You are on page 1of 17

AL BANDARY ENGINEERING, TRADING AND CONTRACTING COMPANY / PROJECT P145 - AL SHAHAD TOWER

REQUEST FOR INFORMATION LOG ELECTRICAL

Rev.00 Rev.00 Rev.01 Rev.01


NUMBER TO DESCRIPTION REF. NUMBER DISCIPLINE Revision
Date Submitted Date Return Date Submitted Date Return

1 MZP Mirror Light Details ABE/P145/RFI/ELEC/MZP/001 ELEC 0 01-Mar-16 05-Mar-16

2 MZP Voice & Data Details ABE/P145/RFI/ELEC/MZP/002 ELEC 0 29-Feb-16 5-Mar-16

3 MZP Passive Detector ABE/P145/RFI/ELEC/MZP/003 ELEC 0 10-Mar-16 16-Mar-16

4 MZP BMS Details ABE/P145/RFI/ELEC/MZP/004 ELEC 0 15-Mar-16 25-Apr-16

MS Log 10/06/2020 1 STATUS CODES


A : Approved
B: Approved with Comments
C : Rejected
U/R : Under Review
MS Log 10/06/2020 2 STATUS CODES
A : Approved
B: Approved with Comments
C : Rejected
U/R : Under Review
AL BANDARY ENGINEERING, TRADING AND CONTRACTING COMPANY / PROJECT P145 - AL SHAHAD TOWER

REQUEST FOR INFORMATION LOG Plumbing

Rev.02
Rev.00 Rev.00 Rev.01 Rev.01
NUMBER TO DESCRIPTION REF. NUMBER DISCIPLINE Revision Date
Date Submitted Date Return Date Submitted Date Return
Submitted
1 MZP Water consumption ABE/P145/RFI/PLUMB/MZP/001 PLUMB 0 20-Feb-16 23-Feb-16

2 MZP Confirmation for re-routing & Connection of drain pipes of fire lift B5 ABE/P145/RFI/PLUMB/MZP/002 PLUMB 1 1-Mar-16 6-Mar-16 15-May-16 5/21/2016

3 MZP Parking Drainds and technical room floor drain at B4 ABE/P145/RFI/PLUMB/MZP/003 PLUMB 0 15-Mar-16 20-Mar-16

4 MZP Floor drain at MCC room ABE/P145/RFI/PLUMB/MZP/004 PLUMB 0 26-Mar-16 29-Mar-16

MS Log 10/06/2020 3 STATUS CODES


A : Approved
B: Approved with Comments
C : Rejected
U/R : Under Review
WER

Rev.02
Date Return

MS Log 10/06/2020 4 STATUS CODES


A : Approved
B: Approved with Comments
C : Rejected
U/R : Under Review
AL BANDARY ENGINEERING, TRADING AND CONTRACTING COMPANY / PROJECT P145 - AL SHAHAD TOWER

REQUEST FOR INFORMATION LOG ARCHITECTURAL

Received
Date Sent to Rev.01 Rev.01
NUMBER TO DESCRIPTION REF. NUMBER DISCIPLINE Revision from
Consultant Date Submitted Date Return
Consultant
1 MZP Access doors for shafts ABE/P145/RFI/ARCH/MZP/001 ARCH 0 25-Jan-16 27-Jan-16

2 MZP Discrepancy in FFI of stairs ABE/P145/RFI/ARCH/MZP/002 ARCH 0 12-Apr-16 13-Apr-16

3 MZP Discrepancy between architectural & structural plans ABE/P145/RFI/ARCH/MZP/003 ARCH 0 12-Apr-16 13-Apr-16

Discrepancy in RC fins locations and number of exhaust air shaft


4 MZP ABE/P145/RFI/ARCH/MZP/004 ARCH 0 23-Apr-16 5-May-16
openings

MS Log 10/06/2020 5 STATUS CODES


A : Approved
B: Approved with Comments
C : Rejected
U/R : Under Review
HAHAD TOWER

Remarks

MS Log 10/06/2020 6 STATUS CODES


A : Approved
B: Approved with Comments
C : Rejected
U/R : Under Review
AL BANDARY ENGINEERING, TRADING AND CONTRACTING COMPANY / PROJECT P145 - AL SHAHAD TOWER

REQUEST FOR INFORMATION LOG GENERAL

Received

Code

Final
code
Date Sent to
NUMBER TO DESCRIPTION REF. NUMBER DISCIPLINE Revision from
Consultant
Consultant
1 MZP Modifying Speed and Car Height of Elevators ABE/P145/RFI/GEN/MZP/001 GEN 0 14-Mar-16 15-Mar-16

2 MZP General Information & Approval required ABE/P145/RFI/GEN/MZP/002 GEN 0 19-Mar-16 19-May-16

3 MZP Elevators head & machine rooms height ABE/P145/RFI/GEN/MZP/003 GEN 0 6-Apr-16 19-Apr-16

4 MZP Discrepancy in trenches location ABE/P145/RFI/GEN/MZP/004 GEN 0 21-May-16 26-May-16

MS Log 10/06/2020 7 STATUS CODES


A : Approved
B: Approved with Comments
C : Rejected
U/R : Under Review
AL BANDARY ENGINEERING, TRADING AND CONTRACTING COMPANY / PROJECT P145 - AL SHAHAD TOWER

REQUEST FOR INFORMATION LOG FP

Received

Code

Final
code
Date Sent to
NUMBER TO DESCRIPTION REF. NUMBER DISCIPLINE Revision from
Consultant
Consultant
1 MZP Fire Fighting System at B5 ABE/P145/RFI/FP/MZP/001 FP 0 26-Mar-16 04-Apr-16

MS Log 10/06/2020 8 STATUS CODES


A : Approved
B: Approved with Comments
C : Rejected
U/R : Under Review
AL BANDARY ENGINEERING, TRADING AND CONTRACTING COMPANY / PROJECT P145 - AL SHAHAD TOWER

REQUEST FOR INFORMATION LOG FAS

Received

Code

Final
code
Date Sent to
NUMBER TO DESCRIPTION REF. NUMBER DISCIPLINE Revision from
Consultant
Consultant
1 MZP Break glass details ABE/P145/RFI/FAS/MZP/001 FAS 0 16-Jul-16 25-Jul-16

2 MZP Changing the location of manual call point at 3rd floor ABE/P145/RFI/FAS/MZP/002 FAS 0 19-Nov-16 20-Nov-16

MS Log 10/06/2020 9 STATUS CODES


A : Approved
B: Approved with Comments
C : Rejected
U/R : Under Review
AL BANDARY ENGINEERING, TRADING AND CONTRACTING COMPANY / PROJECT P145 - AL SHAHAD TOWER

REQUEST FOR INFORMATION LOG HVAC

Received

Code

Final
code
Date Sent to
NUMBER TO DESCRIPTION REF. NUMBER DISCIPLINE Revision from
Consultant
Consultant
1 MZP Condensate Piping rout at B1 to B5 ABE/P145/RFI/HVAC/MZP/001 HVAC 0 26-Mar-16 26-Apr-16

2 MZP Ventelation system for central water heater room ABE/P145/RFI/HVAC/MZP/002 HVAC 0 30-Mar-16 26-Apr-16

3 MZP Clarification required for pressurisation systems (staircase/lobby) ABE/P145/RFI/HVAC/MZP/003 HVAC 0 24-Apr-16 3-May-16

Clarification required for air balancing, sequence of operations, design


4 MZP ABE/P145/RFI/HVAC/MZP/004 HVAC 0 7-May-16 30-May-16
concept in kitchen and dining areas at basement 3, 2

MS Log 10/06/2020 10 STATUS CODES


A : Approved
B: Approved with Comments
C : Rejected
U/R : Under Review
AL BANDARY ENGINEERING, TRADING AND CONTRACTING COMPANY / PROJECT P145 - AL SHAHAD TOWER

REQUEST FOR INFORMATION LOG ELV

Received

Code

Final
code
Date Sent to
NUMBER TO DESCRIPTION REF. NUMBER DISCIPLINE Revision from
Consultant
Consultant
1 MZP CCTV & Public Address Details ABE/P145/RFI/ELV/MZP/01 ELV 0 28-Mar-16 29-Mar-16

2 MZP CCTV IFC plan details ABE/P145/RFI/ELV/MZP/02 ELV 0 12-Jul-16 21-Jul-16

3 MZP Drainage system passing at the GSM room located at 28th floor ABE/P145/RFI/ELV/MZP/03 ELV 0 5-Oct-16 18-Oct-16

MS Log 10/06/2020 11 STATUS CODES


A : Approved
B: Approved with Comments
C : Rejected
U/R : Under Review
AL BANDARY ENGINEERING, TRADING AND CONTRACTING COMPANY / PROJECT P145 - AL SHAHAD TOWER

REQUEST FOR INFORMATION LOG STRUCTURE

Rev.00 Rev.00 Rev.01 Rev.01 Rev.02


NUMBER TO DESCRIPTION REF. NUMBER DISCIPLINE Revision
Date Submitted Date Return Date Submitted Date Return Date Submitted

1 MZP Modified Raft GA due to Updated M.E.P Plan ABE/P145/RFI/STRC/MZP/001 STRC 0 07-Dec-15 08-Dec-15

2 MZP Vertical reinforcements at the retaining wall ABE/P145/RFI/STRC/MZP/002 STRC 0 16-Dec-15 16-Dec-15

3 MZP Check for the structural system of 2nd basement ABE/P145/RFI/STRC/MZP/003 STRC 0 16-Jan-16 20-Jan-16

4 MZP Column/beam connection details ABE/P145/RFI/STRC/MZP/004 STRC 0 16-Jan-16 18-Jan-16

MS Log 10/06/2020 12 STATUS CODES


A : Approved
B: Approved with Comments
C : Rejected
U/R : Under Review
WER

Rev.02
Date Return

MS Log 10/06/2020 13 STATUS CODES


A : Approved
B: Approved with Comments
C : Rejected
U/R : Under Review
AL BANDARY ENGINEERING, TRADING AND CONTRACTING COMPANY / PROJECT P145 - AL SHAHAD TOWER

REQUEST FOR INFORMATION LOG

Rev.00 Rev.01
Rev.00 Rev.01
NUMBER TO DESCRIPTION REF. NUMBER DISCIPLINE Revision Date Submitted Date Submitted
Date Return Date Return

1 MZP Change of co-ordinates for pile S-178 BETC/P145/RFI/MZP/001 STRC 0 22-Dec-14 30-Dec-14

2 MZP Checking of Dewatering Wells BETC/P145/RFI/MZP/002 STRC 0 30-Dec-14 5-Jan-15

3 MZP Clerifying Project Datum to Qatar National Datum BETC/P145/RFI/MZP/003 STRC 0 4-Jan-14 7-Jan-15

4 MZP Clarification on Elevators BETC/P145/RFI/MZP/004 MECH 0 3-Aug-15 9-Aug-15

MS Log 10/06/2020 14 STATUS CODES


A : Approved
B: Approved with Comments
C : Rejected
U/R : Under Review
HAHAD TOWER

MS Log 10/06/2020 15 STATUS CODES


A : Approved
B: Approved with Comments
C : Rejected
U/R : Under Review
RFI Cumulative Summary RFI Cumulative Summary
Total RFI Submitted 149

Total RFI Replied 148

Under Review 1 Total RFI Submitted Total RFI Replied Under Revi
mulative Summary

Total RFI Replied Under Review