1 MZP Water consumption ABE/P145/RFI/PLUMB/MZP/001 PLUMB 0 20-Feb-16 23-Feb-16
2 MZP Confirmation for re-routing & Connection of drain pipes of fire lift B5 ABE/P145/RFI/PLUMB/MZP/002 PLUMB 1 1-Mar-16 6-Mar-16 15-May-16 5/21/2016
3 MZP Parking Drainds and technical room floor drain at B4 ABE/P145/RFI/PLUMB/MZP/003 PLUMB 0 15-Mar-16 20-Mar-16
Rev.02
Date Return
Received
Date Sent to Rev.01 Rev.01
NUMBER TO DESCRIPTION REF. NUMBER DISCIPLINE Revision from
Consultant Date Submitted Date Return
Consultant
1 MZP Access doors for shafts ABE/P145/RFI/ARCH/MZP/001 ARCH 0 25-Jan-16 27-Jan-16
3 MZP Discrepancy between architectural & structural plans ABE/P145/RFI/ARCH/MZP/003 ARCH 0 12-Apr-16 13-Apr-16
Remarks
Received
Code
Final
code
Date Sent to
NUMBER TO DESCRIPTION REF. NUMBER DISCIPLINE Revision from
Consultant
Consultant
1 MZP Modifying Speed and Car Height of Elevators ABE/P145/RFI/GEN/MZP/001 GEN 0 14-Mar-16 15-Mar-16
2 MZP General Information & Approval required ABE/P145/RFI/GEN/MZP/002 GEN 0 19-Mar-16 19-May-16
3 MZP Elevators head & machine rooms height ABE/P145/RFI/GEN/MZP/003 GEN 0 6-Apr-16 19-Apr-16
Received
Code
Final
code
Date Sent to
NUMBER TO DESCRIPTION REF. NUMBER DISCIPLINE Revision from
Consultant
Consultant
1 MZP Fire Fighting System at B5 ABE/P145/RFI/FP/MZP/001 FP 0 26-Mar-16 04-Apr-16
Received
Code
Final
code
Date Sent to
NUMBER TO DESCRIPTION REF. NUMBER DISCIPLINE Revision from
Consultant
Consultant
1 MZP Break glass details ABE/P145/RFI/FAS/MZP/001 FAS 0 16-Jul-16 25-Jul-16
2 MZP Changing the location of manual call point at 3rd floor ABE/P145/RFI/FAS/MZP/002 FAS 0 19-Nov-16 20-Nov-16
Received
Code
Final
code
Date Sent to
NUMBER TO DESCRIPTION REF. NUMBER DISCIPLINE Revision from
Consultant
Consultant
1 MZP Condensate Piping rout at B1 to B5 ABE/P145/RFI/HVAC/MZP/001 HVAC 0 26-Mar-16 26-Apr-16
2 MZP Ventelation system for central water heater room ABE/P145/RFI/HVAC/MZP/002 HVAC 0 30-Mar-16 26-Apr-16
3 MZP Clarification required for pressurisation systems (staircase/lobby) ABE/P145/RFI/HVAC/MZP/003 HVAC 0 24-Apr-16 3-May-16
Received
Code
Final
code
Date Sent to
NUMBER TO DESCRIPTION REF. NUMBER DISCIPLINE Revision from
Consultant
Consultant
1 MZP CCTV & Public Address Details ABE/P145/RFI/ELV/MZP/01 ELV 0 28-Mar-16 29-Mar-16
3 MZP Drainage system passing at the GSM room located at 28th floor ABE/P145/RFI/ELV/MZP/03 ELV 0 5-Oct-16 18-Oct-16
1 MZP Modified Raft GA due to Updated M.E.P Plan ABE/P145/RFI/STRC/MZP/001 STRC 0 07-Dec-15 08-Dec-15
2 MZP Vertical reinforcements at the retaining wall ABE/P145/RFI/STRC/MZP/002 STRC 0 16-Dec-15 16-Dec-15
3 MZP Check for the structural system of 2nd basement ABE/P145/RFI/STRC/MZP/003 STRC 0 16-Jan-16 20-Jan-16
Rev.02
Date Return
Rev.00 Rev.01
Rev.00 Rev.01
NUMBER TO DESCRIPTION REF. NUMBER DISCIPLINE Revision Date Submitted Date Submitted
Date Return Date Return
1 MZP Change of co-ordinates for pile S-178 BETC/P145/RFI/MZP/001 STRC 0 22-Dec-14 30-Dec-14
3 MZP Clerifying Project Datum to Qatar National Datum BETC/P145/RFI/MZP/003 STRC 0 4-Jan-14 7-Jan-15