-16 4 B 0 0 0 B
(F:G/4:7)
125 Cable tray (A:M/1:11) B5 Electrowatt ABE P145 IR ELEC MZP 125 Rev 01 ABE/P145/IR/ELEC/MZP/125/Rev 01 11-Oct-16 19-Oct-16 8 C 12-Nov-16 16-Nov-16 4 B 0 0 B
126 Cable tray (A:M/1:11) B4 Electrowatt ABE P145 IR ELEC MZP 126 Rev 00 ABE/P145/IR/ELEC/MZP/126/Rev 00 11-Oct-16 19-Oct-16 8 B 0 0 0 B
Lightning protection system works in the columns
127 2F Electrowatt ABE P145 IR ELEC MZP 127 Rev 00 ABE/P145/IR/ELEC/MZP/127/Rev 00 12-Oct-16 15-Oct-16 3 B 0 0 0 B
(D:F/7:8)
Lightning protection system works in the stair 4 &
128 GF Electrowatt ABE P145 IR ELEC MZP 128 Rev 00 ABE/P145/IR/ELEC/MZP/128/Rev 00 13-Oct-16 13-Oct-16 0 B 0 0 0 B
4A (I:J/3:4/7:8)
Lighting & power system works in the ramp
129 B5 Electrowatt ABE P145 IR ELEC MZP 129 Rev 00 ABE/P145/IR/ELEC/MZP/129/Rev 00 16-Oct-16 19-Oct-16 3 B 0 0 0 B
(A:B/2:7)
Lighting & power system works in core wall 2
130 4F Electrowatt ABE P145 IR ELEC MZP 130 Rev 00 ABE/P145/IR/ELEC/MZP/130/Rev 00 16-Oct-16 19-Oct-16 3 B 0 0 0 B
(G:H/4:7)
Lighting & power system works in lift lobby
131 3F Electrowatt ABE P145 IR ELEC MZP 131 Rev 00 ABE/P145/IR/ELEC/MZP/131/Rev 00 17-Oct-16 19-Oct-16 2 B 0 0 0 B
(G/4:7)
Lighting system works in staircase 4A landing
132 GF Electrowatt ABE P145 IR ELEC MZP 132 Rev 01 ABE/P145/IR/ELEC/MZP/132/Rev 01 19-Oct-16 22-Oct-16 3 C 23-Oct-16 30-Oct-16 7 B 0 0 B
(I:J/3:8)
Power & lighting system works in the slab
133 3F Electrowatt ABE P145 IR ELEC MZP 133 Rev 01 ABE/P145/IR/ELEC/MZP/133/Rev 01 20-Oct-16 22-Oct-16 C 23-Oct-16 26-Oct-16 3 B 0 0 B
(B:L/1:10)
Power & lighting system works in the core wall 1
134 4F Electrowatt ABE P145 IR ELEC MZP 134 Rev 00 ABE/P145/IR/ELEC/MZP/134/Rev 00 22-Oct-16 30-Oct-16 8 B 0 0 0 B
(F:G/4:7)
Lightning protection system work in the column
135 3F Electrowatt ABE P145 IR ELEC MZP 135 Rev 00 ABE/P145/IR/ELEC/MZP/135/Rev 00 26-Oct-16 27-Oct-16 1 B 0 0 0 B
(D:J/3:8)
Lightning protection system work in the column
136 3F Electrowatt ABE P145 IR ELEC MZP 136 Rev 01 ABE/P145/IR/ELEC/MZP/136/Rev 01 29-Oct-16 30-Oct-16 1 C 31-Oct-16 2-Nov-16 2 B 0 0 B
(D:F/3:8)
Power & lighting system works in the core wall 2
137 5F Electrowatt ABE P145 IR ELEC MZP 137 Rev 00 ABE/P145/IR/ELEC/MZP/137/Rev 00 29-Oct-16 1-Nov-16 3 B 0 0 0 B
(G:H/4:7)
Lighting system works in staircase 4 & 4A
138 GF Electrowatt ABE P145 IR ELEC MZP 138 Rev 00 ABE/P145/IR/ELEC/MZP/138/Rev 00 31-Oct-16 2-Nov-16 2 B 0 0 0 B
landing (I:J/3:4, 7:8)
139 Lighting system works in the ramp (A:B/2:6) B4 Electrowatt ABE P145 IR ELEC MZP 139 Rev 00 ABE/P145/IR/ELEC/MZP/139/Rev 00 1-Nov-16 5-Nov-16 4 B 0 0 0 B
Lightning protection system works in the columns
140 3F Electrowatt ABE P145 IR ELEC MZP 140 Rev 00 ABE/P145/IR/ELEC/MZP/140/Rev 00 2-Nov-16 5-Nov-16 3 B 0 0 0 B
(E:I/6:8)
Power & lighting system works in the lift lobby
141 3F Electrowatt ABE P145 IR ELEC MZP 141 Rev 00 ABE/P145/IR/ELEC/MZP/141/Rev 00 2-Nov-16 5-Nov-16 3 B 0 0 0 B
services (F:H/4:7)
Power & lighting system works in the core wall 1
142 5F Electrowatt ABE P145 IR ELEC MZP 142 Rev 00 ABE/P145/IR/ELEC/MZP/142/Rev 00 3-Nov-16 7-Nov-16 4 B 0 0 0 B
(F:G/4:7)
Lightning protection system work in the columns
143 3F Electrowatt ABE P145 IR ELEC MZP 143 Rev 00 ABE/P145/IR/ELEC/MZP/143/Rev 00 3-Nov-16 7-Nov-16 4 B 0 0 0 B
(E:H/7:8)
Power & lighting system works in the core wall 2
144 3F Electrowatt ABE P145 IR ELEC MZP 144 Rev 00 ABE/P145/IR/ELEC/MZP/144/Rev 00 5-Nov-16 7-Nov-16 2 B 0 0 0 B
(G:H/4:7)
Power & lighting system works in the core wall 2
145 6F Electrowatt ABE P145 IR ELEC MZP 145 Rev 00 ABE/P145/IR/ELEC/MZP/145/Rev 00 8-Nov-16 12-Nov-16 4 B 0 0 0 B
(G:H/4:7)
Power & lighting system works in the core slab
146 3F Electrowatt ABE P145 IR ELEC MZP 146 Rev 00 ABE/P145/IR/ELEC/MZP/146/Rev 00 9-Nov-16 12-Nov-16 3 B 0 0 0 B
(B:L/1:10)
Power & lighting system works in the electrical
147 B2 Electrowatt ABE P145 IR ELEC MZP 147 Rev 00 ABE/P145/IR/ELEC/MZP/147/Rev 00 10-Nov-16 16-Nov-16 6 B 0 0 0 B
room slab (G:H/4:7)
Power & lighting system works in the lift lobby
148 4F Electrowatt ABE P145 IR ELEC MZP 148 Rev 00 ABE/P145/IR/ELEC/MZP/148/Rev 00 12-Nov-16 17-Nov-16 5 B 0 0 0 B
(G/4:7)

149 Cable tray (A:M/1:11) B3 Electrowatt ABE P145 IR ELEC MZP 149 Rev 00 ABE/P145/IR/ELEC/MZP/149/Rev 00 13-Nov-16 17-Nov-16 4 B 0 0 0 B

Power & lighting system works for block work


150 B3 Electrowatt ABE P145 IR ELEC MZP 150 Rev 00 ABE/P145/IR/ELEC/MZP/150/Rev 00 13-Nov-16 17-Nov-16 4 B 0 0 0 B
(A:M/1:11)
Power & lighting system works for block work
151 B4 Electrowatt ABE P145 IR ELEC MZP 151 Rev 00 ABE/P145/IR/ELEC/MZP/151/Rev 00 13-Nov-16 17-Nov-16 4 B 0 0 0 B
(A:M/1:11)
Power & lighting system works in the core wall 1
152 6F Electrowatt ABE P145 IR ELEC MZP 152 Rev 00 ABE/P145/IR/ELEC/MZP/152/Rev 00 13-Nov-16 16-Nov-16 3 B 0 0 0 B
(F:G/4:7)
Lightning protection system works in the columns
153 4F Electrowatt ABE P145 IR ELEC MZP 153 Pending ABE/P145/IR/ELEC/MZP/153/Pending 13-Nov-16 14-Nov-16 1 D 0 0 0 D
(G:J/3:8)
154 Power system works in the column (G:J/3:8) 4F Electrowatt ABE P145 IR ELEC MZP 154 Rev 00 ABE/P145/IR/ELEC/MZP/154/Rev 00 13-Nov-16 15-Nov-16 2 B 0 0 0 B
Lightning protection system works in the columns
155 4F Electrowatt ABE P145 IR ELEC MZP 155 Pending ABE/P145/IR/ELEC/MZP/155/Pending 14-Nov-16 16-Nov-16 2 C 0 0 0 C
(D:G/3:8)
156 Power system works in the column (D:G/3:8) 4F Electrowatt ABE P145 IR ELEC MZP 156 Rev 00 ABE/P145/IR/ELEC/MZP/156/Rev 00 14-Nov-16 17-Nov-16 3 B 0 0 0 B
Lighting system works in the core wall 1 slab
157 B5 Electrowatt ABE P145 IR ELEC MZP 157 Rev 00 ABE/P145/IR/ELEC/MZP/157/Rev 00 19-Nov-16 29-Nov-16 10 B 0 0 0 B
(F:G/4:7)
Lighting system works in the stair case 4 & 4A
158 1F Electrowatt ABE P145 IR ELEC MZP 158 Rev 00 ABE/P145/IR/ELEC/MZP/158/Rev 00 16-Nov-16 17-Nov-16 1 B 0 0 0 B
(I:J/3:4, 7:8)
Power & lighting system works in the core wall 2
159 7F Electrowatt ABE P145 IR ELEC MZP 159 Rev 00 ABE/P145/IR/ELEC/MZP/159/Rev 00 22-Nov-16 26-Nov-16 4 B 0 0 0 B
(G:H/4:7)
160 5F Electrowatt ABE P145 IR ELEC MZP 160 Rev 00 ABE/P145/IR/ELEC/MZP/160/Rev 00 22-Nov-16 26-Nov-16 4 B 0 0 0 B
Power & lighting system works in slab (A:M/1:11)
161 Lightning protection system works (D:J/3:8) 5F Electrowatt ABE P145 IR ELEC MZP 161 Rev 00 ABE/P145/IR/ELEC/MZP/161/Rev 00 23-Nov-16 26-Nov-16 3 B 0 0 0 B

39/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
Power & lighting system works in the lift lobby
162 5F Electrowatt ABE P145 IR ELEC MZP 162 Rev 00 ABE/P145/IR/ELEC/MZP/162/Rev 00 24-Nov-16 28-Nov-16 4 B 0 0 0 B
(G/4:7)
163 5F Electrowatt ABE P145 IR ELEC MZP 163 Pending ABE/P145/IR/ELEC/MZP/163/Pending 24-Nov-16 29-Nov-16 5 C 0 0 0 C
Lightning protection work in columns (D:I/3:8)

164 Power & lighting system work in core wall 1 7F Electrowatt ABE P145 IR ELEC MZP 164 Rev 00 ABE/P145/IR/ELEC/MZP/164/Rev 00 26-Nov-16 29-Nov-16 3 B 0 0 0 C
(F:G/4:7)
Lifhting system works in the stair 4 & 4A (I:J/3:4,
165 2F Electrowatt ABE P145 IR ELEC MZP 165 Rev 00 ABE/P145/IR/ELEC/MZP/165/Rev 00 30-Nov-16 1-Dec-16 1 B 0 0 0 B
7:8)

166 Pending //////Pending 0 0 0 0 0

167 Pending //////Pending 0 0 0 0 0

168 Pending //////Pending 0 0 0 0 0


169 Pending //////Pending 0 0 0 0 0
170 Pending //////Pending 0 0 0 0 0
171 Pending //////Pending 0 0 0 0 0
172 Pending //////Pending 0 0 0 0 0
173 Pending //////Pending 0 0 0 0 0
174 Pending //////Pending 0 0 0 0 0
175 Pending //////Pending 0 0 0 0 0
176 Pending //////Pending 0 0 0 0 0
177 Pending //////Pending 0 0 0 0 0
178 Pending //////Pending 0 0 0 0 0
179 Pending //////Pending 0 0 0 0 0
180 Pending //////Pending 0 0 0 0 0
181 Pending //////Pending 0 0 0 0 0
182 Pending //////Pending 0 0 0 0 0
183 Pending //////Pending 0 0 0 0 0
184 Pending //////Pending 0 0 0 0 0
185 Pending //////Pending 0 0 0 0 0
186 Pending //////Pending 0 0 0 0 0
187 Pending //////Pending 0 0 0 0 0
188 Pending //////Pending 0 0 0 0 0
189 Pending //////Pending 0 0 0 0 0
190 Pending //////Pending 0 0 0 0 0
191 Pending //////Pending 0 0 0 0 0
192 Pending //////Pending 0 0 0 0 0
193 Pending //////Pending 0 0 0 0 0
194 Pending //////Pending 0 0 0 0 0
195 Pending //////Pending 0 0 0 0 0
196 Pending //////Pending 0 0 0 0 0
197 Pending //////Pending 0 0 0 0 0
198 Pending //////Pending 0 0 0 0 0
199 Pending //////Pending 0 0 0 0 0
200 Pending //////Pending 0 0 0 0 0
201 Pending //////Pending 0 0 0 0 0
202 Pending //////Pending 0 0 0 0 0
203 Pending //////Pending 0 0 0 0 0
204 Pending //////Pending 0 0 0 0 0
205 Pending //////Pending 0 0 0 0 0
206 Pending //////Pending 0 0 0 0 0
207 Pending //////Pending 0 0 0 0 0
208 Pending //////Pending 0 0 0 0 0
209 Pending //////Pending 0 0 0 0 0
210 Pending //////Pending 0 0 0 0 0
211 Pending //////Pending 0 0 0 0 0
212 Pending //////Pending 0 0 0 0 0
213 Pending //////Pending 0 0 0 0 0
214 Pending //////Pending 0 0 0 0 0
215 Pending //////Pending 0 0 0 0 0
216 Pending //////Pending 0 0 0 0 0
217 Pending //////Pending 0 0 0 0 0
218 Pending //////Pending 0 0 0 0 0
219 Pending //////Pending 0 0 0 0 0
220 Pending //////Pending 0 0 0 0 0
221 Pending //////Pending 0 0 0 0 0
222 Pending //////Pending 0 0 0 0 0
223 Pending //////Pending 0 0 0 0 0
224 Pending //////Pending 0 0 0 0 0
225 Pending //////Pending 0 0 0 0 0
226 Pending //////Pending 0 0 0 0 0
227 Pending //////Pending 0 0 0 0 0
228 Pending //////Pending 0 0 0 0 0
229 Pending //////Pending 0 0 0 0 0
230 Pending //////Pending 0 0 0 0 0
231 Pending //////Pending 0 0 0 0 0
232 Pending //////Pending 0 0 0 0 0
233 Pending //////Pending 0 0 0 0 0
234 Pending //////Pending 0 0 0 0 0
235 Pending //////Pending 0 0 0 0 0
236 Pending //////Pending 0 0 0 0 0
237 Pending //////Pending 0 0 0 0 0
238 Pending //////Pending 0 0 0 0 0
239 Pending //////Pending 0 0 0 0 0
240 Pending //////Pending 0 0 0 0 0
241 Pending //////Pending 0 0 0 0 0
242 Pending //////Pending 0 0 0 0 0
243 Pending //////Pending 0 0 0 0 0
244 Pending //////Pending 0 0 0 0 0
245 Pending //////Pending 0 0 0 0 0
246 Pending //////Pending 0 0 0 0 0

40/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
247 Pending //////Pending 0 0 0 0 0
248 Pending //////Pending 0 0 0 0 0
249 Pending //////Pending 0 0 0 0 0
250 Pending //////Pending 0 0 0 0 0
251 Pending //////Pending 0 0 0 0 0
252 Pending //////Pending 0 0 0 0 0
253 Pending //////Pending 0 0 0 0 0
254 Pending //////Pending 0 0 0 0 0
255 Pending //////Pending 0 0 0 0 0
256 Pending //////Pending 0 0 0 0
257 Pending //////Pending 0 0 0 0 0
258 Pending //////Pending 0 0 0 0 0
259 Pending //////Pending 0 0 0 0 0
260 Pending //////Pending 0 0 0 0 0
261 Pending //////Pending 0 0 0 0 0
262 Pending //////Pending 0 0 0 0 0
263 Pending //////Pending 0 0 0 0 0
264 Pending //////Pending 0 0 0 0 0
265 Pending //////Pending 0 0 0 0 0
266 Pending //////Pending 0 0 0 0 0
267 Pending //////Pending 0 0 0 0 0
268 Pending //////Pending 0 0 0 0 0
269 Pending //////Pending 0 0 0 0 0
270 Pending //////Pending 0 0 0 0 0
271 Pending //////Pending 0 0 0 0 0
272 Pending //////Pending 0 0 0 0 0
273 Pending //////Pending 0 0 0 0 0
274 Pending //////Pending 0 0 0 0 0
275 Pending //////Pending 0 0 0 0 0
276 Pending //////Pending 0 0 0 0 0
277 Pending //////Pending 0 0 0 0 0
278 Pending //////Pending 0 0 0 0 0
279 Pending //////Pending 0 0 0 0 0
280 Pending //////Pending 0 0 0 0 0
281 Pending //////Pending 0 0 0 0 0
282 Pending //////Pending 0 0 0 0 0
283 Pending //////Pending 0 0 0 0 0
284 Pending //////Pending 0 0 0 0 0
285 Pending //////Pending 0 0 0 0 0
286 Pending //////Pending 0 0 0 0 0
287 Pending //////Pending 0 0 0 0 0
288 Pending //////Pending 0 0 0 0 0
289 Pending //////Pending 0 0 0 0 0
290 Pending //////Pending 0 0 0 0 0
291 Pending //////Pending 0 0 0 0 0
292 Pending //////Pending 0 0 0 0 0
293 Pending //////Pending 0 0 0 0 0
294 Pending //////Pending 0 0 0 0 0
295 Pending //////Pending 0 0 0 0 0
296 Pending //////Pending 0 0 0 0 0
297 Pending //////Pending 0 0 0 0 0
298 Pending //////Pending 0 0 0 0 0
299 Pending //////Pending 0 0 0 0 0
300 Pending //////Pending 0 0 0 0 0
301 Pending //////Pending 0 0 0 0 0
302 Pending //////Pending 0 0 0 0 0
303 Pending //////Pending 0 0 0 0 0
304 Pending //////Pending 0 0 0 0 0
305 Pending //////Pending 0 0 0 0 0
306 Pending //////Pending 0 0 0 0 0
307 Pending //////Pending 0 0 0 0 0
308 Pending //////Pending 0 0 0 0 0
309 Pending //////Pending 0 0 0 0 0
310 Pending //////Pending 0 0 0 0 0
311 Pending //////Pending 0 0 0 0 0
312 Pending //////Pending 0 0 0 0 0
313 Pending //////Pending 0 0 0 0 0
314 Pending //////Pending 0 0 0 0 0
315 Pending //////Pending 0 0 0 0 0
316 Pending //////Pending 0 0 0 0 0
317 Pending //////Pending 0 0 0 0 0
318 Pending //////Pending 0 0 0 0 0
319 Pending //////Pending 0 0 0 0 0
320 Pending //////Pending 0 0 0 0 0
321 Pending //////Pending 0 0 0 0 0
322 Pending //////Pending 0 0 0 0 0
323 Pending //////Pending 0 0 0 0 0
324 Pending //////Pending 0 0 0 0 0
325 Pending //////Pending 0 0 0 0 0
326 Pending //////Pending 0 0 0 0 0
327 Pending //////Pending 0 0 0 0 0
328 Pending //////Pending 0 0 0 0 0
329 Pending //////Pending 0 0 0 0 0
330 Pending //////Pending 0 0 0 0 0
331 Pending //////Pending 0 0 0 0 0
332 Pending //////Pending 0 0 0 0 0
333 Pending //////Pending 0 0 0 0 0
334 Pending //////Pending 0 0 0 0 0
335 Pending //////Pending 0 0 0 0 0
336 Pending //////Pending 0 0 0 0 0
337 Pending //////Pending 0 0 0 0 0
338 Pending //////Pending 0 0 0 0 0
339 Pending //////Pending 0 0 0 0 0
340 Pending //////Pending 0 0 0 0 0
341 Pending //////Pending 0 0 0 0 0
342 Pending //////Pending 0 0 0 0 0

41/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
343 Pending //////Pending 0 0 0 0 0
344 Pending //////Pending 0 0 0 0 0
345 Pending //////Pending 0 0 0 0 0
346 Pending //////Pending 0 0 0 0 0
347 Pending //////Pending 0 0 0 0 0

348 Pending //////Pending 0 0 0 0 0

349 Pending //////Pending 0 0 0 0 0


350 Pending //////Pending 0 0 0 0 0
351 Pending //////Pending 0 0 0 0 0
352 Pending //////Pending 0 0 0 0 0
353 Pending //////Pending 0 0 0 0 0
354 Pending //////Pending 0 0 0 0 0
355 Pending //////Pending 0 0 0 0 0
356 Pending //////Pending 0 0 0 0 0
357 Pending //////Pending 0 0 0 0 0
358 Pending //////Pending 0 0 0 0 0
359 Pending //////Pending 0 0 0 0 0
360 Pending //////Pending 0 0 0 0 0
361 Pending //////Pending 0 0 0 0 0
362 Pending //////Pending 0 0 0 0 0
363 Pending //////Pending 0 0 0 0 0
364 Pending //////Pending 0 0 0 0 0
365 Pending //////Pending 0 0 0 0 0
366 Pending //////Pending 0 0 0 0 0
367 Pending //////Pending 0 0 0 0 0
368 Pending //////Pending 0 0 0 0 0
369 Pending //////Pending 0 0 0 0 0
370 Pending //////Pending 0 0 0 0 0
371 Pending //////Pending 0 0 0 0 0
372 Pending //////Pending 0 0 0 0 0
373 Pending //////Pending 0 0 0 0 0
374 Pending //////Pending 0 0 0 0 0
375 Pending //////Pending 0 0 0 0 0
376 Pending //////Pending 0 0 0 0 0
377 Pending //////Pending 0 0 0 0 0
378 Pending //////Pending 0 0 0 0 0
379 Pending //////Pending 0 0 0 0 0
380 Pending //////Pending 0 0 0 0 0
381 Pending //////Pending 0 0 0 0 0
382 Pending //////Pending 0 0 0 0 0
383 Pending //////Pending 0 0 0 0 0
384 Pending //////Pending 0 0 0 0 0
385 Pending //////Pending 0 0 0 0 0
386 Pending //////Pending 0 0 0 0 0
387 Pending //////Pending 0 0 0 0 0
388 Pending //////Pending 0 0 0 0 0
389 Pending //////Pending 0 0 0 0 0
390 Pending //////Pending 0 0 0 0 0
391 Pending //////Pending 0 0 0 0 0
392 Pending //////Pending 0 0 0 0 0
393 Pending //////Pending 0 0 0 0 0
394 Pending //////Pending 0 0 0 0 0
395 Pending //////Pending 0 0 0 0 0
396 Pending //////Pending 0 0 0 0 0
397 Pending //////Pending 0 0 0 0 0
398 Pending //////Pending 0 0 0 0 0
399 Pending //////Pending 0 0 0 0 0
400 Pending //////Pending 0 0 0 0 0
401 Pending //////Pending 0 0 0 0 0
402 Pending //////Pending 0 0 0 0 0
403 Pending //////Pending 0 0 0 0 0
404 Pending //////Pending 0 0 0 0 0
405 Pending //////Pending 0 0 0 0 0
406 Pending //////Pending 0 0 0 0 0
407 Pending //////Pending 0 0 0 0 0
408 Pending //////Pending 0 0 0 0 0
409 Pending //////Pending 0 0 0 0 0
410 Pending //////Pending 0 0 0 0 0
411 Pending //////Pending 0 0 0 0 0
412 Pending //////Pending 0 0 0 0 0
413 Pending //////Pending 0 0 0 0 0
414 Pending //////Pending 0 0 0 0 0
415 Pending //////Pending 0 0 0 0 0
416 Pending //////Pending 0 0 0 0 0
417 Pending //////Pending 0 0 0 0 0
418 Pending //////Pending 0 0 0 0 0
419 Pending //////Pending 0 0 0 0 0
420 Pending //////Pending 0 0 0 0 0
421 Pending //////Pending 0 0 0 0 0
422 Pending //////Pending 0 0 0 0 0
423 Pending //////Pending 0 0 0 0 0
424 Pending //////Pending 0 0 0 0 0
425 Pending //////Pending 0 0 0 0 0
426 Pending //////Pending 0 0 0 0 0
427 Pending //////Pending 0 0 0 0 0
428 Pending //////Pending 0 0 0 0 0
429 Pending //////Pending 0 0 0 0 0
430 Pending //////Pending 0 0 0 0 0
431 Pending //////Pending 0 0 0 0 0
432 Pending //////Pending 0 0 0 0 0
433 Pending //////Pending 0 0 0 0 0
434 Pending //////Pending 0 0 0 0 0
435 Pending //////Pending 0 0 0 0 0
436 Pending //////Pending 0 0 0 0 0

42/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
437 Pending //////Pending 0 0 0 0 0
438 Pending //////Pending 0 0 0 0 0
439 Pending //////Pending 0 0 0 0 0
440 Pending //////Pending 0 0 0 0 0
441 Pending //////Pending 0 0 0 0 0
442 Pending //////Pending 0 0 0 0 0
443 Pending //////Pending 0 0 0 0 0
444 Pending //////Pending 0 0 0 0 0
445 Pending //////Pending 0 0 0 0 0

446 Pending //////Pending 0 0 0 0 0

447 Pending //////Pending 0 0 0 0 0

448 Pending //////Pending 0 0 0 0 0


449 Pending //////Pending 0 0 0 0 0
450 Pending //////Pending 0 0 0 0 0
451 Pending //////Pending 0 0 0 0 0
452 Pending //////Pending 0 0 0 0 0
453 Pending //////Pending 0 0 0 0 0
454 Pending //////Pending 0 0 0 0 0
455 Pending //////Pending 0 0 0 0 0
456 Pending //////Pending 0 0 0 0 0
457 Pending //////Pending 0 0 0 0 0
458 Pending //////Pending 0 0 0 0 0
459 Pending //////Pending 0 0 0 0 0
460 Pending //////Pending 0 0 0 0 0
461 Pending //////Pending 0 0 0 0 0
462 Pending //////Pending 0 0 0 0 0
463 Pending //////Pending 0 0 0 0 0
464 Pending //////Pending 0 0 0 0 0

465 Pending //////Pending 0 0 0 0 0

466 Pending //////Pending 0 0 0 0 0

467 Pending //////Pending 0 0 0 0 0

468 Pending //////Pending 0 0 0 0 0

469 Pending //////Pending 0 0 0 0 0

470 Pending //////Pending 0 0 0 0 0

471 Pending //////Pending 0 0 0 0 0


472 Pending //////Pending 0 0 0 0 0
473 Pending //////Pending 0 0 0 0 0
474 Pending //////Pending 0 0 0 0 0
475 Pending //////Pending 0 0 0 0 0
476 Pending //////Pending 0 0 0 0 0
477 Pending //////Pending 0 0 0 0 0
478 Pending //////Pending 0 0 0 0 0
479 Pending //////Pending 0 0 0 0 0
480 Pending //////Pending 0 0 0 0 0
481 Pending //////Pending 0 0 0 0 0
482 Pending //////Pending 0 0 0 0 0
483 Pending //////Pending 0 0 0 0 0
484 Pending //////Pending 0 0 0 0 0
485 Pending //////Pending 0 0 0 0 0
486 Pending //////Pending 0 0 0 0 0
487 Pending //////Pending 0 0 0 0 0
488 Pending //////Pending 0 0 0 0 0
489 Pending //////Pending 0 0 0 0 0
490 Pending //////Pending 0 0 0 0 0
491 Pending //////Pending 0 0 0 0 0
492 Pending //////Pending 0 0 0 0 0
493 Pending //////Pending 0 0 0 0 0
494 Pending //////Pending 0 0 0 0 0
495 Pending //////Pending 0 0 0 0 0
496 Pending //////Pending 0 0 0 0 0
497 Pending //////Pending 0 0 0 0 0
498 Pending //////Pending 0 0 0 0 0
499 Pending //////Pending 0 0 0 0 0
500 Pending //////Pending 0 0 0 0 0
501 Pending //////Pending 0 0 0 0 0
502 Pending //////Pending 0 0 0 0 0
503 Pending //////Pending 0 0 0 0 0
504 Pending //////Pending 0 0 0 0 0
505 Pending //////Pending 0 0 0 0 0
506 Pending //////Pending 0 0 0 0 0
507 Pending //////Pending 0 0 0 0 0
508 Pending //////Pending 0 0 0 0 0
509 Pending //////Pending 0 0 0 0 0
510 Pending //////Pending 0 0 0 0 0
511 Pending //////Pending 0 0 0 0 0
512 Pending //////Pending 0 0 0 0 0
513 Pending //////Pending 0 0 0 0 0
514 Pending //////Pending 0 0 0 0 0
515 Pending //////Pending 0 0 0 0 0
516 Pending //////Pending 0 0 0 0 0
517 Pending //////Pending 0 0 0 0 0
518 Pending //////Pending 0 0 0 0 0

43/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
519 Pending //////Pending 0 0 0 0 0
520 Pending //////Pending 0 0 0 0 0
521 Pending //////Pending 0 0 0 0 0
522 Pending //////Pending 0 0 0 0 0
523 Pending //////Pending 0 0 0 0 0
524 Pending //////Pending 0 0 0 0 0
525 Pending //////Pending 0 0 0 0 0
526 Pending //////Pending 0 0 0 0 0
527 Pending //////Pending 0 0 0 0 0
528 Pending //////Pending 0 0 0 0 0
529 Pending //////Pending 0 0 0 0 0
530 Pending //////Pending 0 0 0 0 0
531 Pending //////Pending 0 0 0 0 0
532 Pending //////Pending 0 0 0 0 0
533 Pending //////Pending 0 0 0 0 0
534 Pending //////Pending 0 0 0 0 0
535 Pending //////Pending 0 0 0 0 0
536 Pending //////Pending 0 0 0 0 0
537 Pending //////Pending 0 0 0 0 0
538 Pending //////Pending 0 0 0 0 0
539 Pending //////Pending 0 0 0 0 0
540 Pending //////Pending 0 0 0 0 0
541 Pending //////Pending 0 0 0 0 0
542 Pending //////Pending 0 0 0 0 0
543 Pending //////Pending 0 0 0 0 0
544 Pending //////Pending 0 0 0 0 0
545 Pending //////Pending 0 0 0 0 0
546 Pending //////Pending 0 0 0 0 0
547 Pending //////Pending 0 0 0 0 0
548 Pending //////Pending 0 0 0 0 0
549 Pending //////Pending 0 0 0 0 0
550 Pending //////Pending 0 0 0 0 0
551 Pending //////Pending 0 0 0 0 0
552 Pending //////Pending 0 0 0 0 0
553 Pending //////Pending 0 0 0 0 0
554 Pending //////Pending 0 0 0 0 0
555 Pending //////Pending 0 0 0 0 0
556 Pending //////Pending 0 0 0 0 0
557 Pending //////Pending 0 0 0 0 0
558 Pending //////Pending 0 0 0 0 0
559 Pending //////Pending 0 0 0 0 0
560 Pending //////Pending 0 0 0 0 0
561 Pending //////Pending 0 0 0 0 0
562 Pending //////Pending 0 0 0 0 0
563 Pending //////Pending 0 0 0 0 0
564 Pending //////Pending 0 0 0 0 0
565 Pending //////Pending 0 0 0 0 0
566 Pending //////Pending 0 0 0 0 0
567 Pending //////Pending 0 0 0 0 0
568 Pending //////Pending 0 0 0 0 0
569 Pending //////Pending 0 0 0 0 0
570 Pending //////Pending 0 0 0 0 0
571 Pending //////Pending 0 0 0 0 0
572 Pending //////Pending 0 0 0 0 0
573 Pending //////Pending 0 0 0 0 0
574 Pending //////Pending 0 0 0 0 0
575 Pending //////Pending 0 0 0 0 0
576 Pending //////Pending 0 0 0 0 0
577 Pending //////Pending 0 0 0 0 0
578 Pending //////Pending 0 0 0 0 0
579 Pending //////Pending 0 0 0 0 0
580 Pending //////Pending 0 0 0 0 0
581 Pending //////Pending 0 0 0 0 0
582 Pending //////Pending 0 0 0 0 0
583 Pending //////Pending 0 0 0 0 0
584 Pending //////Pending 0 0 0 0 0
585 Pending //////Pending 0 0 0 0 0
586 Pending //////Pending 0 0 0 0 0
587 Pending //////Pending 0 0 0 0 0
588 Pending //////Pending 0 0 0 0 0

44/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
589 Pending //////Pending 0 0 0 0 0
590 Pending //////Pending 0 0 0 0 0
591 Pending //////Pending 0 0 0 0 0
592 Pending //////Pending 0 0 0 0 0
593 Pending //////Pending 0 0 0 0 0
594 Pending //////Pending 0 0 0 0 0
595 Pending //////Pending 0 0 0 0 0
596 Pending //////Pending 0 0 0 0 0
597 Pending //////Pending 0 0 0 0 0
598 Pending //////Pending 0 0 0 0 0
599 Pending //////Pending 0 0 0 0 0
600 Pending //////Pending 0 0 0 0 0
601 Pending //////Pending 0 0 0 0 0
602 Pending //////Pending 0 0 0 0 0
603 Pending //////Pending 0 0 0 0 0
604 Pending //////Pending 0 0 0 0 0
605 Pending //////Pending 0 0 0 0 0
606 Pending //////Pending 0 0 0 0 0
607 Pending //////Pending 0 0 0 0 0
608 Pending //////Pending 0 0 0 0 0
609 Pending //////Pending 0 0 0 0 0
610 Pending //////Pending 0 0 0 0 0
611 Pending //////Pending 0 0 0 0 0
612 Pending //////Pending 0 0 0 0 0
613 Pending //////Pending 0 0 0 0 0
614 Pending //////Pending 0 0 0 0 0
615 Pending //////Pending 0 0 0 0 0
616 Pending //////Pending 0 0 0 0 0
617 Pending //////Pending 0 0 0 0 0
618 Pending //////Pending 0 0 0 0 0
619 Pending //////Pending 0 0 0 0 0
620 Pending //////Pending 0 0 0 0 0
621 Pending //////Pending 0 0 0 0 0
622 Pending //////Pending 0 0 0 0 0
623 Pending //////Pending 0 0 0 0 0
624 Pending //////Pending 0 0 0 0 0

625 Pending //////Pending 0 0 0 0 0

626 Pending //////Pending 0 0 0 0 0

627 Pending //////Pending 0 0 0 0 0

628 Pending //////Pending 0 0 0 0 0

629 Pending //////Pending 0 0 0 0 0


630 Pending //////Pending 0 0 0 0 0
631 Pending //////Pending 0 0 0 0 0
632 Pending //////Pending 0 0 0 0 0
633 Pending //////Pending 0 0 0 0 0
634 Pending //////Pending 0 0 0 0 0
635 Pending //////Pending 0 0 0 0 0
636 Pending //////Pending 0 0 0 0 0
637 Pending //////Pending 0 0 0 0 0
638 Pending //////Pending 0 0 0 0 0
639 Pending //////Pending 0 0 0 0 0
640 Pending //////Pending 0 0 0 0 0
641 Pending //////Pending 0 0 0 0 0
642 Pending //////Pending 0 0 0 0 0
643 Pending //////Pending 0 0 0 0 0
644 Pending //////Pending 0 0 0 0 0
645 Pending //////Pending 0 0 0 0 0
646 Pending //////Pending 0 0 0 0 0
647 Pending //////Pending 0 0 0 0 0
648 Pending //////Pending 0 0 0 0 0
649 Pending //////Pending 0 0 0 0 0
650 Pending //////Pending 0 0 0 0 0
651 Pending //////Pending 0 0 0 0 0
652 Pending //////Pending 0 0 0 0 0
653 Pending //////Pending 0 0 0 0 0
654 Pending //////Pending 0 0 0 0 0
655 Pending //////Pending 0 0 0 0 0
656 Pending //////Pending 0 0 0 0 0
657 Pending //////Pending 0 0 0 0 0
658 Pending //////Pending 0 0 0 0 0
659 Pending //////Pending 0 0 0 0 0
660 Pending //////Pending 0 0 0 0 0
661 Pending //////Pending 0 0 0 0 0
662 Pending //////Pending 0 0 0 0 0
663 Pending //////Pending 0 0 0 0 0
664 Pending //////Pending 0 0 0 0 0
665 Pending //////Pending 0 0 0 0 0
666 Pending //////Pending 0 0 0 0 0
667 Pending //////Pending 0 0 0 0 0
668 Pending //////Pending 0 0 0 0 0
669 Pending //////Pending 0 0 0 0 0
670 Pending //////Pending 0 0 0 0 0
671 Pending //////Pending 0 0 0 0 0
672 Pending //////Pending 0 0 0 0 0
673 Pending //////Pending 0 0 0 0 0
674 Pending //////Pending 0 0 0 0 0
675 Pending //////Pending 0 0 0 0 0

45/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
676 Pending //////Pending 0 0 0 0 0
677 Pending //////Pending 0 0 0 0 0
678 Pending //////Pending 0 0 0 0 0
679 Pending //////Pending 0 0 0 0 0
680 Pending //////Pending 0 0 0 0 0
681 Pending //////Pending 0 0 0 0 0
682 Pending //////Pending 0 0 0 0 0
683 Pending //////Pending 0 0 0 0 0
684 Pending //////Pending 0 0 0 0 0
685 Pending //////Pending 0 0 0 0 0
686 Pending //////Pending 0 0 0 0 0
687 Pending //////Pending 0 0 0 0 0
688 Pending //////Pending 0 0 0 0 0
689 Pending //////Pending 0 0 0 0 0
690 Pending //////Pending 0 0 0 0 0
691 Pending //////Pending 0 0 0 0 0
692 Pending //////Pending 0 0 0 0 0
693 Pending //////Pending 0 0 0 0 0
694 Pending //////Pending 0 0 0 0 0
695 Pending //////Pending 0 0 0 0 0
696 Pending //////Pending 0 0 0 0 0
697 Pending //////Pending 0 0 0 0 0
698 Pending //////Pending 0 0 0 0 0
699 Pending //////Pending 0 0 0 0 0
700 Pending //////Pending 0 0 0 0 0
701 Pending //////Pending 0 0 0 0 0
702 Pending //////Pending 0 0 0 0 0
703 Pending //////Pending 0 0 0 0 0
704 Pending //////Pending 0 0 0 0 0
705 Pending //////Pending 0 0 0 0 0
706 Pending //////Pending 0 0 0 0 0
707 Pending //////Pending 0 0 0 0 0
708 Pending //////Pending 0 0 0 0 0
709 Pending //////Pending 0 0 0 0 0
710 Pending //////Pending 0 0 0 0 0
711 Pending //////Pending 0 0 0 0 0
712 Pending //////Pending 0 0 0 0 0
713 Pending //////Pending 0 0 0 0 0
714 Pending //////Pending 0 0 0 0 0
715 Pending //////Pending 0 0 0 0 0
716 Pending //////Pending 0 0 0 0 0
717 Pending //////Pending 0 0 0 0 0
718 Pending //////Pending 0 0 0 0 0
719 Pending //////Pending 0 0 0 0 0
720 Pending //////Pending 0 0 0 0 0
721 Pending //////Pending 0 0 0 0 0
722 Pending //////Pending 0 0 0 0 0
723 Pending //////Pending 0 0 0 0 0
724 Pending //////Pending 0 0 0 0 0
725 Pending //////Pending 0 0 0 0 0
726 Pending //////Pending 0 0 0 0 0
727 Pending //////Pending 0 0 0 0 0
728 Pending //////Pending 0 0 0 0 0
729 Pending //////Pending 0 0 0 0 0
730 Pending //////Pending 0 0 0 0 0
731 Pending //////Pending 0 0 0 0 0
732 Pending //////Pending 0 0 0 0 0
733 Pending //////Pending 0 0 0 0 0
734 Pending //////Pending 0 0 0 0 0
735 Pending //////Pending 0 0 0 0 0
736 Pending //////Pending 0 0 0 0 0
737 Pending //////Pending 0 0 0 0 0
738 Pending //////Pending 0 0 0 0 0
739 Pending //////Pending 0 0 0 0 0
740 Pending //////Pending 0 0 0 0 0
741 Pending //////Pending 0 0 0 0 0
742 Pending //////Pending 0 0 0 0 0
743 Pending //////Pending 0 0 0 0 0
744 Pending //////Pending 0 0 0 0 0
745 Pending //////Pending 0 0 0 0 0
746 Pending //////Pending 0 0 0 0 0
747 Pending //////Pending 0 0 0 0 0
748 Pending //////Pending 0 0 0 0 0
749 Pending //////Pending 0 0 0 0 0
750 Pending //////Pending 0 0 0 0 0
751 Pending //////Pending 0 0 0 0 0
752 Pending //////Pending 0 0 0 0 0
753 Pending //////Pending 0 0 0 0 0
754 Pending //////Pending 0 0 0 0 0
755 Pending //////Pending 0 0 0 0 0
756 Pending //////Pending 0 0 0 0 0
757 Pending //////Pending 0 0 0 0 0
758 Pending //////Pending 0 0 0 0 0
759 Pending //////Pending 0 0 0 0 0
760 Pending //////Pending 0 0 0 0 0
761 Pending //////Pending 0 0 0 0 0
762 Pending //////Pending 0 0 0 0 0
763 Pending //////Pending 0 0 0 0 0
764 Pending //////Pending 0 0 0 0 0
765 Pending //////Pending 0 0 0 0 0
766 Pending //////Pending 0 0 0 0 0
767 Pending //////Pending 0 0 0 0 0
768 Pending //////Pending 0 0 0 0 0
769 Pending //////Pending 0 0 0 0 0
770 Pending //////Pending 0 0 0 0 0
771 Pending //////Pending 0 0 0 0 0

46/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
772 Pending //////Pending 0 0 0 0 0
773 Pending //////Pending 0 0 0 0 0
774 Pending //////Pending 0 0 0 0 0
775 Pending //////Pending 0 0 0 0 0
776 Pending //////Pending 0 0 0 0 0
777 Pending //////Pending 0 0 0 0 0
778 Pending //////Pending 0 0 0 0 0
779 Pending //////Pending 0 0 0 0 0
780 Pending //////Pending 0 0 0 0 0
781 Pending //////Pending 0 0 0 0 0
782 Pending //////Pending 0 0 0 0 0
783 Pending //////Pending 0 0 0 0 0
784 Pending //////Pending 0 0 0 0 0
785 Pending //////Pending 0 0 0 0 0
786 Pending //////Pending 0 0 0 0 0
787 Pending //////Pending 0 0 0 0 0
788 Pending //////Pending 0 0 0 0 0
789 Pending //////Pending 0 0 0 0 0
790 Pending //////Pending 0 0 0 0 0
791 Pending //////Pending 0 0 0 0 0
792 Pending //////Pending 0 0 0 0 0
793 Pending //////Pending 0 0 0 0 0
794 Pending //////Pending 0 0 0 0 0
795 Pending //////Pending 0 0 0 0 0
796 Pending //////Pending 0 0 0 0 0
797 Pending //////Pending 0 0 0 0 0
798 Pending //////Pending 0 0 0 0 0
799 Pending //////Pending 0 0 0 0 0
800 Pending //////Pending 0 0 0 0 0
801 Pending //////Pending 0 0 0 0 0
802 Pending //////Pending 0 0 0 0 0
803 Pending //////Pending 0 0 0 0 0
804 Pending //////Pending 0 0 0 0 0
805 Pending //////Pending 0 0 0 0 0
806 Pending //////Pending 0 0 0 0 0
807 Pending //////Pending 0 0 0 0 0
808 Pending //////Pending 0 0 0 0 0
809 Pending //////Pending 0 0 0 0 0
810 Pending //////Pending 0 0 0 0 0
811 Pending //////Pending 0 0 0 0 0
812 Pending //////Pending 0 0 0 0 0

813 Pending //////Pending 0 0 0 0 0

814 Pending //////Pending 0 0 0 0 0


815 Pending //////Pending 0 0 0 0 0
816 Pending //////Pending 0 0 0 0 0
817 Pending //////Pending 0 0 0 0 0
818 Pending //////Pending 0 0 0 0 0
819 Pending //////Pending 0 0 0 0 0
820 Pending //////Pending 0 0 0 0 0
821 Pending //////Pending 0 0 0 0 0
822 Pending //////Pending 0 0 0 0 0
823 Pending //////Pending 0 0 0 0 0
824 Pending //////Pending 0 0 0 0 0
825 Pending //////Pending 0 0 0 0 0
826 Pending //////Pending 0 0 0 0 0
827 Pending //////Pending 0 0 0 0 0
828 Pending //////Pending 0 0 0 0 0
829 Pending //////Pending 0 0 0 0 0
830 Pending //////Pending 0 0 0 0 0
831 Pending //////Pending 0 0 0 0 0
832 Pending //////Pending 0 0 0 0 0
833 Pending //////Pending 0 0 0 0 0
834 Pending //////Pending 0 0 0 0 0
835 Pending //////Pending 0 0 0 0 0
836 Pending //////Pending 0 0 0 0 0
837 Pending //////Pending 0 0 0 0 0
838 Pending //////Pending 0 0 0 0 0
839 Pending //////Pending 0 0 0 0 0
840 Pending //////Pending 0 0 0 0 0
841 Pending //////Pending 0 0 0 0 0
842 Pending //////Pending 0 0 0 0 0
843 Pending //////Pending 0 0 0 0 0
844 Pending //////Pending 0 0 0 0 0
845 Pending //////Pending 0 0 0 0 0
846 Pending //////Pending 0 0 0 0 0
847 Pending //////Pending 0 0 0 0 0
848 Pending //////Pending 0 0 0 0 0
849 Pending //////Pending 0 0 0 0 0
850 Pending //////Pending 0 0 0 0 0
851 Pending //////Pending 0 0 0 0 0
852 Pending //////Pending 0 0 0 0 0
853 Pending //////Pending 0 0 0 0 0
854 Pending //////Pending 0 0 0 0 0
855 Pending //////Pending 0 0 0 0 0
856 Pending //////Pending 0 0 0 0 0
857 Pending //////Pending 0 0 0 0 0
858 Pending //////Pending 0 0 0 0 0
859 Pending //////Pending 0 0 0 0 0
860 Pending //////Pending 0 0 0 0 0
861 Pending //////Pending 0 0 0 0 0
862 Pending //////Pending 0 0 0 0 0
863 Pending //////Pending 0 0 0 0 0
864 Pending //////Pending 0 0 0 0 0

47/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
865 Pending //////Pending 0 0 0 0 0
866 Pending //////Pending 0 0 0 0 0
867 Pending //////Pending 0 0 0 0 0
868 Pending //////Pending 0 0 0 0 0
869 Pending //////Pending 0 0 0 0 0
870 Pending //////Pending 0 0 0 0 0
871 Pending //////Pending 0 0 0 0 0
872 Pending //////Pending 0 0 0 0 0
873 Pending //////Pending 0 0 0 0 0
874 Pending //////Pending 0 0 0 0 0
875 Pending //////Pending 0 0 0 0 0
876 Pending //////Pending 0 0 0 0 0
877 Pending //////Pending 0 0 0 0 0
878 Pending //////Pending 0 0 0 0 0
879 Pending //////Pending 0 0 0 0 0
880 Pending //////Pending 0 0 0 0 0
881 Pending //////Pending 0 0 0 0 0
882 Pending //////Pending 0 0 0 0 0
883 Pending //////Pending 0 0 0 0 0
884 Pending //////Pending 0 0 0 0 0
885 Pending //////Pending 0 0 0 0 0
886 Pending //////Pending 0 0 0 0 0
887 Pending //////Pending 0 0 0 0 0
888 Pending //////Pending 0 0 0 0 0
889 Pending //////Pending 0 0 0 0 0
890 Pending //////Pending 0 0 0 0 0
891 Pending //////Pending 0 0 0 0 0
892 Pending //////Pending 0 0 0 0 0
893 Pending //////Pending 0 0 0 0 0
894 Pending //////Pending 0 0 0 0 0
895 Pending //////Pending 0 0 0 0 0
896 Pending //////Pending 0 0 0 0 0
897 Pending //////Pending 0 0 0 0 0
898 Pending //////Pending 0 0 0 0 0
899 Pending //////Pending 0 0 0 0 0
900 Pending //////Pending 0 0 0 0 0
901 Pending //////Pending 0 0 0 0 0
902 Pending //////Pending 0 0 0 0 0
903 Pending //////Pending 0 0 0 0 0
904 Pending //////Pending 0 0 0 0 0
905 Pending //////Pending 0 0 0 0 0
906 Pending //////Pending 0 0 0 0 0
907 Pending //////Pending 0 0 0 0 0
908 Pending //////Pending 0 0 0 0 0
909 Pending //////Pending 0 0 0 0 0
910 Pending //////Pending 0 0 0 0 0
911 Pending //////Pending 0 0 0 0 0
912 Pending //////Pending 0 0 0 0 0
913 Pending //////Pending 0 0 0 0 0
914 Pending //////Pending 0 0 0 0 0
915 Pending //////Pending 0 0 0 0 0
916 Pending //////Pending 0 0 0 0 0
917 Pending //////Pending 0 0 0 0 0
918 Pending //////Pending 0 0 0 0 0
919 Pending //////Pending 0 0 0 0 0
920 Pending //////Pending 0 0 0 0 0
921 Pending //////Pending 0 0 0 0 0
922 Pending //////Pending 0 0 0 0 0
923 Pending //////Pending 0 0 0 0 0
924 Pending //////Pending 0 0 0 0 0
925 Pending //////Pending 0 0 0 0 0
926 Pending //////Pending 0 0 0 0 0
927 Pending //////Pending 0 0 0 0 0
928 Pending //////Pending 0 0 0 0 0
929 Pending //////Pending 0 0 0 0 0
930 Pending //////Pending 0 0 0 0 0
931 Pending //////Pending 0 0 0 0 0
932 Pending //////Pending 0 0 0 0 0
933 Pending //////Pending 0 0 0 0 0
934 Pending //////Pending 0 0 0 0 0
935 Pending //////Pending 0 0 0 0 0
936 Pending //////Pending 0 0 0 0 0
937 Pending //////Pending 0 0 0 0 0
938 Pending //////Pending 0 0 0 0 0
939 Pending //////Pending 0 0 0 0 0
940 Pending //////Pending 0 0 0 0 0

941 Pending //////Pending 0 0 0 0 0

942 Pending //////Pending 0 0 0 0 0

943 Pending //////Pending 0 0 0 0 0

944 Pending //////Pending 0 0 0 0 0

945 Pending //////Pending 0 0 0 0 0

946 Pending //////Pending 0 0 0 0 0


947 Pending //////Pending 0 0 0 0 0
948 Pending //////Pending 0 0 0 0 0
949 Pending //////Pending 0 0 0 0 0
950 Pending //////Pending 0 0 0 0 0
951 Pending //////Pending 0 0 0 0 0
952 Pending //////Pending 0 0 0 0 0

48/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
953 Pending //////Pending 0 0 0 0 0

954 Pending //////Pending 0 0 0 0 0

955 Pending //////Pending 0 0 0 0 0

956 Pending //////Pending 0 0 0 0 0


957 Pending //////Pending 0 0 0 0 0
958 Pending //////Pending 0 0 0 0 0
959 Pending //////Pending 0 0 0 0 0
960 Pending //////Pending 0 0 0 0 0
961 Pending //////Pending 0 0 0 0 0
962 Pending //////Pending 0 0 0 0 0
963 Pending //////Pending 0 0 0 0 0
964 Pending //////Pending 0 0 0 0 0
965 Pending //////Pending 0 0 0 0 0
966 Pending //////Pending 0 0 0 0 0

967 Pending //////Pending 0 0 0 0 0

968 Pending //////Pending 0 0 0 0 0

969 Pending //////Pending 0 0 0 0 0


970 Pending //////Pending 0 0 0 0 0
971 Pending //////Pending 0 0 0 0 0
972 Pending //////Pending 0 0 0 0 0
973 Pending //////Pending 0 0 0 0 0
974 Pending //////Pending 0 0 0 0 0
975 Pending //////Pending 0 0 0 0 0
976 Pending //////Pending 0 0 0 0 0
977 Pending //////Pending 0 0 0 0 0
978 Pending //////Pending 0 0 0 0 0
979 Pending //////Pending 0 0 0 0 0

980 Pending //////Pending 0 0 0 0 0

981 Pending //////Pending 0 0 0 0 0

982 Pending //////Pending 0 0 0 0 0

983 Pending //////Pending 0 0 0 0 0

984 Pending //////Pending 0 0 0 0 0

985 Pending //////Pending 0 0 0 0 0


986 Pending //////Pending 0 0 0 0 0
987 Pending //////Pending 0 0 0 0 0
988 Pending //////Pending 0 0 0 0 0
989 Pending //////Pending 0 0 0 0 0
990 Pending //////Pending 0 0 0 0 0
991 Pending //////Pending 0 0 0 0 0
992 Pending //////Pending 0 0 0 0 0
993 Pending //////Pending 0 0 0 0 0
994 Pending //////Pending 0 0 0 0 0
995 Pending //////Pending 0 0 0 0 0
996 Pending //////Pending 0 0 0 0 0
997 Pending //////Pending 0 0 0 0 0
998 Pending //////Pending 0 0 0 0 0
999 Pending //////Pending 0 0 0 0 0
1000 Pending //////Pending 0 0 0 0 0

49/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

50/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

51/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

52/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

53/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

54/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

55/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

56/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

57/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

58/305
12

ELECTRICAL WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 1 A 0 A = Approved
B 149 B 10 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 11 C 0 C 0 C 0 C = Revised And Resubmit
D 5 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

59/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

FA & CO, 1st fix imbedded in columns & wall


1 B5 Electrowatt ABE P145 IR FAS MZP 001 Rev 00
(A:L/7:11)
Power sockets & Lighting & Builders work
2 B5 Electrowatt ABE P145 IR FAS MZP 002 Rev 00
imbedded in core-1 (F:G/4:7)
FA & CO, 1st fix imbedded in columns & wall
3 B5 Electrowatt ABE P145 IR FAS MZP 003 Rev 00
(E:L/4:9)
FA & CO, 1st fix in columns and core wall
4 B5 Electrowatt ABE P145 IR FAS MZP 004 Rev 00
(D:K/4:10)
5 FAS, COS, 1st Fix B5 Electrowatt ABE P145 IR FAS MZP 005 Pending
6 COS, 1st Fix B5 Electrowatt ABE P145 IR FAS MZP 006 Rev 00
7 FAS & COS, IST Fix B4 Electrowatt ABE P145 IR FAS MZP 007 Rev 00
8 FAS & COS, IST Fix B4 Electrowatt ABE P145 IR FAS MZP 008 Rev 01
9 FAS & COS, IST Fix B4 Electrowatt ABE P145 IR FAS MZP 009 Rev 00
10 FAS & COS, IST Fix B4 Electrowatt ABE P145 IR FAS MZP 010 Rev 00
11 FAS, 1st Fix B4 Electrowatt ABE P145 IR FAS MZP 011 Rev 00
12 FAS. 1st Fix B4 Electrowatt ABE P145 IR FAS MZP 012 Rev 00
13 FAS. 1st Fix B4 Electrowatt ABE P145 IR FAS MZP 013 Rev 00
14 FAS. 1st Fix (A:E/1:10) B3 Electrowatt ABE P145 IR FAS MZP 014 Rev 00
15 FAS & COS, IST Fix B5 Electrowatt ABE P145 IR FAS MZP 015 Rev 00
16 FAS & COS, IST Fix (A:J/1:11) B4 Electrowatt ABE P145 IR FAS MZP 016 Rev 02
17 FAS 1st fix (A:H/1:3) B3 Electrowatt ABE P145 IR FAS MZP 017 Rev 00
18 FAS, 1st fix (C:G/3:7) B3 Electrowatt ABE P145 IR FAS MZP 018 Rev 00
19 Pending
20 FAS, 1st fix corewall & staircase - 6 (A:I/3:9) B3 Electrowatt ABE P145 IR FAS MZP 020 Rev 00
21 FAS, 1st fix slab (I:M/1:11) B4 Electrowatt ABE P145 IR FAS MZP 021 Rev 00
22 FAS, 1st fix columns (I:M/1:11) B3 Electrowatt ABE P145 IR FAS MZP 022 Rev 00
23 FAS, 1st fix slab (A:J/1:11) B3 Electrowatt ABE P145 IR FAS MZP 023 Rev 00
24 FAS, 1st fix columns (A:J/1:11) B2 Electrowatt ABE P145 IR FAS MZP 024 Rev 00
25 FAS, 1st Fix B2 Electrowatt ABE P145 IR FAS MZP 025 Rev 01

60/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

26 FAS, staircase - 6 (B:C/9:7) B5 Electrowatt ABE P145 IR FAS MZP 026 Rev 00
27 FAS, 1st Fix columns (B:C/7:11) B2 Electrowatt ABE P145 IR FAS MZP 027 Rev 01
28 FAS, 1st fix staircase-2 (B:C/9:7) B2 Electrowatt ABE P145 IR FAS MZP 028 Rev 00
29 FAS, 1st Fix columns (I:M/1:7) B2 Electrowatt ABE P145 IR FAS MZP 029 Rev 00
30 FAS, 1st Fix columns (I:M/5:11) B2 Electrowatt ABE P145 IR FAS MZP 030 Rev 00
31 FAS, 1st Fix corewall (G:F/4:7) B2 Electrowatt ABE P145 IR FAS MZP 031 Rev 01
32 FAS, 1st fix slab (I:M/1:11) B3 Electrowatt ABE P145 IR FAS MZP 032 Rev 00
33 FAS, 1st fix slab (G:H/4:7) B2 Electrowatt ABE P145 IR FAS MZP 033 Rev 00
34 FAS, 1st fix staircase-6 (B:C/8:9) B3 Electrowatt ABE P145 IR FAS MZP 034 Rev 00
35 FAS, 1st fix slab (A:J/1:11) B2 Electrowatt ABE P145 IR FAS MZP 035 Rev 00
36 FAS, 1st fix staircase-6 (B:C/8:9) B2 Electrowatt ABE P145 IR FAS MZP 036 Rev 00
37 FAS, 1st Fix corewall (G:F/4:7) B1 Electrowatt ABE P145 IR FAS MZP 037 Rev 00

38 FAS, 1st Fix corewall 2 + Column (B:H/01:07) B1 Electrowatt ABE P145 IR FAS MZP 038 Rev 00

39 FAS, 1st Fix columns 3C, 6B, 9B, 9I B1 Electrowatt ABE P145 IR FAS MZP 039 Rev 00
40 FAS, 1st Fix last column, FTS (K:3/B:8/C:8) B1 Electrowatt ABE P145 IR FAS MZP 040 Rev 00
41 FAS, 1st Fix column (10:I/10:M) B2 Electrowatt ABE P145 IR FAS MZP 041 Rev 00
42 FAS, 1st Fix column (L:2/K:3/K:7) B1 Electrowatt ABE P145 IR FAS MZP 042 Rev 00
43 FAS, 1st Fix column (L:2) B1 Electrowatt ABE P145 IR FAS MZP 043 Rev 00
44 FAS, 1st Fix column stair case no 6 (8-9/b-c) B1 Electrowatt ABE P145 IR FAS MZP 044 Rev 00
45 FAS, 1st Fix core wall 1 (4-7/F-G) GF Electrowatt ABE P145 IR FAS MZP 045 Rev 00
46 FAS, 1st Fix core wall 2 (4-7/G-H) GF Electrowatt ABE P145 IR FAS MZP 046 Rev 00
47 FAS, 1st Fix slab 2 (1-11/A-M) B1 Electrowatt ABE P145 IR FAS MZP 047 Rev 00
48 FAS, 1st Fix columns (7-9/B-C) GF Electrowatt ABE P145 IR FAS MZP 048 Rev 00
49 FAS, 1st Fix core wall 1 (4-7/F-G) 1F Electrowatt ABE P145 IR FAS MZP 049 Rev 00
50 FAS, 1st Fix columns (4-7/H-J) GF Electrowatt ABE P145 IR FAS MZP 050 Rev 00
51 FAS, 1st Fix core wall 2 (4-7/G-H) 1F Electrowatt ABE P145 IR FAS MZP 051 Rev 00
52 FAS, 1st Fix stair case 4A (3-4/I-J) GF Electrowatt ABE P145 IR FAS MZP 052 Rev 00

61/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

53 2nd fix pulling wire all slab B4 (1:11) B4 Electrowatt ABE P145 IR FAS MZP 053 Pending
54 FAS, 1st Fix slab (1-10/A-L) GF Electrowatt ABE P145 IR FAS MZP 054 Rev 00
55 FAS, 1st Fix core wall 1 (4-7/F-G) 2F Electrowatt ABE P145 IR FAS MZP 055 Rev 00
56 FAS, 1st Fix columns (8-9/G-H) 1F Electrowatt ABE P145 IR FAS MZP 056 Rev 00
57 FAS, 1st Fix core wall 2 (4-7/G-H) 2F Electrowatt ABE P145 IR FAS MZP 057 Rev 00
58 FAS, 1st Fix columns (4-8/I-J) 1F Electrowatt ABE P145 IR FAS MZP 058 Rev 00
59 FAS, 1st Fix columns (4-8/I-J) 1F Electrowatt ABE P145 IR FAS MZP 059 Rev 00
60 FAS, 1st Fix corewall, slab (G:H/4:7) B5 Electrowatt ABE P145 IR FAS MZP 060 Rev 00
61 FAS, 1st Fix slab (B:L/2:10) 1F Electrowatt ABE P145 IR FAS MZP 061 Rev 00
62 FAS, 1st Fix columns (F:G/2:3) 2F Electrowatt ABE P145 IR FAS MZP 062 Rev 00
63 FAS, 1st Fix Core wall (H:G/4:7) 2F Electrowatt ABE P145 IR FAS MZP 063 Rev 00
64 FAS, 1st Fix columns (I:J/7:8) 2F Electrowatt ABE P145 IR FAS MZP 064 Rev 00
65 FAS, 1st Fix columns (I:J/3:4) 2F Electrowatt ABE P145 IR FAS MZP 065 Rev 00
66 FAS, 1st Fix columns (H:I/7:9) 2F Electrowatt ABE P145 IR FAS MZP 066 Rev 00
67 FAS, 1st Fix columns (D:J/4:9) 2F Electrowatt ABE P145 IR FAS MZP 067 Rev 00
68 FAS, 1st Fix slab (H:G/4:7) B4 Electrowatt ABE P145 IR FAS MZP 068 Rev 00
69 FAS, 1st Fix Core wall 1 (E:G/4:6) 3F Electrowatt ABE P145 IR FAS MZP 069 Rev 00
70 FAS, 1st Fix columns (H/8:9) 2F Electrowatt ABE P145 IR FAS MZP 070 Rev 00
71 FAS, 1st Fix Core wall 2 (4-7/G-H) 4F Electrowatt ABE P145 IR FAS MZP 071 Rev 00
72 FAS, 1st Fix ramp (G:H/4:7) B5 Electrowatt ABE P145 IR FAS MZP 072 Rev 00
73 FAS, 1st Fix lift lobby (G/4:7) 3F Electrowatt ABE P145 IR FAS MZP 073 Rev 00
74 FAS, 1st Fix staircase 4A landing (I:J/3:8) GF Electrowatt ABE P145 IR FAS MZP 074 Rev 01
75 FAS, 1st Fix core wall 1 (F:G/4:7) 4F Electrowatt ABE P145 IR FAS MZP 075 Rev 00
76 FAS, 1st Fix slab (L:B/2:10) 2F Electrowatt ABE P145 IR FAS MZP 076 Rev 00
77 FAS, 1st Fix core wall 2 (4-7/G-H) 5F Electrowatt ABE P145 IR FAS MZP 077 Rev 00

78 FAS, 1st Fix staircase 4 & 4A landing (I:J/3:8) GF Electrowatt ABE P145 IR FAS MZP 078 Rev 00

79 FAS, 1st Fix columns (I:J/3:8) 3F Electrowatt ABE P145 IR FAS MZP 079 Rev 00

62/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

80 FAS, 1st Fix core wall 1 (F:G/4:7) 5F Electrowatt ABE P145 IR FAS MZP 080 Rev 00
81 FAS, 1st Fix slab (F:H/4:7) 3F Electrowatt ABE P145 IR FAS MZP 081 Rev 00
82 FAS, 1st Fix core wall 2 (4-7/G-H) 3F Electrowatt ABE P145 IR FAS MZP 082 Rev 00
83 FAS, 1st Fix core wall 2 (4-7/G-H) 6F Electrowatt ABE P145 IR FAS MZP 083 Rev 00
84 FAS, 1st Fix slab (D:J/2:10) 3F Electrowatt ABE P145 IR FAS MZP 084 Rev 00
85 FAS, 1st Fix core wall 2 (4-6/G-H) B2 Electrowatt ABE P145 IR FAS MZP 085 Rev 00
86 FAS, 1st Fix slab (F:G/5:6) 4F Electrowatt ABE P145 IR FAS MZP 086 Rev 00
87 FAS, 1st Fix core wall 1 (F:G/5:6) 6F Electrowatt ABE P145 IR FAS MZP 087 Rev 00
88 FAS, 1st Fix core wall 1 (F:G/5:7) B5 Electrowatt ABE P145 IR FAS MZP 088 Rev 00
89 FAS, 1st Fix core wall 2 (4-7/G-H) 7F Electrowatt ABE P145 IR FAS MZP 089 Rev 00
90 FAS, 1st Fix slab (D:J/3:8) 4F Electrowatt ABE P145 IR FAS MZP 090 Rev 00
91 FAS, 1st Fix slab (F:H/4:7) 5F Electrowatt ABE P145 IR FAS MZP 091 Rev 00
92 FAS, 1st fix slab (G:H/4:7) B1 Electrowatt ABE P145 IR FAS MZP 092 Pending
93 FAS, 1st Fix core wall 1 (F:G/4:7) 7F Electrowatt ABE P145 IR FAS MZP 093 Rev 00
94 FAS, 1st fix stair case 4 & 4A (I:J/3:8) 1F Electrowatt ABE P145 IR FAS MZP 094 Rev 00
95 FAS, 1st Fix core wall 1 (F:G/4:7) B4 Electrowatt ABE P145 IR FAS MZP 095 Pending
96 FAS, 1st Fix slab (D:J/3:8) 5F Electrowatt ABE P145 IR FAS MZP 096 Pending
97 Pending
98 Pending
99 Pending
100 Pending
101 Pending
102 Pending
103 Pending
104 Pending
105 Pending
106 Pending
107 Pending
108 Pending

63/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

109 Pending
110 Pending
111 Pending
112 Pending
113 Pending
114 Pending
115 Pending
116 Pending
117 Pending
118 Pending
119 Pending
120 Pending
121 Pending
122 Pending
123 Pending
124 Pending
125 Pending
126 Pending
127 Pending
128 Pending
129 Pending
130 Pending
131 Pending
132 Pending
133 Pending
134 Pending
135 Pending
136 Pending
137 Pending

64/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

138 Pending
139 Pending

140 Pending

141 Pending

142 Pending

143 Pending
144 Pending
145 Pending

146 Pending

147 Pending
148 Pending

149 Pending

150 Pending

151 Pending
152 Pending
153 Pending
154 Pending
155 Pending
156 Pending
157 Pending
158 Pending

65/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

159 Pending
160 Pending

161 Pending

162 Pending

163 Pending

164 Pending

165 Pending

166 Pending

66/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

167 Pending

168 Pending
169 Pending
170 Pending
171 Pending
172 Pending
173 Pending
174 Pending
175 Pending
176 Pending
177 Pending
178 Pending
179 Pending
180 Pending
181 Pending
182 Pending
183 Pending
184 Pending
185 Pending
186 Pending
187 Pending
188 Pending
189 Pending
190 Pending
191 Pending
192 Pending

67/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

193 Pending
194 Pending
195 Pending
196 Pending
197 Pending
198 Pending
199 Pending
200 Pending
201 Pending
202 Pending
203 Pending
204 Pending
205 Pending
206 Pending
207 Pending
208 Pending
209 Pending
210 Pending
211 Pending
212 Pending
213 Pending
214 Pending
215 Pending
216 Pending
217 Pending
218 Pending
219 Pending
220 Pending
221 Pending

68/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

222 Pending
223 Pending
224 Pending
225 Pending
226 Pending
227 Pending
228 Pending
229 Pending
230 Pending
231 Pending
232 Pending
233 Pending
234 Pending
235 Pending
236 Pending
237 Pending
238 Pending
239 Pending
240 Pending
241 Pending
242 Pending
243 Pending
244 Pending
245 Pending
246 Pending
247 Pending
248 Pending
249 Pending
250 Pending

69/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

251 Pending
252 Pending
253 Pending
254 Pending
255 Pending
256 Pending
257 Pending
258 Pending
259 Pending
260 Pending
261 Pending
262 Pending
263 Pending
264 Pending
265 Pending
266 Pending
267 Pending
268 Pending
269 Pending
270 Pending
271 Pending
272 Pending
273 Pending
274 Pending
275 Pending
276 Pending
277 Pending
278 Pending
279 Pending

70/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

280 Pending
281 Pending
282 Pending
283 Pending
284 Pending
285 Pending
286 Pending
287 Pending
288 Pending
289 Pending
290 Pending
291 Pending
292 Pending
293 Pending
294 Pending
295 Pending
296 Pending
297 Pending
298 Pending
299 Pending
300 Pending
301 Pending
302 Pending
303 Pending
304 Pending
305 Pending
306 Pending
307 Pending
308 Pending

71/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

309 Pending
310 Pending
311 Pending
312 Pending
313 Pending
314 Pending
315 Pending
316 Pending
317 Pending
318 Pending
319 Pending
320 Pending
321 Pending
322 Pending
323 Pending
324 Pending
325 Pending
326 Pending
327 Pending
328 Pending
329 Pending
330 Pending
331 Pending
332 Pending
333 Pending
334 Pending
335 Pending
336 Pending
337 Pending

72/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

338 Pending
339 Pending
340 Pending
341 Pending
342 Pending
343 Pending
344 Pending
345 Pending
346 Pending
347 Pending

348 Pending

349 Pending
350 Pending
351 Pending
352 Pending
353 Pending
354 Pending
355 Pending
356 Pending
357 Pending
358 Pending
359 Pending
360 Pending
361 Pending
362 Pending
363 Pending
364 Pending

73/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

365 Pending
366 Pending
367 Pending
368 Pending
369 Pending
370 Pending
371 Pending
372 Pending
373 Pending
374 Pending
375 Pending
376 Pending
377 Pending
378 Pending
379 Pending
380 Pending
381 Pending
382 Pending
383 Pending
384 Pending
385 Pending
386 Pending
387 Pending
388 Pending
389 Pending
390 Pending
391 Pending
392 Pending
393 Pending

74/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

394 Pending
395 Pending
396 Pending
397 Pending
398 Pending
399 Pending
400 Pending
401 Pending
402 Pending
403 Pending
404 Pending
405 Pending
406 Pending
407 Pending
408 Pending
409 Pending
410 Pending
411 Pending
412 Pending
413 Pending
414 Pending
415 Pending
416 Pending
417 Pending
418 Pending
419 Pending
420 Pending
421 Pending
422 Pending

75/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

423 Pending
424 Pending
425 Pending
426 Pending
427 Pending
428 Pending
429 Pending
430 Pending
431 Pending
432 Pending
433 Pending
434 Pending
435 Pending
436 Pending
437 Pending
438 Pending
439 Pending
440 Pending
441 Pending
442 Pending
443 Pending
444 Pending
445 Pending

446 Pending

447 Pending

448 Pending

76/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

449 Pending
450 Pending
451 Pending
452 Pending
453 Pending
454 Pending
455 Pending
456 Pending
457 Pending
458 Pending
459 Pending
460 Pending
461 Pending
462 Pending
463 Pending
464 Pending

465 Pending

466 Pending

467 Pending

468 Pending

469 Pending

77/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

470 Pending

471 Pending
472 Pending
473 Pending
474 Pending
475 Pending
476 Pending
477 Pending
478 Pending
479 Pending
480 Pending
481 Pending
482 Pending
483 Pending
484 Pending
485 Pending
486 Pending
487 Pending
488 Pending
489 Pending
490 Pending
491 Pending
492 Pending
493 Pending
494 Pending
495 Pending
496 Pending

78/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

497 Pending
498 Pending
499 Pending
500 Pending
501 Pending
502 Pending
503 Pending
504 Pending
505 Pending
506 Pending
507 Pending
508 Pending
509 Pending
510 Pending
511 Pending
512 Pending
513 Pending
514 Pending
515 Pending
516 Pending
517 Pending
518 Pending
519 Pending
520 Pending
521 Pending
522 Pending
523 Pending
524 Pending
525 Pending

79/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

526 Pending
527 Pending
528 Pending
529 Pending
530 Pending
531 Pending
532 Pending
533 Pending
534 Pending
535 Pending
536 Pending
537 Pending
538 Pending
539 Pending
540 Pending
541 Pending
542 Pending
543 Pending
544 Pending
545 Pending
546 Pending
547 Pending
548 Pending
549 Pending
550 Pending
551 Pending
552 Pending
553 Pending
554 Pending

80/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

555 Pending
556 Pending
557 Pending
558 Pending
559 Pending
560 Pending
561 Pending
562 Pending
563 Pending
564 Pending
565 Pending
566 Pending
567 Pending
568 Pending
569 Pending
570 Pending
571 Pending
572 Pending
573 Pending
574 Pending
575 Pending
576 Pending
577 Pending
578 Pending
579 Pending
580 Pending
581 Pending
582 Pending
583 Pending

81/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

584 Pending
585 Pending
586 Pending
587 Pending
588 Pending
589 Pending
590 Pending
591 Pending
592 Pending
593 Pending
594 Pending
595 Pending
596 Pending
597 Pending
598 Pending
599 Pending
600 Pending
601 Pending
602 Pending
603 Pending
604 Pending
605 Pending
606 Pending
607 Pending
608 Pending
609 Pending
610 Pending
611 Pending
612 Pending

82/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

613 Pending
614 Pending
615 Pending
616 Pending
617 Pending
618 Pending
619 Pending
620 Pending
621 Pending
622 Pending
623 Pending
624 Pending

625 Pending

626 Pending

627 Pending

628 Pending

629 Pending
630 Pending
631 Pending
632 Pending

83/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

633 Pending
634 Pending
635 Pending
636 Pending
637 Pending
638 Pending
639 Pending
640 Pending
641 Pending
642 Pending
643 Pending
644 Pending
645 Pending
646 Pending
647 Pending
648 Pending
649 Pending
650 Pending
651 Pending
652 Pending
653 Pending
654 Pending
655 Pending
656 Pending
657 Pending
658 Pending
659 Pending
660 Pending
661 Pending

84/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

662 Pending
663 Pending
664 Pending
665 Pending
666 Pending
667 Pending
668 Pending
669 Pending
670 Pending
671 Pending
672 Pending
673 Pending
674 Pending
675 Pending
676 Pending
677 Pending
678 Pending
679 Pending
680 Pending
681 Pending
682 Pending
683 Pending
684 Pending
685 Pending
686 Pending
687 Pending
688 Pending
689 Pending
690 Pending

85/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

691 Pending
692 Pending
693 Pending
694 Pending
695 Pending
696 Pending
697 Pending
698 Pending
699 Pending
700 Pending
701 Pending
702 Pending
703 Pending
704 Pending
705 Pending
706 Pending
707 Pending
708 Pending
709 Pending
710 Pending
711 Pending
712 Pending
713 Pending
714 Pending
715 Pending
716 Pending
717 Pending
718 Pending
719 Pending

86/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

720 Pending
721 Pending
722 Pending
723 Pending
724 Pending
725 Pending
726 Pending
727 Pending
728 Pending
729 Pending
730 Pending
731 Pending
732 Pending
733 Pending
734 Pending
735 Pending
736 Pending
737 Pending
738 Pending
739 Pending
740 Pending
741 Pending
742 Pending
743 Pending
744 Pending
745 Pending
746 Pending
747 Pending
748 Pending

87/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

749 Pending
750 Pending
751 Pending
752 Pending
753 Pending
754 Pending
755 Pending
756 Pending
757 Pending
758 Pending
759 Pending
760 Pending
761 Pending
762 Pending
763 Pending
764 Pending
765 Pending
766 Pending
767 Pending
768 Pending
769 Pending
770 Pending
771 Pending
772 Pending
773 Pending
774 Pending
775 Pending
776 Pending
777 Pending

88/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

778 Pending
779 Pending
780 Pending
781 Pending
782 Pending
783 Pending
784 Pending
785 Pending
786 Pending
787 Pending
788 Pending
789 Pending
790 Pending
791 Pending
792 Pending
793 Pending
794 Pending
795 Pending
796 Pending
797 Pending
798 Pending
799 Pending
800 Pending
801 Pending
802 Pending
803 Pending
804 Pending
805 Pending
806 Pending

89/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

807 Pending
808 Pending
809 Pending
810 Pending
811 Pending
812 Pending

813 Pending

814 Pending
815 Pending
816 Pending
817 Pending
818 Pending
819 Pending
820 Pending
821 Pending
822 Pending
823 Pending
824 Pending
825 Pending
826 Pending
827 Pending
828 Pending
829 Pending
830 Pending
831 Pending
832 Pending
833 Pending

90/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

834 Pending
835 Pending
836 Pending
837 Pending
838 Pending
839 Pending
840 Pending
841 Pending
842 Pending
843 Pending
844 Pending
845 Pending
846 Pending
847 Pending
848 Pending
849 Pending
850 Pending
851 Pending
852 Pending
853 Pending
854 Pending
855 Pending
856 Pending
857 Pending
858 Pending
859 Pending
860 Pending
861 Pending
862 Pending

91/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

863 Pending
864 Pending
865 Pending
866 Pending
867 Pending
868 Pending
869 Pending
870 Pending
871 Pending
872 Pending
873 Pending
874 Pending
875 Pending
876 Pending
877 Pending
878 Pending
879 Pending
880 Pending
881 Pending
882 Pending
883 Pending
884 Pending
885 Pending
886 Pending
887 Pending
888 Pending
889 Pending
890 Pending
891 Pending

92/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

892 Pending
893 Pending
894 Pending
895 Pending
896 Pending
897 Pending
898 Pending
899 Pending
900 Pending
901 Pending
902 Pending
903 Pending
904 Pending
905 Pending
906 Pending
907 Pending
908 Pending
909 Pending
910 Pending
911 Pending
912 Pending
913 Pending
914 Pending
915 Pending
916 Pending
917 Pending
918 Pending
919 Pending
920 Pending

93/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

921 Pending
922 Pending
923 Pending
924 Pending
925 Pending
926 Pending
927 Pending
928 Pending
929 Pending
930 Pending
931 Pending
932 Pending
933 Pending
934 Pending
935 Pending
936 Pending
937 Pending
938 Pending
939 Pending

940 Pending

941 Pending

942 Pending

943 Pending

94/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

944 Pending

945 Pending

946 Pending
947 Pending
948 Pending
949 Pending
950 Pending
951 Pending
952 Pending
953 Pending

954 Pending

955 Pending

956 Pending
957 Pending
958 Pending
959 Pending
960 Pending
961 Pending
962 Pending
963 Pending
964 Pending
965 Pending
966 Pending

95/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

967 Pending

968 Pending

969 Pending
970 Pending
971 Pending
972 Pending
973 Pending
974 Pending
975 Pending
976 Pending
977 Pending
978 Pending
979 Pending

980 Pending

981 Pending

982 Pending

983 Pending

984 Pending

985 Pending

986 Pending

96/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

987 Pending
988 Pending
989 Pending
990 Pending
991 Pending
992 Pending
993 Pending
994 Pending
995 Pending
996 Pending
997 Pending
998 Pending
999 Pending
1000 Pending

97/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

98/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

99/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

100/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

101/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

102/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

103/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

104/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

105/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

106/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

107/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

108/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

109/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

110/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

111/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

112/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

113/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

114/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

115/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

116/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

117/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

118/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

119/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

120/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

121/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

122/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

123/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

124/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

125/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

126/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

127/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

128/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

129/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

130/305
FIRE ALARM SYSTEM INSPECTION REQUEST LOG
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA

PROJECT No : P145

06 October 2020

For BE use only


Submittal

Project
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev.

131/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

ABE/P145/IR/FAS/MZP/001/Rev 00 20-Feb-16 21-Feb-16 1 B 0 0

ABE/P145/IR/FAS/MZP/002/Rev 00 22-Feb-16 23-Feb-16 1 B 0 0

ABE/P145/IR/FAS/MZP/003/Rev 00 23-Feb-16 24-Feb-16 1 B 0 0

ABE/P145/IR/FAS/MZP/004/Rev 00 24-Feb-16 25-Feb-16 1 B 0 0

ABE/P145/IR/FAS/MZP/005/Pending 5-Mar-16 6-Mar-16 1 D 0 0


ABE/P145/IR/FAS/MZP/006/Rev 00 9-Mar-16 9-Mar-16 0 B 0 0
ABE/P145/IR/FAS/MZP/007/Rev 00 10-Mar-16 10-Mar-16 0 B 0 0
ABE/P145/IR/FAS/MZP/008/Rev 01 12-Mar-16 12-Mar-16 0 C 13-Mar-16 13-Mar-16 0 B 0
ABE/P145/IR/FAS/MZP/009/Rev 00 13-Mar-16 13-Mar-16 0 B 0 0
ABE/P145/IR/FAS/MZP/010/Rev 00 13-Mar-16 14-Mar-16 1 B 0 0
ABE/P145/IR/FAS/MZP/011/Rev 00 14-Mar-16 15-Mar-16 1 B 0 0
ABE/P145/IR/FAS/MZP/012/Rev 00 16-Mar-16 17-Mar-16 1 B 0 0
ABE/P145/IR/FAS/MZP/013/Rev 00 19-Mar-16 21-Mar-16 2 B 0 0
ABE/P145/IR/FAS/MZP/014/Rev 00 6-Apr-16 9-Apr-16 3 B 0 0
ABE/P145/IR/FAS/MZP/015/Rev 00 23-Mar-16 24-Mar-16 1 B 0 0
ABE/P145/IR/FAS/MZP/016/Rev 02 2-Apr-16 3-Apr-16 1 C 6-Apr-16 6-Apr-16 0 D 27-Apr-16 27-Apr-16 0 B
ABE/P145/IR/FAS/MZP/017/Rev 00 5-Apr-16 6-Apr-16 1 B 0 0
ABE/P145/IR/FAS/MZP/018/Rev 00 7-Apr-16 9-Apr-16 2 B 0 0
//////Pending 0 0 0
ABE/P145/IR/FAS/MZP/020/Rev 00 10-Apr-16 12-Apr-16 2 B 0 0
ABE/P145/IR/FAS/MZP/021/Rev 00 11-Apr-16 11-Apr-16 0 B 0 0
ABE/P145/IR/FAS/MZP/022/Rev 00 13-Apr-16 14-Apr-16 1 B 0 0
ABE/P145/IR/FAS/MZP/023/Rev 00 27-Apr-16 28-Apr-16 1 B 0 0
ABE/P145/IR/FAS/MZP/024/Rev 00 2-May-16 3-May-16 1 B 0 0
ABE/P145/IR/FAS/MZP/025/Rev 01 3-May-16 5-May-16 2 C 4-May-16 5-May-16 1 B 0

132/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date
ABE/P145/IR/FAS/MZP/026/Rev 00 4-May-16 4-May-16 0 B 0 0
ABE/P145/IR/FAS/MZP/027/Rev 01 7-May-16 8-May-16 1 C 14-May-16 15-May-16 1 B 0
ABE/P145/IR/FAS/MZP/028/Rev 00 5-May-16 8-May-16 3 B 0 0
ABE/P145/IR/FAS/MZP/029/Rev 00 7-May-16 9-May-16 2 B 0 0
ABE/P145/IR/FAS/MZP/030/Rev 00 11-May-16 14-May-16 3 B 0 0
ABE/P145/IR/FAS/MZP/031/Rev 01 11-May-16 14-May-16 3 C 16-May-16 16-May-16 0 B 0
ABE/P145/IR/FAS/MZP/032/Rev 00 14-May-16 15-May-16 1 B 0 0
ABE/P145/IR/FAS/MZP/033/Rev 00 18-May-16 23-May-16 5 B 0 0
ABE/P145/IR/FAS/MZP/034/Rev 00 21-May-16 25-May-16 4 B 0 0
ABE/P145/IR/FAS/MZP/035/Rev 00 28-May-16 30-May-16 2 B 0 0
ABE/P145/IR/FAS/MZP/036/Rev 00 30-May-16 31-May-16 1 B 0 0
ABE/P145/IR/FAS/MZP/037/Rev 00 1-Jun-16 4-Jun-16 3 B 0 0

ABE/P145/IR/FAS/MZP/038/Rev 00 5-Jun-16 6-Jun-16 1 B 0 0

ABE/P145/IR/FAS/MZP/039/Rev 00 7-Jun-16 11-Jun-16 4 B 0 0


ABE/P145/IR/FAS/MZP/040/Rev 00 11-Jun-16 12-Jun-16 1 B 0 0
ABE/P145/IR/FAS/MZP/041/Rev 00 16-Jun-16 19-Jun-16 3 B 0 0
ABE/P145/IR/FAS/MZP/042/Rev 00 19-Jun-16 25-Jun-16 6 B 0 0
ABE/P145/IR/FAS/MZP/043/Rev 00 23-Jun-16 26-Jun-16 3 B 0 0
ABE/P145/IR/FAS/MZP/044/Rev 00 28-Jun-16 30-Jun-16 2 B 0 0
ABE/P145/IR/FAS/MZP/045/Rev 00 3-Jul-16 10-Jul-16 7 B 0 0
ABE/P145/IR/FAS/MZP/046/Rev 00 18-Jul-16 20-Jul-16 2 B 0 0
ABE/P145/IR/FAS/MZP/047/Rev 00 1-Aug-16 4-Aug-16 3 B 0 0
ABE/P145/IR/FAS/MZP/048/Rev 00 10-Aug-16 10-Aug-16 0 B 0 0
ABE/P145/IR/FAS/MZP/049/Rev 00 11-Aug-16 13-Aug-16 2 B 0 0
ABE/P145/IR/FAS/MZP/050/Rev 00 13-Aug-16 14-Aug-16 1 B 0 0
ABE/P145/IR/FAS/MZP/051/Rev 00 16-Aug-16 20-Aug-16 4 B 0 0
ABE/P145/IR/FAS/MZP/052/Rev 00 17-Aug-16 20-Aug-16 3 B 0 0

133/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

ABE/P145/IR/FAS/MZP/053/Pending 17-Aug-16 18-Aug-16 1 C 0 0


ABE/P145/IR/FAS/MZP/054/Rev 00 1-Sep-16 8-Sep-16 7 B 0 0
ABE/P145/IR/FAS/MZP/055/Rev 00 7-Sep-16 11-Sep-16 4 B 0 0
ABE/P145/IR/FAS/MZP/056/Rev 00 11-Sep-16 18-Sep-16 7 B 0 0
ABE/P145/IR/FAS/MZP/057/Rev 00 17-Sep-16 18-Sep-16 1 B 0 0
ABE/P145/IR/FAS/MZP/058/Rev 00 17-Sep-16 19-Sep-16 2 B 0 0
ABE/P145/IR/FAS/MZP/059/Rev 00 18-Sep-16 21-Sep-16 3 B 0 0
ABE/P145/IR/FAS/MZP/060/Rev 00 25-Sep-16 27-Sep-16 2 B 0 0
ABE/P145/IR/FAS/MZP/061/Rev 00 4-Oct-16 5-Oct-16 1 B 0 0
ABE/P145/IR/FAS/MZP/062/Rev 00 8-Oct-16 9-Oct-16 1 B 0 0
ABE/P145/IR/FAS/MZP/063/Rev 00 8-Oct-16 9-Oct-16 1 B 0 0
ABE/P145/IR/FAS/MZP/064/Rev 00 9-Oct-16 10-Oct-16 1 B 0 0
ABE/P145/IR/FAS/MZP/065/Rev 00 9-Oct-16 10-Oct-16 1 B 0 0
ABE/P145/IR/FAS/MZP/066/Rev 00 9-Oct-16 10-Oct-16 1 B 0 0
ABE/P145/IR/FAS/MZP/067/Rev 00 9-Oct-16 11-Oct-16 2 B 0 0
ABE/P145/IR/FAS/MZP/068/Rev 00 9-Oct-16 16-Oct-16 7 B 0 0
ABE/P145/IR/FAS/MZP/069/Rev 00 11-Oct-16 15-Oct-16 4 B 0 0
ABE/P145/IR/FAS/MZP/070/Rev 00 11-Oct-16 15-Oct-16 4 B 0 0
ABE/P145/IR/FAS/MZP/071/Rev 00 16-Oct-16 19-Oct-16 3 B 0 0
ABE/P145/IR/FAS/MZP/072/Rev 00 16-Oct-16 19-Oct-16 3 B 0 0
ABE/P145/IR/FAS/MZP/073/Rev 00 19-Oct-16 19-Oct-16 0 B 0 0
ABE/P145/IR/FAS/MZP/074/Rev 01 19-Oct-16 22-Oct-16 3 C 24-Oct-16 30-Oct-16 6 B 0
ABE/P145/IR/FAS/MZP/075/Rev 00 22-Oct-16 27-Oct-16 5 B 0 0
ABE/P145/IR/FAS/MZP/076/Rev 00 22-Oct-16 26-Oct-16 4 B 0 0
ABE/P145/IR/FAS/MZP/077/Rev 00 30-Oct-16 1-Nov-16 2 B 0 0

ABE/P145/IR/FAS/MZP/078/Rev 00 31-Oct-16 2-Nov-16 2 B 0 0

ABE/P145/IR/FAS/MZP/079/Rev 00 1-Nov-16 2-Nov-16 1 B 0 0

134/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

ABE/P145/IR/FAS/MZP/080/Rev 00 2-Nov-16 7-Nov-16 5 B 0 0


ABE/P145/IR/FAS/MZP/081/Rev 00 2-Nov-16 5-Nov-16 3 B 0 0
ABE/P145/IR/FAS/MZP/082/Rev 00 5-Nov-16 7-Nov-16 2 B 0 0
ABE/P145/IR/FAS/MZP/083/Rev 00 8-Nov-16 12-Nov-16 4 B 0 0
ABE/P145/IR/FAS/MZP/084/Rev 00 9-Nov-16 12-Nov-16 3 B 0 0
ABE/P145/IR/FAS/MZP/085/Rev 00 12-Nov-16 16-Nov-16 4 B 0 0
ABE/P145/IR/FAS/MZP/086/Rev 00 12-Nov-16 17-Nov-16 5 B 0 0
ABE/P145/IR/FAS/MZP/087/Rev 00 13-Nov-16 16-Nov-16 3 B 0 0
ABE/P145/IR/FAS/MZP/088/Rev 00 19-Nov-16 29-Nov-16 10 B 0 0
ABE/P145/IR/FAS/MZP/089/Rev 00 22-Nov-16 29-Nov-16 7 B 0 0
ABE/P145/IR/FAS/MZP/090/Rev 00 22-Nov-16 26-Nov-16 4 B 0 0
ABE/P145/IR/FAS/MZP/091/Rev 00 24-Nov-16 28-Nov-16 4 B 0 0
ABE/P145/IR/FAS/MZP/092/Pending 24-Nov-16 -42698 0 0
ABE/P145/IR/FAS/MZP/093/Rev 00 26-Nov-16 29-Nov-16 3 B 0 0
ABE/P145/IR/FAS/MZP/094/Rev 00 26-Nov-16 29-Nov-16 3 B 0 0
ABE/P145/IR/FAS/MZP/095/Pending 1-Dec-16 -42705 0 0
ABE/P145/IR/FAS/MZP/096/Pending 1-Dec-16 -42705 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

135/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0
//////Pending 0 0
//////Pending 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

136/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0

//////Pending 0 0 0
//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0
//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

137/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date
//////Pending 0 0 0
//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

138/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

139/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

140/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

141/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

142/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

143/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

144/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

145/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

146/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

147/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

148/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

149/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

150/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

151/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

152/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

153/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

154/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

155/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

156/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

157/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

158/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

159/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

160/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

161/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

162/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

163/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

164/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

165/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

166/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

//////Pending 0 0 0

167/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

//////Pending 0 0 0

168/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0
//////Pending 0 0 0

169/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

170/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

171/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

172/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

173/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

174/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

175/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

176/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

177/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

178/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

179/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

180/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

181/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

182/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

183/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

184/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

185/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

186/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

187/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

188/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

189/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

190/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

191/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

192/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

193/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

194/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

195/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

196/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

197/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

198/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

199/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

200/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

201/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

202/305
12

10

8
1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal

4
A 0 A 0 A 0 A 0
B 84 B 5 B 1 B 0
2 C 7 C 0 C 0 C 0
D 1 D 1 D 0 D 0
0

BE SUBMITTALS

Rev. 00 Rev. 01 Rev. 02 Rev. 03


Reference
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date

203/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 B

0 B

0 B

0 B
0 0
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 0
0 B
0 B
0 B
0 B
0 B
0 B

204/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B

0 B

0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B

205/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 C
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B

0 B

0 B

206/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 B
0 U/R
0 B
0 B
0 U/R
0 U/R
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

207/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

208/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0

0 0

0 0
0 0
0 0

0 0
0 0
0 0
0 0

0 0

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

209/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0

0 0

0 0

0 0

0 0

0 0

0 0

210/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

0 0

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

211/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

212/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

213/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

214/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

215/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

216/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

0 0

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

217/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

218/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

219/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

0 0

0 0

0 0

220/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

0 0

0 0

0 0

221/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

0 0

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

222/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

223/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

224/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

225/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

226/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

0 0

0 0

0 0

0 0

0 0
0 0
0 0
0 0

227/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

228/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

229/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

230/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

231/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

232/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

233/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0

0 0

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

234/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

235/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

236/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

237/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

0 0

0 0

0 0

238/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

0 0

0 0

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

239/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0

0 0

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

0 0

0 0

0 0

0 0

0 0
0 0

240/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

241/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

242/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

243/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

244/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

245/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

246/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

247/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

248/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

249/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

250/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

251/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

252/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

253/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

254/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

255/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

256/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

257/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

258/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

259/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

260/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

261/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

262/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

263/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

264/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

265/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

266/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

267/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

268/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

269/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

270/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

271/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

272/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

273/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

274/305
Legends
A = Approved
B = Approved As Noted
C = Revised And Resubmit
D= Rejected

BMITTALS

Rev. 03

FINAL ACTION PENDING


DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

275/305
12

ELV WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 1 A 0 A 0 A 0 A = Approved
B 110 B 4 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 5 C 0 C 0 C 0 C = Revised And Resubmit
D 1 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
1 CCTV system imbedded in core - 1 (F:G/4:7) B5 Electrowatt ABE P145 IR ELV MZP 001 Rev 00 ABE/P145/IR/ELV/MZP/001/Rev 00 22-Feb-16 23-Feb-16 1 B 0 0 0 B

Data & voice & access control & public address


2 B5 Electrowatt ABE P145 IR ELV MZP 002 Rev 00 ABE/P145/IR/ELV/MZP/002/Rev 00 22-Feb-16 23-Feb-16 1 A 0 0 0 A
imbedded in core 1 (F:G/4:7)
CCTV & Access Control & Data, Voice & Public
3 B5 Electrowatt ABE P145 IR ELV MZP 003 Pending ABE/P145/IR/ELV/MZP/003/Pending 5-Mar-16 6-Mar-16 1 D 0 0 0 D
Address imbedded in slab
4 Public area imbedded in Columns B5 Electrowatt ABE P145 IR ELV MZP 004 Rev 00 ABE/P145/IR/ELV/MZP/004/Rev 00 9-Mar-16 9-Mar-16 0 B 0 0 0 B

5 Public Address imbedded in Column B4 Electrowatt ABE P145 IR ELV MZP 005 Rev 00 ABE/P145/IR/ELV/MZP/005/Rev 00 9-Mar-16 10-Mar-16 1 B 0 0 0 B

6 Public Address & CCTV imbedded in Column B4 Electrowatt ABE P145 IR ELV MZP 006 Rev 00 ABE/P145/IR/ELV/MZP/006/Rev 00 12-Mar-16 13-Mar-16 1 B 0 0 0 B
Public Address & CCTV Access Control
7 B4 Electrowatt ABE P145 IR ELV MZP 007 Rev 00 ABE/P145/IR/ELV/MZP/007/Rev 00 14-Mar-16 15-Mar-16 1 B 0 0 0 B
imbedded in column & Core -1 & Ramp
8 Public Address & CCTV imbedded in core-2 B4 Electrowatt ABE P145 IR ELV MZP 008 Rev 00 ABE/P145/IR/ELV/MZP/008/Rev 00 19-Mar-16 21-Mar-16 2 B 0 0 0 B
9 cctv IMBEDDED IN Retaining wall B4 Electrowatt ABE P145 IR ELV MZP 009 Rev 00 ABE/P145/IR/ELV/MZP/009/Rev 00 19-Mar-16 21-Mar-16 2 B 0 0 0 B
CCTV & Access Control & Data, Voice & Public
10 B5 Electrowatt ABE P145 IR ELV MZP 010 Rev 00 ABE/P145/IR/ELV/MZP/010/Rev 00 20-Mar-16 21-Mar-16 1 B 0 0 0 B
Address imbedded in slab
11 Public Addrss system work in columns B4 Electrowatt ABE P145 IR ELV MZP 011 Rev 00 ABE/P145/IR/ELV/MZP/011/Rev 00 23-Mar-16 24-Mar-16 1 B 0 0 0 B
12 CCTV System Work in column B4 Electrowatt ABE P145 IR ELV MZP 012 Rev 00 ABE/P145/IR/ELV/MZP/012/Rev 00 23-Mar-16 24-Mar-16 1 B 0 0 0 B
Public address & CO. system work in the column
13 B3 Electrowatt ABE P145 IR ELV MZP 013 Rev 00 ABE/P145/IR/ELV/MZP/013/Rev 00 6-Apr-16 9-Apr-16 3 B 0 0 0 B
(B:F/08:10)
14 CCTV system work in retaining wall (L:M/9:10) B4 Electrowatt ABE P145 IR ELV MZP 014 Rev 00 ABE/P145/IR/ELV/MZP/014/Rev 00 2-Apr-16 3-Apr-16 1 B 0 0 0 B
CCTV, PA, Data, Voice & Access control system
15 B4 Electrowatt ABE P145 IR ELV MZP 015 Rev 00 ABE/P145/IR/ELV/MZP/015/Rev 00 2-Apr-16 4-Apr-16 2 B 0 0 0 B
work in the slab (A:J/1/11)
CCTV & CO. system work in the retaining wall
16 B4 Electrowatt ABE P145 IR ELV MZP 016 Rev 00 ABE/P145/IR/ELV/MZP/016/Rev 00 2-Apr-16 3-Apr-16 1 B 0 0 0 B
(L:M/07/10)
Public address & CO. system work in the column
17 B3 Electrowatt ABE P145 IR ELV MZP 017 Rev 00 ABE/P145/IR/ELV/MZP/017/Rev 00 5-Apr-16 6-Apr-16 1 B 0 0 0 B
(B:I/1:7)
Public address & CO. & data & CCTV system
18 B3 Electrowatt ABE P145 IR ELV MZP 018 Rev 00 ABE/P145/IR/ELV/MZP/018/Rev 00 7-Apr-16 9-Apr-16 2 B 0 0 B
work in the column (C:H/02/10)

Data, voice & CCTV & Access control system


19 B3 Electrowatt ABE P145 IR ELV MZP 019 Rev 00 ABE/P145/IR/ELV/MZP/019/Rev 00 9-Apr-16 10-Apr-16 1 B 0 0 0 B
work in the Ramp-1 & Core-1 (A:G/01:07)

CCTV & public adress & CO. system work in


20 B3 Electrowatt ABE P145 IR ELV MZP 020 Rev 00 ABE/P145/IR/ELV/MZP/020/Rev 00 10-Apr-16 10-Apr-16 0 B 0 0 0 B
column (B:J/07:09)
Data, voice & CCTV system work in the Ramp-2
21 B3 Electrowatt ABE P145 IR ELV MZP 021 Rev 00 ABE/P145/IR/ELV/MZP/021/Rev 00 10-Apr-16 12-Apr-16 2 B 0 0 0 B
(L:M/02:06)
CCTV & PA. & Data, voice & Access control &
22 B3 Electrowatt ABE P145 IR ELV MZP 022 Rev 00 ABE/P145/IR/ELV/MZP/022/Rev 00 11-Apr-16 11-Apr-16 0 B 0 0 0 B
CO. system work in the slab
23 CO. system work in the column (C:E/03:07) B3 Electrowatt ABE P145 IR ELV MZP 023 Rev 00 ABE/P145/IR/ELV/MZP/023/Rev 00 11-Apr-16 12-Apr-16 1 B 0 0 0 B
CO. & CCTV & Public address system works in
24 B3 Electrowatt ABE P145 IR ELV MZP 024 Rev 00 ABE/P145/IR/ELV/MZP/024/Rev 00 13-Apr-16 14-Apr-16 1 B 0 0 0 B
the column (A:M/01:11)
Data, CCTV, Public address system work in the
25 B3 Electrowatt ABE P145 IR ELV MZP 025 Rev 00 ABE/P145/IR/ELV/MZP/025/Rev 00 14-Apr-16 16-Apr-16 2 B 0 0 0 B
Core-2 (G:H/01:11)
CO. CCTV system work in the retaining wall
26 B3 Electrowatt ABE P145 IR ELV MZP 026 Rev 00 ABE/P145/IR/ELV/MZP/026/Rev 00 16-Apr-16 17-Apr-16 1 B 0 0 0 B
(A:B/07:11)
27 CO. system work in the retaining wall (A:B/07:08) B3 Electrowatt ABE P145 IR ELV MZP 027 Rev 00 ABE/P145/IR/ELV/MZP/027/Rev 00 19-Apr-16 19-Apr-16 0 B 0 0 0 B

28 CO. system work in the retaining wall (A:B/07:10) B3 Electrowatt ABE P145 IR ELV MZP 028 Rev 00 ABE/P145/IR/ELV/MZP/028/Rev 00 23-Apr-16 24-Apr-16 1 B 0 0 0 B
CCTV & PA. & Data, voice & Access control &
29 B3 Electrowatt ABE P145 IR ELV MZP 029 Rev 00 ABE/P145/IR/ELV/MZP/029/Rev 00 27-Apr-16 28-Apr-16 1 B 0 0 0 B
CO. system work in the slab
CCTV & PA. & CO. system work in the column
30 B2 Electrowatt ABE P145 IR ELV MZP 030 Rev 00 ABE/P145/IR/ELV/MZP/030/Rev 00 2-May-16 3-May-16 1 B 0 0 0 B
(A:I/1:2)
CCTV & PA. & CO. system work in the column
31 B2 Electrowatt ABE P145 IR ELV MZP 031 Rev 01 ABE/P145/IR/ELV/MZP/031/Rev 01 2-May-16 3-May-16 1 C 3-May-16 5-May-16 2 B 0 0 B
(A:I/8:10)
CCTV & PA. & CO. system work in the column
32 B2 Electrowatt ABE P145 IR ELV MZP 032 Rev 00 ABE/P145/IR/ELV/MZP/032/Rev 00 3-May-16 5-May-16 2 B 0 0 0 B
(B:I/3:8)
33 CO. system work in the retaining wall (A:B/01:02) B2 Electrowatt ABE P145 IR ELV MZP 033 Rev 00 ABE/P145/IR/ELV/MZP/033/Rev 00 4-May-16 5-May-16 1 B 0 0 0 B
Co.& CCTV system work in the retaining wall &
34 B2 Electrowatt ABE P145 IR ELV MZP 034 Rev 00 ABE/P145/IR/ELV/MZP/034/Rev 00 7-May-16 10-May-16 3 B 0 0 0 B
stair 6 (A:C/7:10)
CO & Public address system work in the column
35 B2 Electrowatt ABE P145 IR ELV MZP 035 Rev 00 ABE/P145/IR/ELV/MZP/035/Rev 00 7-May-16 9-May-16 2 B 0 0 0 B
(J:M/8:10)
CO & Public address system work in the column
36 B2 Electrowatt ABE P145 IR ELV MZP 036 Rev 00 ABE/P145/IR/ELV/MZP/036/Rev 00 11-May-16 11-May-16 0 B 0 0 0 B
(K:L/02:06)
CO., public address, CCTV, voice & data &
37 access control system work in the slab B3 Electrowatt ABE P145 IR ELV MZP 037 Rev 00 ABE/P145/IR/ELV/MZP/037/Rev 00 14-May-16 15-May-16 1 B 0 0 0 B
(K:L/02:06)
CCTV, voice & data, access control system work
38 B2 Electrowatt ABE P145 IR ELV MZP 038 Rev 00 ABE/P145/IR/ELV/MZP/038/Rev 00 16-May-16 16-May-16 0 B 0 0 0 B
in the core-1 (F:G/04:07)
CCTV, Voice & data, public address & CO.
39 system work in the core-2 & retaining wall B2 Electrowatt ABE P145 IR ELV MZP 039 Rev 00 ABE/P145/IR/ELV/MZP/039/Rev 00 18-May-16 21-May-16 3 B 0 0 0 B
(G:M/04:11)
CO. & Public address system work in the
40 B2 Electrowatt ABE P145 IR ELV MZP 040 Rev 00 ABE/P145/IR/ELV/MZP/040/Rev 00 18-May-16 21-May-16 3 B 0 0 0 B
column(F:M/02:08)
41 CO. system work in the column (D:F/05:06) B2 Electrowatt ABE P145 IR ELV MZP 041 Rev 00 ABE/P145/IR/ELV/MZP/041/Rev 00 19-May-16 21-May-16 2 B 0 0 0 B
42 CO. system work in the column (I:J/05:06) B2 Electrowatt ABE P145 IR ELV MZP 042 Rev 00 ABE/P145/IR/ELV/MZP/042/Rev 00 21-May-16 23-May-16 2 B 0 0 0 B
CO., public address, CCTV, voice & data &
43 access control system work in the slab B2 Electrowatt ABE P145 IR ELV MZP 043 Rev 00 ABE/P145/IR/ELV/MZP/043/Rev 00 28-May-16 30-May-16 2 B 0 0 0 B
(A:J/01:11)
CO., public address & voice and data system
44 B1 Electrowatt ABE P145 IR ELV MZP 044 Rev 01 ABE/P145/IR/ELV/MZP/044/Rev 01 28-May-16 31-May-16 3 C 1-Jun-16 5-Jun-16 4 B 0 0 B
work in the column (A:J/01:11)
45 CCTV work in the ramp-2 (K:M/01:07) B2 Electrowatt ABE P145 IR ELV MZP 045 Rev 00 ABE/P145/IR/ELV/MZP/045/Rev 00 1-Jun-16 5-Jun-16 4 B 0 0 0 B
CCTV & Access Control, Voice & data system
46 B1 Electrowatt ABE P145 IR ELV MZP 046 Rev 00 ABE/P145/IR/ELV/MZP/046/Rev 00 1-Jun-16 4-Jun-16 3 B 0 0 0 B
work in the core-1 (F:G/04:07)
CCTV, PA & CO. system work in the column
47 B1 Electrowatt ABE P145 IR ELV MZP 047 Rev 00 ABE/P145/IR/ELV/MZP/047/Rev 00 5-Jun-16 6-Jun-16 1 B 0 0 0 B
(B:G/08:10)
CO., PA & CCTV system work in the column
48 B1 Electrowatt ABE P145 IR ELV MZP 048 Rev 00 ABE/P145/IR/ELV/MZP/048/Rev 00 5-Jun-16 8-Jun-16 3 B 0 0 0 B
(B:I/01:02)
CCTV, PA, Voice & data system work in core-2
49 B1 Electrowatt ABE P145 IR ELV MZP 049 Pending ABE/P145/IR/ELV/MZP/049/Pending 5-Jun-16 6-Jun-16 1 C 0 0 0 C
(G:I/01:07)
CO., PA & CCTV system work in the column
50 B1 Electrowatt ABE P145 IR ELV MZP 050 Rev 00 ABE/P145/IR/ELV/MZP/050/Rev 00 6-Jun-16 11-Jun-16 5 B 0 0 0 B
(B:I/03:10)
CO., PA & CCTV system work in the column,
51 B1 Electrowatt ABE P145 IR ELV MZP 051 Rev 00 ABE/P145/IR/ELV/MZP/051/Rev 00 9-Jun-16 12-Jun-16 3 B 0 0 0 B
stair 6 & retaining wall (A:B/1:9)
52 CO. system work in the retaining wall (A:B/8:9) B1 Electrowatt ABE P145 IR ELV MZP 052 Rev 00 ABE/P145/IR/ELV/MZP/052/Rev 00 11-Jun-16 13-Jun-16 2 B 0 0 0 B

276/305
12

ELV WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 1 A 0 A 0 A 0 A = Approved
B 110 B 4 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 5 C 0 C 0 C 0 C = Revised And Resubmit
D 1 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
Data & voice system work in the retaining wall
53 B1 Electrowatt ABE P145 IR ELV MZP 053 Rev 00 ABE/P145/IR/ELV/MZP/053/Rev 00 12-Jun-16 14-Jun-16 2 B 0 0 0 B
(C:F/10:11)
Data, voice, PA & CO system work in the fire
54 B1 Electrowatt ABE P145 IR ELV MZP 054 Rev 01 ABE/P145/IR/ELV/MZP/054/Rev 01 16-Jun-16 18-Jun-16 2 C 18-Jun-16 20-Jun-16 2 B 0 0 B
tank & temporary foul tank (D:G/01:04)
Data, voice, PA, CO., access control & CCTV
55 B1 Electrowatt ABE P145 IR ELV MZP 055 Rev 00 ABE/P145/IR/ELV/MZP/055/Rev 00 16-Jun-16 19-Jun-16 3 B 0 0 0 B
system work in the slab (J:M/01:11)
Data, voice, PA, CO. work in the column &
56 B1 Electrowatt ABE P145 IR ELV MZP 056 Rev 00 ABE/P145/IR/ELV/MZP/056/Rev 00 19-Jun-16 25-Jun-16 6 B 0 0 0 B
retaining wall (J:M/01:11)
57 Data, voice work in the retaining wall (F:J/10:11) B1 Electrowatt ABE P145 IR ELV MZP 057 Rev 00 ABE/P145/IR/ELV/MZP/057/Rev 00 23-Jun-16 29-Jun-16 6 B 0 0 0 B

58 Data, voice work in the retaining wall (J:L/10:11) B1 Electrowatt ABE P145 IR ELV MZP 058 Rev 00 ABE/P145/IR/ELV/MZP/058/Rev 00 30-Jun-16 3-Jul-16 3 B 0 0 0 B
Data, voice & CCTV work in the core-1
59 GF Electrowatt ABE P145 IR ELV MZP 059 Rev 00 ABE/P145/IR/ELV/MZP/059/Rev 00 3-Jul-16 10-Jul-16 7 B 0 0 0 B
(F:G/04:07)
CO. & CCTV system work in the retaining wall
60 B1 Electrowatt ABE P145 IR ELV MZP 060 Rev 00 ABE/P145/IR/ELV/MZP/060/Rev 00 4-Jul-16 10-Jul-16 6 B 0 0 0 B
(L:M/10:11)
61 Co. system work in the retaining wall (L:M/07:08) B1 Electrowatt ABE P145 IR ELV MZP 061 Rev 00 ABE/P145/IR/ELV/MZP/061/Rev 00 17-Jul-16 17-Jul-16 0 B 0 0 0 B
CCTV, data, voice & public address system work
62 GF Electrowatt ABE P145 IR ELV MZP 062 Rev 00 ABE/P145/IR/ELV/MZP/062/Rev 00 18-Jul-16 20-Jul-16 2 B 0 0 0 B
in core-2 (F:H/04:07)
Data, voice, PA, CO, access control & CCTV
63 B1 Electrowatt ABE P145 IR ELV MZP 063 Rev 00 ABE/P145/IR/ELV/MZP/063/Rev 00 1-Aug-16 4-Aug-16 3 B 0 0 0 B
system work in the slab (A:M/01:11)
CCTV system & lightning protection system work
64 GF Electrowatt ABE P145 IR ELV MZP 064 Rev 00 ABE/P145/IR/ELV/MZP/064/Rev 00 9-Aug-16 11-Aug-16 2 B 0 0 0 B
in the column (E:G/2:4, D:J/2:4, D:J/7:9)
65 Data & voice system work in the columns (G:8) GF Electrowatt ABE P145 IR ELV MZP 065 Rev 00 ABE/P145/IR/ELV/MZP/065/Rev 00 10-Aug-16 11-Aug-16 1 B 0 0 0 B
66 CCTV system work in the column (B:4) GF Electrowatt ABE P145 IR ELV MZP 066 Rev 00 ABE/P145/IR/ELV/MZP/066/Rev 00 13-Aug-16 14-Aug-16 1 B 0 0 0 B
67 CCTV system work in the core wall 1 (F:G/4:7) GF Electrowatt ABE P145 IR ELV MZP 067 Rev 00 ABE/P145/IR/ELV/MZP/067/Rev 00 13-Aug-16 14-Aug-16 1 B 0 0 0 B
Data & voice system work in the core wall 1
68 GF Electrowatt ABE P145 IR ELV MZP 068 Rev 00 ABE/P145/IR/ELV/MZP/068/Rev 00 13-Aug-16 14-Aug-16 1 B 0 0 0 B
(F:G/4:7)
69 CCTV system work in the column (I:J/2:8) GF Electrowatt ABE P145 IR ELV MZP 069 Rev 00 ABE/P145/IR/ELV/MZP/069/Rev 00 17-Aug-16 20-Aug-16 3 B 0 0 0 B
70 CCTV system work in the core wall 2 (G:H/4:7) GF Electrowatt ABE P145 IR ELV MZP 070 Rev 00 ABE/P145/IR/ELV/MZP/070/Rev 00 17-Aug-16 20-Aug-16 3 B 0 0 0 B
Data & voice system work in the core wall 2
71 GF Electrowatt ABE P145 IR ELV MZP 071 Rev 00 ABE/P145/IR/ELV/MZP/071/Rev 00 17-Aug-16 20-Aug-16 3 B 0 0 0 B
(G:H/4:7)
Public address system work in the columns
72 GF Electrowatt ABE P145 IR ELV MZP 072 Rev 00 ABE/P145/IR/ELV/MZP/072/Rev 00 18-Aug-16 20-Aug-16 2 B 0 0 0 B
(C:H/2:4)
73 CCTV system work in the columns (C/3) GF Electrowatt ABE P145 IR ELV MZP 073 Rev 00 ABE/P145/IR/ELV/MZP/073/Rev 00 18-Aug-16 20-Aug-16 2 B 0 0 0 B
n CCTV system work in the slab (A:L/1:10) GF Electrowatt ABE P145 IR ELV MZP 074 Rev 00 ABE/P145/IR/ELV/MZP/074/Rev 00 1-Sep-16 8-Sep-16 7 B 0 0 0 B
Public address system work in the slab
75 GF Electrowatt ABE P145 IR ELV MZP 075 Rev 00 ABE/P145/IR/ELV/MZP/075/Rev 00 1-Sep-16 8-Sep-16 7 B 0 0 0 B
(A:L/1:10)
76 Voice & data system work in the slab (A:L/1:10) GF Electrowatt ABE P145 IR ELV MZP 076 Rev 00 ABE/P145/IR/ELV/MZP/076/Rev 00 1-Sep-16 8-Sep-16 7 B 0 0 0 B

77 Access control system work in the slab (A:L/1:10) GF Electrowatt ABE P145 IR ELV MZP 077 Rev 00 ABE/P145/IR/ELV/MZP/077/Rev 00 1-Sep-16 8-Sep-16 7 B 0 0 0 B

78 2F Electrowatt ABE P145 IR ELV MZP 078 Rev 00 ABE/P145/IR/ELV/MZP/078/Rev 00 8-Sep-16 11-Sep-16 3 B 0 0 0 B
CCTV system work in the core wall 1 (F:G/4:8)
Voice & data system work in the core wall 1
79 2F Electrowatt ABE P145 IR ELV MZP 079 Rev 00 ABE/P145/IR/ELV/MZP/079/Rev 00 8-Sep-16 11-Sep-16 3 B 0 0 0 B
(F:G/4:8)
Public address system work in the columns
80 1F Electrowatt ABE P145 IR ELV MZP 080 Rev 00 ABE/P145/IR/ELV/MZP/080/Rev 00 17-Sep-16 18-Sep-16 1 B 0 0 0 B
(F:H/8:10)
81 2F Electrowatt ABE P145 IR ELV MZP 081 Rev 00 ABE/P145/IR/ELV/MZP/081/Rev 00 17-Sep-16 18-Sep-16 1 B 0 0 0 B
CCTV system work in the core wall 2 (G:H/4:7)
Voice & data system work in the core wall 2
82 2F Electrowatt ABE P145 IR ELV MZP 082 Rev 00 ABE/P145/IR/ELV/MZP/082/Rev 00 17-Sep-16 18-Sep-16 1 B 0 0 0 B
(G:H/4:7)
Voice & data system work in the 2
83 1F Electrowatt ABE P145 IR ELV MZP 083 Rev 00 ABE/P145/IR/ELV/MZP/083/Rev 00 17-Sep-16 19-Sep-16 2 B 0 0 0 B
(D:E/5)columns
Voice, data, & CO system work, 1st fix on block
84 B5 Electrowatt ABE P145 IR ELV MZP 084 Rev 00 ABE/P145/IR/ELV/MZP/084/Rev 00 18-Sep-16 24-Sep-16 6 B 0 0 0 B
work (A:M/1:11)
85 CCTV system work in stair case (I:J/3:4, 7:8) 1F Electrowatt ABE P145 IR ELV MZP 085 Rev 00 ABE/P145/IR/ELV/MZP/085/Rev 00 19-Sep-16 21-Sep-16 2 B 0 0 0 B
Public address system work in columns
86 1F Electrowatt ABE P145 IR ELV MZP 086 Rev 00 ABE/P145/IR/ELV/MZP/086/Rev 00 21-Sep-16 24-Sep-16 3 B 0 0 0 B
(C:10/G:H/10)
CCTV, PA, access control, voice & data system
87 B5 Electrowatt ABE P145 IR ELV MZP 087 Rev 00 ABE/P145/IR/ELV/MZP/087/Rev 00 25-Sep-16 27-Sep-16 2 B 0 0 0 B
work in slab (G:H/4:7)
CCTV, PA, access control, voice & data system
88 1F Electrowatt ABE P145 IR ELV MZP 088 Rev 00 ABE/P145/IR/ELV/MZP/088/Rev 00 4-Oct-16 5-Oct-16 1 B 0 0 0 B
work in 2nd slab (B:L/2:10)
Public address system work in the column
89 1F Electrowatt ABE P145 IR ELV MZP 089 Rev 00 ABE/P145/IR/ELV/MZP/089/Rev 00 6-Oct-16 9-Oct-16 3 B 0 0 0 B
(C:D/9:10)
CCTV, voice, data system work in the core wall 2
90 3F Electrowatt ABE P145 IR ELV MZP 090 Rev 00 ABE/P145/IR/ELV/MZP/090/Rev 00 9-Oct-16 10-Oct-16 1 B 0 0 0 B
(G:H/4:7)
CCTV, PA, access control, voice & data system
91 B3 Electrowatt ABE P145 IR ELV MZP 091 Rev 00 ABE/P145/IR/ELV/MZP/091/Rev 00 9-Oct-16 16-Oct-16 7 B 0 0 0 B
work in slab (G:H/4:7)
CCTV, voice, data system work in the core wall 2
92 3F Electrowatt ABE P145 IR ELV MZP 092 Rev 00 ABE/P145/IR/ELV/MZP/092/Rev 00 11-Oct-16 15-Oct-16 4 B 0 0 0 B
(F:G/4:7)
CCTV system works in the stair 4A & 4 (I:J/3:4,
93 2F Electrowatt ABE P145 IR ELV MZP 093 Rev 00 ABE/P145/IR/ELV/MZP/093/Rev 00 11-Oct-16 15-Oct-16 4 B 0 0 0 B
7:8)
Access control, CCTV, PA, voice & data system
94 B3 Electrowatt ABE P145 IR ELV MZP 094 Rev 00 ABE/P145/IR/ELV/MZP/094/Rev 00 12-Oct-16 17-Oct-16 5 B 0 0 0 B
works for block work (A:M/1:11)
Access control, CCTV, PA, voice & data system
95 B4 Electrowatt ABE P145 IR ELV MZP 095 Rev 00 ABE/P145/IR/ELV/MZP/095/Rev 00 12-Oct-16 16-Oct-16 4 B 0 0 0 B
works for block work (A:M/1:11)
Public address system work in the ramp
96 B5 Electrowatt ABE P145 IR ELV MZP 096 Rev 00 ABE/P145/IR/ELV/MZP/096/Rev 00 16-Oct-16 19-Oct-16 3 B 0 0 0 B
(A:B/2:7)
CCTV, PA & data system work in the core wall 2
97 4F Electrowatt ABE P145 IR ELV MZP 097 Rev 00 ABE/P145/IR/ELV/MZP/097/Rev 00 16-Oct-16 19-Oct-16 3 B 0 0 0 B
(G:H/4:7)
CCTV, PA, voice & data system work in the lift
98 3F Electrowatt ABE P145 IR ELV MZP 098 Rev 00 ABE/P145/IR/ELV/MZP/098/Rev 00 17-Oct-16 19-Oct-16 2 B 0 0 0 B
lobby (G/4:7)
Access control, CCTV, PA, voice & data system
99 3F Electrowatt ABE P145 IR ELV MZP 099 Rev 01 ABE/P145/IR/ELV/MZP/099/Rev 01 20-Oct-16 22-Oct-16 2 C 23-Oct-16 26-Oct-16 3 B 0 0 B
works for slab (B:L/1:10)
Access control, CCTV, PA, voice & data system
100 4F Electrowatt ABE P145 IR ELV MZP 100 Rev 00 ABE/P145/IR/ELV/MZP/100/Rev 00 22-Oct-16 30-Oct-16 8 B 0 0 0 B
works in the core wall 1 (F:G/4:7)
101 CCTV system work in the core wall 2 (G:H/4:7) 5F Electrowatt ABE P145 IR ELV MZP 101 Rev 00 ABE/P145/IR/ELV/MZP/101/Rev 00 30-Oct-16 31-Oct-16 1 B 0 0 0 B
CCTV, voice & data system works in the lift lobby
102 3F Electrowatt ABE P145 IR ELV MZP 102 Rev 00 ABE/P145/IR/ELV/MZP/102/Rev 00 2-Nov-16 5-Nov-16 3 B 0 0 0 B
services (F:H/4:7)
103 CCTV system work in the core wall 1 (F:G/4:7) 5F Electrowatt ABE P145 IR ELV MZP 103 Rev 00 ABE/P145/IR/ELV/MZP/103/Rev 00 3-Nov-16 7-Nov-16 4 B 0 0 0 B
Public address system work in the column
104 3F Electrowatt ABE P145 IR ELV MZP 104 Rev 00 ABE/P145/IR/ELV/MZP/104/Rev 00 5-Nov-16 7-Nov-16 2 B 0 0 0 B
(E:H/8)

277/305
12

ELV WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 1 A 0 A 0 A 0 A = Approved
B 110 B 4 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 5 C 0 C 0 C 0 C = Revised And Resubmit
D 1 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

Access control, CCTV, PA & voice & data system


105 B3 Electrowatt ABE P145 IR ELV MZP 105 Rev 00 ABE/P145/IR/ELV/MZP/105/Rev 00 6-Nov-16 7-Nov-16 1 B 0 0 0 B
work in basement 2 core 2 slab (G:H/4:7)
Access control, CCTV, PA & voice & data system
106 6F Electrowatt ABE P145 IR ELV MZP 106 Rev 00 ABE/P145/IR/ELV/MZP/106/Rev 00 8-Nov-16 12-Nov-16 4 B 0 0 0 B
work in core 2 (G:H/4:7)
Access control, CCTV, PA & voice & data system
107 3F Electrowatt ABE P145 IR ELV MZP 107 Rev 00 ABE/P145/IR/ELV/MZP/107/Rev 00 9-Nov-16 12-Nov-16 3 B 0 0 0 B
work in slab (B:L/1:10)
Access control, CCTV, PA & voice & data system
108 B2 Electrowatt ABE P145 IR ELV MZP 108 Rev 00 ABE/P145/IR/ELV/MZP/108/Rev 00 10-Nov-16 16-Nov-16 6 B 0 0 0 B
work in the electrical room slab (G:H/4:7)
Access control, CCTV, PA & voice & data system
109 4F Electrowatt ABE P145 IR ELV MZP 109 Rev 00 ABE/P145/IR/ELV/MZP/109/Rev 00 12-Nov-16 17-Nov-16 5 B 0 0 0 B
work in the lift lobby (G/4:7)
Access control, CCTV, PA & voice & data system
110 6F Electrowatt ABE P145 IR ELV MZP 110 Rev 00 ABE/P145/IR/ELV/MZP/110/Rev 00 13-Nov-16 16-Nov-16 3 B 0 0 0 B
work in the core wall 1 (F:G/4:7)
Voice & data system work in the columns
111 4F Electrowatt ABE P145 IR ELV MZP 111 Rev 00 ABE/P145/IR/ELV/MZP/111/Rev 00 13-Nov-16 15-Nov-16 2 B 0 0 0 B
(G:J/3:8)
Voice & data system work in the columns
112 4F Electrowatt ABE P145 IR ELV MZP 112 Rev 00 ABE/P145/IR/ELV/MZP/112/Rev 00 14-Nov-16 17-Nov-16 3 B 0 0 0 B
(D:G/3:8)
Access control, CCTV, PA & voice & data system
113 B5 Electrowatt ABE P145 IR ELV MZP 113 Rev 00 ABE/P145/IR/ELV/MZP/113/Rev 00 19-Nov-16 29-Nov-16 10 B 0 0 0 B
work in the core wall 1 slab (F:G/4:7)
Access control, CCTV, PA & voice & data system
114 7F Electrowatt ABE P145 IR ELV MZP 114 Rev 00 ABE/P145/IR/ELV/MZP/114/Rev 00 22-Nov-16 26-Nov-16 4 B 0 0 0 B
work in the core wall 2 slab (G:H/4:7)
Access control, CCTV, PA & voice & data system
115 5F Electrowatt ABE P145 IR ELV MZP 115 Rev 00 ABE/P145/IR/ELV/MZP/115/Rev 00 22-Nov-16 26-Nov-16 4 B 0 0 0 B
work in slab (A:M/1:11)
116 Voice & data system work in the lift lobby (G/4:7) 5F Electrowatt ABE P145 IR ELV MZP 116 Rev 00 ABE/P145/IR/ELV/MZP/116/Rev 00 24-Nov-16 28-Nov-16 4 B 0 0 0 B
CCTV, voice & data system works in the core
117 7F Electrowatt ABE P145 IR ELV MZP 117 Rev 00 ABE/P145/IR/ELV/MZP/117/Rev 00 26-Nov-16 29-Nov-16 3 B 0 0 0 B
wall 1 (F:G/4:7)
118 Pending //////Pending 0 0 0 0 0
119 Pending //////Pending 0 0 0 0 0
120 Pending //////Pending 0 0 0 0 0
121 Pending //////Pending 0 0 0 0 0
122 Pending //////Pending 0 0 0 0 0
123 Pending //////Pending 0 0 0 0 0
124 Pending //////Pending 0 0 0 0 0
125 Pending //////Pending 0 0 0 0 0
126 Pending //////Pending 0 0 0 0 0
127 Pending //////Pending 0 0 0 0 0
128 Pending //////Pending 0 0 0 0 0
129 Pending //////Pending 0 0 0 0 0
130 Pending //////Pending 0 0 0 0 0
131 Pending //////Pending 0 0 0 0
132 Pending //////Pending 0 0 0 0
133 Pending //////Pending 0 0 0 0
134 Pending //////Pending 0 0 0 0 0
135 Pending //////Pending 0 0 0 0 0
136 Pending //////Pending 0 0 0 0 0
137 Pending //////Pending 0 0 0 0 0
138 Pending //////Pending 0 0 0 0 0
139 Pending //////Pending 0 0 0 0 0

140 Pending //////Pending 0 0 0 0 0

141 Pending //////Pending 0 0 0 0 0

142 Pending //////Pending 0 0 0 0

143 Pending //////Pending 0 0 0 0 0


144 Pending //////Pending 0 0 0 0 0
145 Pending //////Pending 0 0 0 0 0

146 Pending //////Pending 0 0 0 0 0


147 Pending //////Pending 0 0 0 0 0
148 Pending //////Pending 0 0 0 0 0

149 Pending //////Pending 0 0 0 0 0

150 Pending //////Pending 0 0 0 0 0

151 Pending //////Pending 0 0 0 0 0


152 Pending //////Pending 0 0 0 0 0
153 Pending //////Pending 0 0 0 0 0
154 Pending //////Pending 0 0 0 0 0
155 Pending //////Pending 0 0 0 0 0
156 Pending //////Pending 0 0 0 0 0
157 Pending //////Pending 0 0 0 0 0
158 Pending //////Pending 0 0 0 0 0
159 Pending //////Pending 0 0 0 0 0
160 Pending //////Pending 0 0 0 0 0

161 Pending //////Pending 0 0 0 0 0

162 Pending //////Pending 0 0 0 0 0

163 Pending //////Pending 0 0 0 0 0

164 Pending //////Pending 0 0 0 0 0

278/305
12

ELV WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 1 A 0 A 0 A 0 A = Approved
B 110 B 4 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 5 C 0 C 0 C 0 C = Revised And Resubmit
D 1 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

165 Pending //////Pending 0 0 0 0 0

166 Pending //////Pending 0 0 0 0 0

167 Pending //////Pending 0 0 0 0 0

168 Pending //////Pending 0 0 0 0 0


169 Pending //////Pending 0 0 0 0 0
170 Pending //////Pending 0 0 0 0 0
171 Pending //////Pending 0 0 0 0 0
172 Pending //////Pending 0 0 0 0 0
173 Pending //////Pending 0 0 0 0 0
174 Pending //////Pending 0 0 0 0 0
175 Pending //////Pending 0 0 0 0 0
176 Pending //////Pending 0 0 0 0 0
177 Pending //////Pending 0 0 0 0 0
178 Pending //////Pending 0 0 0 0 0
179 Pending //////Pending 0 0 0 0 0
180 Pending //////Pending 0 0 0 0 0
181 Pending //////Pending 0 0 0 0 0
182 Pending //////Pending 0 0 0 0 0
183 Pending //////Pending 0 0 0 0 0
184 Pending //////Pending 0 0 0 0 0
185 Pending //////Pending 0 0 0 0 0
186 Pending //////Pending 0 0 0 0 0
187 Pending //////Pending 0 0 0 0 0
188 Pending //////Pending 0 0 0 0 0
189 Pending //////Pending 0 0 0 0 0
190 Pending //////Pending 0 0 0 0 0
191 Pending //////Pending 0 0 0 0 0
192 Pending //////Pending 0 0 0 0 0
193 Pending //////Pending 0 0 0 0 0
194 Pending //////Pending 0 0 0 0 0
195 Pending //////Pending 0 0 0 0 0
196 Pending //////Pending 0 0 0 0 0
197 Pending //////Pending 0 0 0 0 0
198 Pending //////Pending 0 0 0 0 0
199 Pending //////Pending 0 0 0 0 0
200 Pending //////Pending 0 0 0 0 0
201 Pending //////Pending 0 0 0 0 0
202 Pending //////Pending 0 0 0 0 0
203 Pending //////Pending 0 0 0 0 0
204 Pending //////Pending 0 0 0 0 0
205 Pending //////Pending 0 0 0 0 0
206 Pending //////Pending 0 0 0 0 0
207 Pending //////Pending 0 0 0 0 0
208 Pending //////Pending 0 0 0 0 0
209 Pending //////Pending 0 0 0 0 0
210 Pending //////Pending 0 0 0 0 0
211 Pending //////Pending 0 0 0 0 0
212 Pending //////Pending 0 0 0 0 0
213 Pending //////Pending 0 0 0 0 0
214 Pending //////Pending 0 0 0 0 0
215 Pending //////Pending 0 0 0 0 0
216 Pending //////Pending 0 0 0 0 0
217 Pending //////Pending 0 0 0 0 0
218 Pending //////Pending 0 0 0 0 0
219 Pending //////Pending 0 0 0 0 0
220 Pending //////Pending 0 0 0 0 0
221 Pending //////Pending 0 0 0 0 0
222 Pending //////Pending 0 0 0 0 0
223 Pending //////Pending 0 0 0 0 0
224 Pending //////Pending 0 0 0 0 0
225 Pending //////Pending 0 0 0 0 0
226 Pending //////Pending 0 0 0 0 0
227 Pending //////Pending 0 0 0 0 0
228 Pending //////Pending 0 0 0 0 0
229 Pending //////Pending 0 0 0 0 0
230 Pending //////Pending 0 0 0 0 0
231 Pending //////Pending 0 0 0 0 0
232 Pending //////Pending 0 0 0 0 0
233 Pending //////Pending 0 0 0 0 0
234 Pending //////Pending 0 0 0 0 0
235 Pending //////Pending 0 0 0 0 0
236 Pending //////Pending 0 0 0 0 0
237 Pending //////Pending 0 0 0 0 0
238 Pending //////Pending 0 0 0 0 0
239 Pending //////Pending 0 0 0 0 0
240 Pending //////Pending 0 0 0 0 0
241 Pending //////Pending 0 0 0 0 0
242 Pending //////Pending 0 0 0 0 0
243 Pending //////Pending 0 0 0 0 0
244 Pending //////Pending 0 0 0 0 0
245 Pending //////Pending 0 0 0 0 0
246 Pending //////Pending 0 0 0 0 0
247 Pending //////Pending 0 0 0 0 0
248 Pending //////Pending 0 0 0 0 0
249 Pending //////Pending 0 0 0 0 0
250 Pending //////Pending 0 0 0 0 0

279/305
12

ELV WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 1 A 0 A 0 A 0 A = Approved
B 110 B 4 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 5 C 0 C 0 C 0 C = Revised And Resubmit
D 1 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
251 Pending //////Pending 0 0 0 0 0
252 Pending //////Pending 0 0 0 0 0
253 Pending //////Pending 0 0 0 0 0
254 Pending //////Pending 0 0 0 0 0
255 Pending //////Pending 0 0 0 0 0
256 Pending //////Pending 0 0 0 0
257 Pending //////Pending 0 0 0 0 0
258 Pending //////Pending 0 0 0 0 0
259 Pending //////Pending 0 0 0 0 0
260 Pending //////Pending 0 0 0 0 0
261 Pending //////Pending 0 0 0 0 0
262 Pending //////Pending 0 0 0 0 0
263 Pending //////Pending 0 0 0 0 0
264 Pending //////Pending 0 0 0 0 0
265 Pending //////Pending 0 0 0 0 0
266 Pending //////Pending 0 0 0 0 0
267 Pending //////Pending 0 0 0 0 0
268 Pending //////Pending 0 0 0 0 0
269 Pending //////Pending 0 0 0 0 0
270 Pending //////Pending 0 0 0 0 0
271 Pending //////Pending 0 0 0 0 0
272 Pending //////Pending 0 0 0 0 0
273 Pending //////Pending 0 0 0 0 0
274 Pending //////Pending 0 0 0 0 0
275 Pending //////Pending 0 0 0 0 0
276 Pending //////Pending 0 0 0 0 0
277 Pending //////Pending 0 0 0 0 0
278 Pending //////Pending 0 0 0 0 0
279 Pending //////Pending 0 0 0 0 0
280 Pending //////Pending 0 0 0 0 0
281 Pending //////Pending 0 0 0 0 0
282 Pending //////Pending 0 0 0 0 0
283 Pending //////Pending 0 0 0 0 0
284 Pending //////Pending 0 0 0 0 0
285 Pending //////Pending 0 0 0 0 0
286 Pending //////Pending 0 0 0 0 0
287 Pending //////Pending 0 0 0 0 0
288 Pending //////Pending 0 0 0 0 0
289 Pending //////Pending 0 0 0 0 0
290 Pending //////Pending 0 0 0 0 0
291 Pending //////Pending 0 0 0 0 0
292 Pending //////Pending 0 0 0 0 0
293 Pending //////Pending 0 0 0 0 0
294 Pending //////Pending 0 0 0 0 0
295 Pending //////Pending 0 0 0 0 0
296 Pending //////Pending 0 0 0 0 0
297 Pending //////Pending 0 0 0 0 0
298 Pending //////Pending 0 0 0 0 0
299 Pending //////Pending 0 0 0 0 0
300 Pending //////Pending 0 0 0 0 0
301 Pending //////Pending 0 0 0 0 0
302 Pending //////Pending 0 0 0 0 0
303 Pending //////Pending 0 0 0 0 0
304 Pending //////Pending 0 0 0 0 0
305 Pending //////Pending 0 0 0 0 0
306 Pending //////Pending 0 0 0 0 0
307 Pending //////Pending 0 0 0 0 0
308 Pending //////Pending 0 0 0 0 0
309 Pending //////Pending 0 0 0 0 0
310 Pending //////Pending 0 0 0 0 0
311 Pending //////Pending 0 0 0 0 0
312 Pending //////Pending 0 0 0 0 0
313 Pending //////Pending 0 0 0 0 0
314 Pending //////Pending 0 0 0 0 0
315 Pending //////Pending 0 0 0 0 0
316 Pending //////Pending 0 0 0 0 0
317 Pending //////Pending 0 0 0 0 0
318 Pending //////Pending 0 0 0 0 0
319 Pending //////Pending 0 0 0 0 0
320 Pending //////Pending 0 0 0 0 0
321 Pending //////Pending 0 0 0 0 0
322 Pending //////Pending 0 0 0 0 0
323 Pending //////Pending 0 0 0 0 0
324 Pending //////Pending 0 0 0 0 0
325 Pending //////Pending 0 0 0 0 0
326 Pending //////Pending 0 0 0 0 0
327 Pending //////Pending 0 0 0 0 0
328 Pending //////Pending 0 0 0 0 0
329 Pending //////Pending 0 0 0 0 0
330 Pending //////Pending 0 0 0 0 0
331 Pending //////Pending 0 0 0 0 0
332 Pending //////Pending 0 0 0 0 0
333 Pending //////Pending 0 0 0 0 0
334 Pending //////Pending 0 0 0 0 0
335 Pending //////Pending 0 0 0 0 0
336 Pending //////Pending 0 0 0 0 0
337 Pending //////Pending 0 0 0 0 0
338 Pending //////Pending 0 0 0 0 0
339 Pending //////Pending 0 0 0 0 0
340 Pending //////Pending 0 0 0 0 0
341 Pending //////Pending 0 0 0 0 0
342 Pending //////Pending 0 0 0 0 0
343 Pending //////Pending 0 0 0 0 0
344 Pending //////Pending 0 0 0 0 0
345 Pending //////Pending 0 0 0 0 0
346 Pending //////Pending 0 0 0 0 0

280/305
12

ELV WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 1 A 0 A 0 A 0 A = Approved
B 110 B 4 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 5 C 0 C 0 C 0 C = Revised And Resubmit
D 1 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
347 Pending //////Pending 0 0 0 0 0

348 Pending //////Pending 0 0 0 0 0

349 Pending //////Pending 0 0 0 0 0


350 Pending //////Pending 0 0 0 0 0
351 Pending //////Pending 0 0 0 0 0
352 Pending //////Pending 0 0 0 0 0
353 Pending //////Pending 0 0 0 0 0
354 Pending //////Pending 0 0 0 0 0
355 Pending //////Pending 0 0 0 0 0
356 Pending //////Pending 0 0 0 0 0
357 Pending //////Pending 0 0 0 0 0
358 Pending //////Pending 0 0 0 0 0
359 Pending //////Pending 0 0 0 0 0
360 Pending //////Pending 0 0 0 0 0
361 Pending //////Pending 0 0 0 0 0
362 Pending //////Pending 0 0 0 0 0
363 Pending //////Pending 0 0 0 0 0
364 Pending //////Pending 0 0 0 0 0
365 Pending //////Pending 0 0 0 0 0
366 Pending //////Pending 0 0 0 0 0
367 Pending //////Pending 0 0 0 0 0
368 Pending //////Pending 0 0 0 0 0
369 Pending //////Pending 0 0 0 0 0
370 Pending //////Pending 0 0 0 0 0
371 Pending //////Pending 0 0 0 0 0
372 Pending //////Pending 0 0 0 0 0
373 Pending //////Pending 0 0 0 0 0
374 Pending //////Pending 0 0 0 0 0
375 Pending //////Pending 0 0 0 0 0
376 Pending //////Pending 0 0 0 0 0
377 Pending //////Pending 0 0 0 0 0
378 Pending //////Pending 0 0 0 0 0
379 Pending //////Pending 0 0 0 0 0
380 Pending //////Pending 0 0 0 0 0
381 Pending //////Pending 0 0 0 0 0
382 Pending //////Pending 0 0 0 0 0
383 Pending //////Pending 0 0 0 0 0
384 Pending //////Pending 0 0 0 0 0
385 Pending //////Pending 0 0 0 0 0
386 Pending //////Pending 0 0 0 0 0
387 Pending //////Pending 0 0 0 0 0
388 Pending //////Pending 0 0 0 0 0
389 Pending //////Pending 0 0 0 0 0
390 Pending //////Pending 0 0 0 0 0
391 Pending //////Pending 0 0 0 0 0
392 Pending //////Pending 0 0 0 0 0
393 Pending //////Pending 0 0 0 0 0
394 Pending //////Pending 0 0 0 0 0
395 Pending //////Pending 0 0 0 0 0
396 Pending //////Pending 0 0 0 0 0
397 Pending //////Pending 0 0 0 0 0
398 Pending //////Pending 0 0 0 0 0
399 Pending //////Pending 0 0 0 0 0
400 Pending //////Pending 0 0 0 0 0
401 Pending //////Pending 0 0 0 0 0
402 Pending //////Pending 0 0 0 0 0
403 Pending //////Pending 0 0 0 0 0
404 Pending //////Pending 0 0 0 0 0
405 Pending //////Pending 0 0 0 0 0
406 Pending //////Pending 0 0 0 0 0
407 Pending //////Pending 0 0 0 0 0
408 Pending //////Pending 0 0 0 0 0
409 Pending //////Pending 0 0 0 0 0
410 Pending //////Pending 0 0 0 0 0
411 Pending //////Pending 0 0 0 0 0
412 Pending //////Pending 0 0 0 0 0
413 Pending //////Pending 0 0 0 0 0
414 Pending //////Pending 0 0 0 0 0
415 Pending //////Pending 0 0 0 0 0
416 Pending //////Pending 0 0 0 0 0
417 Pending //////Pending 0 0 0 0 0
418 Pending //////Pending 0 0 0 0 0
419 Pending //////Pending 0 0 0 0 0
420 Pending //////Pending 0 0 0 0 0
421 Pending //////Pending 0 0 0 0 0
422 Pending //////Pending 0 0 0 0 0
423 Pending //////Pending 0 0 0 0 0
424 Pending //////Pending 0 0 0 0 0
425 Pending //////Pending 0 0 0 0 0
426 Pending //////Pending 0 0 0 0 0
427 Pending //////Pending 0 0 0 0 0
428 Pending //////Pending 0 0 0 0 0
429 Pending //////Pending 0 0 0 0 0
430 Pending //////Pending 0 0 0 0 0
431 Pending //////Pending 0 0 0 0 0
432 Pending //////Pending 0 0 0 0 0
433 Pending //////Pending 0 0 0 0 0
434 Pending //////Pending 0 0 0 0 0
435 Pending //////Pending 0 0 0 0 0
436 Pending //////Pending 0 0 0 0 0
437 Pending //////Pending 0 0 0 0 0
438 Pending //////Pending 0 0 0 0 0
439 Pending //////Pending 0 0 0 0 0
440 Pending //////Pending 0 0 0 0 0

281/305
12

ELV WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 1 A 0 A 0 A 0 A = Approved
B 110 B 4 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 5 C 0 C 0 C 0 C = Revised And Resubmit
D 1 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
441 Pending //////Pending 0 0 0 0 0
442 Pending //////Pending 0 0 0 0 0
443 Pending //////Pending 0 0 0 0 0
444 Pending //////Pending 0 0 0 0 0
445 Pending //////Pending 0 0 0 0 0

446 Pending //////Pending 0 0 0 0 0

447 Pending //////Pending 0 0 0 0 0

448 Pending //////Pending 0 0 0 0 0


449 Pending //////Pending 0 0 0 0 0
450 Pending //////Pending 0 0 0 0 0
451 Pending //////Pending 0 0 0 0 0
452 Pending //////Pending 0 0 0 0 0
453 Pending //////Pending 0 0 0 0 0
454 Pending //////Pending 0 0 0 0 0
455 Pending //////Pending 0 0 0 0 0
456 Pending //////Pending 0 0 0 0 0
457 Pending //////Pending 0 0 0 0 0
458 Pending //////Pending 0 0 0 0 0
459 Pending //////Pending 0 0 0 0 0
460 Pending //////Pending 0 0 0 0 0
461 Pending //////Pending 0 0 0 0 0
462 Pending //////Pending 0 0 0 0 0
463 Pending //////Pending 0 0 0 0 0
464 Pending //////Pending 0 0 0 0 0

465 Pending //////Pending 0 0 0 0 0

466 Pending //////Pending 0 0 0 0 0

467 Pending //////Pending 0 0 0 0 0

468 Pending //////Pending 0 0 0 0 0

469 Pending //////Pending 0 0 0 0 0

470 Pending //////Pending 0 0 0 0 0

471 Pending //////Pending 0 0 0 0 0


472 Pending //////Pending 0 0 0 0 0
473 Pending //////Pending 0 0 0 0 0
474 Pending //////Pending 0 0 0 0 0
475 Pending //////Pending 0 0 0 0 0
476 Pending //////Pending 0 0 0 0 0
477 Pending //////Pending 0 0 0 0 0
478 Pending //////Pending 0 0 0 0 0
479 Pending //////Pending 0 0 0 0 0
480 Pending //////Pending 0 0 0 0 0
481 Pending //////Pending 0 0 0 0 0
482 Pending //////Pending 0 0 0 0 0
483 Pending //////Pending 0 0 0 0 0
484 Pending //////Pending 0 0 0 0 0
485 Pending //////Pending 0 0 0 0 0
486 Pending //////Pending 0 0 0 0 0
487 Pending //////Pending 0 0 0 0 0
488 Pending //////Pending 0 0 0 0 0
489 Pending //////Pending 0 0 0 0 0
490 Pending //////Pending 0 0 0 0 0
491 Pending //////Pending 0 0 0 0 0
492 Pending //////Pending 0 0 0 0 0
493 Pending //////Pending 0 0 0 0 0
494 Pending //////Pending 0 0 0 0 0
495 Pending //////Pending 0 0 0 0 0
496 Pending //////Pending 0 0 0 0 0
497 Pending //////Pending 0 0 0 0 0
498 Pending //////Pending 0 0 0 0 0
499 Pending //////Pending 0 0 0 0 0
500 Pending //////Pending 0 0 0 0 0
501 Pending //////Pending 0 0 0 0 0
502 Pending //////Pending 0 0 0 0 0
503 Pending //////Pending 0 0 0 0 0
504 Pending //////Pending 0 0 0 0 0
505 Pending //////Pending 0 0 0 0 0
506 Pending //////Pending 0 0 0 0 0
507 Pending //////Pending 0 0 0 0 0
508 Pending //////Pending 0 0 0 0 0
509 Pending //////Pending 0 0 0 0 0
510 Pending //////Pending 0 0 0 0 0
511 Pending //////Pending 0 0 0 0 0
512 Pending //////Pending 0 0 0 0 0
513 Pending //////Pending 0 0 0 0 0
514 Pending //////Pending 0 0 0 0 0
515 Pending //////Pending 0 0 0 0 0
516 Pending //////Pending 0 0 0 0 0
517 Pending //////Pending 0 0 0 0 0
518 Pending //////Pending 0 0 0 0 0

282/305
12

ELV WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 1 A 0 A 0 A 0 A = Approved
B 110 B 4 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 5 C 0 C 0 C 0 C = Revised And Resubmit
D 1 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
519 Pending //////Pending 0 0 0 0 0
520 Pending //////Pending 0 0 0 0 0
521 Pending //////Pending 0 0 0 0 0
522 Pending //////Pending 0 0 0 0 0
523 Pending //////Pending 0 0 0 0 0
524 Pending //////Pending 0 0 0 0 0
525 Pending //////Pending 0 0 0 0 0
526 Pending //////Pending 0 0 0 0 0
527 Pending //////Pending 0 0 0 0 0
528 Pending //////Pending 0 0 0 0 0
529 Pending //////Pending 0 0 0 0 0
530 Pending //////Pending 0 0 0 0 0
531 Pending //////Pending 0 0 0 0 0
532 Pending //////Pending 0 0 0 0 0
533 Pending //////Pending 0 0 0 0 0
534 Pending //////Pending 0 0 0 0 0
535 Pending //////Pending 0 0 0 0 0
536 Pending //////Pending 0 0 0 0 0
537 Pending //////Pending 0 0 0 0 0
538 Pending //////Pending 0 0 0 0 0
539 Pending //////Pending 0 0 0 0 0
540 Pending //////Pending 0 0 0 0 0
541 Pending //////Pending 0 0 0 0 0
542 Pending //////Pending 0 0 0 0 0
543 Pending //////Pending 0 0 0 0 0
544 Pending //////Pending 0 0 0 0 0
545 Pending //////Pending 0 0 0 0 0
546 Pending //////Pending 0 0 0 0 0
547 Pending //////Pending 0 0 0 0 0
548 Pending //////Pending 0 0 0 0 0
549 Pending //////Pending 0 0 0 0 0
550 Pending //////Pending 0 0 0 0 0
551 Pending //////Pending 0 0 0 0 0
552 Pending //////Pending 0 0 0 0 0
553 Pending //////Pending 0 0 0 0 0
554 Pending //////Pending 0 0 0 0 0
555 Pending //////Pending 0 0 0 0 0
556 Pending //////Pending 0 0 0 0 0
557 Pending //////Pending 0 0 0 0 0
558 Pending //////Pending 0 0 0 0 0
559 Pending //////Pending 0 0 0 0 0
560 Pending //////Pending 0 0 0 0 0
561 Pending //////Pending 0 0 0 0 0
562 Pending //////Pending 0 0 0 0 0
563 Pending //////Pending 0 0 0 0 0
564 Pending //////Pending 0 0 0 0 0
565 Pending //////Pending 0 0 0 0 0
566 Pending //////Pending 0 0 0 0 0
567 Pending //////Pending 0 0 0 0 0
568 Pending //////Pending 0 0 0 0 0
569 Pending //////Pending 0 0 0 0 0
570 Pending //////Pending 0 0 0 0 0
571 Pending //////Pending 0 0 0 0 0
572 Pending //////Pending 0 0 0 0 0
573 Pending //////Pending 0 0 0 0 0
574 Pending //////Pending 0 0 0 0 0
575 Pending //////Pending 0 0 0 0 0
576 Pending //////Pending 0 0 0 0 0
577 Pending //////Pending 0 0 0 0 0
578 Pending //////Pending 0 0 0 0 0
579 Pending //////Pending 0 0 0 0 0
580 Pending //////Pending 0 0 0 0 0
581 Pending //////Pending 0 0 0 0 0
582 Pending //////Pending 0 0 0 0 0
583 Pending //////Pending 0 0 0 0 0
584 Pending //////Pending 0 0 0 0 0
585 Pending //////Pending 0 0 0 0 0
586 Pending //////Pending 0 0 0 0 0
587 Pending //////Pending 0 0 0 0 0
588 Pending //////Pending 0 0 0 0 0

283/305
12

ELV WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 1 A 0 A 0 A 0 A = Approved
B 110 B 4 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 5 C 0 C 0 C 0 C = Revised And Resubmit
D 1 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
589 Pending //////Pending 0 0 0 0 0
590 Pending //////Pending 0 0 0 0 0
591 Pending //////Pending 0 0 0 0 0
592 Pending //////Pending 0 0 0 0 0
593 Pending //////Pending 0 0 0 0 0
594 Pending //////Pending 0 0 0 0 0
595 Pending //////Pending 0 0 0 0 0
596 Pending //////Pending 0 0 0 0 0
597 Pending //////Pending 0 0 0 0 0
598 Pending //////Pending 0 0 0 0 0
599 Pending //////Pending 0 0 0 0 0
600 Pending //////Pending 0 0 0 0 0
601 Pending //////Pending 0 0 0 0 0
602 Pending //////Pending 0 0 0 0 0
603 Pending //////Pending 0 0 0 0 0
604 Pending //////Pending 0 0 0 0 0
605 Pending //////Pending 0 0 0 0 0
606 Pending //////Pending 0 0 0 0 0
607 Pending //////Pending 0 0 0 0 0
608 Pending //////Pending 0 0 0 0 0
609 Pending //////Pending 0 0 0 0 0
610 Pending //////Pending 0 0 0 0 0
611 Pending //////Pending 0 0 0 0 0
612 Pending //////Pending 0 0 0 0 0
613 Pending //////Pending 0 0 0 0 0
614 Pending //////Pending 0 0 0 0 0
615 Pending //////Pending 0 0 0 0 0
616 Pending //////Pending 0 0 0 0 0
617 Pending //////Pending 0 0 0 0 0
618 Pending //////Pending 0 0 0 0 0
619 Pending //////Pending 0 0 0 0 0
620 Pending //////Pending 0 0 0 0 0
621 Pending //////Pending 0 0 0 0 0
622 Pending //////Pending 0 0 0 0 0
623 Pending //////Pending 0 0 0 0 0
624 Pending //////Pending 0 0 0 0 0

625 Pending //////Pending 0 0 0 0 0

626 Pending //////Pending 0 0 0 0 0

627 Pending //////Pending 0 0 0 0 0

628 Pending //////Pending 0 0 0 0 0

629 Pending //////Pending 0 0 0 0 0


630 Pending //////Pending 0 0 0 0 0
631 Pending //////Pending 0 0 0 0 0
632 Pending //////Pending 0 0 0 0 0
633 Pending //////Pending 0 0 0 0 0
634 Pending //////Pending 0 0 0 0 0
635 Pending //////Pending 0 0 0 0 0
636 Pending //////Pending 0 0 0 0 0
637 Pending //////Pending 0 0 0 0 0
638 Pending //////Pending 0 0 0 0 0
639 Pending //////Pending 0 0 0 0 0
640 Pending //////Pending 0 0 0 0 0
641 Pending //////Pending 0 0 0 0 0
642 Pending //////Pending 0 0 0 0 0
643 Pending //////Pending 0 0 0 0 0
644 Pending //////Pending 0 0 0 0 0
645 Pending //////Pending 0 0 0 0 0
646 Pending //////Pending 0 0 0 0 0
647 Pending //////Pending 0 0 0 0 0
648 Pending //////Pending 0 0 0 0 0
649 Pending //////Pending 0 0 0 0 0
650 Pending //////Pending 0 0 0 0 0
651 Pending //////Pending 0 0 0 0 0
652 Pending //////Pending 0 0 0 0 0
653 Pending //////Pending 0 0 0 0 0
654 Pending //////Pending 0 0 0 0 0
655 Pending //////Pending 0 0 0 0 0
656 Pending //////Pending 0 0 0 0 0
657 Pending //////Pending 0 0 0 0 0
658 Pending //////Pending 0 0 0 0 0
659 Pending //////Pending 0 0 0 0 0
660 Pending //////Pending 0 0 0 0 0
661 Pending //////Pending 0 0 0 0 0
662 Pending //////Pending 0 0 0 0 0
663 Pending //////Pending 0 0 0 0 0
664 Pending //////Pending 0 0 0 0 0
665 Pending //////Pending 0 0 0 0 0
666 Pending //////Pending 0 0 0 0 0
667 Pending //////Pending 0 0 0 0 0
668 Pending //////Pending 0 0 0 0 0
669 Pending //////Pending 0 0 0 0 0
670 Pending //////Pending 0 0 0 0 0
671 Pending //////Pending 0 0 0 0 0
672 Pending //////Pending 0 0 0 0 0
673 Pending //////Pending 0 0 0 0 0
674 Pending //////Pending 0 0 0 0 0
675 Pending //////Pending 0 0 0 0 0

284/305
12

ELV WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 1 A 0 A 0 A 0 A = Approved
B 110 B 4 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 5 C 0 C 0 C 0 C = Revised And Resubmit
D 1 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
676 Pending //////Pending 0 0 0 0 0
677 Pending //////Pending 0 0 0 0 0
678 Pending //////Pending 0 0 0 0 0
679 Pending //////Pending 0 0 0 0 0
680 Pending //////Pending 0 0 0 0 0
681 Pending //////Pending 0 0 0 0 0
682 Pending //////Pending 0 0 0 0 0
683 Pending //////Pending 0 0 0 0 0
684 Pending //////Pending 0 0 0 0 0
685 Pending //////Pending 0 0 0 0 0
686 Pending //////Pending 0 0 0 0 0
687 Pending //////Pending 0 0 0 0 0
688 Pending //////Pending 0 0 0 0 0
689 Pending //////Pending 0 0 0 0 0
690 Pending //////Pending 0 0 0 0 0
691 Pending //////Pending 0 0 0 0 0
692 Pending //////Pending 0 0 0 0 0
693 Pending //////Pending 0 0 0 0 0
694 Pending //////Pending 0 0 0 0 0
695 Pending //////Pending 0 0 0 0 0
696 Pending //////Pending 0 0 0 0 0
697 Pending //////Pending 0 0 0 0 0
698 Pending //////Pending 0 0 0 0 0
699 Pending //////Pending 0 0 0 0 0
700 Pending //////Pending 0 0 0 0 0
701 Pending //////Pending 0 0 0 0 0
702 Pending //////Pending 0 0 0 0 0
703 Pending //////Pending 0 0 0 0 0
704 Pending //////Pending 0 0 0 0 0
705 Pending //////Pending 0 0 0 0 0
706 Pending //////Pending 0 0 0 0 0
707 Pending //////Pending 0 0 0 0 0
708 Pending //////Pending 0 0 0 0 0
709 Pending //////Pending 0 0 0 0 0
710 Pending //////Pending 0 0 0 0 0
711 Pending //////Pending 0 0 0 0 0
712 Pending //////Pending 0 0 0 0 0
713 Pending //////Pending 0 0 0 0 0
714 Pending //////Pending 0 0 0 0 0
715 Pending //////Pending 0 0 0 0 0
716 Pending //////Pending 0 0 0 0 0
717 Pending //////Pending 0 0 0 0 0
718 Pending //////Pending 0 0 0 0 0
719 Pending //////Pending 0 0 0 0 0
720 Pending //////Pending 0 0 0 0 0
721 Pending //////Pending 0 0 0 0 0

285/305
12

FFS WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 3 A 0 A 0 A 0 A = Approved
B 11 B 3 B 1 B 0 B = Approved As Noted
06 October 2020 2 C 6 C 1 C 0 C 0 C = Revised And Resubmit
D 2 D 1 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
1 FFS, 1st fix (sleeves) corewall (F:H/4:7) B5 Electrowatt ABE P145 IR FFS MZP 001 Rev 02 ABE/P145/IR/FFS/MZP/001/Rev 02 24-Feb-16 25-Feb-16 1 D 27-Feb-16 28-Feb-16 1 D 15-May-16 15-May-16 0 B 0 B

2 Fire Fighting Sleeves B4 Electrowatt ABE P145 IR FFS MZP 002 Rev 00 ABE/P145/IR/FFS/MZP/002/Rev 00 28-Feb-16 29-Feb-16 1 B 5-Mar-16 6-Mar-16 1 C 0 0 B

3 FFS, 1st fix (sleeves) Slab (A:J/1:11) B5 Electrowatt ABE P145 IR FFS MZP 003 Pending ABE/P145/IR/FFS/MZP/003/Pending 5-Mar-16 6-Mar-16 1 C 0 0 0 C

4 FFS, 1st fix (sleeves) Slab (A:J/1:11) B4 Electrowatt ABE P145 IR FFS MZP 004 Rev 00 ABE/P145/IR/FFS/MZP/004/Rev 00 2-Apr-16 4-Apr-16 2 B 0 0 0 B

5 FFS, 1st fix (sleeves) Slab (K:M/7:11) B4 Electrowatt ABE P145 IR FFS MZP 005 Rev 01 ABE/P145/IR/FFS/MZP/005/Rev 01 9-Apr-16 9-Apr-16 0 C 9-Apr-16 9-Apr-16 0 B 0 0 B

6 FFS, 1st fix (sleeves) Slab (A:J/1:11) B3 Electrowatt ABE P145 IR FFS MZP 006 Rev 00 ABE/P145/IR/FFS/MZP/006/Rev 00 24-Apr-16 25-Apr-16 1 B 0 0 0 B

7 FFS, 1st fix (sleeves) Slab (A:J/1:11) B1 Electrowatt ABE P145 IR FFS MZP 007 Rev 00 ABE/P145/IR/FFS/MZP/007/Rev 00 28-May-16 30-May-16 2 B 0 0 0 B
8 Installation of puddle flange fire water tank B1 Electrowatt ABE P145 IR FFS MZP 008 Rev 00 ABE/P145/IR/FFS/MZP/008/Rev 00 23-Jun-16 26-Jun-16 3 B 0 0 0 B
9 FFS, 1st fix (sleeves) corewall (1:2/L:M) B1 Electrowatt ABE P145 IR FFS MZP 009 Rev 00 ABE/P145/IR/FFS/MZP/009/Rev 00 5-Jul-16 10-Jul-16 5 B 0 0 0 B
10 FFS, 1st fix (sleeves) corewall (F:H/4:7) GF Electrowatt ABE P145 IR FFS MZP 010 Pending ABE/P145/IR/FFS/MZP/010/Pending 19-Jul-16 20-Jul-16 1 D 0 0 0 D
11 FFS, 1st fix (sleeves) Slab (A:H/1:11) GF Electrowatt ABE P145 IR FFS MZP 011 Rev 00 ABE/P145/IR/FFS/MZP/011/Rev 00 30-Jul-16 31-Jul-16 1 B 0 0 0 B
12 FFS, 1st fix (sleeves) Slab (G:H/7:07) B4 Electrowatt ABE P145 IR FFS MZP 012 Rev 00 ABE/P145/IR/FFS/MZP/012/Rev 00 24-Sep-16 26-Sep-16 2 B 0 0 0 B

13 FFS, 1st fix (sleeves) Slab openings (G:H/4:7) B3 Electrowatt ABE P145 IR FFS MZP 013 Rev 00 ABE/P145/IR/FFS/MZP/013/Rev 00 9-Oct-16 9-Oct-16 0 B 0 0 0 B

Installation of main line without final paint


14 B5 Electrowatt ABE P145 IR FFS MZP 014 Rev 01 ABE/P145/IR/FFS/MZP/014/Rev 01 15-Oct-16 16-Oct-16 1 C 22-Oct-16 24-Oct-16 2 B 0 0 B
(A:J/7:10)
Installation of main line without final paint
15 B4 Electrowatt ABE P145 IR FFS MZP 015 Rev 01 ABE/P145/IR/FFS/MZP/015/Rev 01 15-Oct-16 16-Oct-16 1 C 22-Oct-16 24-Oct-16 2 B 0 0 B
(A:J/7:10)
16 Branch line without final paint (A:M/7:11) B4 Electrowatt ABE P145 IR FFS MZP 016 Rev 00 ABE/P145/IR/FFS/MZP/016/Rev 00 29-Oct-16 1-Nov-16 3 B 0 0 0 B
17 First fix sleeves (G:H/5:6) B2 Electrowatt ABE P145 IR FFS MZP 017 Rev 00 ABE/P145/IR/FFS/MZP/017/Rev 00 8-Nov-16 10-Nov-16 2 B 0 0 0 B
18 First fix sleeves slab openings (G:H/5:6) B1 Electrowatt ABE P145 IR FFS MZP 018 Rev 00 ABE/P145/IR/FFS/MZP/018/Rev 00 9-Nov-16 12-Nov-16 3 A 0 0 A
Installation of branched without final paint slab
19 B5 Electrowatt ABE P145 IR FFS MZP 019 Pending ABE/P145/IR/FFS/MZP/019/Pending 26-Nov-16 27-Nov-16 1 C 30-Nov-16 -42704 0 0 U/R
openings (A:M/1:11)
Installation of branched without final paint slab
20 B4 Electrowatt ABE P145 IR FFS MZP 020 Pending ABE/P145/IR/FFS/MZP/020/Pending 26-Nov-16 30-Nov-16 4 C 30-Nov-16 -42704 0 0 U/R
openings (A:M/1:8)

21 FFS, 1st fix (sleeves) Slab openings (G:H/5:6) GF Electrowatt ABE P145 IR FFS MZP 021 Rev 00 ABE/P145/IR/FFS/MZP/021/Rev 00 26-Nov-16 29-Nov-16 3 A 0 0 0 A

22 FFS, 1st fix (sleeves) Slab openings (F:G/5:6) B4 Electrowatt ABE P145 IR FFS MZP 022 Rev 00 ABE/P145/IR/FFS/MZP/022/Rev 00 26-Nov-16 29-Nov-16 3 A 0 0 0 A

23 Pending //////Pending 0 0 0 0 0
24 Pending //////Pending 0 0 0 0 0
25 Pending //////Pending 0 0 0 0 0
26 Pending //////Pending 0 0 0 0 0
27 Pending //////Pending 0 0 0 0 0
28 Pending //////Pending 0 0 0 0 0
29 Pending //////Pending 0 0 0 0 0
30 Pending //////Pending 0 0 0 0 0
31 Pending //////Pending 0 0 0 0 0
32 Pending //////Pending 0 0 0 0 0
33 Pending //////Pending 0 0 0 0 0
34 Pending //////Pending 0 0 0 0 0
35 Pending //////Pending 0 0 0 0 0
36 Pending //////Pending 0 0 0 0 0
37 Pending //////Pending 0 0 0 0 0
38 Pending //////Pending 0 0 0 0 0
39 Pending //////Pending 0 0 0 0 0
40 Pending //////Pending 0 0 0 0 0
41 Pending //////Pending 0 0 0 0 0
42 Pending //////Pending 0 0 0 0 0
43 Pending //////Pending 0 0 0 0 0
44 Pending //////Pending 0 0 0 0 0
45 Pending //////Pending 0 0 0 0 0
46 Pending //////Pending 0 0 0 0 0
47 Pending //////Pending 0 0 0 0 0
48 Pending //////Pending 0 0 0 0 0
49 Pending //////Pending 0 0 0 0 0
50 Pending //////Pending 0 0 0 0 0
51 Pending //////Pending 0 0 0 0 0
52 Pending //////Pending 0 0 0 0 0
53 Pending //////Pending 0 0 0 0 0
54 Pending //////Pending 0 0 0 0 0
55 Pending //////Pending 0 0 0 0 0
56 Pending //////Pending 0 0 0 0 0
57 Pending //////Pending 0 0 0 0 0
58 Pending //////Pending 0 0 0 0 0
59 Pending //////Pending 0 0 0 0 0
60 Pending //////Pending 0 0 0 0 0
61 Pending //////Pending 0 0 0 0 0
62 Pending //////Pending 0 0 0 0 0
63 Pending //////Pending 0 0 0 0 0
64 Pending //////Pending 0 0 0 0 0
65 Pending //////Pending 0 0 0 0 0
66 Pending //////Pending 0 0 0 0 0
67 Pending //////Pending 0 0 0 0 0
68 Pending //////Pending 0 0 0 0 0
69 Pending //////Pending 0 0 0 0 0
70 Pending //////Pending 0 0 0 0 0
71 Pending //////Pending 0 0 0 0 0
72 Pending //////Pending 0 0 0 0 0
73 Pending //////Pending 0 0 0 0 0
74 Pending //////Pending 0 0 0 0 0
75 Pending //////Pending 0 0 0 0 0
76 Pending //////Pending 0 0 0 0 0
77 Pending //////Pending 0 0 0 0 0
78 Pending //////Pending 0 0 0 0 0
79 Pending //////Pending 0 0 0 0 0
80 Pending //////Pending 0 0 0 0 0
81 Pending //////Pending 0 0 0 0 0
82 Pending //////Pending 0 0 0 0 0
83 Pending //////Pending 0 0 0 0 0

286/305
12

FFS WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 3 A 0 A 0 A 0 A = Approved
B 11 B 3 B 1 B 0 B = Approved As Noted
06 October 2020 2 C 6 C 1 C 0 C 0 C = Revised And Resubmit
D 2 D 1 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
84 Pending //////Pending 0 0 0 0 0
85 Pending //////Pending 0 0 0 0 0
86 Pending //////Pending 0 0 0 0 0
87 Pending //////Pending 0 0 0 0 0
88 Pending //////Pending 0 0 0 0 0
89 Pending //////Pending 0 0 0 0 0
90 Pending //////Pending 0 0 0 0 0
91 Pending //////Pending 0 0 0 0 0
92 Pending //////Pending 0 0 0 0 0
93 Pending //////Pending 0 0 0 0 0
94 Pending //////Pending 0 0 0 0 0
95 Pending //////Pending 0 0 0 0 0
96 Pending //////Pending 0 0 0 0 0
97 Pending //////Pending 0 0 0 0 0
98 Pending //////Pending 0 0 0 0 0
99 Pending //////Pending 0 0 0 0 0
100 Pending //////Pending 0 0 0 0 0
101 Pending //////Pending 0 0 0 0 0
102 Pending //////Pending 0 0 0 0 0
103 Pending //////Pending 0 0 0 0 0
104 Pending //////Pending 0 0 0 0 0
105 Pending //////Pending 0 0 0 0 0
106 Pending //////Pending 0 0 0 0 0
107 Pending //////Pending 0 0 0 0 0
108 Pending //////Pending 0 0 0 0 0
109 Pending //////Pending 0 0 0 0 0
110 Pending //////Pending 0 0 0 0 0
111 Pending //////Pending 0 0 0 0 0
112 Pending //////Pending 0 0 0 0 0
113 Pending //////Pending 0 0 0 0 0
114 Pending //////Pending 0 0 0 0 0
115 Pending //////Pending 0 0 0 0 0
116 Pending //////Pending 0 0 0 0 0
117 Pending //////Pending 0 0 0 0 0
118 Pending //////Pending 0 0 0 0 0
119 Pending //////Pending 0 0 0 0 0
120 Pending //////Pending 0 0 0 0 0
121 Pending //////Pending 0 0 0 0 0
122 Pending //////Pending 0 0 0 0 0
123 Pending //////Pending 0 0 0 0 0
124 Pending //////Pending 0 0 0 0 0
125 Pending //////Pending 0 0 0 0 0
126 Pending //////Pending 0 0 0 0 0
127 Pending //////Pending 0 0 0 0 0
128 Pending //////Pending 0 0 0 0 0
129 Pending //////Pending 0 0 0 0 0
130 Pending //////Pending 0 0 0 0 0
131 Pending //////Pending 0 0 0 0
132 Pending //////Pending 0 0 0 0
133 Pending //////Pending 0 0 0 0
134 Pending //////Pending 0 0 0 0 0
135 Pending //////Pending 0 0 0 0 0
136 Pending //////Pending 0 0 0 0 0
137 Pending //////Pending 0 0 0 0 0
138 Pending //////Pending 0 0 0 0 0
139 Pending //////Pending 0 0 0 0 0

140 Pending //////Pending 0 0 0 0 0

141 Pending //////Pending 0 0 0 0 0

142 Pending //////Pending 0 0 0 0

143 Pending //////Pending 0 0 0 0 0


144 Pending //////Pending 0 0 0 0 0
145 Pending //////Pending 0 0 0 0 0

146 Pending //////Pending 0 0 0 0 0


147 Pending //////Pending 0 0 0 0 0
148 Pending //////Pending 0 0 0 0 0

149 Pending //////Pending 0 0 0 0 0

150 Pending //////Pending 0 0 0 0 0

151 Pending //////Pending 0 0 0 0 0


152 Pending //////Pending 0 0 0 0 0
153 Pending //////Pending 0 0 0 0 0
154 Pending //////Pending 0 0 0 0 0
155 Pending //////Pending 0 0 0 0 0
156 Pending //////Pending 0 0 0 0 0
157 Pending //////Pending 0 0 0 0 0
158 Pending //////Pending 0 0 0 0 0
159 Pending //////Pending 0 0 0 0 0
160 Pending //////Pending 0 0 0 0 0

161 Pending //////Pending 0 0 0 0 0

162 Pending //////Pending 0 0 0 0 0

287/305
12

FFS WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 3 A 0 A 0 A 0 A = Approved
B 11 B 3 B 1 B 0 B = Approved As Noted
06 October 2020 2 C 6 C 1 C 0 C 0 C = Revised And Resubmit
D 2 D 1 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

163 Pending //////Pending 0 0 0 0 0

164 Pending //////Pending 0 0 0 0 0

165 Pending //////Pending 0 0 0 0 0

166 Pending //////Pending 0 0 0 0 0

167 Pending //////Pending 0 0 0 0 0

168 Pending //////Pending 0 0 0 0 0


169 Pending //////Pending 0 0 0 0 0
170 Pending //////Pending 0 0 0 0 0
171 Pending //////Pending 0 0 0 0 0
172 Pending //////Pending 0 0 0 0 0
173 Pending //////Pending 0 0 0 0 0
174 Pending //////Pending 0 0 0 0 0
175 Pending //////Pending 0 0 0 0 0
176 Pending //////Pending 0 0 0 0 0
177 Pending //////Pending 0 0 0 0 0
178 Pending //////Pending 0 0 0 0 0
179 Pending //////Pending 0 0 0 0 0
180 Pending //////Pending 0 0 0 0 0
181 Pending //////Pending 0 0 0 0 0
182 Pending //////Pending 0 0 0 0 0
183 Pending //////Pending 0 0 0 0 0
184 Pending //////Pending 0 0 0 0 0
185 Pending //////Pending 0 0 0 0 0
186 Pending //////Pending 0 0 0 0 0
187 Pending //////Pending 0 0 0 0 0
188 Pending //////Pending 0 0 0 0 0
189 Pending //////Pending 0 0 0 0 0
190 Pending //////Pending 0 0 0 0 0
191 Pending //////Pending 0 0 0 0 0
192 Pending //////Pending 0 0 0 0 0
193 Pending //////Pending 0 0 0 0 0
194 Pending //////Pending 0 0 0 0 0
195 Pending //////Pending 0 0 0 0 0
196 Pending //////Pending 0 0 0 0 0
197 Pending //////Pending 0 0 0 0 0
198 Pending //////Pending 0 0 0 0 0
199 Pending //////Pending 0 0 0 0 0
200 Pending //////Pending 0 0 0 0 0
201 Pending //////Pending 0 0 0 0 0
202 Pending //////Pending 0 0 0 0 0
203 Pending //////Pending 0 0 0 0 0
204 Pending //////Pending 0 0 0 0 0
205 Pending //////Pending 0 0 0 0 0
206 Pending //////Pending 0 0 0 0 0
207 Pending //////Pending 0 0 0 0 0
208 Pending //////Pending 0 0 0 0 0
209 Pending //////Pending 0 0 0 0 0
210 Pending //////Pending 0 0 0 0 0
211 Pending //////Pending 0 0 0 0 0
212 Pending //////Pending 0 0 0 0 0
213 Pending //////Pending 0 0 0 0 0
214 Pending //////Pending 0 0 0 0 0
215 Pending //////Pending 0 0 0 0 0
216 Pending //////Pending 0 0 0 0 0
217 Pending //////Pending 0 0 0 0 0
218 Pending //////Pending 0 0 0 0 0
219 Pending //////Pending 0 0 0 0 0
220 Pending //////Pending 0 0 0 0 0
221 Pending //////Pending 0 0 0 0 0
222 Pending //////Pending 0 0 0 0 0
223 Pending //////Pending 0 0 0 0 0
224 Pending //////Pending 0 0 0 0 0
225 Pending //////Pending 0 0 0 0 0
226 Pending //////Pending 0 0 0 0 0
227 Pending //////Pending 0 0 0 0 0
228 Pending //////Pending 0 0 0 0 0
229 Pending //////Pending 0 0 0 0 0
230 Pending //////Pending 0 0 0 0 0
231 Pending //////Pending 0 0 0 0 0
232 Pending //////Pending 0 0 0 0 0
233 Pending //////Pending 0 0 0 0 0
234 Pending //////Pending 0 0 0 0 0
235 Pending //////Pending 0 0 0 0 0
236 Pending //////Pending 0 0 0 0 0
237 Pending //////Pending 0 0 0 0 0
238 Pending //////Pending 0 0 0 0 0
239 Pending //////Pending 0 0 0 0 0
240 Pending //////Pending 0 0 0 0 0
241 Pending //////Pending 0 0 0 0 0

288/305
12

FFS WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 3 A 0 A 0 A 0 A = Approved
B 11 B 3 B 1 B 0 B = Approved As Noted
06 October 2020 2 C 6 C 1 C 0 C 0 C = Revised And Resubmit
D 2 D 1 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
242 Pending //////Pending 0 0 0 0 0
243 Pending //////Pending 0 0 0 0 0
244 Pending //////Pending 0 0 0 0 0
245 Pending //////Pending 0 0 0 0 0
246 Pending //////Pending 0 0 0 0 0
247 Pending //////Pending 0 0 0 0 0
248 Pending //////Pending 0 0 0 0 0
249 Pending //////Pending 0 0 0 0 0
250 Pending //////Pending 0 0 0 0 0
251 Pending //////Pending 0 0 0 0 0
252 Pending //////Pending 0 0 0 0 0
253 Pending //////Pending 0 0 0 0 0
254 Pending //////Pending 0 0 0 0 0
255 Pending //////Pending 0 0 0 0 0
256 Pending //////Pending 0 0 0 0
257 Pending //////Pending 0 0 0 0 0
258 Pending //////Pending 0 0 0 0 0
259 Pending //////Pending 0 0 0 0 0
260 Pending //////Pending 0 0 0 0 0
261 Pending //////Pending 0 0 0 0 0
262 Pending //////Pending 0 0 0 0 0
263 Pending //////Pending 0 0 0 0 0
264 Pending //////Pending 0 0 0 0 0
265 Pending //////Pending 0 0 0 0 0
266 Pending //////Pending 0 0 0 0 0
267 Pending //////Pending 0 0 0 0 0
268 Pending //////Pending 0 0 0 0 0
269 Pending //////Pending 0 0 0 0 0
270 Pending //////Pending 0 0 0 0 0
271 Pending //////Pending 0 0 0 0 0
272 Pending //////Pending 0 0 0 0 0
273 Pending //////Pending 0 0 0 0 0
274 Pending //////Pending 0 0 0 0 0
275 Pending //////Pending 0 0 0 0 0
276 Pending //////Pending 0 0 0 0 0
277 Pending //////Pending 0 0 0 0 0
278 Pending //////Pending 0 0 0 0 0
279 Pending //////Pending 0 0 0 0 0
280 Pending //////Pending 0 0 0 0 0
281 Pending //////Pending 0 0 0 0 0
282 Pending //////Pending 0 0 0 0 0
283 Pending //////Pending 0 0 0 0 0
284 Pending //////Pending 0 0 0 0 0
285 Pending //////Pending 0 0 0 0 0
286 Pending //////Pending 0 0 0 0 0
287 Pending //////Pending 0 0 0 0 0
288 Pending //////Pending 0 0 0 0 0
289 Pending //////Pending 0 0 0 0 0
290 Pending //////Pending 0 0 0 0 0
291 Pending //////Pending 0 0 0 0 0
292 Pending //////Pending 0 0 0 0 0
293 Pending //////Pending 0 0 0 0 0
294 Pending //////Pending 0 0 0 0 0
295 Pending //////Pending 0 0 0 0 0
296 Pending //////Pending 0 0 0 0 0
297 Pending //////Pending 0 0 0 0 0
298 Pending //////Pending 0 0 0 0 0
299 Pending //////Pending 0 0 0 0 0
300 Pending //////Pending 0 0 0 0 0
301 Pending //////Pending 0 0 0 0 0
302 Pending //////Pending 0 0 0 0 0
303 Pending //////Pending 0 0 0 0 0
304 Pending //////Pending 0 0 0 0 0
305 Pending //////Pending 0 0 0 0 0
306 Pending //////Pending 0 0 0 0 0
307 Pending //////Pending 0 0 0 0 0
308 Pending //////Pending 0 0 0 0 0
309 Pending //////Pending 0 0 0 0 0
310 Pending //////Pending 0 0 0 0 0
311 Pending //////Pending 0 0 0 0 0
312 Pending //////Pending 0 0 0 0 0
313 Pending //////Pending 0 0 0 0 0
314 Pending //////Pending 0 0 0 0 0
315 Pending //////Pending 0 0 0 0 0
316 Pending //////Pending 0 0 0 0 0
317 Pending //////Pending 0 0 0 0 0
318 Pending //////Pending 0 0 0 0 0
319 Pending //////Pending 0 0 0 0 0
320 Pending //////Pending 0 0 0 0 0
321 Pending //////Pending 0 0 0 0 0
322 Pending //////Pending 0 0 0 0 0
323 Pending //////Pending 0 0 0 0 0
324 Pending //////Pending 0 0 0 0 0
325 Pending //////Pending 0 0 0 0 0
326 Pending //////Pending 0 0 0 0 0
327 Pending //////Pending 0 0 0 0 0
328 Pending //////Pending 0 0 0 0 0
329 Pending //////Pending 0 0 0 0 0
330 Pending //////Pending 0 0 0 0 0
331 Pending //////Pending 0 0 0 0 0
332 Pending //////Pending 0 0 0 0 0
333 Pending //////Pending 0 0 0 0 0
334 Pending //////Pending 0 0 0 0 0
335 Pending //////Pending 0 0 0 0 0
336 Pending //////Pending 0 0 0 0 0
337 Pending //////Pending 0 0 0 0 0

289/305
12

FFS WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 3 A 0 A 0 A 0 A = Approved
B 11 B 3 B 1 B 0 B = Approved As Noted
06 October 2020 2 C 6 C 1 C 0 C 0 C = Revised And Resubmit
D 2 D 1 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
338 Pending //////Pending 0 0 0 0 0
339 Pending //////Pending 0 0 0 0 0
340 Pending //////Pending 0 0 0 0 0
341 Pending //////Pending 0 0 0 0 0
342 Pending //////Pending 0 0 0 0 0
343 Pending //////Pending 0 0 0 0 0
344 Pending //////Pending 0 0 0 0 0
345 Pending //////Pending 0 0 0 0 0
346 Pending //////Pending 0 0 0 0 0
347 Pending //////Pending 0 0 0 0 0

348 Pending //////Pending 0 0 0 0 0

349 Pending //////Pending 0 0 0 0 0


350 Pending //////Pending 0 0 0 0 0
351 Pending //////Pending 0 0 0 0 0
352 Pending //////Pending 0 0 0 0 0
353 Pending //////Pending 0 0 0 0 0
354 Pending //////Pending 0 0 0 0 0
355 Pending //////Pending 0 0 0 0 0
356 Pending //////Pending 0 0 0 0 0
357 Pending //////Pending 0 0 0 0 0
358 Pending //////Pending 0 0 0 0 0
359 Pending //////Pending 0 0 0 0 0
360 Pending //////Pending 0 0 0 0 0
361 Pending //////Pending 0 0 0 0 0
362 Pending //////Pending 0 0 0 0 0
363 Pending //////Pending 0 0 0 0 0
364 Pending //////Pending 0 0 0 0 0
365 Pending //////Pending 0 0 0 0 0
366 Pending //////Pending 0 0 0 0 0
367 Pending //////Pending 0 0 0 0 0
368 Pending //////Pending 0 0 0 0 0
369 Pending //////Pending 0 0 0 0 0
370 Pending //////Pending 0 0 0 0 0
371 Pending //////Pending 0 0 0 0 0
372 Pending //////Pending 0 0 0 0 0
373 Pending //////Pending 0 0 0 0 0
374 Pending //////Pending 0 0 0 0 0
375 Pending //////Pending 0 0 0 0 0
376 Pending //////Pending 0 0 0 0 0
377 Pending //////Pending 0 0 0 0 0
378 Pending //////Pending 0 0 0 0 0
379 Pending //////Pending 0 0 0 0 0
380 Pending //////Pending 0 0 0 0 0
381 Pending //////Pending 0 0 0 0 0
382 Pending //////Pending 0 0 0 0 0
383 Pending //////Pending 0 0 0 0 0
384 Pending //////Pending 0 0 0 0 0
385 Pending //////Pending 0 0 0 0 0
386 Pending //////Pending 0 0 0 0 0
387 Pending //////Pending 0 0 0 0 0
388 Pending //////Pending 0 0 0 0 0
389 Pending //////Pending 0 0 0 0 0
390 Pending //////Pending 0 0 0 0 0
391 Pending //////Pending 0 0 0 0 0
392 Pending //////Pending 0 0 0 0 0
393 Pending //////Pending 0 0 0 0 0
394 Pending //////Pending 0 0 0 0 0
395 Pending //////Pending 0 0 0 0 0
396 Pending //////Pending 0 0 0 0 0
397 Pending //////Pending 0 0 0 0 0
398 Pending //////Pending 0 0 0 0 0
399 Pending //////Pending 0 0 0 0 0
400 Pending //////Pending 0 0 0 0 0
401 Pending //////Pending 0 0 0 0 0
402 Pending //////Pending 0 0 0 0 0
403 Pending //////Pending 0 0 0 0 0
404 Pending //////Pending 0 0 0 0 0
405 Pending //////Pending 0 0 0 0 0
406 Pending //////Pending 0 0 0 0 0
407 Pending //////Pending 0 0 0 0 0
408 Pending //////Pending 0 0 0 0 0
409 Pending //////Pending 0 0 0 0 0
410 Pending //////Pending 0 0 0 0 0
411 Pending //////Pending 0 0 0 0 0
412 Pending //////Pending 0 0 0 0 0
413 Pending //////Pending 0 0 0 0 0
414 Pending //////Pending 0 0 0 0 0
415 Pending //////Pending 0 0 0 0 0
416 Pending //////Pending 0 0 0 0 0
417 Pending //////Pending 0 0 0 0 0
418 Pending //////Pending 0 0 0 0 0
419 Pending //////Pending 0 0 0 0 0
420 Pending //////Pending 0 0 0 0 0
421 Pending //////Pending 0 0 0 0 0
422 Pending //////Pending 0 0 0 0 0
423 Pending //////Pending 0 0 0 0 0
424 Pending //////Pending 0 0 0 0 0
425 Pending //////Pending 0 0 0 0 0
426 Pending //////Pending 0 0 0 0 0
427 Pending //////Pending 0 0 0 0 0
428 Pending //////Pending 0 0 0 0 0
429 Pending //////Pending 0 0 0 0 0
430 Pending //////Pending 0 0 0 0 0
431 Pending //////Pending 0 0 0 0 0

290/305
12

FFS WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 3 A 0 A 0 A 0 A = Approved
B 11 B 3 B 1 B 0 B = Approved As Noted
06 October 2020 2 C 6 C 1 C 0 C 0 C = Revised And Resubmit
D 2 D 1 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
432 Pending //////Pending 0 0 0 0 0
433 Pending //////Pending 0 0 0 0 0
434 Pending //////Pending 0 0 0 0 0
435 Pending //////Pending 0 0 0 0 0
436 Pending //////Pending 0 0 0 0 0
437 Pending //////Pending 0 0 0 0 0
438 Pending //////Pending 0 0 0 0 0
439 Pending //////Pending 0 0 0 0 0
440 Pending //////Pending 0 0 0 0 0
441 Pending //////Pending 0 0 0 0 0
442 Pending //////Pending 0 0 0 0 0
443 Pending //////Pending 0 0 0 0 0
444 Pending //////Pending 0 0 0 0 0
445 Pending //////Pending 0 0 0 0 0

446 Pending //////Pending 0 0 0 0 0

447 Pending //////Pending 0 0 0 0 0

448 Pending //////Pending 0 0 0 0 0


449 Pending //////Pending 0 0 0 0 0
450 Pending //////Pending 0 0 0 0 0
451 Pending //////Pending 0 0 0 0 0
452 Pending //////Pending 0 0 0 0 0
453 Pending //////Pending 0 0 0 0 0
454 Pending //////Pending 0 0 0 0 0
455 Pending //////Pending 0 0 0 0 0
456 Pending //////Pending 0 0 0 0 0
457 Pending //////Pending 0 0 0 0 0
458 Pending //////Pending 0 0 0 0 0
459 Pending //////Pending 0 0 0 0 0
460 Pending //////Pending 0 0 0 0 0
461 Pending //////Pending 0 0 0 0 0
462 Pending //////Pending 0 0 0 0 0
463 Pending //////Pending 0 0 0 0 0
464 Pending //////Pending 0 0 0 0 0

465 Pending //////Pending 0 0 0 0 0

466 Pending //////Pending 0 0 0 0 0

467 Pending //////Pending 0 0 0 0 0

468 Pending //////Pending 0 0 0 0 0

469 Pending //////Pending 0 0 0 0 0

470 Pending //////Pending 0 0 0 0 0

471 Pending //////Pending 0 0 0 0 0


472 Pending //////Pending 0 0 0 0 0
473 Pending //////Pending 0 0 0 0 0
474 Pending //////Pending 0 0 0 0 0
475 Pending //////Pending 0 0 0 0 0
476 Pending //////Pending 0 0 0 0 0
477 Pending //////Pending 0 0 0 0 0
478 Pending //////Pending 0 0 0 0 0
479 Pending //////Pending 0 0 0 0 0
480 Pending //////Pending 0 0 0 0 0
481 Pending //////Pending 0 0 0 0 0
482 Pending //////Pending 0 0 0 0 0
483 Pending //////Pending 0 0 0 0 0
484 Pending //////Pending 0 0 0 0 0
485 Pending //////Pending 0 0 0 0 0
486 Pending //////Pending 0 0 0 0 0
487 Pending //////Pending 0 0 0 0 0
488 Pending //////Pending 0 0 0 0 0
489 Pending //////Pending 0 0 0 0 0
490 Pending //////Pending 0 0 0 0 0
491 Pending //////Pending 0 0 0 0 0
492 Pending //////Pending 0 0 0 0 0
493 Pending //////Pending 0 0 0 0 0
494 Pending //////Pending 0 0 0 0 0
495 Pending //////Pending 0 0 0 0 0
496 Pending //////Pending 0 0 0 0 0
497 Pending //////Pending 0 0 0 0 0
498 Pending //////Pending 0 0 0 0 0
499 Pending //////Pending 0 0 0 0 0
500 Pending //////Pending 0 0 0 0 0
501 Pending //////Pending 0 0 0 0 0
502 Pending //////Pending 0 0 0 0 0
503 Pending //////Pending 0 0 0 0 0
504 Pending //////Pending 0 0 0 0 0
505 Pending //////Pending 0 0 0 0 0
506 Pending //////Pending 0 0 0 0 0
507 Pending //////Pending 0 0 0 0 0
508 Pending //////Pending 0 0 0 0 0
509 Pending //////Pending 0 0 0 0 0
510 Pending //////Pending 0 0 0 0 0
511 Pending //////Pending 0 0 0 0 0
512 Pending //////Pending 0 0 0 0 0
513 Pending //////Pending 0 0 0 0 0
514 Pending //////Pending 0 0 0 0 0
515 Pending //////Pending 0 0 0 0 0

291/305
12

FFS WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 3 A 0 A 0 A 0 A = Approved
B 11 B 3 B 1 B 0 B = Approved As Noted
06 October 2020 2 C 6 C 1 C 0 C 0 C = Revised And Resubmit
D 2 D 1 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
516 Pending //////Pending 0 0 0 0 0
517 Pending //////Pending 0 0 0 0 0
518 Pending //////Pending 0 0 0 0 0

292/305
12

FFS WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 3 A 0 A 0 A 0 A = Approved
B 11 B 3 B 1 B 0 B = Approved As Noted
06 October 2020 2 C 6 C 1 C 0 C 0 C = Revised And Resubmit
D 2 D 1 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
519 Pending //////Pending 0 0 0 0 0
520 Pending //////Pending 0 0 0 0 0
521 Pending //////Pending 0 0 0 0 0
522 Pending //////Pending 0 0 0 0 0
523 Pending //////Pending 0 0 0 0 0
524 Pending //////Pending 0 0 0 0 0
525 Pending //////Pending 0 0 0 0 0
526 Pending //////Pending 0 0 0 0 0
527 Pending //////Pending 0 0 0 0 0
528 Pending //////Pending 0 0 0 0 0
529 Pending //////Pending 0 0 0 0 0
530 Pending //////Pending 0 0 0 0 0
531 Pending //////Pending 0 0 0 0 0
532 Pending //////Pending 0 0 0 0 0
533 Pending //////Pending 0 0 0 0 0
534 Pending //////Pending 0 0 0 0 0
535 Pending //////Pending 0 0 0 0 0
536 Pending //////Pending 0 0 0 0 0
537 Pending //////Pending 0 0 0 0 0
538 Pending //////Pending 0 0 0 0 0
539 Pending //////Pending 0 0 0 0 0
540 Pending //////Pending 0 0 0 0 0
541 Pending //////Pending 0 0 0 0 0
542 Pending //////Pending 0 0 0 0 0
543 Pending //////Pending 0 0 0 0 0
544 Pending //////Pending 0 0 0 0 0
545 Pending //////Pending 0 0 0 0 0
546 Pending //////Pending 0 0 0 0 0
547 Pending //////Pending 0 0 0 0 0
548 Pending //////Pending 0 0 0 0 0
549 Pending //////Pending 0 0 0 0 0
550 Pending //////Pending 0 0 0 0 0
551 Pending //////Pending 0 0 0 0 0
552 Pending //////Pending 0 0 0 0 0
553 Pending //////Pending 0 0 0 0 0
554 Pending //////Pending 0 0 0 0 0
555 Pending //////Pending 0 0 0 0 0
556 Pending //////Pending 0 0 0 0 0
557 Pending //////Pending 0 0 0 0 0
558 Pending //////Pending 0 0 0 0 0
559 Pending //////Pending 0 0 0 0 0
560 Pending //////Pending 0 0 0 0 0
561 Pending //////Pending 0 0 0 0 0
562 Pending //////Pending 0 0 0 0 0
563 Pending //////Pending 0 0 0 0 0
564 Pending //////Pending 0 0 0 0 0
565 Pending //////Pending 0 0 0 0 0
566 Pending //////Pending 0 0 0 0 0
567 Pending //////Pending 0 0 0 0 0
568 Pending //////Pending 0 0 0 0 0
569 Pending //////Pending 0 0 0 0 0
570 Pending //////Pending 0 0 0 0 0
571 Pending //////Pending 0 0 0 0 0
572 Pending //////Pending 0 0 0 0 0
573 Pending //////Pending 0 0 0 0 0
574 Pending //////Pending 0 0 0 0 0
575 Pending //////Pending 0 0 0 0 0
576 Pending //////Pending 0 0 0 0 0
577 Pending //////Pending 0 0 0 0 0
578 Pending //////Pending 0 0 0 0 0
579 Pending //////Pending 0 0 0 0 0
580 Pending //////Pending 0 0 0 0 0
581 Pending //////Pending 0 0 0 0 0
582 Pending //////Pending 0 0 0 0 0
583 Pending //////Pending 0 0 0 0 0
584 Pending //////Pending 0 0 0 0 0
585 Pending //////Pending 0 0 0 0 0
586 Pending //////Pending 0 0 0 0 0
587 Pending //////Pending 0 0 0 0 0
588 Pending //////Pending 0 0 0 0 0

293/305
12

FFS WORKS INSPECTION REQUEST LOG 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 3 A 0 A 0 A 0 A = Approved
B 11 B 3 B 1 B 0 B = Approved As Noted
06 October 2020 2 C 6 C 1 C 0 C 0 C = Revised And Resubmit
D 2 D 1 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
589 Pending //////Pending 0 0 0 0 0
590 Pending //////Pending 0 0 0 0 0
591 Pending //////Pending 0 0 0 0 0
592 Pending //////Pending 0 0 0 0 0
593 Pending //////Pending 0 0 0 0 0
594 Pending //////Pending 0 0 0 0 0
595 Pending //////Pending 0 0 0 0 0
596 Pending //////Pending 0 0 0 0 0
597 Pending //////Pending 0 0 0 0 0
598 Pending //////Pending 0 0 0 0 0
599 Pending //////Pending 0 0 0 0 0
600 Pending //////Pending 0 0 0 0 0
601 Pending //////Pending 0 0 0 0 0
602 Pending //////Pending 0 0 0 0 0
603 Pending //////Pending 0 0 0 0 0
604 Pending //////Pending 0 0 0 0 0
605 Pending //////Pending 0 0 0 0 0
606 Pending //////Pending 0 0 0 0 0
607 Pending //////Pending 0 0 0 0 0
608 Pending //////Pending 0 0 0 0 0
609 Pending //////Pending 0 0 0 0 0
610 Pending //////Pending 0 0 0 0 0
611 Pending //////Pending 0 0 0 0 0
612 Pending //////Pending 0 0 0 0 0
613 Pending //////Pending 0 0 0 0 0
614 Pending //////Pending 0 0 0 0 0
615 Pending //////Pending 0 0 0 0 0
616 Pending //////Pending 0 0 0 0 0
617 Pending //////Pending 0 0 0 0 0
618 Pending //////Pending 0 0 0 0 0
619 Pending //////Pending 0 0 0 0 0
620 Pending //////Pending 0 0 0 0 0
621 Pending //////Pending 0 0 0 0 0
622 Pending //////Pending 0 0 0 0 0
623 Pending //////Pending 0 0 0 0 0
624 Pending //////Pending 0 0 0 0 0

625 Pending //////Pending 0 0 0 0 0

626 Pending //////Pending 0 0 0 0 0

627 Pending //////Pending 0 0 0 0 0

628 Pending //////Pending 0 0 0 0 0

629 Pending //////Pending 0 0 0 0 0


630 Pending //////Pending 0 0 0 0 0
631 Pending //////Pending 0 0 0 0 0
632 Pending //////Pending 0 0 0 0 0
633 Pending //////Pending 0 0 0 0 0
634 Pending //////Pending 0 0 0 0 0
635 Pending //////Pending 0 0 0 0 0
636 Pending //////Pending 0 0 0 0 0
637 Pending //////Pending 0 0 0 0 0
638 Pending //////Pending 0 0 0 0 0
639 Pending //////Pending 0 0 0 0 0
640 Pending //////Pending 0 0 0 0 0
641 Pending //////Pending 0 0 0 0 0
642 Pending //////Pending 0 0 0 0 0
643 Pending //////Pending 0 0 0 0 0
644 Pending //////Pending 0 0 0 0 0
645 Pending //////Pending 0 0 0 0 0
646 Pending //////Pending 0 0 0 0 0
647 Pending //////Pending 0 0 0 0 0
648 Pending //////Pending 0 0 0 0 0
649 Pending //////Pending 0 0 0 0 0
650 Pending //////Pending 0 0 0 0 0
651 Pending //////Pending 0 0 0 0 0
652 Pending //////Pending 0 0 0 0 0
653 Pending //////Pending 0 0 0 0 0
654 Pending //////Pending 0 0 0 0 0
655 Pending //////Pending 0 0 0 0 0
656 Pending //////Pending 0 0 0 0 0
657 Pending //////Pending 0 0 0 0 0
658 Pending //////Pending 0 0 0 0 0
659 Pending //////Pending 0 0 0 0 0

294/305
12

INSPECTION REQUEST LOG GENERAL 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 0 A 0 A = Approved
B 43 B 4 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 5 C 0 C 0 C 0 C = Revised And Resubmit
D 1 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
Scaffolding stair case temporary access from
1 basement level to ground level to close SOR-GEN-001 ABE ABE P145 IR GEN MZP 001 Rev 00 ABE/P145/IR/GEN/MZP/001/Rev 00 28-Dec-15 29-Dec-15 1 B 0 0 0 B
SOR/GEN/001 & Rev .01
2 Improper hygeine and sanitation on site SOR-GEN-002 ABE ABE P145 IR GEN MZP 002 Rev 00 ABE/P145/IR/GEN/MZP/002/Rev 00 24-Feb-16 25-Feb-16 1 B 0 0 0 B

3 Core wall opening B5 Electrowatt ABE P145 IR GEN MZP 003 Rev 00 ABE/P145/IR/GEN/MZP/003/Rev 00 24-Feb-16 25-Feb-16 1 B 0 0 0 B

4 Core wall opening B5 Electrowatt ABE P145 IR GEN MZP 004 Rev 00 ABE/P145/IR/GEN/MZP/004/Rev 00 27-Feb-16 28-Feb-16 1 B 0 0 0 B

5 Core wall opening B5 Electrowatt ABE P145 IR GEN MZP 005 Rev 00 ABE/P145/IR/GEN/MZP/005/Rev 00 29-Feb-16 1-Mar-16 1 B 0 0 0 B

6 Slab Opening B4 Electrowatt ABE P145 IR GEN MZP 006 Pending ABE/P145/IR/GEN/MZP/006/Pending 5-Mar-16 6-Mar-16 1 C 0 0 0 C

7 Staircase pressurisation duct opening B4 Electrowatt ABE P145 IR GEN MZP 007 Rev 01 ABE/P145/IR/GEN/MZP/007/Rev 01 13-Mar-16 14-Mar-16 1 D 15-Mar-16 16-Mar-16 1 B 0 0 B
8 Pending //////Pending 0 0 0 0 0
9 Core wall opening (4-7/F-G) B4 Electrowatt ABE P145 IR GEN MZP 009 Pending ABE/P145/IR/GEN/MZP/009/Pending 19-Mar-16 20-Mar-16 1 C 0 0 0 C
10 Slab opening (I-M/1-11) B4 Electrowatt ABE P145 IR GEN MZP 010 Rev 00 ABE/P145/IR/GEN/MZP/010/Rev 00 21-Mar-16 21-Mar-16 0 B 0 0 0 B
11 Core wall 1 & 2 (4-7/F-H) B4 Electrowatt ABE P145 IR GEN MZP 011 Rev 00 ABE/P145/IR/GEN/MZP/011/Rev 00 22-Mar-16 22-Mar-16 0 B 0 0 0 B
12 MEP slab opening (A-I/1-11) B3 Electrowatt ABE P145 IR GEN MZP 012 Rev 00 ABE/P145/IR/GEN/MZP/012/Rev 00 2-Apr-16 4-Apr-16 2 B 0 0 0 B
13 Basement 3 MEP slab opening (I-M/1-11) B3 Electrowatt ABE P145 IR GEN MZP 013 Rev 01 ABE/P145/IR/GEN/MZP/013/Rev 01 9-Apr-16 9-Apr-16 0 C 9-Apr-16 10-Apr-16 1 B 0 0 B
14 Basement 3 core wall opening (4-7/F-G) B3 Electrowatt ABE P145 IR GEN MZP 014 Rev 01 ABE/P145/IR/GEN/MZP/014/Rev 01 9-Apr-16 9-Apr-16 0 C 9-Apr-16 10-Apr-16 1 B 0 0 B
15 Basement 3 staircase (6) (8-9/A-C) B3 Electrowatt ABE P145 IR GEN MZP 015 Rev 00 ABE/P145/IR/GEN/MZP/015/Rev 00 11-Apr-16 12-Apr-16 1 B 0 0 0 B
16 Basement 3 core wall opening (4-7/G-H) B3 Electrowatt ABE P145 IR GEN MZP 016 Rev 00 ABE/P145/IR/GEN/MZP/016/Rev 00 18-Apr-16 19-Apr-16 1 B 0 0 0 B
17 Basement 2 MEP slab opening (A-I/1-11) B2 Electrowatt ABE P145 IR GEN MZP 017 Rev 00 ABE/P145/IR/GEN/MZP/017/Rev 00 26-Apr-16 28-Apr-16 2 B 0 0 0 B
18 Basement 2 stair case (6) (B-C/8-9) B2 Electrowatt ABE P145 IR GEN MZP 018 Rev 00 ABE/P145/IR/GEN/MZP/018/Rev 00 7-May-16 9-May-16 2 B 0 0 0 B
19 Basement 2 MEP slab opening (J-M/1-11) B2 Electrowatt ABE P145 IR GEN MZP 019 Rev 00 ABE/P145/IR/GEN/MZP/019/Rev 00 11-May-16 14-May-16 3 B 0 0 0 B

20 Basement 2 MEP core wall opening (F:G/4:7) B2 Electrowatt ABE P145 IR GEN MZP 020 Rev 00 ABE/P145/IR/GEN/MZP/020/Rev 00 17-May-16 17-May-16 0 B 0 0 0 B

21 Basement 2 MEP slab opening (G:H/4:7) B2 Electrowatt ABE P145 IR GEN MZP 021 Rev 00 ABE/P145/IR/GEN/MZP/021/Rev 00 17-May-16 17-May-16 0 B 0 0 0 B

22 Basement 1 MEP slab opening (A:I/1:11) B1 Electrowatt ABE P145 IR GEN MZP 022 Rev 00 ABE/P145/IR/GEN/MZP/022/Rev 00 28-May-16 30-May-16 2 B 0 0 0 B

23 Basement 1 MEP core wall opening (F:G/4:7) B1 Electrowatt ABE P145 IR GEN MZP 023 Rev 00 ABE/P145/IR/GEN/MZP/023/Rev 00 2-Jun-16 4-Jun-16 2 B 0 0 0 B

24 Basement 1 MEP core wall opening (G:H/4:7) B1 Electrowatt ABE P145 IR GEN MZP 024 Rev 00 ABE/P145/IR/GEN/MZP/024/Rev 00 6-Jun-16 6-Jun-16 0 B 0 0 0 B

25 Basement 1 MEP core wall opening (G:H/4:7) B1 Electrowatt ABE P145 IR GEN MZP 025 Pending ABE/P145/IR/GEN/MZP/025/Pending 11-Jun-16 20-Jun-16 9 C 0 0 0 C

26 Basement 1 stair case 6 (B:C/8:9) B1 Electrowatt ABE P145 IR GEN MZP 026 Rev 00 ABE/P145/IR/GEN/MZP/026/Rev 00 13-Jun-16 14-Jun-16 1 B 0 0 0 B
27 Basement 1 MEP slab opening (J:M/01:11) B1 Electrowatt ABE P145 IR GEN MZP 027 Rev 00 ABE/P145/IR/GEN/MZP/027/Rev 00 16-Jun-16 19-Jun-16 3 B 0 0 0 B
Basement 1 MEP retaining wall (water city drain)
28 B1 Electrowatt ABE P145 IR GEN MZP 028 Rev 00 ABE/P145/IR/GEN/MZP/028/Rev 00 16-Jun-16 19-Jun-16 3 B 0 0 0 B
& foul tank sleeves (D:G/1:2)
B1 MEP core wall opening core wall (02) (G-H/4-
29 B1 Electrowatt ABE P145 IR GEN MZP 029 Rev 00 ABE/P145/IR/GEN/MZP/029/Rev 00 27-Jun-16 29-Jun-16 2 B 0 0 0 B
7)
B1 storm water tank and water city sleeves (K-
30 B1 Electrowatt ABE P145 IR GEN MZP 030 Rev 00 ABE/P145/IR/GEN/MZP/030/Rev 00 29-Jun-16 3-Jul-16 4 B 5-Jul-16 10-Jul-16 5 B 0 0 B
M/2-8)
31 Ground floor core wall opening (F:H/4:7) GF Electrowatt ABE P145 IR GEN MZP 031 Rev 00 ABE/P145/IR/GEN/MZP/031/Rev 00 19-Jul-16 20-Jul-16 1 B 0 0 0 B
32 Ground floor slab opening (A:M/1:11) GF Electrowatt ABE P145 IR GEN MZP 032 Rev 00 ABE/P145/IR/GEN/MZP/032/Rev 00 30-Jul-16 31-Jul-16 1 B 0 0 0 B
33 1F core wall opening (F:H/4:7) 1F Electrowatt ABE P145 IR GEN MZP 033 Rev 00 ABE/P145/IR/GEN/MZP/033/Rev 00 16-Aug-16 20-Aug-16 4 B 0 0 0 B
34 1F slab opening (B:L/2:10) 1F Electrowatt ABE P145 IR GEN MZP 034 Rev 00 ABE/P145/IR/GEN/MZP/034/Rev 00 30-Aug-16 1-Sep-16 2 B 0 0 0 B
35 2F corewall opening (F:G/4:7) 2F Electrowatt ABE P145 IR GEN MZP 035 Rev 00 ABE/P145/IR/GEN/MZP/035/Rev 00 10-Sep-16 11-Sep-16 1 B 0 0 0 B
36 2F corewall opening (G:H/4:7) 2F Electrowatt ABE P145 IR GEN MZP 036 Rev 00 ABE/P145/IR/GEN/MZP/036/Rev 00 17-Sep-16 19-Sep-16 2 B 0 0 0 B
37 2F slab opening (B:L/2:10) 2F Electrowatt ABE P145 IR GEN MZP 037 Rev 00 ABE/P145/IR/GEN/MZP/037/Rev 00 1-Oct-16 4-Oct-16 3 B 0 0 0 B
38 3F corewall opening (G:H/4:7) 3F Electrowatt ABE P145 IR GEN MZP 038 Rev 00 ABE/P145/IR/GEN/MZP/038/Rev 00 9-Oct-16 10-Oct-16 1 B 0 0 0 B
39 3F corewall opening (F:G/4:7) 3F Electrowatt ABE P145 IR GEN MZP 039 Rev 00 ABE/P145/IR/GEN/MZP/039/Rev 00 9-Oct-16 10-Oct-16 1 B 0 0 0 B
40 4F corewall opening (G:H/4:7) 4F Electrowatt ABE P145 IR GEN MZP 040 Rev 00 ABE/P145/IR/GEN/MZP/040/Rev 00 17-Oct-16 18-Oct-16 1 B 0 0 0 B
41 4F corewall opening (F:G/4:7) 4F Electrowatt ABE P145 IR GEN MZP 041 Rev 00 ABE/P145/IR/GEN/MZP/041/Rev 00 20-Oct-16 27-Oct-16 7 B 0 0 0 B
42 3F slab opening (F:G/4:7) 3F Electrowatt ABE P145 IR GEN MZP 042 Rev 00 ABE/P145/IR/GEN/MZP/042/Rev 00 24-Oct-16 25-Oct-16 1 B 0 0 0 B
43 5F corewall opening (G:H/4:7) 5F Electrowatt ABE P145 IR GEN MZP 043 Rev 00 ABE/P145/IR/GEN/MZP/043/Rev 00 31-Oct-16 1-Nov-16 1 B 0 0 0 B
44 5F corewall opening (G:H/4:7) 5F Electrowatt ABE P145 IR GEN MZP 044 Rev 00 ABE/P145/IR/GEN/MZP/044/Rev 00 2-Nov-16 8-Nov-16 6 B 0 0 0 B
45 4F slab openings (D:J/3:8) 4F Electrowatt ABE P145 IR GEN MZP 045 Rev 00 ABE/P145/IR/GEN/MZP/045/Rev 00 8-Nov-16 10-Nov-16 2 B 0 0 0 B
46 6F slab openings (D:J/3:8) 6F Electrowatt ABE P145 IR GEN MZP 046 Rev 00 ABE/P145/IR/GEN/MZP/046/Rev 00 10-Nov-16 12-Nov-16 2 B 0 0 0 B
47 6F core wall openings (F:J/3:8) 6F Electrowatt ABE P145 IR GEN MZP 047 Rev 00 ABE/P145/IR/GEN/MZP/047/Rev 00 14-Nov-16 16-Nov-16 2 B 0 0 0 B
48 5F slab openings (D:J/3:8) 5F Electrowatt ABE P145 IR GEN MZP 048 Rev 00 ABE/P145/IR/GEN/MZP/048/Rev 00 19-Nov-16 21-Nov-16 2 B 0 0 0 B
49 7F core wall openings (D:J/3:8) 7F Electrowatt ABE P145 IR GEN MZP 049 Rev 00 ABE/P145/IR/GEN/MZP/049/Rev 00 23-Nov-16 27-Nov-16 4 B 0 0 0 B
50 7F core wall openings (F:G/3:8) 7F Electrowatt ABE P145 IR GEN MZP 050 Rev 00 ABE/P145/IR/GEN/MZP/050/Rev 00 27-Nov-16 29-Nov-16 2 B 0 0 0 B
51 6F slab openings (D:J/3:8) 6F Electrowatt ABE P145 IR GEN MZP 051 Pending ABE/P145/IR/GEN/MZP/051/Pending 1-Dec-16 -42705 0 0 0 U/R
52 Pending //////Pending 0 0 0 0 0
53 Pending //////Pending 0 0 0 0 0
54 Pending //////Pending 0 0 0 0 0
55 Pending //////Pending 0 0 0 0 0
56 Pending //////Pending 0 0 0 0 0
57 Pending //////Pending 0 0 0 0 0
58 Pending //////Pending 0 0 0 0 0
59 Pending //////Pending 0 0 0 0 0
60 Pending //////Pending 0 0 0 0 0
61 Pending //////Pending 0 0 0 0 0
62 Pending //////Pending 0 0 0 0 0
63 Pending //////Pending 0 0 0 0 0
64 Pending //////Pending 0 0 0 0 0
65 Pending //////Pending 0 0 0 0 0
66 Pending //////Pending 0 0 0 0 0
67 Pending //////Pending 0 0 0 0 0
68 Pending //////Pending 0 0 0 0 0
69 Pending //////Pending 0 0 0 0 0
70 Pending //////Pending 0 0 0 0 0
71 Pending //////Pending 0 0 0 0 0
72 Pending //////Pending 0 0 0 0 0
73 Pending //////Pending 0 0 0 0 0
74 Pending //////Pending 0 0 0 0 0
75 Pending //////Pending 0 0 0 0 0
76 Pending //////Pending 0 0 0 0 0
77 Pending //////Pending 0 0 0 0 0
78 Pending //////Pending 0 0 0 0 0
79 Pending //////Pending 0 0 0 0 0
80 Pending //////Pending 0 0 0 0 0
81 Pending //////Pending 0 0 0 0 0

295/305
12

INSPECTION REQUEST LOG GENERAL 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 0 A 0 A = Approved
B 43 B 4 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 5 C 0 C 0 C 0 C = Revised And Resubmit
D 1 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
82 Pending //////Pending 0 0 0 0 0
83 Pending //////Pending 0 0 0 0 0
84 Pending //////Pending 0 0 0 0 0
85 Pending //////Pending 0 0 0 0 0
86 Pending //////Pending 0 0 0 0 0
87 Pending //////Pending 0 0 0 0 0
88 Pending //////Pending 0 0 0 0 0
89 Pending //////Pending 0 0 0 0 0
90 Pending //////Pending 0 0 0 0 0
91 Pending //////Pending 0 0 0 0 0
92 Pending //////Pending 0 0 0 0 0
93 Pending //////Pending 0 0 0 0 0
94 Pending //////Pending 0 0 0 0 0
95 Pending //////Pending 0 0 0 0 0
96 Pending //////Pending 0 0 0 0 0
97 Pending //////Pending 0 0 0 0 0
98 Pending //////Pending 0 0 0 0 0
99 Pending //////Pending 0 0 0 0 0
100 Pending //////Pending 0 0 0 0 0
101 Pending //////Pending 0 0 0 0 0
102 Pending //////Pending 0 0 0 0 0
103 Pending //////Pending 0 0 0 0 0
104 Pending //////Pending 0 0 0 0 0
105 Pending //////Pending 0 0 0 0 0
106 Pending //////Pending 0 0 0 0 0
107 Pending //////Pending 0 0 0 0 0
108 Pending //////Pending 0 0 0 0 0
109 Pending //////Pending 0 0 0 0 0
110 Pending //////Pending 0 0 0 0 0
111 Pending //////Pending 0 0 0 0 0
112 Pending //////Pending 0 0 0 0 0
113 Pending //////Pending 0 0 0 0 0
114 Pending //////Pending 0 0 0 0 0
115 Pending //////Pending 0 0 0 0 0
116 Pending //////Pending 0 0 0 0 0
117 Pending //////Pending 0 0 0 0 0
118 Pending //////Pending 0 0 0 0 0
119 Pending //////Pending 0 0 0 0 0
120 Pending //////Pending 0 0 0 0 0
121 Pending //////Pending 0 0 0 0 0
122 Pending //////Pending 0 0 0 0 0
123 Pending //////Pending 0 0 0 0 0
124 Pending //////Pending 0 0 0 0 0
125 Pending //////Pending 0 0 0 0 0
126 Pending //////Pending 0 0 0 0 0
127 Pending //////Pending 0 0 0 0 0
128 Pending //////Pending 0 0 0 0 0
129 Pending //////Pending 0 0 0 0 0
130 Pending //////Pending 0 0 0 0 0
131 Pending //////Pending 0 0 0 0
132 Pending //////Pending 0 0 0 0
133 Pending //////Pending 0 0 0 0
134 Pending //////Pending 0 0 0 0 0
135 Pending //////Pending 0 0 0 0 0
136 Pending //////Pending 0 0 0 0 0
137 Pending //////Pending 0 0 0 0 0
138 Pending //////Pending 0 0 0 0 0
139 Pending //////Pending 0 0 0 0 0

140 Pending //////Pending 0 0 0 0 0

141 Pending //////Pending 0 0 0 0 0

142 Pending //////Pending 0 0 0 0

143 Pending //////Pending 0 0 0 0 0


144 Pending //////Pending 0 0 0 0 0
145 Pending //////Pending 0 0 0 0 0

146 Pending //////Pending 0 0 0 0 0


147 Pending //////Pending 0 0 0 0 0
148 Pending //////Pending 0 0 0 0 0

149 Pending //////Pending 0 0 0 0 0

150 Pending //////Pending 0 0 0 0 0

151 Pending //////Pending 0 0 0 0 0


152 Pending //////Pending 0 0 0 0 0
153 Pending //////Pending 0 0 0 0 0
154 Pending //////Pending 0 0 0 0 0
155 Pending //////Pending 0 0 0 0 0
156 Pending //////Pending 0 0 0 0 0
157 Pending //////Pending 0 0 0 0 0
158 Pending //////Pending 0 0 0 0 0
159 Pending //////Pending 0 0 0 0 0
160 Pending //////Pending 0 0 0 0 0

161 Pending //////Pending 0 0 0 0 0

162 Pending //////Pending 0 0 0 0 0

296/305
12

INSPECTION REQUEST LOG GENERAL 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 0 A 0 A = Approved
B 43 B 4 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 5 C 0 C 0 C 0 C = Revised And Resubmit
D 1 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

163 Pending //////Pending 0 0 0 0 0

164 Pending //////Pending 0 0 0 0 0

165 Pending //////Pending 0 0 0 0 0

166 Pending //////Pending 0 0 0 0 0

167 Pending //////Pending 0 0 0 0 0

168 Pending //////Pending 0 0 0 0 0


169 Pending //////Pending 0 0 0 0 0
170 Pending //////Pending 0 0 0 0 0
171 Pending //////Pending 0 0 0 0 0
172 Pending //////Pending 0 0 0 0 0
173 Pending //////Pending 0 0 0 0 0
174 Pending //////Pending 0 0 0 0 0
175 Pending //////Pending 0 0 0 0 0
176 Pending //////Pending 0 0 0 0 0
177 Pending //////Pending 0 0 0 0 0
178 Pending //////Pending 0 0 0 0 0
179 Pending //////Pending 0 0 0 0 0
180 Pending //////Pending 0 0 0 0 0
181 Pending //////Pending 0 0 0 0 0
182 Pending //////Pending 0 0 0 0 0
183 Pending //////Pending 0 0 0 0 0
184 Pending //////Pending 0 0 0 0 0
185 Pending //////Pending 0 0 0 0 0
186 Pending //////Pending 0 0 0 0 0
187 Pending //////Pending 0 0 0 0 0
188 Pending //////Pending 0 0 0 0 0
189 Pending //////Pending 0 0 0 0 0
190 Pending //////Pending 0 0 0 0 0
191 Pending //////Pending 0 0 0 0 0
192 Pending //////Pending 0 0 0 0 0
193 Pending //////Pending 0 0 0 0 0
194 Pending //////Pending 0 0 0 0 0
195 Pending //////Pending 0 0 0 0 0
196 Pending //////Pending 0 0 0 0 0
197 Pending //////Pending 0 0 0 0 0
198 Pending //////Pending 0 0 0 0 0
199 Pending //////Pending 0 0 0 0 0
200 Pending //////Pending 0 0 0 0 0
201 Pending //////Pending 0 0 0 0 0
202 Pending //////Pending 0 0 0 0 0
203 Pending //////Pending 0 0 0 0 0
204 Pending //////Pending 0 0 0 0 0
205 Pending //////Pending 0 0 0 0 0
206 Pending //////Pending 0 0 0 0 0
207 Pending //////Pending 0 0 0 0 0
208 Pending //////Pending 0 0 0 0 0
209 Pending //////Pending 0 0 0 0 0
210 Pending //////Pending 0 0 0 0 0
211 Pending //////Pending 0 0 0 0 0
212 Pending //////Pending 0 0 0 0 0
213 Pending //////Pending 0 0 0 0 0
214 Pending //////Pending 0 0 0 0 0
215 Pending //////Pending 0 0 0 0 0
216 Pending //////Pending 0 0 0 0 0
217 Pending //////Pending 0 0 0 0 0
218 Pending //////Pending 0 0 0 0 0
219 Pending //////Pending 0 0 0 0 0
220 Pending //////Pending 0 0 0 0 0
221 Pending //////Pending 0 0 0 0 0
222 Pending //////Pending 0 0 0 0 0
223 Pending //////Pending 0 0 0 0 0
224 Pending //////Pending 0 0 0 0 0
225 Pending //////Pending 0 0 0 0 0
226 Pending //////Pending 0 0 0 0 0
227 Pending //////Pending 0 0 0 0 0
228 Pending //////Pending 0 0 0 0 0
229 Pending //////Pending 0 0 0 0 0
230 Pending //////Pending 0 0 0 0 0
231 Pending //////Pending 0 0 0 0 0
232 Pending //////Pending 0 0 0 0 0
233 Pending //////Pending 0 0 0 0 0
234 Pending //////Pending 0 0 0 0 0
235 Pending //////Pending 0 0 0 0 0
236 Pending //////Pending 0 0 0 0 0
237 Pending //////Pending 0 0 0 0 0
238 Pending //////Pending 0 0 0 0 0
239 Pending //////Pending 0 0 0 0 0
240 Pending //////Pending 0 0 0 0 0
241 Pending //////Pending 0 0 0 0 0

297/305
12

INSPECTION REQUEST LOG GENERAL 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 0 A 0 A = Approved
B 43 B 4 B 0 B 0 B = Approved As Noted
06 October 2020 2 C 5 C 0 C 0 C 0 C = Revised And Resubmit
D 1 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
242 Pending //////Pending 0 0 0 0 0
243 Pending //////Pending 0 0 0 0 0
244 Pending //////Pending 0 0 0 0 0
245 Pending //////Pending 0 0 0 0 0
246 Pending //////Pending 0 0 0 0 0
247 Pending //////Pending 0 0 0 0 0
248 Pending //////Pending 0 0 0 0 0
249 Pending //////Pending 0 0 0 0 0
250 Pending //////Pending 0 0 0 0 0
251 Pending //////Pending 0 0 0 0 0
252 Pending //////Pending 0 0 0 0 0
253 Pending //////Pending 0 0 0 0 0
254 Pending //////Pending 0 0 0 0 0
255 Pending //////Pending 0 0 0 0 0
256 Pending //////Pending 0 0 0 0
257 Pending //////Pending 0 0 0 0 0
258 Pending //////Pending 0 0 0 0 0
259 Pending //////Pending 0 0 0 0 0
260 Pending //////Pending 0 0 0 0 0
261 Pending //////Pending 0 0 0 0 0
262 Pending //////Pending 0 0 0 0 0
263 Pending //////Pending 0 0 0 0 0
264 Pending //////Pending 0 0 0 0 0
265 Pending //////Pending 0 0 0 0 0
266 Pending //////Pending 0 0 0 0 0
267 Pending //////Pending 0 0 0 0 0
268 Pending //////Pending 0 0 0 0 0
269 Pending //////Pending 0 0 0 0 0
270 Pending //////Pending 0 0 0 0 0
271 Pending //////Pending 0 0 0 0 0
272 Pending //////Pending 0 0 0 0 0
273 Pending //////Pending 0 0 0 0 0
274 Pending //////Pending 0 0 0 0 0
275 Pending //////Pending 0 0 0 0 0
276 Pending //////Pending 0 0 0 0 0
277 Pending //////Pending 0 0 0 0 0
278 Pending //////Pending 0 0 0 0 0
279 Pending //////Pending 0 0 0 0 0
280 Pending //////Pending 0 0 0 0 0
281 Pending //////Pending 0 0 0 0 0
282 Pending //////Pending 0 0 0 0 0
283 Pending //////Pending 0 0 0 0 0
284 Pending //////Pending 0 0 0 0 0
285 Pending //////Pending 0 0 0 0 0
286 Pending //////Pending 0 0 0 0 0
287 Pending //////Pending 0 0 0 0 0
288 Pending //////Pending 0 0 0 0 0
289 Pending //////Pending 0 0 0 0 0
290 Pending //////Pending 0 0 0 0 0
291 Pending //////Pending 0 0 0 0 0
292 Pending //////Pending 0 0 0 0 0
293 Pending //////Pending 0 0 0 0 0
294 Pending //////Pending 0 0 0 0 0
295 Pending //////Pending 0 0 0 0 0
296 Pending //////Pending 0 0 0 0 0
297 Pending //////Pending 0 0 0 0 0
298 Pending //////Pending 0 0 0 0 0
299 Pending //////Pending 0 0 0 0 0
300 Pending //////Pending 0 0 0 0 0
301 Pending //////Pending 0 0 0 0 0
302 Pending //////Pending 0 0 0 0 0
303 Pending //////Pending 0 0 0 0 0
304 Pending //////Pending 0 0 0 0 0
305 Pending //////Pending 0 0 0 0 0
306 Pending //////Pending 0 0 0 0 0
307 Pending //////Pending 0 0 0 0 0
308 Pending //////Pending 0 0 0 0 0
309 Pending //////Pending 0 0 0 0 0
310 Pending //////Pending 0 0 0 0 0
311 Pending //////Pending 0 0 0 0 0
312 Pending //////Pending 0 0 0 0 0
313 Pending //////Pending 0 0 0 0 0
314 Pending //////Pending 0 0 0 0 0
315 Pending //////Pending 0 0 0 0 0
316 Pending //////Pending 0 0 0 0 0
317 Pending //////Pending 0 0 0 0 0
318 Pending //////Pending 0 0 0 0 0
319 Pending //////Pending 0 0 0 0 0
320 Pending //////Pending 0 0 0 0 0
321 Pending //////Pending 0 0 0 0 0
322 Pending //////Pending 0 0 0 0 0
323 Pending //////Pending 0 0 0 0 0
324 Pending //////Pending 0 0 0 0 0
325 Pending //////Pending 0 0 0 0 0
326 Pending //////Pending 0 0 0 0 0
327 Pending //////Pending 0 0 0 0 0
328 Pending //////Pending 0 0 0 0 0
329 Pending //////Pending 0 0 0 0 0
330 Pending //////Pending 0 0 0 0 0
331 Pending //////Pending 0 0 0 0 0
332 Pending //////Pending 0 0 0 0 0
333 Pending //////Pending 0 0 0 0 0
334 Pending //////Pending 0 0 0 0 0
335 Pending //////Pending 0 0 0 0 0
336 Pending //////Pending 0 0 0 0 0

298/305
12

INSPECTION REQUEST LOG ARCH. 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 0 A 0 A = Approved
B 17 B 5 B 1 B 0 B = Approved As Noted
06 October 2020 2 C 14 C 2 C 0 C 0 C = Revised And Resubmit
D 7 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
Setting out & first course for block work (1-11/A-
1 B5 ABE ABE P145 IR ARCH MZP 001 Rev 02 ABE/P145/IR/ARCH/MZP/001/Rev 02 14-May-16 14-May-16 0 C 21-May-16 22-May-16 1 C 22-May-16 23-May-16 1 B 0 B
M)

2 Mock-up of block work complete walls (3-4/G-H) B5 ABE ABE P145 IR ARCH MZP 002 Rev 01 ABE/P145/IR/ARCH/MZP/002/Rev 01 28-May-16 29-May-16 1 C 20-Jun-16 22-Jun-16 2 B 0 0 B

3 Block work at B5 (1-11/A-M) B5 ABE ABE P145 IR ARCH MZP 003 Rev 01 ABE/P145/IR/ARCH/MZP/003/Rev 01 20-Jun-16 22-Jun-16 2 D 5-Jul-16 13-Jul-16 8 B 0 0 B

Setting out and first course for block work (1-


4 B4 ABE ABE P145 IR ARCH MZP 004 Rev 01 ABE/P145/IR/ARCH/MZP/004/Rev 01 22-Jun-16 25-Jun-16 3 C 30-Jun-16 3-Jul-16 3 B 0 0 B
11/A-M)

Surface prep., joint finish and primer coat for 5th


5 B5 ABE ABE P145 IR ARCH MZP 005 Rev 01 ABE/P145/IR/ARCH/MZP/005/Rev 01 14-Jul-16 16-Jul-16 2 C 24-Jul-16 24-Jul-16 0 B 0 0 B
basement ceiling (5-11/G-M)
6 Setting out for block work (1-11/A-M) B3 ABE ABE P145 IR ARCH MZP 006 Rev 00 ABE/P145/IR/ARCH/MZP/006/Rev 00 19-Jul-16 20-Jul-16 1 B 0 0 0 B

Surface prep., joint finish and primer coat for 5th


7 B5 ABE ABE P145 IR ARCH MZP 007 Rev 01 ABE/P145/IR/ARCH/MZP/007/Rev 01 21-Jul-16 23-Jul-16 2 D 24-Jul-16 24-Jul-16 0 B 0 0 B
basement ceiling (5-11/A-G)
8 Surface prep., for B5 ceiling (1-6/A-M) B5 ABE ABE P145 IR ARCH MZP 008 Rev 00 ABE/P145/IR/ARCH/MZP/008/Rev 00 25-Jul-16 26-Jul-16 1 B 0 0 0 B
9 First course for block work (1-11/A-M) B3 ABE ABE P145 IR ARCH MZP 009 Rev 00 ABE/P145/IR/ARCH/MZP/009/Rev 00 25-Jul-16 26-Jul-16 1 B 0 0 0 B
NCR-ARCH-
10 Block work at B4 (1-11/A-M) ABE ABE P145 IR ARCH MZP 010 Pending ABE/P145/IR/ARCH/MZP/010/Pending 30-Jul-16 30-Jul-16 0 D 8-Nov-16 10-Nov-16 2 C 0 0 C
004
11 Glass visual mock-up for color approval Mock up ABE ABE P145 IR ARCH MZP 011 Pending ABE/P145/IR/ARCH/MZP/011/Pending 15-Aug-16 17-Aug-16 2 D 0 0 0 D
12 Setting out for block work (1-11/A-M) B2 ABE ABE P145 IR ARCH MZP 012 Rev 00 ABE/P145/IR/ARCH/MZP/012/Rev 00 29-Aug-16 30-Aug-16 1 B 0 0 0 B
13 Surface preparation for B4 ceiling B5 ABE ABE P145 IR ARCH MZP 013 Rev 00 ABE/P145/IR/ARCH/MZP/013/Rev 00 30-Aug-16 1-Sep-16 2 B 0 0 0 B
14 Surface preparation for B4 ceiling (1-7/A-M) B4 ABE ABE P145 IR ARCH MZP 014 Rev 00 ABE/P145/IR/ARCH/MZP/014/Rev 00 31-Aug-16 1-Sep-16 1 B 0 0 0 B
15 First course for block work (1-11/A-M) B2 ABE ABE P145 IR ARCH MZP 015 Rev 00 ABE/P145/IR/ARCH/MZP/015/Rev 00 3-Sep-16 5-Sep-16 2 B 0 0 0 B
16 Color for glass of curtain wall (mock-up) Curtain wall ABE ABE P145 IR ARCH MZP 016 Pending ABE/P145/IR/ARCH/MZP/016/Pending 5-Sep-16 -42618 9-Nov-16 -42683 0 0 U/R
17 Surface preparation for B3 ceiling (7-11/A-M) B3 ABE ABE P145 IR ARCH MZP 017 Rev 00 ABE/P145/IR/ARCH/MZP/017/Rev 00 18-Sep-16 18-Sep-16 0 B 0 0 0 B
Fixation of internal head restraints at B5, B4 &
18 B3, B4 & B5 ABE ABE P145 IR ARCH MZP 018 Rev 00 ABE/P145/IR/ARCH/MZP/018/Rev 00 18-Sep-16 19-Sep-16 1 B 0 0 0 B
B3 (1-11/A-M)
19 Surface preparation for B3 ceiling (1-7/A-M) B3 ABE ABE P145 IR ARCH MZP 019 Rev 00 ABE/P145/IR/ARCH/MZP/019/Rev 00 28-Sep-16 29-Sep-16 1 B 0 0 0 B
20 Setting out for block work (5-10/B-I) GF ABE ABE P145 IR ARCH MZP 020 Rev 00 ABE/P145/IR/ARCH/MZP/020/Rev 00 9-Oct-16 10-Oct-16 1 B 0 0 0 B
21 First course for block work (5-10/B-I) GF ABE ABE P145 IR ARCH MZP 021 Pending ABE/P145/IR/ARCH/MZP/021/Pending 9-Oct-16 10-Oct-16 1 C 0 0 0 C
22 Six layers for block work at G.F (5-10/B-I) GF ABE ABE P145 IR ARCH MZP 022 Pending ABE/P145/IR/ARCH/MZP/022/Pending 11-Oct-16 11-Oct-16 0 D 0 0 0 D
Surface preparation for concrete walls and
23 B5 ABE ABE P145 IR ARCH MZP 023 Rev 00 ABE/P145/IR/ARCH/MZP/023/Rev 00 11-Oct-16 17-Oct-16 6 B 0 0 0 B
columns (1-11/A-M)
Surface preparation for concrete walls and
24 B4 ABE ABE P145 IR ARCH MZP 024 Rev 00 ABE/P145/IR/ARCH/MZP/024/Rev 00 11-Oct-16 17-Oct-16 6 B 0 0 0 B
columns (1-11/A-M)
25 Surface preparation for ceiling (6-11/A-M) B2 ABE ABE P145 IR ARCH MZP 025 Rev 00 ABE/P145/IR/ARCH/MZP/025/Rev 00 11-Oct-16 11-Oct-16 0 B 0 0 0 B
26 Setting out for block work (1-5/H-M) GF ABE ABE P145 IR ARCH MZP 026 Rev 00 ABE/P145/IR/ARCH/MZP/026/Rev 00 13-Oct-16 16-Oct-16 3 B 0 0 0 B
27 surface preparation for ceiling (1-6/A-M) B2 ABE ABE P145 IR ARCH MZP 027 Rev 00 ABE/P145/IR/ARCH/MZP/027/Rev 00 18-Oct-16 18-Oct-16 0 B 0 0 0 B
28 Joint finish & primer coat for ceiling (1-11/A-M) B5 ABE ABE P145 IR ARCH MZP 028 Pending ABE/P145/IR/ARCH/MZP/028/Pending 29-Oct-16 31-Oct-16 2 C 0 0 0 C
29 Texture paint for ceiling (1-11/A-M) B5 ABE ABE P145 IR ARCH MZP 029 Pending ABE/P145/IR/ARCH/MZP/029/Pending 29-Oct-16 31-Oct-16 2 C 0 0 0 C
30 Joint finish & primer coat for ceiling (1-11/A-M) B4 ABE ABE P145 IR ARCH MZP 030 Pending ABE/P145/IR/ARCH/MZP/030/Pending 29-Oct-16 31-Oct-16 2 C 0 0 0 C
31 Texture paint for ceiling (1-11/A-M) B4 ABE ABE P145 IR ARCH MZP 031 Pending ABE/P145/IR/ARCH/MZP/031/Pending 29-Oct-16 31-Oct-16 2 C 0 0 0 C
32 Joint finish & primer coat for ceiling (1-11/A-M) B3 ABE ABE P145 IR ARCH MZP 032 Pending ABE/P145/IR/ARCH/MZP/032/Pending 29-Oct-16 31-Oct-16 2 C 0 0 0 C
33 Texture paint for ceiling (1-11/A-M) B3 ABE ABE P145 IR ARCH MZP 033 Pending ABE/P145/IR/ARCH/MZP/033/Pending 29-Oct-16 31-Oct-16 2 C 0 0 0 C
34 Setting out for block work (1-11/A-M) B1 ABE ABE P145 IR ARCH MZP 034 Pending ABE/P145/IR/ARCH/MZP/034/Pending 29-Oct-16 31-Oct-16 2 C 0 0 0 C
35 Block work (1-11/A-M) B3 ABE ABE P145 IR ARCH MZP 035 Pending ABE/P145/IR/ARCH/MZP/035/Pending 9-Nov-16 10-Nov-16 1 C 0 0 0 C
36 First coarse block work (1-5/H-M) GF ABE ABE P145 IR ARCH MZP 036 Pending ABE/P145/IR/ARCH/MZP/036/Pending 14-Nov-16 15-Nov-16 1 D 0 0 0 D
Setting out and first course for block work (4-7/G-
37 B4 ABE ABE P145 IR ARCH MZP 037 Pending ABE/P145/IR/ARCH/MZP/037/Pending 16-Nov-16 16-Nov-16 0 D 0 0 0 D
H)
Setting out and first course for block work (4-7/G-
38 B3 ABE ABE P145 IR ARCH MZP 038 Pending ABE/P145/IR/ARCH/MZP/038/Pending 26-Nov-16 29-Nov-16 3 C 0 0 0 C
H)
39 Fire stop works mock-up at (2-3/F-G) B5 ABE ABE P145 IR ARCH MZP 039 Rev 00 ABE/P145/IR/ARCH/MZP/039/Rev 00 26-Nov-16 29-Nov-16 3 B 0 0 0 B
40 Pending //////Pending 0 0 0 0 0
41 Pending //////Pending 0 0 0 0 0
42 Pending //////Pending 0 0 0 0 0
43 Pending //////Pending 0 0 0 0 0
44 Pending //////Pending 0 0 0 0 0
45 Pending //////Pending 0 0 0 0 0
46 Pending //////Pending 0 0 0 0 0
47 Pending //////Pending 0 0 0 0 0
48 Pending //////Pending 0 0 0 0 0
49 Pending //////Pending 0 0 0 0 0
50 Pending //////Pending 0 0 0 0 0
51 Pending //////Pending 0 0 0 0 0
52 Pending //////Pending 0 0 0 0 0
53 Pending //////Pending 0 0 0 0 0
54 Pending //////Pending 0 0 0 0 0
55 Pending //////Pending 0 0 0 0 0
56 Pending //////Pending 0 0 0 0 0
57 Pending //////Pending 0 0 0 0 0
58 Pending //////Pending 0 0 0 0 0
59 Pending //////Pending 0 0 0 0 0
60 Pending //////Pending 0 0 0 0 0
61 Pending //////Pending 0 0 0 0 0
62 Pending //////Pending 0 0 0 0 0
63 Pending //////Pending 0 0 0 0 0
64 Pending //////Pending 0 0 0 0 0
65 Pending //////Pending 0 0 0 0 0
66 Pending //////Pending 0 0 0 0 0
67 Pending //////Pending 0 0 0 0 0
68 Pending //////Pending 0 0 0 0 0
69 Pending //////Pending 0 0 0 0 0
70 Pending //////Pending 0 0 0 0 0
71 Pending //////Pending 0 0 0 0 0
72 Pending //////Pending 0 0 0 0 0
73 Pending //////Pending 0 0 0 0 0
74 Pending //////Pending 0 0 0 0 0
75 Pending //////Pending 0 0 0 0 0
76 Pending //////Pending 0 0 0 0 0
77 Pending //////Pending 0 0 0 0 0

299/305
12

INSPECTION REQUEST LOG ARCH. 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 0 A 0 A = Approved
B 17 B 5 B 1 B 0 B = Approved As Noted
06 October 2020 2 C 14 C 2 C 0 C 0 C = Revised And Resubmit
D 7 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
78 Pending //////Pending 0 0 0 0 0
79 Pending //////Pending 0 0 0 0 0
80 Pending //////Pending 0 0 0 0 0
81 Pending //////Pending 0 0 0 0 0
82 Pending //////Pending 0 0 0 0 0
83 Pending //////Pending 0 0 0 0 0
84 Pending //////Pending 0 0 0 0 0
85 Pending //////Pending 0 0 0 0 0
86 Pending //////Pending 0 0 0 0 0
87 Pending //////Pending 0 0 0 0 0
88 Pending //////Pending 0 0 0 0 0
89 Pending //////Pending 0 0 0 0 0
90 Pending //////Pending 0 0 0 0 0
91 Pending //////Pending 0 0 0 0 0
92 Pending //////Pending 0 0 0 0 0
93 Pending //////Pending 0 0 0 0 0
94 Pending //////Pending 0 0 0 0 0
95 Pending //////Pending 0 0 0 0 0
96 Pending //////Pending 0 0 0 0 0
97 Pending //////Pending 0 0 0 0 0
98 Pending //////Pending 0 0 0 0 0
99 Pending //////Pending 0 0 0 0 0
100 Pending //////Pending 0 0 0 0 0
101 Pending //////Pending 0 0 0 0 0
102 Pending //////Pending 0 0 0 0 0
103 Pending //////Pending 0 0 0 0 0
104 Pending //////Pending 0 0 0 0 0
105 Pending //////Pending 0 0 0 0 0
106 Pending //////Pending 0 0 0 0 0
107 Pending //////Pending 0 0 0 0 0
108 Pending //////Pending 0 0 0 0 0
109 Pending //////Pending 0 0 0 0 0
110 Pending //////Pending 0 0 0 0 0
111 Pending //////Pending 0 0 0 0 0
112 Pending //////Pending 0 0 0 0 0
113 Pending //////Pending 0 0 0 0 0
114 Pending //////Pending 0 0 0 0 0
115 Pending //////Pending 0 0 0 0 0
116 Pending //////Pending 0 0 0 0 0
117 Pending //////Pending 0 0 0 0 0
118 Pending //////Pending 0 0 0 0 0
119 Pending //////Pending 0 0 0 0 0
120 Pending //////Pending 0 0 0 0 0
121 Pending //////Pending 0 0 0 0 0
122 Pending //////Pending 0 0 0 0 0
123 Pending //////Pending 0 0 0 0 0
124 Pending //////Pending 0 0 0 0 0
125 Pending //////Pending 0 0 0 0 0
126 Pending //////Pending 0 0 0 0 0
127 Pending //////Pending 0 0 0 0 0
128 Pending //////Pending 0 0 0 0 0
129 Pending //////Pending 0 0 0 0 0
130 Pending //////Pending 0 0 0 0 0
131 Pending //////Pending 0 0 0 0
132 Pending //////Pending 0 0 0 0
133 Pending //////Pending 0 0 0 0
134 Pending //////Pending 0 0 0 0 0
135 Pending //////Pending 0 0 0 0 0
136 Pending //////Pending 0 0 0 0 0
137 Pending //////Pending 0 0 0 0 0
138 Pending //////Pending 0 0 0 0 0
139 Pending //////Pending 0 0 0 0 0

140 Pending //////Pending 0 0 0 0 0

141 Pending //////Pending 0 0 0 0 0

142 Pending //////Pending 0 0 0 0

143 Pending //////Pending 0 0 0 0 0


144 Pending //////Pending 0 0 0 0 0
145 Pending //////Pending 0 0 0 0 0

146 Pending //////Pending 0 0 0 0 0


147 Pending //////Pending 0 0 0 0 0
148 Pending //////Pending 0 0 0 0 0

149 Pending //////Pending 0 0 0 0 0

150 Pending //////Pending 0 0 0 0 0

151 Pending //////Pending 0 0 0 0 0


152 Pending //////Pending 0 0 0 0 0
153 Pending //////Pending 0 0 0 0 0
154 Pending //////Pending 0 0 0 0 0
155 Pending //////Pending 0 0 0 0 0
156 Pending //////Pending 0 0 0 0 0
157 Pending //////Pending 0 0 0 0 0
158 Pending //////Pending 0 0 0 0 0
159 Pending //////Pending 0 0 0 0 0
160 Pending //////Pending 0 0 0 0 0

161 Pending //////Pending 0 0 0 0 0

300/305
12

INSPECTION REQUEST LOG ARCH. 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 0 A 0 A = Approved
B 17 B 5 B 1 B 0 B = Approved As Noted
06 October 2020 2 C 14 C 2 C 0 C 0 C = Revised And Resubmit
D 7 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE

162 Pending //////Pending 0 0 0 0 0

163 Pending //////Pending 0 0 0 0 0

164 Pending //////Pending 0 0 0 0 0

165 Pending //////Pending 0 0 0 0 0

166 Pending //////Pending 0 0 0 0 0

167 Pending //////Pending 0 0 0 0 0

168 Pending //////Pending 0 0 0 0 0


169 Pending //////Pending 0 0 0 0 0
170 Pending //////Pending 0 0 0 0 0
171 Pending //////Pending 0 0 0 0 0
172 Pending //////Pending 0 0 0 0 0
173 Pending //////Pending 0 0 0 0 0
174 Pending //////Pending 0 0 0 0 0
175 Pending //////Pending 0 0 0 0 0
176 Pending //////Pending 0 0 0 0 0
177 Pending //////Pending 0 0 0 0 0
178 Pending //////Pending 0 0 0 0 0
179 Pending //////Pending 0 0 0 0 0
180 Pending //////Pending 0 0 0 0 0
181 Pending //////Pending 0 0 0 0 0
182 Pending //////Pending 0 0 0 0 0
183 Pending //////Pending 0 0 0 0 0
184 Pending //////Pending 0 0 0 0 0
185 Pending //////Pending 0 0 0 0 0
186 Pending //////Pending 0 0 0 0 0
187 Pending //////Pending 0 0 0 0 0
188 Pending //////Pending 0 0 0 0 0
189 Pending //////Pending 0 0 0 0 0
190 Pending //////Pending 0 0 0 0 0
191 Pending //////Pending 0 0 0 0 0
192 Pending //////Pending 0 0 0 0 0
193 Pending //////Pending 0 0 0 0 0
194 Pending //////Pending 0 0 0 0 0
195 Pending //////Pending 0 0 0 0 0
196 Pending //////Pending 0 0 0 0 0
197 Pending //////Pending 0 0 0 0 0
198 Pending //////Pending 0 0 0 0 0
199 Pending //////Pending 0 0 0 0 0
200 Pending //////Pending 0 0 0 0 0
201 Pending //////Pending 0 0 0 0 0
202 Pending //////Pending 0 0 0 0 0
203 Pending //////Pending 0 0 0 0 0
204 Pending //////Pending 0 0 0 0 0
205 Pending //////Pending 0 0 0 0 0
206 Pending //////Pending 0 0 0 0 0
207 Pending //////Pending 0 0 0 0 0
208 Pending //////Pending 0 0 0 0 0
209 Pending //////Pending 0 0 0 0 0
210 Pending //////Pending 0 0 0 0 0
211 Pending //////Pending 0 0 0 0 0
212 Pending //////Pending 0 0 0 0 0
213 Pending //////Pending 0 0 0 0 0
214 Pending //////Pending 0 0 0 0 0
215 Pending //////Pending 0 0 0 0 0
216 Pending //////Pending 0 0 0 0 0
217 Pending //////Pending 0 0 0 0 0
218 Pending //////Pending 0 0 0 0 0
219 Pending //////Pending 0 0 0 0 0
220 Pending //////Pending 0 0 0 0 0
221 Pending //////Pending 0 0 0 0 0
222 Pending //////Pending 0 0 0 0 0
223 Pending //////Pending 0 0 0 0 0
224 Pending //////Pending 0 0 0 0 0
225 Pending //////Pending 0 0 0 0 0
226 Pending //////Pending 0 0 0 0 0
227 Pending //////Pending 0 0 0 0 0
228 Pending //////Pending 0 0 0 0 0
229 Pending //////Pending 0 0 0 0 0
230 Pending //////Pending 0 0 0 0 0
231 Pending //////Pending 0 0 0 0 0
232 Pending //////Pending 0 0 0 0 0
233 Pending //////Pending 0 0 0 0 0
234 Pending //////Pending 0 0 0 0 0
235 Pending //////Pending 0 0 0 0 0
236 Pending //////Pending 0 0 0 0 0
237 Pending //////Pending 0 0 0 0 0

301/305
12

INSPECTION REQUEST LOG ARCH. 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 0 A 0 A = Approved
B 17 B 5 B 1 B 0 B = Approved As Noted
06 October 2020 2 C 14 C 2 C 0 C 0 C = Revised And Resubmit
D 7 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
238 Pending //////Pending 0 0 0 0 0
239 Pending //////Pending 0 0 0 0 0
240 Pending //////Pending 0 0 0 0 0
241 Pending //////Pending 0 0 0 0 0
242 Pending //////Pending 0 0 0 0 0
243 Pending //////Pending 0 0 0 0 0
244 Pending //////Pending 0 0 0 0 0
245 Pending //////Pending 0 0 0 0 0
246 Pending //////Pending 0 0 0 0 0
247 Pending //////Pending 0 0 0 0 0
248 Pending //////Pending 0 0 0 0 0
249 Pending //////Pending 0 0 0 0 0
250 Pending //////Pending 0 0 0 0 0
251 Pending //////Pending 0 0 0 0 0
252 Pending //////Pending 0 0 0 0 0
253 Pending //////Pending 0 0 0 0 0
254 Pending //////Pending 0 0 0 0 0
255 Pending //////Pending 0 0 0 0 0
256 Pending //////Pending 0 0 0 0
257 Pending //////Pending 0 0 0 0 0
258 Pending //////Pending 0 0 0 0 0
259 Pending //////Pending 0 0 0 0 0
260 Pending //////Pending 0 0 0 0 0
261 Pending //////Pending 0 0 0 0 0
262 Pending //////Pending 0 0 0 0 0
263 Pending //////Pending 0 0 0 0 0
264 Pending //////Pending 0 0 0 0 0
265 Pending //////Pending 0 0 0 0 0
266 Pending //////Pending 0 0 0 0 0
267 Pending //////Pending 0 0 0 0 0
268 Pending //////Pending 0 0 0 0 0
269 Pending //////Pending 0 0 0 0 0
270 Pending //////Pending 0 0 0 0 0
271 Pending //////Pending 0 0 0 0 0
272 Pending //////Pending 0 0 0 0 0
273 Pending //////Pending 0 0 0 0 0
274 Pending //////Pending 0 0 0 0 0
275 Pending //////Pending 0 0 0 0 0
276 Pending //////Pending 0 0 0 0 0
277 Pending //////Pending 0 0 0 0 0
278 Pending //////Pending 0 0 0 0 0
279 Pending //////Pending 0 0 0 0 0
280 Pending //////Pending 0 0 0 0 0
281 Pending //////Pending 0 0 0 0 0
282 Pending //////Pending 0 0 0 0 0
283 Pending //////Pending 0 0 0 0 0
284 Pending //////Pending 0 0 0 0 0
285 Pending //////Pending 0 0 0 0 0
286 Pending //////Pending 0 0 0 0 0
287 Pending //////Pending 0 0 0 0 0
288 Pending //////Pending 0 0 0 0 0
289 Pending //////Pending 0 0 0 0 0
290 Pending //////Pending 0 0 0 0 0
291 Pending //////Pending 0 0 0 0 0
292 Pending //////Pending 0 0 0 0 0
293 Pending //////Pending 0 0 0 0 0
294 Pending //////Pending 0 0 0 0 0
295 Pending //////Pending 0 0 0 0 0
296 Pending //////Pending 0 0 0 0 0
297 Pending //////Pending 0 0 0 0 0
298 Pending //////Pending 0 0 0 0 0
299 Pending //////Pending 0 0 0 0 0
300 Pending //////Pending 0 0 0 0 0
301 Pending //////Pending 0 0 0 0 0
302 Pending //////Pending 0 0 0 0 0
303 Pending //////Pending 0 0 0 0 0
304 Pending //////Pending 0 0 0 0 0
305 Pending //////Pending 0 0 0 0 0
306 Pending //////Pending 0 0 0 0 0
307 Pending //////Pending 0 0 0 0 0
308 Pending //////Pending 0 0 0 0 0
309 Pending //////Pending 0 0 0 0 0
310 Pending //////Pending 0 0 0 0 0
311 Pending //////Pending 0 0 0 0 0
312 Pending //////Pending 0 0 0 0 0
313 Pending //////Pending 0 0 0 0 0
314 Pending //////Pending 0 0 0 0 0
315 Pending //////Pending 0 0 0 0 0
316 Pending //////Pending 0 0 0 0 0
317 Pending //////Pending 0 0 0 0 0
318 Pending //////Pending 0 0 0 0 0
319 Pending //////Pending 0 0 0 0 0
320 Pending //////Pending 0 0 0 0 0
321 Pending //////Pending 0 0 0 0 0
322 Pending //////Pending 0 0 0 0 0
323 Pending //////Pending 0 0 0 0 0
324 Pending //////Pending 0 0 0 0 0
325 Pending //////Pending 0 0 0 0 0
326 Pending //////Pending 0 0 0 0 0
327 Pending //////Pending 0 0 0 0 0
328 Pending //////Pending 0 0 0 0 0
329 Pending //////Pending 0 0 0 0 0
330 Pending //////Pending 0 0 0 0 0
331 Pending //////Pending 0 0 0 0 0
332 Pending //////Pending 0 0 0 0 0
333 Pending //////Pending 0 0 0 0 0

302/305
12

INSPECTION REQUEST LOG ARCH. 10

8
PROJECT : AL-SHAHAD TOWER (5B + G + 38) AL DAFNA 1st 2nd 3rd 4th
6 Submittal Submittal Submittal Submittal Legends
PROJECT No : P145 4
A 0 A 0 A 0 A 0 A = Approved
B 17 B 5 B 1 B 0 B = Approved As Noted
06 October 2020 2 C 14 C 2 C 0 C 0 C = Revised And Resubmit
D 7 D 0 D 0 D 0 D= Rejected
0

For BE use only


Submittal BE SUBMITTALS

Project
Rev. 00 Rev. 01 Rev. 02 Rev. 03
No./ Dept.
Sr. Description Location Sub Contractor From Code DISCIPLINE To Serial No. Rev. Reference
FINAL ACTION PENDING
SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS SUB Date RET Date DAYS STATUS REMARKS / Dwg No.
STATUS BY SINCE
334 Pending //////Pending 0 0 0 0 0
335 Pending //////Pending 0 0 0 0 0
336 Pending //////Pending 0 0 0 0 0

303/305
MS Material
SDS Shopdrawing
Work Inspection Request Work Inspection Request Cumulative Summary
Cumulative Summary

Total Code A 21

Total Code B 1329

Total Code C 35

Total Code D 24
Total Code A Total Code B Total Code C
Total Code D Under Review U/R
Under Review U/R 18

1427

You might also like