LONG.-GUIDE BEARING ASSEMBLY LGB TRANS.-GUIDE BEARING ASSEMBLY TGB FREE - BEARING ASSEMBLY FB FIXED - BEARING TGB
(SCALE 1:7.5) (SCALE 1:7.5) (SCALE 1:7.5) (SCALE 1:7.5)
X-SECTIONAL VIEW ACROSS LONGITUDINAL AXIS OF GIRDER (CENTER LINE OF THE GIRDER COINCIDES WITH CENTER LINE OF BEARING SHOWN)
2+2
75 75
700
55
20 10 DETAIL X
30
600
55
300
ELEVATION 340
(SCALE 1:7.5)
43
30
50 40 570 50
STAINLESS STEEL PLATE
6 MM THICK, WELD 3mm 340 3
750 ELEVATION
(SCALE 1:7.5)
740 LEGEND SYMBOL
ELEVATION
30
50
640
43
5
3 DUST SEAL
PISTON BASE
DUST SEAL 10x15 ALLROUND
43 33
10
40 STAINLESS STEEL PLATE SURFACE HARDENED TO
STAINLESS STEEL PLATE 25x3x470, POLY TETERA FLUORO ETHYLENE (PTFE)
300 BHN MINIMUM 5 5
160
43 40x3x690, WELD 2mm 300
480
470
WELD 2 MM
ELEVATION 340
500
HIGH STRENGTH BOLT
(SCALE 1:7.5)
PTFE SHEET 4.5 MM
THICK, DIMPLED OR VIEW FROM TOP
160
MODULAR, PASTED IN PART C: BRASS RINGS
PISTON WALL
740 10 NOTE:
5
2.5 MM DEEP RECESS
FOR RETAINING
50
50 33 43 488 43 33 50
400
488
740
480
ELASTOMER IN POT 1. All dimensions are in MM.
400 (SCALE 1:7.5) 2. The design is in accordance with IRC- 83 (PART-III)-2002.
160
4
STAINLESS STEEL PLATE
VIEW FROM TOP 6 MM THICK, WELD 3 MM 3. The concrete in bed block shall be of min M40 GRADE.
(SCALE 1:7.5) ALL ROUND
150
160
30
26
ELEVATION operations. Any mortar or foreign material contaminating the bearing shall be
33 43
(SCALE 1:7.5) completely removed.
49 340 10
150
6. Manufacture & finishing of bearings shall be as per para 927.2 & 927.3 of IRC 83
50
Part III
35
10
550
700
3
ELASTOMERIC PAD 7. Manufacturing tolerances shall be as per para 927.1 of IRC 83 Part III
DETAIL Y 50 600 50
339 8. Acceptance of bearing shall be as per para 928 of IRC 83 Part III.
150
700
SURFACE HARDENED 25x3x470, WELD 2 MM 9. Material to be used for pot, piston and top plate including all guides, lugs etc shall
STAINLESS STEEL PLATE TO 300 BHN MINIMUM ELEVATION (NOT TO BE PROVIDED IN FREE BEARING) be of cast steel to IS 1030:1989 grade 340-570W.
6 MM THK, WELD 3 MM (SCALE 1:7.5) VIEW FROM BOTTOM 10. All the flame cut, sawn or planed edges of the plates should be machined. All
ALL ROUND
PART F: TOP PLATE FOR TRANSVERSE GUIDE sheared corners shall be rounded off with 2 MM radius.
150
(SCALE 1:7.5) 11. For welding stainless steel sheet, M1 electrode type with stainless steel core wire as
300 per IRS: M-28-2012 shall be used.
VIEW FROM TOP
5
340 12. PTFE sheet shall be pure poly tetra fluoro ethylene, and shall be 4.5 mm thick,
3
STAINLESS STEEL PLATE PART E: POT FOR BEARINGS having either dimples (hot pressed or moulded) or modules as per IRC 83 Part III.
33x3x690 WELD 2 mm SURFACE HARDENED (SCALE 1:7.5)
These shall be pasted in recess 2.5 MM deep in the bearing and the peel strength of
5
50
TO 300 BHN MINIMUM VIEW FROM TOP glue to be used shall not be less than 4 N/MM.
VIEW FROM BOTTOM PART D: ELASTOMER 13. Material to be used for wiper seal and dust seal shall be of microcellular
480
10 polychloroprene rubber or polythene foam & it's adhesion to metal shall be with
PART A: TOP PLATE FOR LONG. GUIDE PAD FOR BEARINGS polychloroprene rubber based adhesive dunlop S-758, dendrite PC-65 or any other
(SCALE 1:7.5) R5
(SCALE 1:7.5) R170 equivalent brands.
AFTER 15 MM
14. All non-working surfaces shall be given protective coating comprising of 2 coats
CURVE
700 50 600 50 of epoxy primer enriched with metallic zinc, one intermediate coat of high build
15
50 600 50
AFTER 30 MM
epoxy paint reinforced with mio (micaceous iron oxide) & one coat of high
15
PISTON
performance epoxy finish paint as per para 39.2.2 of IRS B1.
CURVE
340
73
15. All bearings shall be sent by manufacturer duly set. Marked with center line of
30
R170
3 480 3 bearing along the girder and across it, along with the shipping mark of the bearing
500 DETAIL Y and fitted with transportation clamps. It is prohibited to open transportation clamps
SURFACE HARDENED TO before final assembly of the bearing on the girder without the presence of bearing
30
339
ELEVATION 300 BHN MINIMUM DETAIL X DETAIL Y manufacturer representative.
VIEW FROM BOTTOM
35
ELEVATION (SCALE 1:5) (SCALE 1:5)
50
(SCALE 1:7.5)
16. After the girders are properly leveled/ aligned and bearings tied to the girder using
PART B: PISTON FOR (SCALE 1:7.5)
Class 8.8 bolts, transportation clamps shall be opened and all expansion type
50
FREE/SLIDING BEARINGS SURFACE HARDENED
bearing shall be set properly as per ambient temperature. Thereafter holes in
substructure already provided (shall be drilled at this stage if not already provided),
(SCALE 1:7.5) TO 300 BHN MINIMUM shall be filled with holding down bolts and quickly grouted.
OF SYMMETRY 17. Anchor bolts shall be provided in holes (max. dia 40 MM) made in pier top/
600
NUT pedestals.
FIXED BEARING LONG. GUIDE BEARING
BOTTOM LONG. BEAM 18. Anchor bolts and nuts shall be hot dip galvanized 100 micron thick, as per IS:
90
4759.
150
150
32
700
ROUND WASHER FOR 32 DIA. BOLT
ISOMETRIC THREAD
DIA.
MIN EMBEDDED LENGTH 330
150
SURFACE ROUGHENED BY
150
PISTON
50 600 50
50 600 50
700
700 32000 DETAILS OF PTFE POT BEARING
600