CONTRACT NO.

6600030489
COGENERATION INTERCONNECTION FACILITIES
BI-01252 ABQAIQ GAS PLANT

JOB SAFETY ANALYSIS


DIVISION: DATE PREPARED: DATE ISSUED:
PLANT/EQUIPMENT:
OPERATION 10/19/2015
ABQAIQ PLANTS
UNIT: JSA NO.
UTILITY 08
DESCRIPTION OF JOB/TASK: EQUIPMENT/TOOLS USED: Crane, Welding Machine and
1) Consist of installation of split tee 24’’ x 24’’ x 12’’ with existing fuel gas Grinder. Etc.
line. Activities:
1. Lifting
2. Cold cutting
3. Hot works (welding, grinding)
PREPARED BY: JASON LLOYD F. SALES REVIEWED BY: APPROVED BY:
IMAD- SAFETY SUPERVISOR SAFETY & COMPLIANCE GROUP OPS FOREMAN

REVIEWED BY: APPROVED BY: APPROVED BY:


FRANCOIS NAUDE PROCESS AREA ENGINEER MAINT. SUPERVISOR
SAPMT – SAFETY ADVISOR
REFERENCES: CSM 5th Edition & GI’s
 2.100 – WORK PERMIT SYSTEM
 2.709 – GAS TESTING
 7.025 - HEAVY EQUIPMENT OPERATOR TESTING AND CERTIFICATION
 7.031 - EQUIPMENT SERVICES
 HEAT STRESS PLAN – SACSM Chapter 1-13

1
CONTRACT NO. 6600030489
COGENERATION INTERCONNECTION FACILITIES
BI-01252 ABQAIQ GAS PLANT

JOB SAFETY ANALYSIS


DIVISION: DATE PREPARED: DATE ISSUED:
PLANT/EQUIPMENT:
OPERATION 10/19/2015
ABQAIQ PLANTS
UNIT: JSA NO.
UTILITY 08
SAFETY EQUIPMENT REQUIRED:
 Personal Protective Equipment (PPE&FRC)
 Conduct safety meeting with the execution team (OPS and contractor) the condition with the required precaution
 Orientation & EMERGENCY RESPONSE PLAN should be communicated

Recommendations/Notes ASSIGNED TO:


1 All site personnel are required to wear appropriate PPE such as Safety IMAD CO./ OPERATION & PMT
Helmet, Safety Glasses, Gloves, and Safety Shoes
2 Conduct Tool Box Safety Meeting prior to every work activity IMAD CO./ SAFETY OFICER & FOREMAN/SUPERVISOR
3 Explain to key personnel the purpose of JSA and enforce the implementation
of content. IMAD CO./ ENGINEER
4 Use the JSA to identify hazards and list the precaution on the permit.
5 Garbage shall be disposed properly on a daily basis. IMAD CO./ OPERATION
6 If an injury or near occurs, the JAS shall be reviewed immediately to
determine whether changes are needed in the job procedures. IMAD CO./ SAFETY OFICER & FOREMAN
7 In case of any emergencies, the Project Emergency Preparedness &
Response Plan be followed all affected personnel and Certified First Aider and IMAD CO./ SAETY /COORDINATOR / SUPERVISOR/WPR
Ambulance shall be ready and available.
EMERGENCY RESPONSE PROCEDURE EMERGENCY CONTACT NO. When reporting an emergency give the clear
In an EMERGENCY, or on hearing of “Stop Work Saudi Aramco – 110 information such as:
Alarm”, every supervisor shall ensure the following: SAPMT:
1. All work is stopped at once. Francois Naude 0540997678 1. Your exact location.
2. All equipment is shutdown. Shayban Abdul hakeem 0558120105 2. Nature of emergency.
3. All personnel are evacuated to the predetermined

2
CONTRACT NO. 6600030489
COGENERATION INTERCONNECTION FACILITIES
BI-01252 ABQAIQ GAS PLANT

assembly area. IMAD COMPANY 3. Service required and repeat he message.


4 All roll on call is taken and man is accounted for. Mohammad Zawana 0596932643 4. Your name and badge number.
5. No one is permitted to return until notification has Abdullah Bamallan 0500563513
been receive from operations or from the company. Moises P. Bias 0553991185 Stay on the telephone until you are told to hang
Jason Lloyd Sales 0500674202 up post a lookout to direct the ambulance, fire
HSE Officer truck or helicopter to the right location.
Ali Naser Sha 0582513784

SEQUENCE OF BASIC JOB STEPS POTENTIAL HAZARDS REQ HAZARD CONTROLS/SAFE WORK
PROCEDURES

1. Request work permits and permission


 Unauthorized Work  Secure an approved & valid work permits
Joint site inspection
 Certified work permit receivers should be present
 Joint walkthrough from permit issuer and work permit
receivers
2. Hot Tap Location  Poor Communication/Miss Location  Joint survey with the operation personnel on the hot
tap exact location. *As-built and IFC drawings
to be provided.

 Falling from height/Injury to Personnel  Obtain work permit per G.I. 2.100
3.Scaffolding Erection  All scaffold crews for erection shall wear full body
harness and 100% tie off. * Scaffolding shall be
erected, inspected and tagged as per the requirements
of G.I. 8.001

3
CONTRACT NO. 6600030489
COGENERATION INTERCONNECTION FACILITIES
BI-01252 ABQAIQ GAS PLANT

4. Ultrasonic Testing  Wrong interpretation Provide qualified technician for ultrasonic testing.

SEQUENCE OF BASIC JOB STEPS: POTENTIAL HAZARDS RECOMMENDED ACTION OR PROCEDURE

 Provide taglines on all loads to be lifted/no lifts if wind exceeds 32


KPH.
 Hot tap machine shall be rigidly supported.

5) Hot Tapping Activities  Obtain work permit, all work shall be in strict compliance with G.I.
2.100.
 Ensure that all relevant personnel are aware of the hot top activities.
 Ensure that the proper safety and firefighting equipment’s are on site
and in working condition.
 Provide barricades and warning signs around the work area.
 Hot tap technician shall be certified by the hot tap equipment
manufacturer.
 Maintain good housekeeping of jobsite.

 Obtain work permit as per G.I.2.100


 Cranes shall have valid inspection sticker.
6) Dismantling of Hot Tap Machine
 Cranes shall be level & outriggers shall be fully extended.

4
CONTRACT NO. 6600030489
COGENERATION INTERCONNECTION FACILITIES
BI-01252 ABQAIQ GAS PLANT

Crane Lifts and Rigging  G.I. 7.028 requirements shall be fully implemented
 Rigging hardware shall be inspected prior to lifting.
 Crane lift areas shall be barricaded and warning signs posted.
 Provide taglines on all loads to be lifted/no lifts if wind exceeds 32
KPH.
 Maintain good housekeeping of the work area.