NGCP Transmission Plans Program PDF
NGCP Transmission Plans Program PDF
2. Transmission Projects
Stronger transmission
for a stronger nation.
Generation- 616MW
Peak Demand – 312MW Generation- 821MW
Excess/Deficiency – 306MW Peak Demand – 240MW
Excess/Deficiency – 581MW
Generation- 1,018MW
Peak Demand – 962MW
Excess/Deficiency – 56MW
Generation- 637MW
Peak Demand – 309MW
Excess/Deficiency – 328MW
Generation- 31MW
Peak Demand – 70MW Legend:
Excess/Deficiency – (39MW)
230 kV
138 kV
69 kV
Based on Coincident System Peak Demand as of May 2016 Generation Data based on Existing Power Plants in Visayas as of March 2016
Stronger transmission
for a stronger nation.
2. Transmission Projects
VISAYAS GRID
Mindanao
VISAYAS
2015
Calong-calong S/S
CEDC G
Cebu S/S
G TPC
Toledo S/S
Mandaue S/S
Lapu-Lapu S/S
Quiot S/S
Legend:
230 kV
Naga S/S Colon S/S
138 kV
69 kV
CTPP
CDPP
GG G KSPC
Aya S/S
LBGT G
Load Growth
VISAYAS Generation Entry
Magdugo
Cebu S/S
S/S
G G TPC
TVI Toledo S/S
Quiot S/S
Calong-calong S/S
CEDC G To Compostela S/S
Magdugo
Cebu S/S
S/S
Mandaue S/S
Lapu-Lapu S/S
Quiot S/S
Umapad 230 kV Substation Project
(Jun 2023)
Laray S/S
Legend:
230 kV
Legend:
230 kV
138 kV
69 kV
Load Growth
VISAYAS Generation Entry
Panitan – Nabas 138 kV T/L Upgrading
(Mar 2017)*
2020 Panitan – Nabas 138 kV Transmission Line 2 Project
System Reliability
Legend:
230 kV
138 kV
69 kV
VISAYAS
2015
Legend:
230 kV
138 kV
69 kV
Load Growth
VISAYAS Allen S/S
Power Quality
138 kV
69 kV
Load Growth
VISAYAS Allen S/S
Power Quality
Babatngon S/S
Palo S/S
Babatngon-Palo 138 kV T/L Project
(Dec 2022)*
Maasin S/S
Sibonga S/S
Corella CTS
138 kV
69 kV
Visayas-Mindanao Interconnection Project
Option 1
(VMIP)
Option 2
Bato HVDC – Bato
San Carlos - Amlan:
Electrode Station: 20kV 230kV, ST-DC, 4x795MCM,
HVDC, ST-DC, 2x795MCM, San Carlos Bato
122km
Bato 20km
End of Presentation