: N/A
Operations and Maintenance Maintenance Package No. : N/A
Date Validity Feb. 13-19, 2024
WORK PERMIT AND Time Limitations : 6:00 AM - 10:00 PM
Prepared By : JMM Vasquez
MAINTENANCE TAG Approved By : AP Santos
I. Scope/Description of Work (To be filled up by Regional Planner)
Substation Maintenance Cold Line Maintenance Hot Line Maintenance
√ Others
Project Title and
GRID PROTECTION RELAY REPLACEMENT PROJECT (PHASE 3)-(SCHEDULE III) (AMLAN SS); Sp.22GPRRPP3(III).Vt.0571
Location (SS):
Details of Activities:
1. Preliminary Lay-out, Clearing and Grubbing for GPRRPP3
2 Demolation of Existing of Control Building
3. Relocation of NGCP Materials
4. Construction of Cable Trench
5. Construction of Multipurpose Building Expansion
6. Construction of Teamfacil
7. Construction of Genset House
8. Construct of MRF
II. List of Manpower (To be filled up by Regional Planner and to be confirmed by SSPE on actual attendance)
NGCP Personnel MTD TL Other NGCP Group: ____________
√ Non-NGCP Personnel (Name of Contractor) : MIESCOR BUILDERS INC
IV. Safety Measures and precautions including location where grounding clusters will be installed
(To be filled up by Substation Principal Engineer)
Available
Yes No N/A
1. Documents and Clearances
1.1. For NGCP personnel
Maintenance Order
Other, specify:
6. Stringing Plan
IX. Non-compliance and Correction Action (To be filled up by Substation Principal Engineer)
Remarks:
ALVIN S. AVISO
Substation Principal Engineer
Acknowledged
Submitted by: ROWEL G. FLORES Submission by: ALVIN S. AVISO
WG Team Lead Substation Principal Engineer